Projects Instruction or Rubric

1. This project involves measuring quantities for piling works and steel framing according to the Standard Method of Measurement 2nd Edition (SMM2) using relevant software. 2. Students must take off quantities from provided drawings, applying measurement principles and ensuring accurate dimensions and calculations with no errors. 3. The final deliverable is a complete bill of quantities organized properly in the relevant software and following the correct format, structure, and sequencing according to SMM2.

Uploaded by

dzulfahmi shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views6 pages

Projects Instruction or Rubric

1. This project involves measuring quantities for piling works and steel framing according to the Standard Method of Measurement 2nd Edition (SMM2) using relevant software. 2. Students must take off quantities from provided drawings, applying measurement principles and ensuring accurate dimensions and calculations with no errors. 3. The final deliverable is a complete bill of quantities organized properly in the relevant software and following the correct format, structure, and sequencing according to SMM2.

Uploaded by

dzulfahmi shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT (30%) - GROUP

COURSE: CONSTRUCTION MEASUREMENT OF STRUCTURAL WORKS II (BEQ


2164)

LECTURER: 1. Sr Sitti Diana Tamjehi


2. Dr Siti Syariazulfa Kamaruddin

CLO: 1. Apply the principle of measurement for piling works, basement and steel
frame using relevant Standard Method of Measurement to the current
industry.
2. Measure the quantities for piling works, basement and steel frame using
relevant Standard Method of Measurement to the current industry.
3. Organise Bill of quantities for piling works, basement and steel frame using
related measurement software

LEARNING 1. Piling and Steel frame.


UNIT:

Instruction

1. Based on given drawing, measure works for piling works (Bored pile) and Steel works using
the slip sort and applicable software (Microsoft Excell).

2. All items are measured in accordance to Standard Measurement of Building Works Method

2nd Edition (SMM2).

3. From the measurement, produce a bill of quantity for those works.


4. The assignment deadline is on 2nd January 2022 (Monday), before 11.59 pm.
RUBRIC FOR PROJECT BEQ2164 (30%)

SESSION 1 (2022/2023)

1 2 3 4 5

Very poor description Poor


writingdescription writing
Good anddescription writingVeryand
good descriptionExcellent
writing description writing and
and incomplete complete components and complete complete components
components such as incomplete such as name of item components such as such as name of item
Writing Description (4%) name of item components such as measured, size and name of item measured, size and
measured, size and name of item quality according to measured, size and quality according to
quality. Not in measured, size and the requirements of quality according to the requirements of
accordance to the quality. Not in SMM2 and certain the requirements of SMM2 and certain
requirements of SMM2 accordance to the common rules. SMM2 and certain common rules.
and certain common requirements of common rules.
Apply the principle of rules. SMM2 and certain
measurement for piling common rules.
works and steel frame Principle of Taking-
Poor understanding Satisfactory
of understanding
Goodof understanding of Very good Exceptional understanding of
using relevant Standard Off (3%) measurement measurement measurement Understanding of measurement measurement
Method of Measurement. principles. Inaccurate principles. Some principles.Some principles. Most of principle.All
(7%) dimension basedDimensions
on the are inaccurate
Dimension are inaccurate based the dimensions Dimensions
are are accurate based
drawings given. There based on the on the drawings given. accurate based on the on the drawings given.
are many arithmetical drawings given. There are also some drawings given. No No arithmetical errors
errors in the There are also some arithmetical errors in arithmetical errors in in calculation.
calculation. A lot of arithmetical errors in calculation. calculation. Appropriate information was
missing information in calculation. Appropriate information Appropriatewas information was written in the slip sort
the slip-sort such as Appropri written in the slip sort written in the slip sort such as
description, project such as description, such as description, description,project
title, element and page project title, element project title, element title, element and
number. and page number. and page number. page number.
Measure the No taking-off andIncomplete
not taking-off and
Complete
not taking-off, Complete taking-off, structured
Complete taking-off.
qu accordance to SMM2. accordance to inconsistent structure Consistently follow the
ant SMM2. and formatting. and formatted sequence, perfectly
itie Incorrect use of structured and
s deduction, squaring, in accordance to formatted in
for
unit and abbreviation. SMM2. Correct use accordance to SMM2.
pili
of deduction, Correct use of
ng
wo squaring, unit and deduction, squaring,
rks abbreviation in unit and abbreviation
an accordance to in accordance to
d SMM2. SMM2.
ste
el
fra
me
usi
ng
rel
ev
ant
Sta
nd
ar
d
Me
tho
d
of
Me
as
ur
em
ent
to
the
cu
rre
nt
ind
ust
ry.
(8
%)

Organise Incomplete
Incomplete Bill of Quantity but Complete
Complete Bill of Quantity,
Complete, consistent bill of
Bil B not using software. B using software and Quantity, using
l of il il proper format. software and proper
qu l l format.
ant o o
itie
f f
s
Q Q
for
pili u u
ng a a
wo n n
rks ti ti
an t t
d y y
ste a b
el n u
fra d t
me n u
usi o si
ng
t n
rel
u g
ate si s
d n o
me g ft
as s w
ur o a
em
ft r
ent
w e.
sof
tw a
are r
(15 e.
%)
Total (30%)