0% found this document useful (0 votes)
262 views40 pages

East and West Hararghe Zones Idps Return Relocation and Rehabilitation Response Plan July 2019

This document provides a conflict-induced IDP return, relocation, and recovery plan for East and West Hararghe zones in Oromia, Ethiopia. It profiles the IDPs in the regions, detailing their displacement due to armed conflict and expulsion from urban areas. The plan then outlines needs for basic service rehabilitation in water, health, education, agriculture, essential supplies, and protection for returning IDPs. This includes lists of infrastructure requiring repair, livestock and farming assistance, and other support to facilitate sustainable returns and community recovery. The conclusion provides a budget summary table for implementing the outlined IDP return and recovery plan.

Uploaded by

Neway Getahun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
262 views40 pages

East and West Hararghe Zones Idps Return Relocation and Rehabilitation Response Plan July 2019

This document provides a conflict-induced IDP return, relocation, and recovery plan for East and West Hararghe zones in Oromia, Ethiopia. It profiles the IDPs in the regions, detailing their displacement due to armed conflict and expulsion from urban areas. The plan then outlines needs for basic service rehabilitation in water, health, education, agriculture, essential supplies, and protection for returning IDPs. This includes lists of infrastructure requiring repair, livestock and farming assistance, and other support to facilitate sustainable returns and community recovery. The conclusion provides a budget summary table for implementing the outlined IDP return and recovery plan.

Uploaded by

Neway Getahun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

East and West Hararghe zones

Disaster Risk Management Offices


Conflict-Induced IDPs Return, Relocation
and Recovery Plan

A report compiled by Multi-Agency Belg


2019 Assessment Team of East and West
Hararghe zones

July 2019
Contents
1. Background information ...................................................................................................................................... 4
2. IDP and IDP return profile .................................................................................................................................. 5
2.1 East Hararghe IDP profile ........................................................................................................................... 5
2.2 West Hararghe IDP profile ................................................................................................................................ 9
3. Basic services needing rehabilitation and repairs in areas of IDP returnees ................................................ 10
3.1 WASH Needs ............................................................................................................................................... 10
3.1.1 Water schemes rehabilitation needs in areas of IDP returnees of East Hararghe zone ............... 10
3.1.2 Water schemes rehabilitatio needs in areas of IDP returnees of West Hararghe zone ................ 11
3.1.3 Water Treatment Chemica Needs in East Hararghe zone .............................................................. 13
3.1.4 Water Treatment Chemical Needs in West Hararghe zone ............................................................ 14
3.1.5 Emergency Water Truck need-East Hararghe ................................................................................ 15
3.1.6 Emergency Water Truck need-West Hararghe ............................................................................... 15
3.2 Health facilities............................................................................................................................................... 16
3.2.1 Human Health facilities requiring repairs/rehabilitation in areas of IDP returnees in East Hararghe
16
3.2.2 Human Health facilities requiring repairs/rehabilitation in areas of IDP returnees in West
Hararghe .............................................................................................................................................................. 19
3.2.3 Animal Health facilities requiring repairs in East Hararghe.......................................................... 19
3.2.4 Animal Health facilities requiring rehabilitation in West Hararghe ............................................. 19
3.3 Education/Schools ......................................................................................................................................... 20
3.3.1 Schools requiring repairs/rehabilitation in areas of IDP returnees in East Hararghe ................. 20
3.3.2 Schools requiring repairs/rehabilitation in areas of IDP returnees in West Hararghe ................ 20
3.3.3 School feeding needs in East Hararghe zone .................................................................................... 21
3.3.4 School feeding needs in West Hararghe ............................................................................................ 21
3.4 Agriculture .................................................................................................................................................... 22
3.4.1 East Hararghe zone Emergency feed requirement for Livestocks ...................................................... 22
3.4.2 Livestock health needs for East Hararghe zone .................................................................................... 23
3.4.3 Livestock health needs for West Hararghe zone .............................................................................. 26
3.4.4 East Hararghe Livestock Vaccine needs ............................................................................................... 27
3.4.5 West Hararghe zone Emergency Livestock Vaccination needs ...................................................... 30
3.4.6 Emergency Livestock drug requirement-West Hararghe zone ....................................................... 31
3.4.7 East Hararghe Farm Tools and restocking needs ............................................................................ 32
3.4.8 West Hararghe Emergency Farm Tools Needs for returning IDPs ............................................... 33
3.4.9 Emergency seed requrement for East Hararghe ................................................................................. 34
3.4.10 Emergency Seed requirement for IDP returnees of West Hararghe zone .......................................... 35
3.5 ES/NFI needs for returning IDPs ..................................................................................................................... 36
3.5.1 ES/NFI needs for returning IDPs of East Hararghe .............................................................................. 36
3.5.2 ES/NFI needs for returning IDPs of West Hararghe .............................................................................. 36
3.6 Protection ...................................................................................................................................................... 37
4. Conclusion and recommendations ..................................................................................................................... 39
Table 4.1 Summary budget table for the IDPs Return and Recovery Plan ............................................................... 40
East and West Hararghe zones IDPs Return and
Relocation response plan
1. Background information
East and West Hararghe zones of Oromiya Regional States are the two most populus zones of the region with
over 6 million people(East Hararghe-3.8 million and West Hararghe 2.6 million). The geographic nature of
East Hararghe zone is characterized as 8% high land, 25% midland and 67% low land with the altitude
ranges from 500-3405 masl and the temprature ranges from 130c to 280c.Similarly,73% of West Hararghe
zone is Agrarian whereas the remaining 27%(4 woredas ) are pastoralist.The agroecology of West Hararghe
zone is characterized by 10% highland,38% midland and the remaining 52% lowland.The altitude of the zone
ranges from 1200masl to 3600masl.Average annual temprature ranges from 20.50c to 240c.

Both zones are charectorized with erratic rainfalls resulting in recurrent drought emergencies leaving over
millions of people to relay on rellief assistance every year. .Due to the huge population pressure,the
population density of these zones is estimated at 0.025m2 per person with a land holding size of less than
quarter of a hectare per household.

East and West Hararghe zones are recurrently affected by drought with its major impacts on food security
and livelihood of the community, water for both human and livestock’s and pasture for livestock. During the
drought years, competition over resources has been very common among communities within the zones and
across the border with Somali region. Such competition used to lead to minor and seasonal conflicts which
normally lasts for short period of time and being solved as per the existing cultural way of conflict resolution
mechanism mainly lead by the community elders from both communities. But recently, conflict induced
displacement has become the major emergency in both zones. According to the zonal officials and witnessed
by the displaced community, the very nature of the conflicts they used to have over resources started changing
since 2015 to an armed conflict across the borders resulting in losses of life, mass displacement and
destruction of properties and infrastructures. The very nature was also escalated to urban cities where ethinic
Oromos were expelled out of urban cities of Somali region and Somali land at the beginning of September
2017. These IDPs were expelled forcefully with exertion of physical attacks which resulted in serious trauma
cases. They were made to flee empty handed deprived of their assets which they owned during their stay in
the region. Majority of the IDPs who registered large capital loss stayed more than 20 to 40 years in the
region and some are even born and grown in the region.

The IDPs accross the border were also pushed out of their homes with agressive invasion of the Somali
community supported and agitated by the Ex-Somali Region Liyu Police.The majority of these IDPs are
pastoralist and agropasoralist.They lost their land,their houses were burnt,basic service infrastructures were
damaged,propertise were looted from health and education institutions.These people were made to flee back
to be dependent on the host community who themselves are under relief aid due to the consecuative failure
of rain led drought affecting their livelihood.

Following the federal and regional government changes since the year 2018,relative peace have been observed across the border
of Oromia and Somali region contributing to the return process of IDPs.Accordingly,starting from the month of March 2019, the
government of Ethiopia is aggressively working on building peace in areas of conflict to pave ways for voluntarily return of the IDPs
mainly those across the border to let them start harvesting the belg and meher season of the year 2019/20.Accordingly, East
Hararghe zone conducted peace conferences in Babile and Chinaksen woredas followed by return of over 154,000 border IDPs in
eight woredas and West Hararghe managed to return over 94,000 border IDPs in four woredas. Despite these IDPs have willingly
moved to their areas, still huge gaps encounter them to go to their houses as most of their houses were either totally or partially
damaged. In addition, most of the basic services like schools, HPs and WASH schemes have been damaged and requiring huge
investment to repair or rehabilitate for which the government is asks partners to support. This document is therefore prepared for
return and relocation response plan to seek support from partners and donor community.

