Interim Payment Certificate No.
8
-
BP Code:- PJ00079
Main Contractor: M/s Shahid Builders (Pvt) Ltd. Project Code SCQ00075
Project: Const of 1x32 Men Bde for Bde HQ Date:- 7-Dec-2023
Sub-Contractor: Javed Iqbal Contact:- 0300-9688069
Works: Plumbing Work
Valuation Date: 7-Dec-2023
Deductions
Other
Total Value of Advance Retention Net Payable
Sr. Recover
Description Executed Works Payment Money (Rs.)
No. ables
(Rs.) (Rs.) (Rs.)
(Rs.)
0% 5%
A Total Contract value 88,743 - (4,437) 84,306
B Work Executed Value
IPC # 1 21,887 1,094.35 20,793
IPC # 2 8,208 410.40 7,798
IPC # 3 6,921 346.05 6,575
IPC # 4 27,984 1,399 29,383
IPC # 5 2,500 125 2,625
IPC # 6 4,000 200 4,200
IPC # 7 3,500 175 3,675
IPC # 8 - - -
C Sub-Total 75,000 - 3,750 - 75,048
D This Bill (IPC-08) 13,743 - 687 13,056
E Gross payable 88,743 - - 4,437 - 84,306
F Paid (Already) 64,126
G Net Payable 20,180
Submitted by Prepared by: Checked by: Checked by: Recommanded by:
Sub Cont Electrical Engineer MEP Engineer MEP Manager Director
Const of 1x32 Men Bde for Bde HQ
Plumbing Works
Sub-Contractor :- Javed Iqbal
Abstract of Cost ( IPC - 8)
BOQ Contrac Previous Current Accumulative
S/No Descriptions Unit Qty Site Qty Rate Amount
REF t Type % Qty Amount % Qty Amount % Qty Amount
UPVC
Labour Supply and Fix, WC Asiatic pattern not less than 550 mm with flushing system complete all as
1 1
Rate specified.
Each 3.00 3.00 1,500.00 4,500 100% 3.00 4,500.00 0.00% - - 100% 3.00 4,500.00
Labour Supply and fix, Vanity bowl, glazed ware, one hole, with bottle trap, waste coupling etc. complete
2 2
Rate all as specified. Incl CP Pillar cock).
Each 4.00 4.00 1,500.00 6,000 100% 4.00 6,000.00 0.00% - - 100% 4.00 6,000.00
Labour Supply and fix mirror, any shape and pattern, 5mm thick imported edges ground complete, fixed to
3 3
Rate concrete,brick, stone, or wood work.
Sqm 2.79 2.79 150.00 418 100% 2.79 418.05 0.00% - - 100% 2.79 418.05
Labour
4 4
Rate
Supply and fix, uPVC Floor Trap, 100 mm dia. including CP 150 x 150mm grating etc., complete. Each 9.00 9.00 1,600.00 14,400 100% 9.00 14,400.00 0.00% - - 100% 9.00 14,400.00
Labour Supply and fix UPVC Soil and waste pipe 75mm bore (outside dia) complete with plain end and
5 5
Rate solvent cement joint as specified.
Mtr 10.06 10.06 80.00 805 100% 10.06 804.67 0.00% - - 100% 10.06 804.67
Labour Supply and fix UPVC Soil and waste pipe 110mm bore (outside dia) complete with plain end and
6 6
Rate solvent cement joint as specified.
Mtr 12.50 12.50 110.00 1,375 100% 12.50 1,374.65 0.00% - - 100% 12.50 1,374.65
Labour Supply and fix UPVC Soil and waste pipe 160mm bore (outside dia) complete with plain end and
7 7
Rate solvent cement joint as specified.
