Estimate - MR College JN To SBI Main Branch BT Road Berm
Estimate - MR College JN To SBI Main Branch BT Road Berm
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H--ordinary soil--
manual means upto 3m depth for small drains and culverts unit 1.00 cum
a Manual means Taking output = 10 cum
a) Labour
Mate
Mazdoor (Unskilled) 3.64 day #REF! #REF!
20% on labour 20% #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Cost for 10 cum = a+b+c #REF!
Rate per cum = (a+b+c)/10 #REF!
b Mechanical Means Upto 3 m depth Taking output = 240 cum Unit = cum
a) Labour
Mate day
Mazdoor (Unskilled) 8.32 day #REF! #REF!
20% on labour 20% #REF! #REF!
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (shovel 0.50 cum capacity
6.00 hour 2791.60 16749.60
Sl.no 52)
#REF!
c&d) Overheads & Contractors Profit13.615% 13.615% #REF! #REF!
Cost for 240 cum = a+b+c+d #REF!
Rate per cum = (a+b+c+d)/240 #REF!
Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH for
2
foundations of cc drains and pipe line trench RBR-FNDN-2(1)
Sand filling unit 1.00 cum
a) Labour
Mate day
Mazdoor (Unskilled) 0.31 day #REF! #REF!
20% on labour 20% #REF! #REF!
b) Material
Sand 1.00 cum #REF! #REF!
water 0.10 KL #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Filling with gravel /stone dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH for
3
shoulders RBR-FNDN-2(1)
a gravel filling unit 1.00 cum
a) Labour
Mate day
Mazdoor (Unskilled) 0.31 day #REF! #REF!
20% on labour 20% #REF! #REF!
b) Material
Gravel 1.00 cum #REF! #REF!
water 0.10 KL #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
b stone dust filling unit 1.00 cum
a) Labour
Mate day
Mazdoor (Unskilled) 0.31 day #REF! #REF!
20% on labour 20% #REF! #REF!
b) Material
stone dust 1.00 cum #REF! #REF!
water 0.10 KL #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
4 Cement mortor (1:3)---unit 1.00 cum
A-MATERIALS
Cement 480.00 kg #REF! #REF!
Sand including 5% wastage 1.05 cum #REF! #REF!
Seigniorage charges for sand 1.05 cum 0.00 0.00
B- MACHINARY
Nil 0.00 0.00 0.00
C-LABOUR
Man mazdoor for mixing mortar 0.20 day #REF! #REF!
20% on labour as per premble area allowances 20% #REF! #REF!
Rate/cum #REF!
Plain cement concrete (1:4:8) using 40mm m/c SS5 HBG including machine mixing, laying, compacting, finishing, curing
5
etc for foundations of CC drains , culverts and buildings unit 1.00 cum
A. MATERIALS
Cement kg 162.00 #REF! #REF!
Coarse aggregate 40mm cum 0.90 #REF! #REF!
Fine aggregate (sand) cum 0.45 #REF! #REF!
Seigniorage charges for C.A cum 0.90 0.00 0.00
Seigniorage charges for F.A cum 0.45 0.00 0.00
B .MACHINARY
Concrete mixer 300/200 Diesel item -16 hour 1.00 #REF! #REF!
C.LABOUR
Mason 1st class -labour rates day 0.10 #REF! #REF!
Mazdoor unskilled day 1.39 #REF! #REF!
20% on labour as per premble area allowances 20% #REF! #REF!
Water including curing M-189 KL 1.20 #REF! #REF!
Grand total #REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Plain cement concrete (1:4:8) using 40mm graded m/c SS5 HBG metal including machine mixing, centering, laying,
6
vibrating, finishing curing etc for CC pavemants unit 1.00 cum
A. MATERIALS
Cement kg 162.00 #REF! #REF!
40 mm m/c SS5 cum 0.90 #REF! #REF!
Fine aggregate (sand) cum 0.45 #REF! #REF!
Seigniorage charges for C.A cum 0.90 0.00 0.00
Seigniorage charges for F.A cum 0.45 0.00 0.00
B .MACHINARY
Concrete mixer 300/200 Diesel hour 1.00 #REF! #REF!