2. IDP and IDP return profile


2.1 East Hararghe IDP profile
East Hararghe zone used to host over 300,000 IDPs.There were three types of displaced population in East Hararghe zone. These
are: IDPs from urban cities of Somali region and Somali Land, deportees from Djibouti and IDPs across the border areas with the
Somali region. Table below shows the IDP figure for all the three types:

Table 2.1.1 Updated border IDPs of East Hararghe zone

HH Total IDP
S.No Woreda
Male Female Total Male Female Total
1 Kumbi 4977 4179 9156 22668 20837 43505
2 Mayu 6535 1534 8069 18576 21769 40345
3 Cinaksan 1251 536 1787 4,900 5,825 10,725
4 Babille 14,264 4355 18,619 39,572 45,419 84,991
Midhega
5 1091 530 1621 5,586 5,339 10,925
Tola
6 Gursum 867 141 1008 2165 2509 4674
7 Meta 192 88 280 1,024 949 1,973
8 Jarso 323 254 577 1,448 1,225 2,673
Goro
9 132 137 269 553 540 1,093
Gutuu
10 Fadiis 187 11 198 1,133 780 1,913
Total 29,819 11,765 41,584 97,625 105,192 202,817

Table 2.1.2 IDPs from urban cities of Somali region, Somali land and Djibouti

HH Total Family
S.No Woreda
Male Female Total Male Female Total
1 Baabilee 750 519 1269 2667 3626 6293
2 Baddannoo 113 78 191 376 330 706
3 Cinaksan 1542 1504 3046 8500 9775 18,275
4 Dadar 1264 541 1805 3071 3753 6,824
5 Fadiis 2379 975 3354 7939 6811 14,750
6 Girawa 126 84 210 364 324 688
7 Gola Odaa 107 39 146 519 317 836
Goro
8 504 360 864 1615 1724 3,339
Guutuu
Goro
9 163 82 245 350 344 694
Muuxii
10 Gursum 1187 762 1949 5818 6737 12,555
11 Hara maya 128 360 488 835 1129 1,964
12 Jaarso 1043 451 1494 3796 3851 7,647
13 Kombolcha 84 95 179 265 355 620
Kurfa
14 39 40 79 89 120 209
Chale
15 Melka Belo 236 248 484 494 601 1,095
16 Mayyu 46 13 59 137 158 295
17 Metaa 434 446 880 1942 2023 3,965
Midhega
18 1488 435 1923 4126 3767 7,893
Tola
19 Karsa 225 387 612 986 1155 2,141
Total 90,789*
* From the above total figure, around 15,000 were deportees from Djibouti.

Table 2.1.3 Border IDPs reported returned home

HH Total Family
S.No Woreda
Male Female Total Male Female Total
1 Kumbi 1773 2272 4045 5,505 6,064 15,569
2 Mayu 3838 674 4512 19,190 3,370 22,560
3 Cinaksan 1251 536 1787 4,900 5,825 10,725
4 Babille 14,264 4355 18,619 39,572 45,419 84,991
Midhega
5 1091 530 1621 5,586 5,339 10,925
Tola
6 Gursum 867 141 1008 2165 2509 4674
7 Meta 192 88 280 1,024 949 1,973
8 Jarso 323 254 577 1,448 1,225 2,673
Goro
9 132 137 269 553 540 1,093
Gutuu
10 Fadiis 187 11 198 1,133 780 1,913
Total 23,918 8,998 32,916 81,076 72,020 157,096
Table 2.1.4 Border IDPs not yet returned

HH Total Family
S.No Woreda
Male Female Total Male Female Total
1 Kumbi 2472 2184 4656 13,453 14,483 27,936
2 Mayu 2803 754 3557 8,324 9,461 17,785
Total 5,275 2,938 8,213 21,777 23,944 45,721

Table 2.1.5. IDPs reported returned to urban cities of Somali region

HH Total Family
S.No Woreda
Male Female Total Male Female Total

1 Mayu Muluke 15 1 16 25 26 51

2 Midhaga Tola 63 12 75 164 117 281

3 Goro Muxi 3 1 4 8 7 15

4 Chinaksen 466 454 920 2,664 3,006 5,650

Total 547 468 1,015 2,861 3,156 5,997

Table 2.1.6 IDPs reported not yet returned to urban cities of Somali region, Somali land and Djibouti

HH Total Family
S.No Returned IDPs types
Male Female Total Male Female Total

Total IDPs from urban cities of


11858 7419 19277 43,889 46,900 90,789
Somali region and deportees
1

Total who returned 547 468 1,015 2,861 3,156 5,997


1

Not yet returned 11,311 6,951 18,262 41,028 43,744 84,792


2
Table 2.1.7. Total Displaced population in East Hararghe zone

HH Total
S.No IDPs
Male Female Total Male Female Total

1 Border IDPs 29,819 11,765 41,584 97,625 105,192 202,817

IDPs from urban


cities of Somali
Region, Somali
2 11858 7419 19277 43,889 46,900 90,789
Land and
Deportees from
Djibouti
Total 41,677 19,184 60,861 141,514 152,092 293,606

Table 2.1.8 Total IDPs reported returned

Returned IDPs HH Total Family


S.No
types
Male Female Total Male Female Total

1 Border IDPs 23,918 8,998 32,916 81,076 72,020 157,096

To urban cities
2 547 468 1,015 2,861 3,156 5,997
of Somali region

Total 24,465 9,466 33,931 83,937 75,176 163,093

Table 2.1.9 Total IDPs and deportees not yet returned

HH Total Family
S.No IDPs
Male Female Total Male Female Total

1 Border IDPs 5,275 2,938 8,213 21,777 23,944 45,721

IDPs from urban


cities of Somali
2 region, Somali Land 11,311 6,951 18,262 41,028 43,744 84,792
and Deportees from
Djibouti
Total 16,586 9,889 26,475 62,805 67,688 130,513
2.2 West Hararghe IDP profile

Table 2.2.1 IDPs and deportees’ population in West Hararghe zone by origin and woreda

No. IDP type No. HH Total Remark


1 Border 18,294 100,438
2 From urban cities of Smali region,Somali Land 1284 5707
3 Deportees from Djibouti 1781 6289
4 Displaced from Bale zone 15 69
5 Displaced from Guji zone 65 250
Total 15,439 112,753

Table 2.2.2 Border IDPs by woreda

HH Total Remark
No. Woreda
M F T M F T
Internal/within the
1 Hawi Hudina 4177 1734 5911 26275 10328 36603 zone
Internal/within the
2 Daro Lebu 2754 1140 3894 11054 10024 21078 zone
3 Chiro 219 26 245 398 162 560
4 Habro 72 24 96 333 328 661
5 Guba Koricha 102 13 115 291 227 518
6 Burka Dhintu 67 66 133 257 241 498
7 Gumbi Bordode 2041 658 2699 5010 4177 9187
8 Mieso 3093 941 4034 13914 11824 25738
9 Doba 0 0 1167 0 0 5595
Total 12525 4602 18294 57532 37311 100,438*

Table 2.2.3 Border IDPs reported returned

HH Total
No. Woreda
M F T M F T
1 Hawi Hudina 4177 1734 5911 26275 10328 36603
2 Daro Lebu 2754 1140 3894 11054 10024 21078
3 Chiro 219 26 245 398 162 560
4 Habro 72 24 96 333 328 661
5 Guba Koricha 102 13 115 291 227 518
6 Burka Dhintu 67 66 133 257 241 498
7 Gumbi Bordode 2041 658 2699 5010 4177 9187
8 Mieso 3093 941 4034 13914 11824 25738
9 Doba 0 0 0 0 0 0
Total 12525 4602 17127 57532 37311 94843*
*94.43% of the border IDPs reported returned
3. Basic services needing rehabilitation and repairs in areas of IDP
returnees
3.1 WASH Needs
3.1.1 Water schemes rehabilitation needs in areas of IDP returnees of East Hararghe
zone
Table 3.1.1 damaged water schemes needing rehabilitation-East Hararghe
No. Woreda Site name Schem No. of Type of damage Repair needed Estimated
name e name beneficia cost
ries
Nagataa Replacement of Indian
(SHW) 470 pump broken 23,240.40
Gamachisa mark II Pipe- 16
Replacement of Indian
Tuuullaa SHW 450 " 22,364
mark II Pipe- 17
Replacement of Indian
Gamachuu SHW 550 " 23,713
mark II Pipe- 18
Replacement of Indian
1 Babile Abdi buch SHW 450 " 22,364
mark II Pipe- 17
Replacement of Indian
Erarguda SHW 500 " 24,204
mark II Pipe- 16
Replacement of Indian
Barkale SHW 500 " 23,328
mark II Pipe- 16
Replacement of Indian
Tulu Horo SHW 430 " 24,939
mark II Pipe- 16
Makanisaoro Hall fallen and Bore hall145 mts and
DW 3,350 3,079,280
mo pump damaged 18.5 KW pump
Bore hall 160mts, Pump
Hall fallen and
Cirile DW 6,098 18.5 kw and 50KV 3,523,007
pump damaged
generator
Burning of
Gellaa DW 27,000 125KVA generator 782,537
2 Chinaksan generator
Makanisa 200mts bore hall and 3,073,007
DW 4,670 Hall closed
Hasan Eybo 18.5KVA pump
Generator and 60 KVA generator
Danbaslee SHW 2,572 line and21/2 inch line 2,245,933.3
transmission transmission for 2.2 km
Tiroosandar Hall fallen and 198mt hall and 26KVA
DW 8,497 3,153,007
ee pump damaged generator
Hall 330 mts bore hall to be
3 Kumbi Jaajoo DW 2,745 3,494,262.0
fallen/damaged dug
Replacement of
Mayu
4 Ifa Baas DW 2,375 old pipes Replacement of pipes 277,500.0
Muluke
linkages
Total
19,792,685.
rehabilitat
7
ion cost
In addition to the above rehabilitation plan, need for construction of new water supply project for IDP returnees in
Darera Arba kebel which could also benefit IDP returnees of Tulu Horo kebeles as well has been requested
critically.The prject has been studied four years ago with estimation const of about 22 million ETB and the project
proposal document is available for it.

