1.6 Structural Roof Layout Rev 2
1.6 Structural Roof Layout Rev 2
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 1
TRUSS TYPE 2
TRUSS TYPE 2
TRUSS TYPE 1
1450
250
AND RELEVANT SECTIONS OF SANS 1200(LATEST
20
ISSUE).
20 3) DO NOT SCALE, USE FIGURED DIMENSIONS
1450
200
ONLY.
4) ALL SETTING OUT DIMENSIONS AND LEVELS TO
BE VERIFIED ON SITE AND ANY DISCREPANCIES
200
1426 48 1426
1050
1280
5) V3 CONSULTING ENGINEERS IS NOT
13380
200
RESPONSIBLE FOR THE ADEQUACY OF ANY
4 x M12 FOUNDATIONS, BRICKWORK, BEAMS, COLUMNS
AND IN-SITU CONCRETE DESIGNED BY OTHERS.
200
CHEMICAL
ANCHORS
1450
230 x 90 PFC
1450
B
350
250
ROOF BRACING NEW 250 WIDE x 250 DEEP ROOF BRACING DETAIL A
FIBREGLASS GUTTER WITH SCALE 1 : 20
4 x 150x150mm DOWN PIPES.
STRUCTURAL STEEL :
425
JOINED.
4. ALL WELDING TO BE 6mm CONTINUOUS FILLET WELDS UNLESS OTHERWISE A B
SPECIFIED.
5. ALL WELDS TO BE DONE WITH E70 18 ELECTRODES UNLESS OTHERWISE 13380
SPECIFIED. 1450 1450
6. A COMPLETE SET OF SHOP DRAWINGS SHALL BE SUBMITTED TO THE
425
950 890 1450 1450 1450 1426 48 1426 1450 1450 1450 890 350 1 R8@425c/c(BW)
ENGINEER FOR APPROVAL BEFORE FABRICATION COMMENCES.
7. ALL COLD FORMED HOLLOW SECTIONS AND STRUCTURAL STEELWORK DETAIL D
SHALL BE GRADE 350W. ROOF SHEETING
WATER PROOFING
8. ALL STRUCTURAL BOLTS TO BE GRADE 8.8 (U.N.O). A MINIMUM OF 2 BOLTS TO ARCHITECTS
SHUTTER BOARD SUPPORTED ON ACCORDING TO ARCHITECTS
PER CONNECTION WILL BE USED. (U.N.O). SPECIFICATIONS
SPECIFICATIONS
425
9. WHERE TEMPORARY PROPPING IS NECESSARY, THE CONTRACTOR SHALL BE R8 BARS@425mm c/c
RESPONSIBLE FOR THE DESIGN, MAINTENANCE AND REMOVAL OF SUCH
SUPPORTS.
10. IF SPLICES IN STEEL MEMBERS ARE REQUIRED FOR THE TRANSPORT OR
530
530
MANUFACTURE, PROPOSALS FOR THIS WILL BE SUBMITTED TO THE ENGINEER 2 R8@425c/c ALONG THE LENGTH OF
FOR APPROVAL. THE WALL
11. BASE PLATES SHALL BE GROUTED WITH A CEMENTITIOUS NON-SHRINK GROUT
WITH A MINIMUM STRENGTH OF 40 MPa. GROUTING MUST TAKE PLACE BEFORE
THE PRIMARY LOADS ARE APPLIED TO THE STRUCTURE. WATER PROOFING
12. HSFG BOLTS ARE TO BE TIGHTENED BY THE "TURN OF NUT" METHOD AS PER ACCORDING TO ARCHITECTS
SABS 0162 PART 1 - 1993. ALL FRICTION SURFACES ARE TO BE BLAST CLEANED SPECIFICATIONS
AND UNPAINTED AND MUST BE PROTECTED AGAINST CORROSION UNTIL THE
CONNECTION IS MADE. THE CONTRACTOR MUST SUPPLY A METHOD OF STATEMENT
TO THE ENGINEER FOR APPROVAL.
13. ALL PAINTING MUST COMPLY WITH SABS 1200 HC. EXISTING ROOF STRUCTURE
14. ALL ANGLE IRONS SUPPORTING BRICKWORK TO BE GALVANIZED.
15. FIREPROOFING OF STEELWORK IF REQUIRED, TO COMPLY WITH THE REQUIREMENTS OF
SABS 0400 PART T. THE FIREPROOFING METHOD MUST BE SUBMITTED TO THE FIRE
DETAIL A
TRUSS TYPE 1 REBAR DETAIL B
ENGINEER FOR APPROVAL. SCALE 1:50 SCALE 1 : 20
16. CORROSION PROTECTION SHALL CONSIST OF :
a. ALL STRUCTURAL STEEL SHOT BLAST TO SA 2.5 OF SIS-05-59-00.
b. APPLY ONE COAT (75 MICRON) PRIMER, INTERZINC 233 EX PLASCON OR SIGMA
TORNUSIL MC 60 EX DULUX IN ACCORDANCE WITH MANUFACTURERS DATA
SHEETS AND SABS 681. TRUSS TRUSS
c. APPLY ONE COAT (100 MICRON) INTERMEDIATE COAT INTERSEAL 010- MIO EX
PLASCON OR SIGMACOVER CM MIO EX DULUX IN ACCORDANCE WITH
MANUFACTURERS DATA SHEETS AND SABS 681. PFC FIXED TO BRICKWORK WITH M12
d. APPLY ONE FINISHING COAT (50 TO 75 MICRON) TO ARCHITECTS' COLOUR CHEMICAL ANCHORS U.O.S @ 300m c/c
SPECIFICATION OF INTERTHANE 990 EX PLASCON OR SIGMADUR GLOSS EX
300 70 x 70 x 6L SPLICE (TYPICAL 300mm
DULUX IN ACCORDANCE WITH MANUFACTURERS DATA SHEETS AND SABS 681. 300 150 80 150 300
DAMAGED AREAS OF PAINT SHALL BE MADE GOOD ON SITE IN ACCORDANCE WITH LONG) SEE DETAIL C
SABS 0120.