C.LABOUR
Mason 1st class -labour rates - day 0.10 #REF! #REF!
Mazdoor unskilled day 1.39 #REF! #REF!
20% on labour as per premble area allowances 20% #REF! #REF!
Water including curing KL 1.20 #REF! #REF!
Grand total #REF!
d) Formwork @ 3% of (a+b+c) 3% #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as
7
per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. unit
1.00 cum Nominal mix 1:3:6
Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per item 11.4. P.C.C grade M 10
(a) Material
Cement 0.22 t #REF! #REF!
Coarse sand 0.45 cum #REF! #REF!
20 mm aggregate graded m/c SS5 0.90 cum #REF! #REF!
Water including curing M-189 1.20 KL #REF! #REF!
(b) Labour
Mate - day
Mason (1st Class) 0.10 day #REF! #REF!
Mazdoor (Unskilled) 1.39 day #REF! #REF!
20% on labour 20% #REF! #REF!
(c) Machinery
Concrete mixer 300/200 Diesel 0.40 hour #REF! #REF!
#REF!
(d) Formwork @ 4% on cost of material, labour and machinery
4.00% #REF! #REF!
(a+b+c)
#REF!
e&f) Overheads & Contractors Profit13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Providing concrete for plain/reinforced concrete in open foundations using 2/3 of 40 mm and 1/3 of 20mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for
8
14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH.Nominal mix 1:3:6
Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per item 11.4.P.C.C grade M 10
Unit = cum
(a) Material
Cement 0.22 T #REF! #REF!
Coarse sand 0.45 cum #REF! #REF!
40 mm aggregate m/c SS5 0.60 cum #REF! #REF!
20 mm aggregate m/c SS5 0.30 cum #REF! #REF!
Water including curing M-189 1.20 kl #REF! #REF!
(b) Labour
Mate - day
Mason (1st Class) 0.10 day #REF! #REF!
Mazdoor (Unskilled) 1.39 day #REF! #REF!
20% on labour 20% #REF! #REF!
(c) Machinery
Concrete mixer 300/200 Diesel item -16 0.40 hour #REF! #REF!
#REF!
(d) Formwork @ 4% on cost of material, labour and machinery
4.00% #REF! #REF!
(a+b+c)
#REF!
e&f) Overheads & Contractors Profit13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/
Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and
tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and
9
drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of
work in all floors.( APSS No.126) for pre cast slabs of culverts
Material
HYSD bars including 5% for overlaps and wastage
1.05 MT #REF! #REF!
Binding wire item-3 6.00 kgs #REF! #REF!
Labour for cutting bending shifting to site tying and placing in position
black smith/bar bender 10.00 day #REF! #REF!
Mazdoor unskilled 10.00 day #REF! #REF!
20% on labour as per premble area allowances 20% #REF! #REF!
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
#REF!
Rate /kg #REF!
Supply of Bitumenious hot sealing compound (Grade 'A' ISI) / polysulphide and sealing the joints including cost
7 and conveyance of all material etc., including labour charges for placing in position for contraction joints at-4.50
M interval / for expansion joints/ for longitudinal joints Os per MORTH specification No. 602
Bitumen solution ,Primer of Approved quality zori prime BT or
Kg 0.30 74.00 22.20
Equivalent
22.20
add contractors profit &over heads @13.615% 3.02
25.22
Rmt
11 Plastering with CM (1:3) 12mm thick unit 10.00 sqm for CC drains
Materials
Cement mortar (1:3) 0.15 cum #REF! #REF!
Labour
Mason 1st class 0.45 day #REF! #REF!
Mason 2nd class 1.05 day #REF! #REF!
Mazdoor unskilled 2.80 day #REF! #REF!