3.1.2 Water schemes rehabilitatio needs in areas of IDP returnees of West Hararghe zone

Table 3.1.2 damaged water schemes needing rehabilitation-East Hararghe


Need of Materials
(Electro Sub. BH
N Name of Mechanical) Gene Submersib Riser Genera Pump drilling Estimated
o Woreda Scheme Replacement rator le Pump Pipe tor Cost Cost Cost cost

1 Mieso H/Chachole Rehabilitation 25,000.00

Supply of
Submersible Pump
Installation & 2 1/2 700,000.
2 Mieso K/Jarty developing 30 "=22 00 0 700,000.00

3 Mieso Asabot Rehabilitation 0 25,000.00

Gumbi
4 Bordade Hayu Rehabilitation 25,000.00

Pipe line
maintenance, water
Gumbi point constructions 1,200,000.
5 Bordode Gololcha & expansion 0 00

Expansion from
Tutuftu RWS
Scheme to D/Kora
PA &WP 1,500,000.
6 Mieso Dire Kora Conistruction 00

Oda HDW Supply of Afridev


7 Bultum Schemes Hand Pump 15 set 525,000.00

Supply of
Submersible pump
& Generator,
Oda Installation & 2 1/2 600,000 650,000. 1,250,000.
8 Bultum Bososo developing 85 26 "=25 .00 00 0 00

600,000
9 Chiro Y/Bobasa Supply of Generator 60 .00 0 600,000.00

Supply of Generator 600,000


10 Chiro Kololo & Installation 85 .00 0 600,000.00
Supply of
Submersible pump
& Generator,
Medhicho Installation & 600,000 650,000. 1,250,000.
11 Chiro No.9 developing 75 22 2 "=20 .00 00 0 00

Emergency Drilling 3,500, 3,500,000.


12 Mieso Bililo of BH 000 00

Emergency Drilling 3,500, 3,500,000.


13 Mieso A/Chale of BH 000 00

Oda Emergency Drilling 3,500, 3,500,000.


14 Bultum Kolu of BH 000 00

Supply of
Submersible pump,
Installation & 600,000
15 Mieso H/Chachole developing .00 600,000.00

Supply of
Submersible pump
& Generator,
Gumbi Installation & 600,000 600,000. 1,200,000.
16 Bordade Dire Kalu developing 85 26 2 1/2= .00 00 00

Supply of
Submersible pump
& Generator,
Installation & 600,000 600,000. 1,200,000.
17 Chiro Beka developing 75 22 2=25 .00 00 00

Supply of
Submersible pump,
Installation & 600,000.
18 Chiro Saro developing 18.5 2=25 00 600,000.00

Supply of
Submersible pump,
Guba Installation & 600,000.
19 Koricha Bube developing 18.5 00 600,000.00

22,400,000.
Total 00

In addition to the rehabilitation of the existing schemes,there is a need for construction of water scheme
extention to the relocation site of Gumbi Bordode relocation site.Estimation cost for this has been done.
Expansion from the existing water source was impossible as the discharge potential is very weak. Another
option proposed was the extension from the three 3 dug bore holes. One of the bore hole which is dug by
Oromia Water Bureau for Bordede town water supply and currently having document can be obtained from
Oromia Region Water Office to integrate through communicating with the Water Office. Currently, the zonal
level professionals recommended that this bore hole will be functional if submersible pump and Generator
installation cost as well the cost of civil works like reservoir are fulfilled. In addition to this, there is a need
for water point (Birka) construction

It is recommended that for the 588 HHs with total population of 1,228 to be relocated in Gumbi Bordode in
147 blocks of 4 houses construction of at least 2 water distribution points (Birkas) are required. Detail cost
estimation for this proposal need to be included by the zone water office.

3.1.3 Water Treatment Chemica Needs in East Hararghe zone

Table 3.1.3 WTCs needs -East Hararghe


Response
Beneficiaries

chemicalada
provided

Gap(Kar.)
mu (kar.)
Available
Needed
No Water
amount

Woreda Aqua
Aradda

. Purifi
HH

Tab M

T
F
er
(kar.)
(kar.)
1 Kumbi 79 9,300 7 6,200 16,488 14,055 30,543 9,379 0 9379
2 Mayu 114 13,327 11 8,885 21,769 22,659 44,428 13,441 0 13441
3 Babillee 192 22,500 11 15,000 27,427 28,557 55,984 22,692 0 22692
4 Chinaksan 92 10,776 8 7,184 18,943 14,948 33,912 10,868 0 10868
5 Kurfa Calle 88 9,300 8 8,200 26,488 14,055 40,543 9,379 0 9379
6 Haramaya 114 13,327 10 8,885 21,769 22,659 44,428 13,441 0 13441
7 Karsa 192 22,500 12 15,000 27,427 28,557 55,984 22,692 0 22692
8 Goro Muxi 92 10,776 9 7,184 18,943 14,948 33,912 10,868 0 10868
111,8 179,25 160,43 339,73 112,7 1127
Total 963 76 76,538 0
06 4 8 4 60 60
3.1.4 Water Treatment Chemical Needs in West Hararghe zone

Table 3.1.4 WTCs and WASH NFI needs

water guard
Water Needs for 90 days chlorine for 90 waha agar for 90
Chemi Bishan Gari days days
No of cal Dr
N Kebel Benifici u Karto
o Woredas es ry sachet Birr m Birr n Birr Total Cost
Hawi 600,00
1 Gudina 31 62,103 0 1,200,000 1 4,500.00 500 900,000 2,104,500.00
2 Boke 21 600,00
16,725 0 1,200,000 2 9,000.00 - - 1,209,000.00
3 B/Dhintu 21 85,000 1,200,0 1
00 2,400,000 4,500.00 - - 2,404,500.00
18 1,393,0
4 Daro Lebu 66,439 00 2,786,000 3 13,500.00 500 900,000 3,699,500.00
5 Oda Bultum 12 32,925 450,00 2
0 900,000 9,000.00 500 900,000 1,809,000.00
6 Gemechis 15 14,888 500,00 2
0 1,000,000 9,000.00 500 900,000 1,909,000.00
Gumbi 1,100,0
7 Bordede 25 76,503 60 2,200,120 2 9,000.00 - - 2,209,120.00
8 Mieso 28 60,175 900,00 2
0 1,800,000 9,000.00 - - 1,809,000.00
9 Habro 7 7,500 150,00 3
0 300,000 13,500.00 500 900,000 1,213,500.00
1 15,000 300,00 2
0 Doba 14 0 600,000 9,000.00 500 900,000 1,509,000.00
1 100,00
1 Mesela 7 5,000 0 200,000 1 4,500.00 500 900,000 1,104,500.00
1
2 Tulo 7 5,000 - - 2 9,000.00 500 900,000 909,000.00
1 200,00
3 G/Koricha 10 21,646 0 400,000 2 9,000.00 500 900,000 1,309,000.00
1 250,00
4 Anchar 12 20,718 0 500,000 1 4,500.00 500 900,000 1,404,500.00
1 100,00
5 Chiro 8 3,000 0 200,000 2 9,000.00 500 900,000 1,109,000.00

492,62 7,843,0 15,686,12 126,000.0 9,900,00 25,712,120.0


TOTAL 236 2 60 0 28 0 5,500 0 0
3.1.5 Emergency Water Truck need-East Hararghe

lakk Woreda name Affected kebeles Population affected Water trucks Remark
Requested Availed Gap
1 Mayu 10 66,657 4 1 3
2 Qumbii 14 77,500 6 2 4
3 Gola Odaa 6 54,866 4 0 4
4 Gursum 6 25,600 2 2 0
5 Midhaga 8 35,000 3 2 1
6 Baabilee 4 55,594 4 2 2
7 Cinaaksan 10 64,200 3 0 3
8 Fadis 6 26,400 2 2 0
9 Girawa 9 7,600 1 0 1
10 Meta 8 25,687 2 0 2
11 Haramaya 5 2550 2 0 2
12 Melka Balloo 10 38,895 3 1 2
13 Goro Muxii 4 19,735 2 0 2
14 kurfa cale 4 21000 2 1 1
15 Goroguutu 2 3,346 1 0 1
Total 106 524,630 41 13 28
Despite improved water availability, there will be shortage in the lowland woredas after September 2019

3.1.6 Emergency Water Truck need-West Hararghe

Water shortage is still a problem in lowland woredas of West Hararghe zone.During the last month a total of
988 livestock death has been reported due to water and pasture shortage.Highly affected woredas are Hawi
Gudina-284 cattle,&74 goat, Burka Dhintu-150 cattle,Habroo-284 cattle &75 Donkeys, Mi’eso-266 cattle
and from Doba 4 cattle were reported died. In total,988 cattle and 74 Goats and 75 Donkeys have died. Due
to poor Belg rain harvest, still shortage of water has been reported from lowland woredas. Table below shows
water needs for the coming six months.

