INTEGRASI BIM DAN GIS DALAM PROJEK
INFRASTRUKTUR KERAJAAN
INTEGRATION OF BIM AND
GIS IN JKR
INFRASTRUCTURE PROJECT
BY:
MUHAMMAD IYAS BIN MAHZAN
UTNM RESOURCES SDN BHD
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
ABOUT ME
• Muhammad Iyas Bin Mahzan
• Director of UTNM Resources Sdn Bhd
• Autodesk Authorized Training Center (ATC) Manager (until 2018)
• Pasukan Pakar Negara BIM for WSC 2022, CIDB BIM Master Trainer, BIM Experts & BIM Manager
• Authored 2 BIM Modules for CIDB Malaysia:
• Fundamental Modelling of Infrastructure (Roads & Highways)
• BIM Project Quantification
• Involve in building and infrastructure projects
• 10 years experience in BIM
• I have trained more than 1,000 participants in BIM including JKR Malaysia, JKR Sabah and JKR
Sarawak
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND
• In 2050, world
population will grow to
9.7 billion
• Average of 13,000
building need to be
constructed daily
• Nearly 2/3 population
will live in cities
• 200,000 people will
migrate to urban areas
daily
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND
• At peak, China have to
build 3,318 buildings a
day
• 28 EU countries will have
to build 1,339 buildings
• India and USA will have
to build around 1,100
buildings daily
• Africa have to build
more building than India
or USA, at 1,327
buildings daily
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND
• In 2018, China constructed nearly 1
million buildings annually, or around
2,800 buildings daily
• This trend expected to grow more
than 20% in the next 30 years
• USA, EU, India and Africa also will
grow at faster rate than now
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND
• In 2018, 11,098
buildings were
constructed daily
• By 2050, we need to
build 3,600 more
buildings per day
• All non-residential and
residential buildings
(excluding single
family homes) in urban
area
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND
• More buildings mean more infrastructure needed
• Roads
• Bridges
• Rails
• Supply water system
• Electricity
• Gas
• Telecommunication and etc
• Need better ways to plan, design and execute the infrastructure project
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
WHAT IS BIM?
• BIM stands for Building Information Modelling
• Information is the key
• 3D Models helps to visualized the projects for
better understanding of design intent
• BIM is very useful for the entire project life
cycle
• Integrated process to Produce, Communicate
and Analyzed digital model
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
INFRAWOKS 360,
CIVIL 3D & RECAP PRO
INRAWORKS 360 CIVIL 3D
https://www.youtube.com/watch?v=jups9i9fKvQ&ab_channel=AutodeskReCap
RECAP PRO
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
WHAT IS GIS?
• GIS stands for Geographic
Information System
• Information is the key
ACTION
• Provide Geospatial information Decision
about a location and its attribute Planning & Making
Geodesign
Analysis &
Modelling
Visualization
and Mapping
Data
Integration &
Management
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
THE RELATIONSHIP
BIM needs
GIS provides
context to
the
ensure
Frameworks
outcomes
for Analysis
from design
and Decision
and
Making
construction
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
CURRENT REQUIREMENT
Level of Level of Information Needed BIM Model
Development
(LOD)
100 • Existing Condition • Proposed road alignment including junction
• Topography • Proposed Bridge
• Existing Site Element (e.g river, road, building, utility
services etc.)
200 • Road platform level • Earthwork Volume
• Drainage • Earthwork profile
• Road Alignment • Proposed road level & alignment
• Proposed invert level
Site Analysis • Bridge/Structural components
• Contour
• Slope
• Elevation
• Water Flow
• Traffic
• Lane acquisition
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
CURRENT REQUIREMENT
Level of Level of Information Needed BIM Model
Development
(LOD)
300 • Earthwork Volume • Complete BIM Model
• Earthwork profile • Tender Drawing extracted from BIM Model
• Proposed road level & alignment • Material QTO
• Proposed invert level • Material Specification
• Bridge/Structural components
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
OUR PRACTICE
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
OUR PRACTICE
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
OUR PRACTICE
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
THE CHALLENGES
• No standards or guidelines for survey works to move into BIM
• No standards or guidelines for BIM & GIS Integration
• Lack of infrastructure (computer & Internet)
• Lack of software
• Lack of competency
• No policy to enforce BIM & GIS
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
INTEGRASI BIM DAN GIS DALAM PROJEK
INFRASTRUKTUR KERAJAAN
THANK YOU
Sincerely:
MUHAMMAD IYAS BIN MAHZAN
UTNM RESOURCES SDN BHD
[email protected]
013 - 3999 055
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd