Post Installation Instructions
9. POST INSTALLATION INSTRUCTIONS
9.1 The Party Code stickers and our Contact Numbers should be pasted on the equipment as
per the place specified.
9.2 Technic chart should be fixed near the machine and operator/customer should be
explained the Technic chart.
9.3 The Service Engineer should demonstrate the equipment to the operator. The operator
should be given training on essential Do’s and Don’ts like ---
a. Use as much of Shielding material as possible, use lead screens, lead aprons, lead
goggles and shields etc.
b. Radiation Dose should be as low as reasonably achievable.
c. Use collimators/cones and collimate radiation field to the smallest possible area.
d. Before giving an exposure for the first time in the day, try to warm up the
equipment for 10-15 minutes. For this purpose simply switch ON the machine and
leave it as it is.
9.4 The Equipment should be handed over to the customer. The Installation Report should be
properly filled along with the Warranty Card and required Serial Nos.
Allengers 100 Installation/Service Manual Page 40
AX 100 SM