S/ Name of No. of No of Duration of Water Unit Cost Unit Unit Unit Cost/
N woredas Affected affected Intervention Trucks Cost/ da Cost/mont 3 months
kebele individuals (Month) needed h
1 Gumbi Bordode 16 62,980 3 2 5,700.00 11,400 342,000 1,026,000
2 Burka Dhintu 17 61,684 3 2 6,600.00 13,200 396,000 1,188,000
3 Daro Labu 13 45,852 3 2 6,300.00 12,600 378,000 1,134,000
4 Hawi Gudina 9 33,137 3 2 6,700.00 13,400 402,000 1,206,000
5 Boke 5 24,316 3 2 6,500.00 13,000 390,000 1,170,000
6 Mieso 9 37,765 3 2 5,500.00 11,000 330,000 990,000
7 Doba 8 34,877 3 2 5,700.00 11,400 342,000 1,026,000
8 Gemachis 5 22,946 3 2 6,200.00 12,400 372,000 1,116,000
Total 93 368,553 3 16
49,200.0
0 98,400 2,952,000 8,856,000
Water containers need in West Hararghe

S/ Woreda No of No of Estimated Total Cost No of Estimate Total Cost To Total Cost for
N Kebele Rottos of Cost for (in ETB) Rotos d of Cost (in ETB) tal 10m3 +5m3(in
(10m3) 10m3 (5m3) for 5m3 ETB)
1 Hawi 31 6 32,000 192,000.00 4 20,000 80,000.00 10 272,000.00
Gudina
2 Boke 21 5 32,000 160,000.00 5 20,000 100,000.0 10 260,000.00
0
3 B/Dhintu 21 5 32,000 60,000.00 5 20,000 100,000.0 10 260,000.00
0
4 Daro 18 5 32,000 60,000.00 5 20,000 100,000.0 10 260,000.00
Lebu 0
5 Oda 12 4 32,000 128,000.00 2 20,000 40,000.00 6 168,000.00
Bultum
6 Gemechi 15 6 32,000 192,000.00 4 20,000 80,000.00 10 272,000.00
s
7 Gumbi 25 7 32,000 224,000.00 5 20,000 100,000.0 12 324,000.00
Bordede 0
8 Mieso 28 5 32,000 160,000.00 5 20,000 100,000.0 10 260,000.00
0
9 Doba 14 4 32,000 128,000.00 4 20,000 80,000.00 8 208,000.00
1 G/Korich 10 4 32,000 128,000.00 2 20,000 40,000.00 6 168,000.00
0 a
1 Chiro 8 5 32,000 160,000.00 5 20,000 00,000.00 10 260,000.00
1
Total 203 56 32,000 1,792,000.0 46 20,000.0 920,000.0 10 2,712,000.00
0 0 0 2

3.2 Health facilities

3.2.1 Human Health facilities requiring repairs/rehabilitation in areas of IDP


returnees in East Hararghe
Due to the conflict,52 HPs and 5HCs have been damaged in East Hararghe zones. Moreover, drugs, medical
equipment’s and three block staff residence houses were damage and lost in the five woredas of East
Hararghe zone Oromia region, namely: Gursum, Chinakson, Meyu Muluke, Babile and Kumbi.In East
Hararghe zone, a total 56 HPs and 5HCs have been damaged due to conflict. Table below shows the
facilities,extent of damages and proposed cost of rehabilitation
Table 3.2.1. HC repairs/rehabilitation in East Hararghe
Current Estimated cost
S. Kebel Extent of Status of of
N Zone Woreda e damage the facility rehabilitation Remark
E/Hara Non occupied by
1 rghe Gursum Kore partial Function 2,588,522.38 region five
Awus Threat of
2 >> Babile heriif partial functional 100,900.00 security
Amba Threat of
3 >> Chinakson ro partial functional 335,671.00 security
Threat of
4 >> Chinakson Orda partial functional 563,743.33 security
Threat of
5 >> Kumbi Mino partial functional 1,308,270.00 security

Total 4,897,106.71

Table .3.2.2 Some of the HP requiring rehabilitation in East Hararghe zone


Current Status
of the facility Estimated cost of
health Post (Functional or destroyed/damage
S. Wored Damage non- d items/medical
N a Kebele Status functional) equipment Remark
Threat of security
Bakaka Partial non functional 291316.84
Threat of security
Wara Ali Partial non functional 280875.1
Threat of security
Wara Guye Partial non functional 300419.02
Threat of security
Gursum

1 Noliye Partial non functional 319585.61


Threat of security
Kulmiye Partial non functional 304108.57
Kasa
Oromia Partial non functional 322996.48 Threat of security
Without full material
Partial service
Oda Oromia Partial function 298056.42 provided
Without full material
Partial service
Bilisuma Partial function 307288.24 provided
Without full material
Partial service
Hariro Partial function 305594.83 provided
Without full material
Hawa Partial service
santala Partial function 306681.44 provided
Without full material
Partial service
Nursalam Partial function 310427.29 provided
Threat of security
Chalo Partial non functional 467620.9
Meyu Muluke

Threat of security
Kile Partial non functional 111545.62
2
Mojo Threat of security
waldaha Partial non functional 111545.62
Threat of security
Miluke Partial non functional 112945.62
Without full material
Partial service
Lakole Partial function 10820.52 provided
Without full material
Partial service
Awusherir Partial function 49000 provided
Without full material
Babile

3 Partial service
Darera Partial function 5000 provided
Without full material
Partial service
Sk/Husen Partial function 3000 provided
Without full material
Partial service
E/Ibada Partial function 6225 provided
Without full material
Chinaks

4 Ambaro Partial service


on

1ffaa Partial function 13860 provided


Without full material
Ambaro Partial service
1ffaa Partial function 219523.33 provided
Without full material
Orda Partial service
1(1ffaa) Partial function 16,360 provided
Without full material
Partial service
Orda 2ffaa Partial function 314080 provided
Without full material
Partial service
Tiro gudo Partial function 935134.33 provided
Threat of security
Jajo Partial non functional 119454
Threat of security
Roka Partial non functional 119454
Kumbi

5
Burka Threat of security
nagaya Partial non functional 126281
Threat of security
Mino Partial non functional 120090
6,209,289.78

3.2.2 Human Health facilities requiring repairs/rehabilitation in areas of IDP returnees


in West Hararghe

3.2.3 Animal Health facilities requiring repairs in East Hararghe

In East Hararghe zone,a total of 6 animal Health Posts were damaged .To rehabilitate these,a total cost of
10.2 million birr has been estimated with a cost of 1.7 million for each HP.

3.2.4 Animal Health facilities requiring rehabilitation in West Hararghe


3.3 Education/Schools
3.3.1 Schools requiring repairs/rehabilitation in areas of IDP returnees in East Hararghe

School properties damaged Remark


No. Woreda No. kebeles No. of Estimated cost of
name affected rehabilitation
schools/total
and partial
damages
1 Babile 8 13 6,906,850.00 To be given
priority attention
2 Mayu 3 3 2,147,300.00
Muluke
3 Kumbi 8 11 3,368,955.00
4 Chinaksen 22 31 8,480,460.00
5 Gursum 9 14 8,719,780.00
6 Midhega 3 3 204,880.00
Tola
Total 53 75 29,828,225.00 64 of these
schools are still
closed leaving
18,944 students
out of schools

3.3.2 Schools requiring repairs/rehabilitation in areas of IDP returnees in West Hararghe

In West Hararghe,a total of 15 schools were affected due to conflict.Some of these schools were damaged
totaly and the majority are damaged partially.

No of Schools No of Affected Estimated cost


No of Schools Closed due Damaged School-Children of repairs
N Woreda Schools in to Emerg.
o. Name the
woreda Totally Partially M F
Prim. ABE KG
1 Mi'esso 48 3 0 0 1 2 306 195 750,000
Gumbi 420,000
2 53 1 0 0 1 0 82 68
Bordodde
Hawi 550,000
3 65 0 0 0 0 11 2205 1387
Gudina
Total 166 4 0 0 2 13 2593 1650 1,720,000
3.3.3 School feeding needs in East Hararghe zone
Quite large number of school dropout (0ver 49,000 students) was reported from East Hararghe zone during the
academic calandar 2018/19. The major cause of the school dropout was reported as drought resulting in wash
emergencies where students are forced to support the family in going after their livestock during migration, support
of family during food insecurity crises and for use of child labor. School feeding program has been mentioned as the
appropriate program to keep students in schools and to reduce school dropouts. The impact was highly demanding
for the most vulnerable IDP students. Table below indicates the school feeding needs for the first six months of the
next academic calandar.

No. students
No. Worda No. schools Remark
M F T
1 Qumbii 6 1552 941 2493
2 Gola Odaa 57 15856 12573 28429
3 Mayyuu 19 4782 3836 9315
4 Midhega Tolaa 34 9581 6942 16523
5 Cinaaksan 34 5896 3985 9881
6 Fadis 34 10248 7167 17415
7 Baabbilee 32 12400 9252 21632
8 Gursum 70 23717 16504 40221
9 Malkaa Bal'oo 52 12625 9141 21766
10 Goroo Guutuu 89 26980 23602 51345
11 Kurfaa Callee 43 13145 10447 23592
12 Gurawa 89 30749 23036 72469
13 Qarsaa 82 24447 16438 54883
14 Jarsoo 23 6558 4577 11135
15 Baddannoo 90 47258 39318 258988
16 Meettaa 76 29965 24790 54755
17 Goroo Muxii 39 14511 12460 26971
18 Dadar 105 36130 28246 64376
19 Kombolcha 10 3453 2785 6238
20 Haramaayaa 29 10979 7178 18157
Total 1,013 340,832 263,218 810,584

3.3.4 School feeding needs in West Hararghe


Similarly,in West Hararghe also,large number of students have droped out of school for simlilar reasons of critical
water shortage during drought seasons,,household food insecurity,child labor utlization by families etc.0ver 46,000
students have dropedout pf school in West Hararghe during the academic calandar 2018/19.School feeding program
has been mentioned as the appropriate program to keep students in schools and to reduce school dropouts.The
impact was highly demanding for the most volunerable IDP students.
Number of students in neeed of support
Lakk Woreda name Number of schools M F T
1 Haawwii Guddinaa 55 15208 10344 25552
2 Miesso 32 8996 6283 15279
3 Gumbii Bordode 44 11643 8328 19971
4 Burqaa Dhintuu 38 8603 6800 15403
5 Bookee 41 18266 14935 33201

6 Odaa Bultum 68 26377 18762 45139


7 Doobbaa 68 23502 18074 41576
8 Gubbaa Qoricha 37 14994 11492 26486
9 Ancaar 48 14228 11666 25894
10 Daroo Labuu 56 18605 14827 33432
11 Gamachis 51 20443 14080 34523
12 Shanan Dhugo 51 22455 18312 40767
13 Ciroo 61 24656 17346 42002
14 Tulo 46 20213 15184 35397
15 Habro 51 27966 20974 48940
Total 747 276,155 207,407 483,562

3.4 Agriculture

3.4.1 East Hararghe zone Emergency feed requirement for Livestocks


Table 3.4.1 Emergency feed need for East Hararghe

Number of Livestock
Households
(HHs) in need
Wor Male Fema Total Specie Numb Conce Conce Total Hay/Stra Hay/Straw total price
eda head le s er ntrate ntrate price w (Bale) (Bale) Unite
ed Head (quint Unit Price (Birr)
ed als) Price
(Birr)

21,8 3,57
00 2
May
uu 1634 230 1864 Cattle 17934 179.34 25 4483.5 161406 15 2421090
Sheep 3976 7.952 25 198.8 35784 15 536760
Goat 21650 43.3 25 1082.5 194850 15 2922750
Cina
aksa
n 2726 524 3250 Cattle 31572 315.72 25 7893 284148 15 4262220
Sheep 25256 50.512 25 1262.8 227304 15 3409560
Goat 44200 88.4 25 2210 397800 15 5967000

Gola
Oda 10244.
a 3040 622 3662 Cattle 40978 409.78 25 5 368802 15 5532030
Sheep 2142 4.284 25 107.1 19278 15 289170
Goat 9572 478.6 25 11965 86148 15 1292220

Qum
bi 760 174 934 Cattle 22606 226.06 25 5651.5 203454 15 3051810
Sheep 16592 33.184 25 829.6 149328 15 2239920
Goat 5168 1033.6 25 25840 46512 15 697680

Midh
.
Tola
a 2740 236 2976 Cattle 17052 170.52 25 4263 153468 15 2302020
Sheep 5786 11.572 25 289.3 52074 15 781110
Goat 19604 39.208 25 980.2 176436 15 2646540
1090 1268 3092.0 77300. 38,351,88
Total 0 1786 6 32 8 2556792 0
3.4.2 Livestock health needs for East Hararghe zone
Table 3.4.2 Emergency/Recovery and Resilience livestock HEALTH requirements (Anthelmintic Treatment)
for the period July – Dec 2019
Number of Households Lives Type and amount of drug treatment
(HHs) in need tock needed
Woreda Male Fem Total Species Numb Unit Drug Unit Total
No head ale er Dru Amount Price Cost
ed Hea g (Unit) (Birr) (Birr)
ded Typ
e
1 Babile Cattle 9447 Albendazole Bolus 5
4,487 236 4,723 Cattle 18,894 94,470
2 Fadis 3971 328 " 10131 " " 5
4,299 20,262 101,310
3 Gorog 7324 724 " 4005 " " 5
8,048 8,010 40,050
utu
4 Gursu 2205 244 " 15734 " " 5
2,449 31,468 157,340
m
5 Melka 4745 479 " 9591 " " 5
5,224 19,182 95,910
belo
6 Jarso 2515 839 " 6200 " " 5
3,354 12,400 62,000
7 Qumb " " " 5
45,212 226,060
l 762 175 937 22606
8 Mayy " " " 5
35,868 179,340
uu 1658 232 1890 17934
9 Mldh/ " " " 5
34,104 170,520
Tolaa 2742 238 2980 17052
10 Gola " 40978 " " 5
81,956 409,780
odaa 3042 620 3662
11 Clnaa " 31572 " " 5
63,144 315,720
ksan 2732 528 3260
Total " 55108 " " 5
36,18 4,64 40,826 370,500 1,852,5
3 3 00
1 Babile Goats 4415 Albendazole Bolus 1
4,487 236 4,723 Goat 8,830 8,830
2 Fadis 3971 328 " " " 1
4,299 22606 45,212 45,212
3 Gorog 7324 724 " " " 1
8,048 35,868 35,868
utu 17934
4 Gursu 2205 244 " " " 1
2,449 34,104 34,104
m 17052
5 Melka 4745 479 " 40978 " " 1
5,224 81,956 81,956
belo
6 Jarso 2515 839 " 31572 " " 1
3,354 63,144 63,144
7 Qumb " 1
45,212 45,212
l 762 175 937 22606
8 Mayy " 1
35,868 35,868
uu 1658 232 1890 17934
9 Mldh/ " 1
34,104 34,104
Tolaa 2742 238 2980 17052
10 Gola " 40978 1
81,956 81,956
odaa 3042 620 3662
11 Clnaa " 31572 1
63,144 63,144
ksan 2732 528 3260
Total " " "
36,18 4,64 40,826 - 134,5 529,398 529,398
3 3 57
1 Babile Sheep 4415 Albendazole Bolus 1
4,487 236 4,723 sheep 8,830 8,830
2 Fadis 3971 328 " 7208 " " 1
4,299 14,416 14,416
3 Gorog 7324 724 " 2195 " " 1
8,048 4,390 4,390
utu
4 Gursu 2205 244 " 13056 " " 1
2,449 26,112 26,112
m
5 Melka 4745 479 " 6439 " " 1
5,224 12,878 12,878
belo
6 Jarso 2515 839 " 6530 " " 1
3,354 13,060 13,060
7 Qumb " " " 1
45,212 45,212
l 762 175 937 22606
8 Mayy " " " 1
35,868 35,868
uu 1658 232 1890 17934
9 Mldh/ " " " 1
34,104 34,104
Tolaa 2742 238 2980 17052
10 Gola " 40978 " " 1
81,956 81,956
odaa 3042 620 3662
11 Clnaa " 31572 " " 1
63,144 63,144
ksan 2732 528 3260
Total
36,18 4,64 339,970 339,970
3 3 40,826
Gran
d 2,721,
Total 868
3.4.3 Livestock health needs for West Hararghe zone