RCC M-25 Nominal mix (cement,fine aggregate,coarse aggregate) corresponding to Table -9 of IS -456 using 20 mm size
graded machine crushed hard granite metal (coarse agggregate) from approved quarry including cost and conveyance of
all materials like cement,fine aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales
12
and other taxes on all materials including all operational ,incidental and labour charges such as machine mixing ,laying
concrete ,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work,but including
centering,shuttering unit 1.00cum for culvert slabs
M 20 mix
A. MATERIALS
20 mm graded HBG metal 0.90 cum #REF! #REF!
sand 0.45 cum #REF! #REF!
Cement 380.00 kgs #REF! #REF!
B. LABOUR
Mason 1st class -labour rates -skilled category item I-11 0.10 day #REF! #REF!
Mazdoor unskilled item III-4 1.39 day #REF! #REF!
20% on labour 20% #REF! #REF!
C MACHINERY
Concrete mixer 300/200 Diesel item -16 hour 1.00 #REF! #REF!
Genrator hire charges 0.133 liters 0.00 0.00
#REF!
(d) Formwork @ 10% on cost of material, labour and machinery
10% #REF! #REF!
(a+b+c)
#REF!
Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Rate/cum #REF!
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with
43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS :
383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix
design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using
13
needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and
construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and
water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. item RBR-CCPV-5 of
standard data
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate day -
Mason (1st class) day 5.00 #REF! #REF!
Mason (2nd class) day 5.00 #REF! #REF!
Mazdoor (Unskilled) day 150.00 #REF! #REF!
Mazdoor (Skilled) day 6.00 #REF! #REF!
Surveyor day 2.00 0.00 0.00
Mazdoor (Semi-Skilled) day 6.00 0.00
Blacksmith for cutting of dowel bars including removal of burrs,
day 1.00 0.00 0.00
fabrications & fixing of dowel bars.
20% on labour 20% #REF! #REF!
b) Machinery
Concrete mixer 600/400 Diesel item-18 hour 36.00 #REF! #REF!
Needle vibrator hour 9.00 #REF! #REF!
Screed vibrator hour 9.00 0.00 0.00
Plate vibrator item -39 hour 9.00 0.00 0.00
Concrete joint cutting machine for initial & final cuts hour 4.00 0.00 0.00
Water tanker 6 kl capacity hour 5.00 #REF! #REF!
Air Compressor (1 hour initial + 1 hour final) hour 2.00 0.00 0.00
c) Material
Crushed stone coarse aggregates, grading will be as per Clause
1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of concrete
(25 mm & 12.5 mm blending) 67.50 cum
25 mm 2/3*67.5=45.00 cum cum 45.00 #REF! #REF!
12.50 mm 1/3*67.50=22.50 cum 22.50 #REF! #REF!
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45
cum 33.75 #REF! #REF!
cum/cum of concrete
Cement @ 310 kg/cum of concrete t 26.25 #REF! #REF!
Polythene sheet 125 micron (LR) sqm 412.50 10.00 4125.00
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long 20 Nos. at
culvert/bridge slab and at construction joint including 5 per cent wastage.
(4x20x0.500)+5 per cent wastage = 42 m @ 2.80 kg per m = 117.60kg t 0.118 0.00 0.00
Bitumen primer @ 200 ml per joint for 23 joints BMT -H-94 of building
kg 5.00 0.00 0.00
SSR
Bituminous sealant 800 ml per joint for 23 joints BMT-H.146 of building
litre 19.00 0.00 0.00
SSR
Jute rope 12 mm dia including 5 per cent wastage m 90.00 0.00 0.00
Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm (thick) cut-out
m 90.00 0.00 0.00
of rubber filler
Polythene board orcovering
sheathing, similar material including
2/3rd dowel 5 per cent
bars (20x23) andwastage
tight fit
No. 483.00 0.00 0.00
including 5 0.5
Plasticizer perper
centcent
wastage
by weight of cement(sl BMT-H-64 page 24 of
litre 122.00 0.00 0.00
building SSR material rates 2010-11)
Curing compound (if used) @ 0.33 litre per sqm litre 131.25 0.00 0.00
Water for curing M-189 kl 18.00 #REF! #REF!
Joint filler board 20 mm thick as per IS:1838
sqm 3.00 735.00 2205.00
(4 x 3.75 x 0.200 = 3 sqm) BMT-U-02
#REF!
d) Formwork @ 3% of (a+b+c) 3.00% #REF! #REF!
