Hazard Identification Plan

This Hazard Identification Plan (HIP) is for the Replace Raw Water Pipeline - Abqaiq project. The project involves replacing an existing 20-inch deteriorated cement-lined carbon steel pipeline with a new 20-inch reinforced thermoplastic resin pipeline. The existing pipeline supplies groundwater from Shedgum wells to storage tanks, facilities, and communities including Abqaiq plant. The HIP will identify potential hazards associated with the project and ensure compliance with Saudi laws and Saudi Aramco safety requirements. It covers topics such as site preparation, equipment mobilization, right of way construction, and more. The HIP provides preventive measures to control hazards during construction activities.

Uploaded by

Asad Ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
167 views113 pages

Hazard Identification Plan

This Hazard Identification Plan (HIP) is for the Replace Raw Water Pipeline - Abqaiq project. The project involves replacing an existing 20-inch deteriorated cement-lined carbon steel pipeline with a new 20-inch reinforced thermoplastic resin pipeline. The existing pipeline supplies groundwater from Shedgum wells to storage tanks, facilities, and communities including Abqaiq plant. The HIP will identify potential hazards associated with the project and ensure compliance with Saudi laws and Saudi Aramco safety requirements. It covers topics such as site preparation, equipment mobilization, right of way construction, and more. The HIP provides preventive measures to control hazards during construction activities.

Uploaded by

Asad Ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 113

PIPELINES PROJECTS DEPARTMENT

CROSS COUNTRY PIPELINES PROJECTS DIVISION


SOUTHERN AREA PIPELINES PROJECTS UNIT
Room 332, Al Butain Tower/PMT Office, Al Khobar
Tel: (013) 869-3919

April 30, 2023

TRANSMITTAL

SAPPU/BI-10-01935/TL-552/23
BI-10-01935, Replace Raw Water Pipeline -
ABQ
AL ESSA HAZARD IDENTIFICATION PLAN (HIP)
REV-01 B.I 10-01935

REYAZUL HAQUE, Contractor Representative


Saad Alessa Group
Head Office, P.O. BOX 126- 31992,
Abqaiq
INFO REVIEW APPROVAL ACTION USE
LETTER
FORMS
PROCEDURE
OTHERS

ITEM NO. DESCRIPTION

1. With reference to the received transmittal, SA-RWP-1273-23- AL ESSA Hazard Identification


Plan (HIP) REV-01 B.I 10-01935.
REVIEWED APPROVED W/ COMMENTS REJECTED

Remarks
Please find Attached AL ESSA HAZARD IDENTIFICATION PLAN (HIP) REV-01 B.I 10-01935 reviewed and
approved.

Abdulrahman Al-Hajri, Senior Project Engineer


Southern Area P/L Projects
Received By:
Name:
Signature:
Date:
Cc: Transmittal File

Saudi Aramco: Company General Use


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 1 of 88

PROJECT:

Replace Raw Water Pipeline – Abqaiq


CROSS COUNTRY PIPELINE PROJECTS DIVISION
Contract # 6600045303

CLIENT:
SAUDI ARABIAN OIL COMPANY
Dhahran - 31311, Saudi Arabia

CONTRACTOR: SAAD ALI AL ESSA FOR CONTRACTING


P.O Box 126, Abqaiq 31992,KSA

Tel: (013)5662858, Fax: (013)5662622

HAZARD IDENTIFICATION PLAN (HIP)


Prepared By: Bilal khan Al Essa Safety Manager

Reviewed By: Reyazul Haque Al Essa Project Manager

Reviewed By: Michael Soriano SAPMT Safety Advisor

Concurred by: Khalid N. Al-Gharbi, SAPMT Project Engineer

Approved by: Abdulrahman Al -Hajri Sr. project Engineer

Shedgum well SDGM-967 to


REV. 02 LOCATION DATE MAY 06,2023
Abqaiq plant.

DOSSIER FILE NO. PAGE/SCALE B.I NO. DOCUMENT NO.

01 L 10-01935 SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline B.I # 10-01935 HIP Comments and Compliance

NO Comments Compliance Page No Status


1 In activity “Site 1. Section 03 modified from site preparation activities to prior to start 12 Closed
Preparation” (# 3) is way work and preventive action.
too general. All activities
related to site preparation 2. Added section 05 heavy equipment/vehicle mobilization and 14
must be elaborated preventive actions. Closed
including ROW construction
and its maintenance.
3. Added section 06 Right of way construction and preventive actions. 15 Closed
Contractor must then,
identify all corresponding
potential hazards and
control measures.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 2 of 88

Table of Contents

1. Introduction 4

2. Definition 4

3. Objectives, Scope and Abbreviations 6

4. Basis Of Hip 8

5. Hazard Classification 9

6. Possible Hip Topics as Per CSM 10

Attachments 11

7. 11
(I)Hazard Identification Plan
(Ii) Heat Stress Index 89

8. References 90
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 3 of 88

1. INTRODUCTION

The purpose of the proposed facilities is to replace the existing deteriorated 20-inch raw water pipeline between
Shedgum water wells and Abqaiq plant to ensure reliable water supply.