Table 3.4.3 Emergency/Recovery and Resilience livestock HEALTH requirements


(Oxytetracycline20% Treatment) for the period July- Dec 2019

Number of Households Livestock Type and amount of drug treatment


N
(HHs) in need needed
o Woreda Male Female Total Spe Num Drug U Drug Unit Total Cost
headed Headed cies ber Type ni Amoun Price (Birr)
t t (Unit) (Birr)
1 Babile 4,487 236 Catt 9447 Oxytetr Vi 80
4,723 le acyclin al 1,889 151,152
e20% s
2 Fadis 3971 328 " 1013 " " 80
4,299 1 2,026 162,096
3 Gorog 7324 724 " 4005 " " 80
8,048 801 64,080
utu
4 Gursu 2205 244 " 1573 " " 80
2,449 4 3,147 251,744
m
5 Melka 4745 479 " 9591 " " 80
5,224 1,918 153,456
belo
6 Jarso 2515 839 " 6200 " " 80
3,354 1,240 99,200
Total 25,247 2,850 " 5510 " " 80
28,097 8 11,022 881,728
1 Babile 4,487 236 Goa 4415 Oxytetr Vi 65
4,723 ts acyclin al 221 14,349
e20% s
2 Fadis 3971 328 " 7208 " " 65
4,299 360 23,426
3 Gorog 7324 724 " 2195 " " 65
8,048 110 7,134
utu
4 Gursu 2205 244 " 1305 " " 65
2,449 6 653 42,432
m
5 Melka 4745 479 " 6439 " " 65
5,224 322 20,927
belo
6 Jarso 2515 839 " 6530 " " 65
3,354 327 21,223
Total 25,247 2,850 Oxytetr " 65
28,097 - 39,84 acycline 1,992 129,490
3 20%
1 Babile 4,487 236 She 4415 Vi 65
4,723 ep al 221 14,349
s
2 Fadis 3971 328 " 7208 " " 65
4,299 360 23,426
3 Gorog 7324 724 " 2195 " " 65
8,048 110 7,134
utu
4 Gursu 2205 244 " 1305 " " 65
2,449 6 653 42,432
m
5 Melka 4745 479 " 6439 " " 65
5,224 322 20,927
belo
6 Jarso 2515 839 " 6530 " " 65
3,354 327 21,223
Total 25,247 2,850 " " 65
28,097 - 39,84 1,992 129,490
3

Grand 1,140,70
Total 8

3.4.4 East Hararghe Livestock Vaccine needs

Number of Households Livestock Type and amount of Vaccines


(HHs) in need needed
n Woreda Male Female Total Spe Numb Vaccin Vacci Unit Price Total Cost
o headed Headed cies er e Type ne (Birr) (Birr)
. Amo
unt
(Dose
s)
1 Babile Cat 9447 Bovin 1889 0.75
4,487 236 4,723 tle e 4 14,171
Paster
olosis
2 Fadis 3971 328 " 10131 " 2026 0.75
4,299 2 15,197
3 Gorog 7324 724 " 4005 " 8010 0.75
8,048 6,008
utu
4 Gursu 2205 244 " 15734 " 3146 0.75
2,449 8 23,601
m
5 Melka 4745 479 " 9591 " 1918 0.75
5,224 2 14,387
belo
6 Jarso 2515 839 " 6200 " 1240 0.75
3,354 0 9,300
7 Qumb " " 4521 0.75
2 33,909
l 762 175 937 22606
8 Mayy " " 3586 0.75
8 26,901
uu 1658 232 1890 17934
9 Mldh/ " " 3410 0.75
4 25,578
Tolaa 2742 238 2980 17052
1 Gola " 40978 " 8195 0.75
0 6 61,467
odaa 3042 620 3662
1 Clnaa " 31572 " 6314 0.75
1 4 47,358
ksan 2732 528 3260
Total " 11270 " 2254 0.75
25,247 2,850 28,097 0 00 277,875
1 Babile Goa 9447 Caprin 0.7
4,487 236 4,723 ts e 4,723 3,306
Paster
olosis
2 Fadis 3971 328 " 10131 " 0.7
4,299 4,299 3,009
3 Gorog 7324 724 " 4005 " 0.7
8,048 8,048 5,634
utu
4 Gursu 2205 244 " 15734 " 0.7
2,449 2,449 1,714
m
5 Melka 4745 479 " 9591 " 0.7
5,224 5,224 3,657
belo
6 Jarso 2515 839 " 6200 " 0.7
3,354 3,354 2,348
7 Qumb " 5168 " 0.7
656
l 762 175 937 937
8 Mayy " 21650 " 0.7
1,323
uu 1658 232 1890 1890
9 Mldh/ " 19604 " 0.7
2,086
Tolaa 2742 238 2980 2980
1 Gola " 9572 " 0.7
0 2,563
odaa 3042 620 3662 3662
1 Clnaa " 44200 " 0.7
1 2,282
ksan 2732 528 3260 3260
Total " 15530 " 0.7
25,247 2,850 28,097 2 40,82 28,578
6
1 Babile She 9447 Ovine 0.7
4,487 236 4,723 ep Paster 4,723 3,306
olosis
2 Fadis 3971 328 " 10131 " 0.7
4,299 4,299 3,009
3 Gorog 7324 724 " 4005 " 0.7
8,048 8,048 5,634
utu
4 Gursu 2205 244 " 15734 " 0.7
2,449 2,449 1,714
m
5 Melka 4745 479 " 9591 " 0.7
5,224 5,224 3,657
belo
6 Jarso 2515 839 " 6200 " 0.7
3,354 3,354 2,348
7 Qumb " 16592 " 0.7
656
l 762 175 937 937
8 Mayy " 3976 " 0.7
1,323
uu 1658 232 1890 1890
9 Mldh/ " 5786 " 0.7
2,086
Tolaa 2742 238 2980 2980
1 Gola " 2142 " 0.7
0 2,563
odaa 3042 620 3662 3662
1 Clnaa " 25256 " 0.7
1 2,282
ksan 2732 528 3260 3260
Total " 10886 " 0.7
25,247 2,850 28,097 0 28,09 28,578
7
1 Babile Cat 9447 Foot 3778 10
4,487 236 4,723 tle &mou 8 377,880
th
2 Fadis 3971 328 " 10131 " 4052 10
4,299 4 405,240
3 Gorog 7324 724 " 4005 " 1602 10
8,048 0 160,200
utu
4 Gursu 2205 244 " 15734 " 6293 10
2,449 6 629,360
m
5 Melka 4745 479 " 9591 " 3836 10
5,224 4 383,640
belo
6 Jarso 2515 839 " 6200 " 2480 10
3,354 0 248,000
7 Qumb 5168 " 2067 10
2 206,720
l 762 175 937
8 Mayy 21650 " 8660 10
0 866,000
uu 1658 232 1890
9 Mldh/ 19604 " 7841 10
6 784,160
Tolaa 2742 238 2980
1 Gola 9572 " 3828 10
0 8 382,880
odaa 3042 620 3662
1 Clnaa 44200 " 1768 10
1 00 1,768,000
ksan 2732 528 3260
Total " 55108 " 5834 10
25,247 2,850 28,097 20 6,212,080
Grand
Total 6,547,111

3.4.5 West Hararghe zone Emergency Livestock Vaccination needs

Total
cost for
Total population for vaccination
vaccinati
on
FMD LSD PPR
Wored Un
a it Unit Unit
Total Total Total
pri price price
Cattle ce Cattle Shoats
per
per per
do Price price Price
dose dose
No. se
Burka 10000
1 Dhimtu 10000 10 0 38320 0.45 17244 16960 0.5 8480 124840
10000 26662.
2 Boke 10000 10 0 59250 0.45 5 24950 0.5 12475 139137.5
Oda 10000
3 Bultum 10000 10 0 37500 0.45 16875 - - - 116875
Gamach
4 is 7000 10 70000 19250 0.45 8662.5 6450 0.5 3225 81887.5
10000
5 Chiro 10000 10 0 6700 0.45 3015 2100 0.5 1050 104065
10000
6 Doba 10000 10 0 15200 0.45 6840 3700 0.5 1850 108690
Shanan
7 Dhugoo 7000 10 70000 28500 0.45 12825 14100 0.5 7050 89875
8 Tullo - - - 5000 0.45 2250 3500 0.5 1750 4000
Gu/Bord 12506 21073.
9 ede 12506 10 0 46830 0.45 5 35960 0.5 17980 39053.5
H/Gudin
10 aa 9844 10 98440 61940 0.45 27873 33950 0.5 16975 44848
11 Habro 872 10 8720 18410 0.45 8284.5 4800 0.5 2400 10684.5
Gu/ 10382
12 Koricha 10382 10 0 29620 0.45 13329 11450 0.5 5725 19054
28741.
13 Mi’esoo 8044 10 80440 63870 0.45 5 32200 0.5 16100 44841.5
Daro 13322 25492.
14 Labu 13322 10 0 56650 0.45 5 36400 0.5 18200 43692.5
1620 2798
15 Ancaar 1620 10 0.45 12591 15700 0.5 7850 20441
0 0
1205 14 1,205 5150 23175 2,436,75
Total 6.75 242220 7 121110
90 0 ,900 20 9 3