Mtr 28.96 28.96 170.00 4,923 100% 28.96 4,922.52 0.00% - - 100% 28.96 4,922.52
Labour Supply and fix UPVC Vent pipe 50mm bore (outside dia) complete with plain end and solvent
8 8
Rate cement joint as specified
Mtr 4.11 4.11 70.00 288 100% 4.11 288.04 0.00% - - 100% 4.11 288.04
Labour Supply and fix Eccentric Reducer 50mm x 110mm dia complete with solvent cement joint all as
9 9
Rate specified
Each 1.00 1.00 460.00 460 100% 1.00 460.00 0.00% - - 100% 1.00 460.00
Labour Supply and fix 110mm dia UPVC Elbow/bend 900 complete with solvent cement joint all as
10 10
Rate specified
Each 4.00 4.00 500.00 2,000 100% 4.00 2,000.00 0.00% - - 100% 4.00 2,000.00
Labour Supply and fix uPVC Access/door tee 110mm dia complete with solvent cement joint all as
11 11
Rate specified
Each 1.00 1.00 500.00 500 100% 1.00 500.00 0.00% - - 100% 1.00 500.00
Labour
12 12
Rate
Supply and fix uPVC Equal Tee 110mm dia complete with solvent cement joint all as specified Each 2.00 2.00 500.00 1,000 100% 2.00 1,000.00 0.00% - - 100% 2.00 1,000.00
Labour
13 13
Rate
Supply and fix uPVC Vent Cowl 50mm dia on top of ventilating pipes Each 1.00 1.00 500.00 500 100% 1.00 500.00 0.00% - - 100% 1.00 500.00
Labour Supply and fix soap/sponge tray any shape, pattern and size, Pak Made, complete with plugs and
14 14
Rate screws etc, fixed to concrete, brick, stone or wood work.
Each 7.00 7.00 223.00 1,561 100% 7.00 1,561.00 0.00% - - 100% 7.00 1,561.00
Labour Supply and fix towel rail, chromium plated, single rod, any pattern shape and size, Pak made, with
15 15
Rate plugs screws etc., fixed to concrete,brick, stone or wood work.
Each 5.00 5.00 223.00 1,115 100% 5.00 1,115.00 0.00% - - 100% 5.00 1,115.00
16 Internal Water Supply
Labour
17 1
Rate
S/F Polyethylene Pipe (PE-100), 25 mm dia, Class PN-10 / SDR-17 (excluding cost of excavation). Mtr 15.00 15.00 50.00 750 100% 15.00 750.00 0.00% - - 100% 15.00 750.00
Labour
18 2
Rate
S/F Polyethylene Pipe (PE-100), 40 mm dia, Class PN-10 / SDR-17 (excluding cost of excavation). Mtr 38.00 38.00 70.00 2,660 100% 38.00 2,660.00 0.00% - - 100% 38.00 2,660.00
Labour
19 3
Rate
S/F Polyethylene Pipe (PE-100), 50 mm dia, Class PN-10 / SDR-17 (excluding cost of excavation). Mtr 5.00 5.00 80.00 400 100% 5.00 400.00 0.00% - - 100% 5.00 400.00
Labour S/F PPR pipe, with all fittings i.e. socket, bend, tee, elbow, where required, 20 mm dia, Class PN-
20 4
Rate 20 (excl excavation).
Mtr 42.00 42.00 190.00 7,980 100% 42.00 7,980.00 0.00% - - 100% 42.00 7,980.00
Labour
21 5
Rate
S/F Ball Tap with handle, 25 mm dia, for PPR pipe. Each 1.00 1.00 550.00 550 100% 1.00 550.00 0.00% - - 100% 1.00 550.00
Labour
22 6
Rate
S/F Ball Tap with handle, 40 mm dia, for PPR pipe. Each 3.00 3.00 600.00 1,800 100% 3.00 1,800.00 0.00% - - 100% 3.00 1,800.00
Labour
23 7
Rate
S/F Ball Tap with handle, 50 mm dia, for PPR pipe. Each 1.00 1.00 810.00 810 100% 1.00 810.00 0.00% - - 100% 1.00 810.00
Labour
24 8
Rate
S/F Bib cock, Brass, CP, fancy type, screwed down, BSP, 15 mm dia. Each 6.00 6.00 250.00 1,500 100% 6.00 1,500.00 0.00% - - 100% 6.00 1,500.00
Labour
25 9
Rate
S/F Stop cock brass, CP, screw down, high pressure, fancy type, 15mm dia. But Concealed type Each 3.00 3.00 250.00 750 100% 3.00 750.00 0.00% - - 100% 3.00 750.00
Labour
26 10
Rate
S/F Stop cock brass, CP, screw down, high pressure, fancy type, 15mm dia. But Tee Stop Cock Each 9.00 9.00 250.00 2,250 100% 9.00 2,250.00 0.00% - - 100% 9.00 2,250.00
Labour S/F Float valves, brass (Corydon) or other approved pattern, with plastic ball screwed for iron
27 11
Rate (brass ferrule), with copper ball, 40mm dia.
