0% found this document useful (0 votes)
29 views1 page

Plano Diseño Obras

The document contains technical data related to a road project. It includes measurements of elevation levels at set distances along the road, as well as the slope and alignment of the roadway.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Plano Diseño Obras

The document contains technical data related to a road project. It includes measurements of elevation levels at set distances along the road, as well as the slope and alignment of the roadway.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N=9600

975

PENDIENTE

KILOMETRAJE
E=5574

ALINEAMIENTO
00

NIVEL DE TERRENO
0

NIVEL DE LA RASANTE
00
N=9600
975

0+

274
284
294

265
266
268
270
276
278
280
286
288
290

272
282
292
279.70

1.15 0.00 279.84

0.86 0.00 279.97

0
0.69 0.00 280.00

10
0+
0.54 0.00 280.00

0.39 0.00 280.00

-0.75%

L=173.339
S=-0.751%
0.37 0.00 279.86
0
N=960
0+20
1050
0.62 0.00 279.47

0.87 0.00 279.07

1.43 0.00 278.40

2.29 0.00 277.55


1
3.21 0.00 276.64 04
= 0+
KM

1+
N=9601
4.00 0.00 275.85

3
050

611+.73
4.63 0.00 275.22
055
0
4.87 0.00 274.98
1+
30

4.89 0.00 274.96


0

5.05 0.00 274.81


1 +
25

5.27 0.00 274.59


0

5.46 0.00 274.41


1+
20
0

5.65 0.00 274.21


N=960
1125

5.85 0.00 274.01


1+
15
0

5.87 0.00 274.00


1+

5.87 0.00 274.00


10
0

E=5576

5.88 0.00 274.00


25
1+

5.87 0.00 274.01


0
50

N=9601
125
5.82 0.00 274.06
1+
0

4.52 0.00 275.36


00

4.44 0.00 275.45


0+
9

4.97 0.00 274.92


50

4.53 0.00 275.36


0+
90

2.77 0.00 277.13


0

3.73 0.00 276.17


0+

ESC. 1:2500
85

N=960
0

5.27 0.00 274.63


1200

6.85 0.00 273.05


0+
80
0

6.91 0.00 273.00

ESC. H 1:2500 V 1:250


0+

6.91 0.00 273.00


75
0

6.84 0.00 273.07


0+

6.87 0.00 273.04


70

N=9601
200
0

6.92 0.00 273.00


0.01%

S=0.014%
L=1152.300
6.92 0.00 273.00
0+650

6.93 0.00 273.00


0

6.91 0.00 273.02


60
0+

6.89 0.00 273.04


0

6.89 0.00 273.04


55

6.90 0.00 273.03


0+

N=960
1275
6.93 0.00 273.01
PLANTA - PUENTE CUENCA HUALLAGA
0
50

9.22 0.00 270.72


0+

11.18 0.00 268.76


0

12.14 0.00 267.81


45
0+

12.68 0.00 267.27


0

N=960
12.95 0.00 267.00
1275

PERFIL LONGITUDINAL - PUENTE CUENCA HUALLAGA


40

13.18 0.00 266.78


0+

13.43 0.00 266.53


0
35

13.68 0.00 266.28


0+

13.93 0.00 266.03


00

13.97 0.00 266.00


3
0+

00

13.97 0.00 266.00


1+1
0

13.97 0.00 266.00 N=9601


35
25

0
13.88 0.00 266.09 1+200
0+

13.51 0.00 266.47


00

13.12 0.00 266.87


0+2

12.04 0.00 267.94

10.38 0.00 269.61 N=960


0+1

1350
5.80 0.00 274.19
50

4.62 0.00 275.37


0
+

2.83 0.00 277.17


1
0
0

0.37 0.00 279.63


0+
05
0.00 285.91 0

0.00 287.04 0+
287.20 00
0
E=5574

265
266
268
270
272
274
276
278
280
282
284
286
288
290
292
294
75

N=9601
5 42
PLANO
0

SUBPROYECTO
A.R.=
C.T.=

A.C.=
1:500-A1

C.R.=
NAME
ESCALA GRAFICA
1:1000-A3

AREA DE CORTE
ÁREA DE CORTE

RIO HUALLAGA
5.0 10.0 15.0 20.0 25.0m

AREA DE RELLENO
COTA DE RASANTE
COTA DE TERRENO
DIQUES PROYECTADOS

C01
DISEÑO DE OBRAS DEL
N

LINEA DE TERRENO NATURAL

NIVEL DE LIMPIEZA DE CAUCE