3.4.6 Emergency Livestock drug requirement-West Hararghe zone

No Woreda Oxytetracyclin Multi Albendazole 2500 Albendazole 300 Total


20% vitamins mg mg cost
v Un Total vial Un Total Bolu Uni Total Bolu Uni Total for
i it price it price s t price s t price drugs
a pri pri pric pri
l ce ce e ce
1 Burka 7 60. 4200. 200 80. 16000. 7664 2.00 15328 3392 1.0 3392. 38920.
Dhimtu 0 00 00 00 00 .00 0 00 00
2 Boke 8 60. 4800. 220 80. 17600. 1185 2.00 23700 4990 1.0 4990. 51090.
0 00 00 00 00 0 .00 0 00 00
3 OdaBult 6 60. 3600. 170 80. 13600. 7500 2.00 15000 - - - 32200.
u 0 00 00 00 00 .00 00
4 Gamachi 5 60. 3000. 100 80. 8000.0 3843 2.00 7686. 1286 1.0 1286. 19972.
s 0 00 00 00 0 00 0 00 00
5 Chiro 3 60. 1800. 100 80. 8000.0 6700 2.00 13400 2100 1.0 2100. 25300.
0 00 00 00 0 .00 0 00 00
6 Doba 5 60. 3000. 130 80. 10400. 1520 2.00 30400 3700 1.0 3700. 47500.
0 00 00 00 00 0 .00 0 00 00
7 Tullo 3 60. 1800 100 80. 8000.0 6700. 2.00 13400 2100 1.0 2100. 25300.
0 00 00 0 .00 0 00 00
8 Sha/dhug 7 60. 4200. 200 80. 16000. 2850 2.00 5700. 1400 1.0 1400. 39900.
o 0 00 00 00 00 00 0 0 00 00
9 G/Borde 8 60. 4800 220 80. 17600 8770 2.00 17540 4212 1.0 4212 44152
de 0 00 00 0
10 Hawi 8 60. 4800 220 80. 17600 1077 2.00 21540 5360 1.0 5360 49300
Gudinaa 0 00 00 0 0
11 Habro 3 60. 1800 100 80. 8000 4680 2.00 9360 2154 1.0 2154 21314
0 00 00 0
12 GuKoric 5 60. 3000 100 80. 8000 4680 2.00 9360 2615 1.0 2615 22975
ha 0 00 00 0
13 Mi’esoo 9 60. 5400 240 80. 19200 1310 2.00 26200 4864 1.0 4864 55664
0 00 00 0 0
14 Daro 8 60. 4800 220 80. 17600 1420 2.00 28200 3978 1.0 3978 54578
Labu 0 00 00 0 0
15 Ancaar 5 60. 3000 100 80. 8000 9400 2.00 18800 3315 1.0 3315 33115
0 00 00 0
Total 9 62 6240 242 19520 2483 49662 1823 1823 1,824,
9 40 0 0 10 0 89 89 738
0 0

3.4.7 East Hararghe Farm Tools and restocking needs

S/n Items description Unit of, Unit price in Total Total Amount of
measurement ETB Quantity ETB Required
2 Farm tool No
2.1 Axe No 180 32,609 5,869,620
2.2 Plough No 350 32,609 11,413,150
2.3 Spade No 200 32,609 6,521,800
3 Restocking No
3.1 Small ruminants No 1,500 97,827 146,740,500
3.2 Poultry No 120 163,045 19,565,400.00
3.3 Heifers No 8,000 32,609 260,872,000.00
Total 427,177,900
3.4.8 West Hararghe Emergency Farm Tools Needs for returning IDPs
IDP Emergency /Recovery and Resilience FARM TOOLS requirement for the period Jun- 2019
Number of HHs in need Farm Tools
Mlale Feamle Total Type of farm Quantity No. Unit Price Total Cost Delivery
no Woreda
headed headed tools (Birr) (Birr) time
2,920 1,712 4,632 5,229,500
1 Mieso 670 130 800 Mould board 800 750 600,000 June
200 50 250 Tie ridger 250 500 125,000 June
10 15 25 Metal Sillo 15 7500 112,500 June
50 50 100 Maize Tresher 5 65000 325,000 June
60 20 80 Sorghum Tresher 4 30000 120,000 June
50 50 100 Maize Planter 15 4500 67,500 June
75 32 107 Wheat Harvester 6 12000 72,000 June
175 125 300 Garii Harkaa 300 1500 450,000 June
2 G/Bordodde 50 50 100 Mould board 100 750 75,000 June
25 25 50 Tie ridger 50 500 25,000 June
10 15 25 Metal Sillo 15 7500 112,500 June
50 50 100 Maize Tresher 5 65000 325,000 June
20 20 40 Sorghum Tresher 2 30000 60,000 June
50 50 100 Maize Planter 15 4500 67,500 June
15 20 35 Wheat Harvester 5 12000 60,000 June
10 15 25 'Garii Harkaa'' 25 1500 37,500 June
3 H/Gudina 150 50 200 Mould board 200 750 150,000 June
25 25 50 Tie ridger 50 500 25,000 June
10 15 25 Metal Sillo 15 7500 112,500 June
50 50 100 Maize Tresher 5 65000 325,000 June
20 20 40 Sorghum Tresher 2 30000 60,000 June
140 80 220 Maize Planter 15 4500 67,500 June
140 80 220 Wheat Planter 15 4500 67,500 June
15 20 35 Wheat Harvester 5 12000 60,000 June
10 15 25 'Garii Harkaa'' 25 1500 37,500 June
4 D0ba 50 50 100 Mould board 100 750 75,000 June
25 25 50 Tie ridger 50 500 25,000 June
10 15 25 Metal Sillo 15 7500 112,500 June
50 50 100 Maize Tresher 5 65000 325,000 June
20 20 40 Sorghum Tresher 2 30000 60,000 June
50 50 100 Maize Planter 15 4500 67,500 June
50 50 100 Wheat Planter 15 4500 67,500 June
15 20 35 Wheat Harvester 5 12000 60,000 June
65 20 85 'Garii Harkaa'' 25 1500 37,500 June
D/Lebu 120 90 210 Mould board 100 750 75,000 June
70 25 95 Tie ridger 50 500 25,000 June
10 15 25 Metal Sillo 15 7500 112,500 June
50 50 100 Maize Tresher 5 65000 325,000 June
75 20 95 Sorghum Tresher 3 30000 90,000 June
50 50 100 Maize Planter 15 4500 67,500 June
50 50 100 Wheat Planter 15 4500 67,500 June
15 20 35 Wheat Harvester 5 12000 60,000 June
65 20 85 'Garii Harkaa'' 25 1500 37,500 June
3.4.9 Emergency seed requrement for East Hararghe

HH

Seed type Amoun Hect. Sowing


t in of T Provisio windo
No. Seed verity quit. land M F n period w

Ckeck 1360 Augest- Auget-


harertii
1 pea 1600 1600 0 2400 17000 10 20

1071 3301 Jully-


Beans
2 Awash-M 6280 5 0 5990 37500 Jully-05 15

4853 Jully-
Wheat
3 Adda adda 4680 4860 5 8565 57100 Jully-05 15

Bubu,jalene,chir Jully-
Potato
4 o, 4900 245 8925 1575 10500 Jully-05 15

Melk2 600 2400 5100 900 6000 June-1-5 15-Jun


Maize
5 Melk6 300 1200 2100 900 3000 June-1-5 15-Jun

Jully-
Teff Boset 290 1160 9650 1050 10600
5 June-1-5 15

Abshiir 300 3000 5100 900 6000 June-1-5 15-Jun

6 Sorghum Gubiyee 300 3000 5100 900 6000 June-1-5 15-Jun

Tashaala 300 3000 5100 900 6000 June-1-5 15-Jun

7 Vegetabl Kg 2,400 8,152.2 19,565,400.0


e seed 5 0

Tota
l
cost
3.4.10 Emergency Seed requirement for IDP returnees of West Hararghe zone
West Hararghe Zone Office of Agriculture and Natural Resource Emergency Seeds Requirement for
IDPs Meher 2019/2011 E.C Meher season
Seed
wore Total variety Area(ha) Seed Sowing Delivery Price
Type
da HH (Qt) windew time (ETB) Total
D/Lab 194.7
u 3894 Teff kunicho 1947 12-Jul 2-Jul 3500 681450
3894 H/bean Awash-1 973.5 973.5 11-Jul 16-Jul 2800 2725800
sub total 2920.5 1168.2 3407250
Ciroo 245 H/bean Awash-1 245 122.5 11-Jul 16-Jul 2600 318500
245 Teff kunicho 26 24.5 11-Jul 16-Jul 3200 78400
sub total 271 147 5800 396900
Dobb kuncho/cr
a 2547 Teff -37 5000 500 11-Jul 16-Jul 3500 1750000
2547 H/bean Awash-1 636.75 636.75 11-Jul 16-Jul 2700 1719225
sub- 1136.7
total sub total 5636.75 5 6200 3469225
Hawi
Gudin
a 5911 Teff kuncho 7500 750 11-Jul 16-Jul 3500 2625000
5911 H/baen Awash-1 1182.2 1182.2 11-Jul 16-Jul 2850 3369270
sub-
total sub total 8682.2 1932.2 6350 5994270
Habr
o 96 Teff kuncho 15 15 11-Jul 16-Jul 2800 42000
96 H/bean Awash-1 48 48 11-Jul 16-Jul 2500 120000
sub total 63 63 5300 162000
Mies Sorghu Melakam/
o 4034 m Teshale 2017 201.7 11-Jul 16-Jul 2600 524420
4034 H/bean Awash-1 300 300 11-Jul 16-Jul 2700 810000
sub total 2317 501.7 5300 2659010
Gum
bi
Bord
ode 2699 Teff cr-37 1000 100 11-Jul 16-Jul 3500 350000
2699 H/bean Awash-1 550 550 11-Jul 16-Jul 2700 1485000
sub total 1550 650 6200 1835000
3515 17,923,6
G/Total 21440.45 5598.85 0 55
3.5 ES/NFI needs for returning IDPs