Each 1.00 1.00 1,500.00 1,500 100% 1.00 1,500.00 0.00% - - 100% 1.00 1,500.00
Labour
28 12
Rate
S/F Chromium Plated (CP) shower rose of any dia, fixed or adjustable. Each 3.00 3.00 302.00 906 100% 3.00 906.00 0.00% - - 100% 3.00 906.00
Labour
29 13
Rate
S/F Electric Water Cooler, SP, 220/240V, cooling capacity 60 Lit/hr, complete. Each 1.00 1.00 2,000.00 2,000 100% 1.00 2,000.00 0.00% - - 100% 1.00 2,000.00
30 External Water Supply
Const of 1x32 Men Bde for Bde HQ
Plumbing Works
Sub-Contractor :- Javed Iqbal
Abstract of Cost ( IPC - 8)
BOQ Contrac Previous Current Accumulative
S/No Descriptions Unit Qty Site Qty Rate Amount
REF t Type % Qty Amount % Qty Amount % Qty Amount
Labour
31 1
Rate
S/F Polyethylene (PE) Pipe, 40 mm dia Class PN-10 / SDR-17 (excl cost of excavation). Mtr 150.00 150.00 50.00 7,500 100% 150.0 7,500.00 0.00% - - 100% 150.00 7,500.00
Labour
32 2
Rate
S/F Red Coupler 50 x 40mm Each 1.00 1.00 300.00 300 100% 1.00 300.00 0.00% - - 100% 1.00 300.00
Labour
33 3
Rate
S/F Coupler/Socket, 40 mm dia, for PE pipe. Each 2.00 2.00 300.00 600 100% 2.00 600.00 0.00% - - 100% 2.00 600.00
Labour S/F Peet Pattern valve, strong gunmetal , high pressure full way valve with iron wheel head,
34 4
Rate screwed both ends for pipe 40mm dia
Each 1.00 1.00 500.00 500 100% 1.00 500.00 0.00% - - 100% 1.00 500.00
Labour
35 5
Rate
S/F Flange adopter 50mm for PE Pipe (40mm dia) Each 2.00 2.00 1,200.00 2,400 100% 2.00 2,400.00 0.00% - - 100% 2.00 2,400.00
36 B:: Extra / Additional Items
37 B External & Extra Works
Labour
38 1
Rate
PE Pipe Laying 40mm Rft 82.00 82.00 30.00 2,460 0% - - 100.00% 82.00 2,460.00 100% 82.00 2,460.00
Labour
39 2
Rate
Connection No. 1.00 1.00 2,000.00 2,000 0% - - 100.00% 1.00 2,000.00 100% 1.00 2,000.00
Labour Upvc pipe 6" dia Laying
40 3
Rate
Rft 125.66 125.66 50.00 6,283 0% - - 100.00% 125.66 6,282.99 100% 125.66 6,282.99
Labour
41 4
Rate
Core Cutting Nos 2.00 2.00 1,500.00 3,000 0% - - 100.00% 2.00 3,000.00 100% 2.00 3,000.00
Total 88,743 75,000 13,743 88,743
Prepared by: Checked By: Inspected by: Recommended by
Electrical Engineer MEP Engineer MEP Manager Director