BIM & GIS Integration for JKR Projects

The document discusses integrating building information modeling (BIM) and geographic information systems (GIS) for infrastructure projects. BIM provides 3D models that help visualize design intent throughout a project's lifecycle while GIS provides geospatial context for analysis and decision making. Currently, infrastructure projects require BIM models at various levels of development to provide information needed for site analysis, earthworks calculations, proposed alignments and more to support the project planning and design process. Integrating BIM and GIS can improve infrastructure project delivery to address growing construction demands.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
312 views18 pages

BIM & GIS Integration for JKR Projects

The document discusses integrating building information modeling (BIM) and geographic information systems (GIS) for infrastructure projects. BIM provides 3D models that help visualize design intent throughout a project's lifecycle while GIS provides geospatial context for analysis and decision making. Currently, infrastructure projects require BIM models at various levels of development to provide information needed for site analysis, earthworks calculations, proposed alignments and more to support the project planning and design process. Integrating BIM and GIS can improve infrastructure project delivery to address growing construction demands.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

INTEGRASI BIM DAN GIS DALAM PROJEK

INFRASTRUKTUR KERAJAAN

INTEGRATION OF BIM AND


GIS IN JKR
INFRASTRUCTURE PROJECT
BY:
MUHAMMAD IYAS BIN MAHZAN
UTNM RESOURCES SDN BHD

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


ABOUT ME

• Muhammad Iyas Bin Mahzan


• Director of UTNM Resources Sdn Bhd
• Autodesk Authorized Training Center (ATC) Manager (until 2018)
• Pasukan Pakar Negara BIM for WSC 2022, CIDB BIM Master Trainer, BIM Experts & BIM Manager
• Authored 2 BIM Modules for CIDB Malaysia:
• Fundamental Modelling of Infrastructure (Roads & Highways)
• BIM Project Quantification
• Involve in building and infrastructure projects
• 10 years experience in BIM
• I have trained more than 1,000 participants in BIM including JKR Malaysia, JKR Sabah and JKR
Sarawak
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND

• In 2050, world
population will grow to
9.7 billion

• Average of 13,000
building need to be
constructed daily

• Nearly 2/3 population


will live in cities

• 200,000 people will


migrate to urban areas
daily

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


FUTURE DEMAND

• At peak, China have to


build 3,318 buildings a
day

• 28 EU countries will have


to build 1,339 buildings

• India and USA will have


to build around 1,100
buildings daily

• Africa have to build


more building than India
or USA, at 1,327
buildings daily
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
FUTURE DEMAND

• In 2018, China constructed nearly 1


million buildings annually, or around
2,800 buildings daily

• This trend expected to grow more


than 20% in the next 30 years

• USA, EU, India and Africa also will


grow at faster rate than now

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


FUTURE DEMAND

• In 2018, 11,098
buildings were
constructed daily

• By 2050, we need to
build 3,600 more
buildings per day

• All non-residential and


residential buildings
(excluding single
family homes) in urban
area

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


FUTURE DEMAND

• More buildings mean more infrastructure needed


• Roads
• Bridges
• Rails
• Supply water system
• Electricity
• Gas
• Telecommunication and etc
• Need better ways to plan, design and execute the infrastructure project

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


WHAT IS BIM?

• BIM stands for Building Information Modelling


• Information is the key
• 3D Models helps to visualized the projects for
better understanding of design intent
• BIM is very useful for the entire project life
cycle
• Integrated process to Produce, Communicate
and Analyzed digital model

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


INFRAWOKS 360,
CIVIL 3D & RECAP PRO

INRAWORKS 360 CIVIL 3D

https://www.youtube.com/watch?v=jups9i9fKvQ&ab_channel=AutodeskReCap

RECAP PRO
Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd
WHAT IS GIS?

• GIS stands for Geographic


Information System
• Information is the key
ACTION
• Provide Geospatial information Decision
about a location and its attribute Planning & Making
Geodesign
Analysis &
Modelling
Visualization
and Mapping

Data
Integration &
Management

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


THE RELATIONSHIP

BIM needs
GIS provides
context to
the
ensure
Frameworks
outcomes
for Analysis
from design
and Decision
and
Making
construction

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


CURRENT REQUIREMENT

Level of Level of Information Needed BIM Model


Development
(LOD)

100 • Existing Condition • Proposed road alignment including junction


• Topography • Proposed Bridge
• Existing Site Element (e.g river, road, building, utility
services etc.)
200 • Road platform level • Earthwork Volume
• Drainage • Earthwork profile
• Road Alignment • Proposed road level & alignment
• Proposed invert level
Site Analysis • Bridge/Structural components
• Contour
• Slope
• Elevation
• Water Flow
• Traffic
• Lane acquisition

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


CURRENT REQUIREMENT

Level of Level of Information Needed BIM Model


Development
(LOD)

300 • Earthwork Volume • Complete BIM Model


• Earthwork profile • Tender Drawing extracted from BIM Model
• Proposed road level & alignment • Material QTO
• Proposed invert level • Material Specification
• Bridge/Structural components

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


OUR PRACTICE

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


OUR PRACTICE

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


OUR PRACTICE

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


THE CHALLENGES

• No standards or guidelines for survey works to move into BIM


• No standards or guidelines for BIM & GIS Integration
• Lack of infrastructure (computer & Internet)
• Lack of software
• Lack of competency
• No policy to enforce BIM & GIS

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd


INTEGRASI BIM DAN GIS DALAM PROJEK
INFRASTRUKTUR KERAJAAN

THANK YOU
Sincerely:
MUHAMMAD IYAS BIN MAHZAN
UTNM RESOURCES SDN BHD
[email protected]
013 - 3999 055

Website: www.utnm.my Contact: 016-304 9055 UTNM Resources Sdn Bhd

You might also like