#REF!
e&f) Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Cost for 75 cum = a+b+c+d+e+f #REF!
Rate per cum = (a+b+c+d+e+f)/75 #REF!
Gravel sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of
granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by
14 mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density
complete as per Clause 401.4 as per Technical Specification Clause 408 MORD. using gravel unit 1.00 cum with power
roller RBR-SBBS-12(11)
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48 #REF! #REF!
Mazdoor (Unskilled) day 10.00 #REF! #REF!
20% on labour 20% #REF! #REF!
b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00 0.00 0.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00 1137.90 34137.00
Tractor with rotavator 25 cum per hour hour 12.00 0.00 0.00
Water tanker 6 kl capacity hour 5.00 #REF! #REF!
c) Material
Naturally occurring gravel (Local materials as per Table 400.13) cum 384.00 #REF! #REF!
Water M-189 kl 30.00 #REF! #REF!
#REF!
d&e) Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
Cost for 300 cum = a+b+c+d+e #REF!
Rate per cum = a+b+c+d+e/300 #REF!
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of
granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by
15 mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density
complete as per Clause 401.4 as per Technical Specification Clause 408 MORD. using stone dust unit 1.00 cum with
power roller RBR-SBBS-12(11)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying
18 in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to
100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of
diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers
with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth
20
wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause
401 MORD / MORTH.
Unit = 1cum
A. MATERIALS:
Cement mt 162.00 #REF! #REF!
Coarse aggregate 40 mm cum 0.90 #REF! #REF!
Fine aggregate (Sand) cum 0.45 #REF! #REF!
Seigniorage charges for C.A cum 0.90
Seigniorage charges for F.A cum 0.45
Water (including for curing) kl 1.20 #REF! #REF!
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Pg.No.137/60) hour 1.00 #REF! #REF!
Add: M.A. on Crew Charges hour 1.00 46.02
C. LABOUR:
Mason 1st class day 0.10 #REF! #REF!
Mazdoor (unskilled) day 1.39 #REF! #REF!
Water Charges 1% -
Add: M.A. 20% on Labour #REF!
Overheads & Contractors Profit #REF!
Grand Total #REF!
.
Providing, laying, spreading and compacting graded stone aggregate to Wet mix
macadam specification including permiximg the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site , laying in
uniform layers in sub base/base course on a well prepared subbase and compacting
with smooth wheel roller of 80 to 100 KN / etc as per Tables 400.11 & 400.12 and
Technical Specification Clause 406 MORD / MORTH . (Pg No.337)
Steel
Unit = 1 Kg.
HYSD Bars MT 1.05 #REF! #REF!
Binding Wire (11/3) Kg. 6.00 53.00 318.00
Barbender (9/1) No. 10.00 600.00 6000.00
Mazdoor No. 10.00 #REF! #REF!
Add: M.A. 20% on Labour #REF!
Overheads & Contractors Profit #REF!
Grand Total #REF!
#REF!
VRCC M30 Design mix using 20mm HBG (SS-5) downgraded metal
for culvert slabs (Cover Slabs)
Unit: 1 Cum
A. MATERIALS:
Cement mt 400.00 #REF! #REF!
20mm HBG downgraded metal cum 0.90 #REF! #REF!
Fine aggregate (Sand) cum 0.45 #REF! #REF!
Seigniorage charges for C.A cum 0.90
Seigniorage charges for F.A cum 0.45
Water (including for curing) kl 1.20 #ERROR! #ERROR!
B. MACHINERY
Concrete Mixer 300/200 (diesel) hour 1.00 389.50 389.50
Add: M.A. on Crew Charges hour 1.00 46.02
C. LABOUR:
Mason 1st class day 1.333 #REF! #REF!
Mason 2nd class day 0.27 #REF! #REF!
Mazdoor (unskilled) day 4.60 #REF! #REF!