Implementation of the project will meet the organizational business objective of operational continuity and
reliability by replacing existing pipelines with a new non-metallic RTR pipeline.

Based on a condition assessment performed by SA/CR Community Services Department and North Ghawar
Inspection Department, the existing 20-inch cement-lined carbon steel pipeline, constructed in 1950s, is
determined unreliable.

The existing 20-inch pipeline is currently supplying ground water from Shedgum 7 wells to the locations that
are listed in Table-1 Locations below:

No. Location

1 Shedgum Storage tanks

2 Shedgum GOSP-5

3 Shedgum Support Facilities Complex

4 Ainakhil CONTRACTOR Residential & Industrial Areas

5 Industrial Security Force Base.

6 Abqaiq GOSP-5

7 Abqaiq Community

8 Abqaiq Plant

The purpose of the facilities under this budget item is to Maintain Integrity. The new pipeline will ensure a
reliable raw water supply to Abqaiq Plants, Abqaiq Community, and other industrial facilities. This budget
item shall install a new pipeline to replace the existing, deteriorated,20-inch cement-lined carbon steel
pipeline with 20” RTR Pipeline.

This Hazard Identification Plan shall comply with the provisions of the:

a. Saudi Arabian Laws and Regulations.

b. Saudi Aramco Construction Safety Manual and Health Specification and Regulations.

c. Schedule “D”, “B” of the Contract and related requirements, specifications and standards.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 4 of 88

d. Saudi Aramco Master Environmental and Social Management.

e. Saudi Aramco Construction Environmental Management Plan and Waste Management


Program.

Company Representative may assist the CONTRACTOR by explaining good safety and sound environmental
practices, pointing out unsafe conditions and by applying experience and judgment, to assist. Such assistance
by Saudi Aramco shall in no way relieve CONTRACTOR of its responsibilities.

Saudi Aramco Safety Goal is to achieve ZERO ACCIDENTS.

Should anything be missed in this guideline, CONTRACTOR shall refer to the above-mentioned Laws,
Regulations, Contract obligations, etc.

This Hazard Identification Plan may be reviewed and updated whenever necessary or from one phase to
another one of site activities.

During the site execution phase, any change shall be agreed with the CONTRACTOR Site Construction
Manager and all parties shall be informed of subsequent revisions.

This Hazard Identification Plan shall be applied by CONTRACTOR, together with its Subcontractor(s),
Suppliers and Vendors present at Site, performing Construction, Pre-commissioning, and Commissioning
works.

2. DEFINITION

In this document, the following definitions are defined:

“Company Group” means SAUDI ARAMCO and all of its Affiliates, and their directors, officers, employees,
agents, consultants and representatives, but shall not include any contractor or vendor engaged by SAUDI
ARAMCO nor any of the CONTRACTOR Group.

"Company Representative" means a party or parties duly authorized by SAUDI ARAMCO to act on behalf of
SAUDI ARAMCO.

“CONTRACTOR” means the entity entering into this Contract with SAUDI ARAMCO, as set forth on the
signature sheet of this Contract.

“Contractor Design Office” is the location at which the CONTRACTOR shall perform all or part of the
engineering, detailed design and procurement for the WORK.

“CONTRACTOR Group” means CONTRACTOR, all CONTRACTOR’s Subcontractors, all CONTRACTOR


Personnel, the Affiliated Contractor, all Affiliated Subcontractors (as defined in the Affiliated Contract) and all
Contractor Personnel (as defined in the Affiliated Contract) and all of their respective Affiliates, directors,
officers, employees, agents, consultants and representatives, but shall not include any of the Company Group.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 5 of 88

“CONTRACTOR Personnel” means all of the personnel, labor and supervision required to perform the
WORK (including personnel, labor and supervision of any Subcontractor).

"CONTRACTOR Representative" means a party or parties duly authorized by CONTRACTOR to act on


behalf of CONTRACTOR.

3. OBJECTIVES, SCOPE AND ABBREVIATIONS

3.1 Objective

This Hazard Identification Plan (HIP) is drafted in accordance with the requirements specified in Saudi
Aramco CSM to give instruction and information to all employees for taking effective safety controls and
precautions to mitigate hazards. It outlines all tasks/activities associated with the CONTRACTOR contracted
work, potential hazards of each activity and control measures to mitigate these hazards. It identifies all
potential hazards associated with the work to be performed.