3.5.1 ES/NFI needs for returning IDPs of East Hararghe


No Item required #HHs/people Unit cost Estimated cost Gap Remark
1 Corrugated Iron 32,916 6000 197,496,000 197,496,000 30 CIS/HH;
Sheet for 1 CIS for
Permanent 200 birr
Shelter repairs
2 Iron nails 2kg/HH 100 birr 6,583,200 6,583,200
3 NFI -full kit 16,916 4700 79,505,200 79,505,200 To 50% of
including ITN the border
IDPs
4 Unconditional 32,916 4700 154,705,200 154,705,200
cash support
Total 438,289,600 438,289,60

3.5.2 ES/NFI needs for returning IDPs of West Hararghe


No Item required #HHs/people Unit cost Estimated cost Gap Remark
1 Corrugated Iron 18,294 6000 109,764,000 109,764,000 30 CIS/HH;
Sheet for 1 CIS for
Permanent 200 birr
Shelter repairs
2 Iron nails 2kg/HH 100 birr 3,658,800 3,658,800
3 NFI -full kit 9,147 4700 42,990,900 42,990,900 To 50% of
including ITN the border
IDPs
4 Unconditional 18,294 4700 85,981,800 85,981,800
cash support
Total 242,395,500 242,395,500
3.6 Protection
Proposed protection activities for IDPs and returning IDPs

Forecast
Expected Numbe
S. M
Intervention beneficiari Qua r of Total
No on Unit cost 70 Remark
activities es to be ntity wored Budget
. ths
reached as

Psychosocial Officer
1 (Child/Women safe 207200 12 12 12 20,000.0 267,686. 2,880,00
space supervisor) 0 38 0
4
Para social workers communiti
2 (safe space) for 207200 4 12 12 es’
2,000.00 96,000
each woreda workers/ea
ch woreda
CP/GBV Community 2 Patra
workers (safe social
3 207200 2 12 12
space) for East 2,000.00 48,000 workers/ea
Hararghe ch woreda
General Child
4 207200 12 12 12 20,000.0 20,931.4 2,880,00
protection officer
0 7 0
Child Protection
5 207200 12 12 12 20,000.0 21,582.0 2,880,00
Officer
0 2 0

6 GBV Officer 207200 12 12 12 20,000.0 12,523.4 2,880,00


0 4 0
Production and
dissemination of
IEC materials
Lum
(leaflets) on
7 207200 p 12 12 20,000.0
community 240,000
sum 0
awareness on
Child/women safe
space sessions
Awareness,
sensitization on
CP/GBV issues
/Community
sensitization work 100
8 500000 1 12
prevention for 00 1,500.00 18,000
500000 community
members, 1000
sessions –
refreshment cost
Focus group
discussions with
12000 beneficiaries 120
9 12000 6 12 12,000.0
receiving NFI kits 00 500.00
0
(refreshments for
participation)
Mobile safe space
10 set up for 12 207200 60 12 12 60,000.0 43,200,0
woreda IDPs 0 00
CP/GBV training of
local authorities in
charge of CP/GBV
11 Case management 216 1 1 12 1,080,00
5,000.00
for East Hararghe (2 0
sessions for 18
participants)
Para social workers
and CP/GBV
12 community workers 72 1 1 12 360,000.
5,000.00
training on Safe 00
space management
Protection
sensitization
session with
13 216 1 1 12
selected partners 2,500.00 540,000
on protection
advocacy
lum
Materials for Safe
14 1 p 1 12 40,000.0
Space 480,000
sum 0

15 Project Manager 3 12 12 12 28,000.0


84,000
0
Office utilities,
Consumables and
16 12 1 12 12 20,000.0
Communication 2,050.00 240,000
0
cost
Per diem and
accommodation for
120
17 the mobile safe 48 12 12 1,728,00
days 300.00
space and mobile 0
protection team)
360
18 Vehicle Rent 6 12 12 8,640,00
days 4,000.00 1,816.00
0
68,286,0
Grand Total 273,300. #REF!
00
00
4. Conclusion and recommendations
Human security refers to the value of life of the people of a particular society. Anything that reduces the
quality of life, which could include; conflict, scarcity of vital resources, environmental degradation or
demographic pressures, infringes on human security is considered a threat to human security.
One of the significant symptoms of human insecurity crises is internally displaced persons. As opined by the
United Nations Guiding Principles, these are persons or groups of persons who have been forced or obliged
to flee or to leave their homes or places of habitual residence, in particular as a result of or in order to avoid
the effects of armed conflict, situations of generalized violence, violations of human rights or natural or
human-made disasters, and who have not crossed an internationally recognized state border.

Internally displaced persons might lack from different parties for different reasons.But,the primary
responsibility lies on the government both Federal and Regional to ensure rights and protection of these
people These persons leave their comfort for a life of uncertainty elsewhere which triggers insecurity from
within them coupled with the minimal attention received thereby exposing these people to economic threats,
health threats, personal threats, political threats, environmental threats and community threats. While great
concerns should have been generated by both local and international agencies due to the poor living
conditions of these persons which in turn, leads to poor sanitations therefore raise in sicknesses and diseases.
Importantly, internally displaced persons become dependent on others for basic amenities either on the host
community or external intervention. With all these, internally displaced persons’ crises make it very difficult
for the government to actualize sustainable development.

In a very similar fashion, many Oromo people have been forced to leave their homes to seek safety unfamiliar
to them in the process losing their assets and being exposed to enormous hardship. In the midst of these
hardships, these displaced persons experience challenges with regards to their rights and their welfare
condition. At the moment, there are over 400,000 conflict induced IDPs or IDP returnees in 11 woredas of
Oromiya across the border of Somali region. These people were hosted in the host community who by
themselves depend on relief aid due to the recurring drought affecting production consecutively for the last
three years.

Cognizant of the improving security situation across the border disputes, the Oromiya National Regional
State is taking the move to return, rehabilitate and support with recovery programs. So far, following a
number of peace building processes, over 250,000 border IDPs across Oromiya-Somali region have returned
home voluntarily but they are still facing some humanitarian as well as development response gaps. Table
below shows the summary of the overall estimated cost of the return and relocation as well as rehabilitation
costs:
Table 4.1 Summary budget table for the IDPs Return and Recovery Plan

S. N Sector Estimated cost Available Gap Remark


resource
1 Shelter/NFI 680,685,100 - 680,685,100
2 Rehabilitation of basic 72,647,305 - 72,647,305
services/wash/health/education
3 Agriculture/seed 37,489,055 - 37,489,055
4 Livestock needs/feed/health 53,023,058 53,023,058
4 Protection 68,286,000 68,286,000
5 Farm tools and restocking 432,407,400 432,407,400
Total 1,344,537,918 1,344,537,918 $ 46,523,803.39

With the great hope that all humanitarian and development partners will take this initiative seriously and
show their usual cooperation in rehabilitating these IDPs who have suffered a lot for the last two to three
years. School age children couldn’t get access to school and the livelihood of all the IDPs have been affected.
There is no development that we can register without including part of our community. Thus, to realize our
DRM through development intervention and to create resilient society to any shocks of emergency, the need
has arisen to really make these IDPs to exercise their rights to food and life with dignity.
We hope that with the very dynamics of IDP situation which also depends on the sustainable security
situation, this document can be taken as a base for planning of any project support with the attention in mind
that this document could be amended and updated as situation allows.

The Government of Oromiya National Regional state and the East and West Hararghe Administrations as
well as East and West Hararghe zone Disaster Risk Management Offices would very much welcome the
support of NGO’s, UN Agencies and Donor organizations with the realization of this IDPs return and
recovery plan activities.

Together, we believe that we can rehabilitate our people in a better position than before!

You might also like