Needle Vibrator hour 0.12 203.50 24.42
Screed Vibrator (Concrete Paver 100 Sqm / Hour) hour 0.12 754.30 90.52
Plate Vibrator (Plate Sharing Machine) hour 0.12 361.70 43.40
Add: M.A. 20% on Labour #REF!
(d) Formwork @ 3.50% on cost of material, labour and machinery (a+b+c) 3.50% #REF!
e&f) Overheads & Contractors Profit #REF!
Grand Total #REF!
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2
cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates
RBR- including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes,
CCPV-5 compacted using needle, scareed and plate vibrators and finished in continuous operation including
provision of contraction and expansion, construction joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. item
RBR-CCPV-5 of standard data
Unit = cum
Taking output = 75 cum (172.50 t) Cement 400.00 kgs
(100 x 3.75 x 0.200)
a) Labour
Mate day 0.00 0.00
Mason (1st class) day 5.00 #REF! #REF!
Mason (2nd class) day 5.00 #REF! #REF!
Mazdoor (Unskilled) day 150.00 #REF! #REF!
Mazdoor (Skilled) day 6.00 #REF! #REF!
Surveyor day 2.00 725.00 1450.00
Mazdoor
Blacksmith(Semi-Skilled)
for cutting of dowel bars including removal day 6.00 #REF! #REF!
day 1.00 #REF! 0.00
of burrs, fabrications
b) Machinery & fixing of dowel bars.
Concrete mixer item-18 hour 36.00 525.60 18921.60
Needle vibrator hour 9.00 203.50 1831.50
Screed vibrator hour 9.00 0.00 0.00
Concrete joint cutting machine for initial & final cuts hour 4.00 450.00 1800.00
Water tanker 6 kl capacity hour 5.00 #REF! #REF!
Air Compressor
Crushed (1 houraggregates,
stone coarse initial + 1 hour final)
grading will be as hour 2.00 556.50 1113.00
c)
perMaterial
Clause 1501.2.4.1 (Table 1500.1) of specifications
@
250.90
mm cum/cum of concrete
2/3*67.5=45.00 cum (25 mm & 12.5 mm cum 45.00 1519.72 68387.40
blending)
12.50 mm 67.50 cum
Sand as per1/3*67.50=22.50
IS:383 and conforming to Clause cum 22.50 1313.72 29558.70
cum 33.75 227.62 7682.18
1500.2.4.2
Cement @ 400 @ 0.45 cum/cum
kg/cum of concrete
of concrete t 30.00 3882.00 116460.00
Mild steel dowel bar 25 mm
Polythene sheet 125 micron item dia of grade
177 S 240. 500 sqm 412.50 15.25 6290.63
mm
(4x20x0.500)+5 per cent wastage = slab
long 20 Nos. at culvert/bridge 42 mand at kg per
@ 2.80
construction
Bitumen joint including 5 per cent wastage.
primer @ 200 ml per joint for 23 joints BMT - t 0.118 42000.00 0.00
m = 117.60kg kg 5.00 78.00 390.00
Bituminous sealant
H-94 of building SSR800 ml per joint for 23 joints BMT- litre 19.00 112.00 2128.00
H.146 of
Debonding building
Jute rope 12 strips SSRincluding
mm 3.75
dia m (length) x 10cent
5 per mmwastage
(width) x 5 m 90.00 8.35 751.50
mm (thick)sheathing,
Polythene cut-out ofcovering
rubber filler
2/3rdboard or bars
dowel similar m 90.00 8.55 769.50
material including
Plasticizer 5 per cent wastage No. 483.00 2.00 0.00
(20x23) and0.5 perfit
tight cent by weight
including 5 perofcent
cement(sl
wastageBMT-H-
litre 150.00 43.00 6450.00
64 pagecompound
Curing 24 of building SSR material
(if used) rates
@ 0.33 litre per2010-11)
sqm litre 123.75 0.00 0.00
Water for curing M-189
Joint filler board 20 mm thick as per IS:1838 kl 18.00 103.00 1854.00
sqm 3.00 735.00 2205.00
(4 x 3.75 x 0.200 = 3 sqm) BMT-U-02 #REF!
d) Formwork @ 3% of (a+b+c) 3.00% #REF! #REF!