17. STRUCTURAL STEELWORK TO BE HOT DIPPED GALVANIZED IN ACCORDANCE WITH The copyright of this drawing vests in the
SABS 763 TO BE SHOT BLAST TO SA 2.5 OF SIS-05-59-00. A 230 x 90 PFC RAIL
eThekwini Municipality as represented by
a. PLASCON COATING SYSTEM TO GALVANIZED STEEL : 230 x 90 PFC RAIL
APPLY ONE COAT (50 MICRON) PLASCOGUARD GEHOPON 5 PRIMER AND the Architecture Department, and may
APPLY ONE (50 MICRON) INTERTHANE 990 TO ARCHITECTS' COLOUR AND DETAIL C not be reproduced without the written
SPECIFICATION IN ACCORDANCE WITH MANUFACTURERS DATA SHEETS. 8618
b. DULUX COATING SYSTEM TO GALVANIZED STEEL : 350 600 890 1450 1450 1450 1426 1350 approval of the D/H Architecture.
APPLY ONE COAT (50 MICRON) SIGMACOVER PRIMER AND APPLY ONE COAT FLASHING TO ARCHITECTS
(50 MICRON) SIGMADUR GLOSS TO ARCHITECTS' COLOUR SPECIFICATION IN DETAILS AND SPECIFICATIONS 1840 1840 1690 150 150
ACCORDANCE WITH MANUFACTURERS DATA SHEETS. ROOF SHEETING
TO ARCHITECTS 3860 TYPICALL PANEL LENGTH
18. H.D. BOLTS TO BE HOT-DIPPED GALVANIZED AND THREADS UNDERCUT AFTER
GALVANIZING. SPECIFICATIONS
3680 TYPICAL TRUSS CENTERS
19. PURLINS ARE SPACED IN ACCORDANCE WITH ROOF SHEETING SPECIFICATION.
1230
20. NEW CLEATS FOR THE PURLINS ARE TO BE INSTALLED IF THE POSITION OF THE NEW
PURLINS ARE MORE THAN 20mm AWAY FROM THE EXISTING PURLIN POSITION.
530
IF THEY ARE LESS THAN 20mm THEN THE GAP BETWEEN THE EXISTING CLEAT AND
NEW PURLIN MUST BE FILLED WITH A PACKER.
21. WHERE NEW CLEATS ARE INSTALLED,THE LOCAL AREA OF THE RAFTER IS TO BE 7 x M12
TYPICAL ROOF HOLDING DOWN BRACKET PANEL DETAIL
SCALE 1 : 20 Suite A5,Block A,
COLD GALVANIZED. CHEMICAL Netcare Office Park ,
ANCHORS
22. FABRICATOR TO MEASURE ON SITE PRIOR TO COMMENCING WITH FABRICATION 95 Umhlanga Rocks Drive
DRAWINGS.
23. FABRICATION DRAWINGS ARE TO BE SUBMITTED TO THE ENGINEER FOR APPROVAL IN
Tel: (031) 045 0460
PRINCIPAL PRIOR TO COMMENCING WITH FABRICATION OF STEELWORK. [email protected]
24. ENGINEER TO BE NOTIFIED FOR INSPECTION OF THE TRUSS PRIOR TO DELIVERY TO SITE .
TRUSS TYPE 2 115 60 115 300 166 K.E. Masinga Road, Durban 4001
SCALE 1:50 P.O. Box 1548, Durban 4000
150 150 ETHEKWINI Tel: 031 311 7783 Fax: 031 311 7111
MUNC
IP
I ALT
IY www.durban.gov.za
38 75 75 75 38
70 x 70 x 6L SPLICE (TYPICAL 300mm LONG)
1 R8@425c/c (BW) ETHEKWINI MUNICIPALITY
2 x M16 BOLTS EACH SIDE 2 x M16 BOLTS EACH SIDE HUMAN SETTLEMENTS,
ENGINEERING SERVICES &
PFC FIXED TO BRICKWORK WITH M12
TRANSPORT AUTHORITY CLUSTER
70
VERTICALS @SUPPORT : 125 x 75 x 10 UNEQUAL LEG CHEMICAL ANCHORS U.O.S @ 300m c/c
ENGINEERING UNIT
ROOF SHEETING PURLIN
ARCHITECTURE DEPARTMENT
TO ARCHITECTS 4 x M16 BOLTS
SPECIFICATIONS
3 x M16 BOLTS
Project Description :
PFC FIXED TO BRICKWORK WITH M12
CITY FLEET ADMIN HQ:
70
CHEMICAL ANCHORS U.O.S @ 300m c/c
35
50
REPLACEMENT OF ROOF
50
35
LAYOUT,SECTIONS AND
DETAILS
DETAIL D
SCALE 1 : 20
M.N.REDDY M.I.TOOTLA
DETAIL C SECTION AS
SCALE 1 : 5 A0 31/08/2021
SHOWN
10602000-STR-001 2
FOR TENDER PURPOSES