#REF!
e&f) Overheads & Contractors Profit 13.615% 13.615% #REF! #REF!
25% on labour 25% #REF! #REF!
Cost for 75 cum = a+b+c+d+e+f #REF!
Rate per cum = (a+b+c+d+e+f)/75
For VDF(Vaccum Dewatering Power trowling to finish) #REF!
485.00
per Cum
Total Per Cum #REF!
Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other
structure
Unit = cumcomprising of masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary, sorting the dismantled
Taking output = 1.25
material, disposal cum
of unserviceable material and stacking the serviceable material
Cement Concrete M15 & M20
a) labour
Mate day -
Mazdoor (Unskilled) day 1.300 #REF! #REF!
Add: M.A. 20% on Labour #REF!
b) Machinery
c&d) Overheads & Contractors Profit #REF!
Cost for 1.25 cum = a+b+c+d #REF!
Rate per cum = (a+b+c+d)/1.25 #REF!
3 Dismantling of existing structures like culverts, bridges,
Unit - 1 Cum
retaining walls and other structure comprising of
Out put - 1.25
masonry, Cum
cement concrete, wood work, steel work,
a) labour T&P and scaffolding wherever necessary,
including
Mate day -
Blacksmith day 0.400 400.00 160.00
Mazdoor (Unskilled) day 3.500 400.00 1400.00
1560.00
Add MAA 20% 312.00
b) Machinery
Tractor hour 0.270 413.60 111.67
1983.67
c&d) Overheads & Contractors Profit 13.615% 1671.67 227.60
Cost for 1.25 cum 2211.27
Rate per cum 1769.02
11 Collection, supply and spreaing of good red gravel from
Unit = cum
appoved quarry and filling the same on the proposed road
Taking output
sholder = 6and
surface cumramming with hand roller and all
a) Labour
labour charges and other incidental charges etc., complete
Mazdoor day 3.12 400.00 1248.00
Add 25% MAA 312.00
c) Material
Gravel cum 6.00 134.73 808.38
Total 2368.38
Contractors profit and over head charges 2056.38 13.615% 279.98
Cost for 6 cum = a+b+c+d+e 2648.36
Rate per cum = a+b+c+d+e/6 441.39
Carting 2 Km Lead
Unit: 1 Cum
Conveyance Charges (Pg.No.350/1/2) cum 45.30
day
8.32 day #REF! #REF!
#REF!
6.00 hour #REF! #REF!
#REF!
#REF!
#REF!
#REF!
Materials Qty
S.No. Description of Item Est.Qty Crusher
Metal Sand Gravel
Dust
1 Wet Mix Macadam 74.56 74.56
2 Gsb 42.00 42.00
3 Filling of Sand 9.00 - 9.00 -
4 VCC M10 0.00 0.00 0.00
5 PCC M20 72.00 64.80 32.40
6 BM 349.20 - 314.28 0
7 BC 209.52 - 188.568 0
8 Plastering Cm (1:4) 1780.00 801.00
9 VCC M10 213.60 192.24 96.12
Total Qty 2749.88 0.00 876.45 938.52 0.00
250
31546.40 Kgs 126.83 1.00 Kgs
13 Painting with Emulsion paint two coats using approved superior
quality colour and shade Emulsion paint over one coat of primary
including cost and conveyance of all materials and all labour
charges etc., complete as per SS and as directed by the
Engineer-in-charge
2 x 2 162 648.00
648.00 No 336.00 1.00 No
Cutting Road Surface Including Stacking of excavated materials
cutting open CC road surface with concrete saw cutter and
removal with braker
1 x 1 1.00 1.00
1.00 Nos 9000.00 1.00 Nos
Construction of pedestal to fix granite plaque of size 2'6'' X 5'
with brick masonary in cm (1:5) with red brick of 23X11X7 cm
and Plastering with cm (1:3) 12mm thick, applying emulsion
painting two coats over primary etc., as specified by the
departmental engineer including transportation to the work site
etc., complete as directed by the department engineer.
1 x 1 1.00 1.00
1.00 Nos 6000.00 1.00 Nos
SUB TOTAL ECV
Seignorage Charges LS
SUB TOTAL
Provision towards Nac @ 0.10% 0.10%
_________________________________________________________________________Only) under
_________________________________________________________________ .
ad Left side) to SBI Main
Lakhs
Amount in Rs.
81911.25
17193.97
66227.28
177686.76
341168.40
2501071.67
89744.40
2138576.05
1111862.76
714723.40
890
65326.00
4001029.91
375277.40
299266.57
93600.00
1061.16
722119.38
0.00
0.00
LAB-00648
0.00 3739.07
LAB-00647
118.05
2597.10
46910.81
6911.75
6939.27
7756.38
401380.56
MAT-05734 5251.29
315077.40
0.00
0.00
13584358.46
172732.00
13757090.46
13757.00
13770847.46
2478753.00
20377.00
50000.00
407531.00
135844.00
135844.00
803.54
17000000.00 0.00
l Corporation
_________
Only) under
_________
.
VIZIANAGARAM MUNICIPAL CORPORATION
ABSTRACT ESTIMATE
Name of the work: Laying of BT Road End to End Road From Gautam Buddha Statue (Rama Rayudu Road Left Side) to SBI Main branch in
Vizianagaram Muncipal Corporation Under NCAP Funds.
Estimate Amount: 177.67 Lakhs
S.
Description of Item Nos L Qty Rate Per Amount
No.
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per 289.90 282.55 Cum 81911.25
Technical Specification 305 MORD / 304 MORTH(for Civil work)For
widening poration
2 Carting away the surplus excavated earth from the work site with a
lead of 2.0 KM beyond initial lead including loading, unloading and
conveyance and spreading the same in low laying areas etc.,
complete to relevant standard specifications and as directed by the 289.90 59.31 Cum 17193.97
officer-in-charge of the work.
7 Providing and applying tack coat with Bitumen emulsion (RS-1) (Rapid
Setting) using emulsion distributor at the rate of 0.20 to 0.25 kg per
sqm on the prepared bituminous surface cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD. 6984.00 12.85 Sqm 89744.40
For BT Road
8 Providing and laying bituminous concrete with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading - II, premixed with bituminous
VG 30 binder @ 5.4 per cent of mix and filler, transporting the hot
mix to work site, laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired 209.60 10203.13 Cum 2138576.05
compaction as per MORTH specification clause No. 509 complete in
all respects
For BT Road
Centre Divider
9 Vibrated Plain Cement Concrete in (1:3:6) prop. Using graded HBG
metal including cost and conveynace of materials to site inclding
seignorage fee machine mixing concrete laying
tamping,vibrating,wtaering curing and all labour charge hire and
oprational charges of mechinery water lead chagres and including 213.60 5205.35 cum 1111862.76
bailing of water etc.,complete for finished item of work for foundations
and Flooring
For Divider walls
11 Filling with Red soil (Red soil in this context it is defined as sandy
loamy gardensoil congenial for plant growth which shall be of light
textured, crystalline, porousand friable, fertile, slightly 178.00 367.00 Cum 65326.00
13 Painting with Emulsion paint two coats using approved superior quality 1780.00 210.83 Sqm
colour and shade Emulsion paint over one coat of primary including
cost and conveyance of all materials and all labour charges etc., 375277.40
complete as per SS and as directed by the Engineer-in-charge
14 Painting to New Iron work with two coats of ready mixed synthetic
enamel paint first quality all shades over red oxide primer Grade-I
making three (3) coats in all to given and even shade after thourughly
brushing the surface to remove all dirt and remains of loose powered
materials, including cost and conveyance of all materials to
1520.20 196.86 Sqm 299266.57
site,incidental, operational and all labour charges etc., complete for
finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
23 Carting away the surplus excavated earth from the work site with a
lead of 2.0 KM beyond initial lead including loading, unloading and
conveyance and spreading the same in low laying areas etc.,
complete to relevant standard specifications and as directed by the 117.00 59.31 Cum 6939.27
officer-in-charge of the work.