The HIP will be implemented by the AL ESSA with periodic monitoring and reporting by the COMPANY and
appointed representatives. CONTRACTOR is responsible for the safety management of all activities and
identifies specific hazards arising out of the nature of the works to be carried out on the Project.

3.2 Scope

The HIP is applicable to all construction activities undertaken as part of the Replace Raw Water Pipeline
Abqaiq Area Project. The HIP shall not be considered to be all inclusive, or all hazards may be encountered,
and it will be continuously updated as the project proceeds.

(New Shedgum – Abqaiq Raw Water


DESCRIPTION Pipeline)

Product UNITS Raw Water


Starting point Shedgum well SDGM-967
Approximate Underground pipeline
total length: Kilometers 49.7
Approximate Underground pipeline
length from Shedgum water wells to
Kilometers 15.35
Shedgum tanks:
Approximate Underground pipeline
length from Shedgum tanks to
Abqaiq tanks: Kilometers 34.35

a. Al Essa shall construct / install the facilities in accordance with this Scope of Work. The Project
drawings provide construction locations, dimensions, and layout and installation details.
b. Provide and Install new RTR pipeline to replace the existing carbon steel pipeline.
c. Twenty nine (29) tie-ins connections along with new raw water pipeline: seven (7) tie-ins for water
wells, two (2) tie-ins for chlorination, two (2) tie-ins for trunk line, six (6) tie-ins for interconnection
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 6 of 88

with the existing 24” pipeline, one (1) tie-in for head quarter at Shedgum, one (1) tie-in for Shedgum
GOSP-1, one (1) tie-in for maintenance, two (2) tie-ins for water storage tank at Shedgum, two (2)
tie-ins for Ain Akhil Residential & Industrial, one (1) tie-in for Abqaiq GOSP-5, one (1) tie-in for
Security Base, one (1) tie-in to downstream of PCV-853 at Abqaiq plant, one (1) tie-in to
downstream of PCV-331 at Abqaiq plant and one (1) tie-in to upstream of PCV-208 at Abqaiq plant.
d. Demolish all existing piping and transport it to Saudi Aramco specified location.
e. Open cut and horizontal directional drilling.
f. Number of personnel for this project will be about 150-200 at the peak, including the Project
Manager, Site Superintendent, QA/QC staff and Safety personnel. And intended working hours per
day would be 10 hours (plus overtime if needed).

3.3 Abbreviations

ALARP As Low as Reasonably Practicable

SASC Saudi Aramco Sanitary Code

MOWE Ministry of Water & Electricity

CSM Construction Safety Manual

GIs General Instruction Standards

GERR General Environmental Regulations and Rules

PME Presidency of Meteorology and the Environment

EMP Environmental Management Program

MSDS Material Safety Data Sheet

EPC Engineering, Procurement & Construction

NDE / NDT Non-Destructive Examination / Non-Destructive Testing

HSE Health, Safety & Environment

PMT Project Management Team


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 7 of 88

4. BASIS OF HIP

The HIP is based on COMPANY Health, Safety and Environment Policy and it shall comply with the
provisions of the:

a. Saudi Arabian Laws and Regulations.

b. Saudi Aramco Construction Safety Manual and Health Specification and Regulations.

c. Schedule “D” of the Contract and related requirements, specifications and standards.

d. Saudi Aramco Construction Environmental Management Plan and Waste Management


Program.

e. SAUDI ARAMCO Hazardous Waste Code, the SAUDI ARAMCO Sanitary Code (notably SASC-
S-03, Solid Waste Management).

5. HAZARD CLASSIFICATION

Once the hazards are identified, they will be classified as Class A, B, or C.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 8 of 88

a. Class “A” Hazards

A condition or practice that is likely to cause permanent disability, loss of life or body part and/or
extensive loss of structure, equipment or material.

b. Class “B” Hazards

A condition or practice that is likely to cause serious injury or illness (resulting in temporary
disability) or property damage that is disruptive, but less severe than Class “A.”

c. Class “C” Hazards

A condition or practice, which is likely to cause minor (non-disabling) injury, illness, or no disruptive
property damage.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 9 of 88

6. Possible HIP Topics as per CSM

1. Abrasive Blasting 23. First aid, medical facility, hospital transfer provisions

2. Work permits 24. Hand Tools


3. Chemical and chemical handling 25. Heat Stress hazards
4. Compressed Gas cylinders 26. Heavy Equipment operations
5. Concrete formwork & shoring 27. Housekeeping
6. Concrete Placement 28. Hydrogen sulfide (H₂S)
7. Confined space entry/rescue 29. Pressure testing
8. Cranes and rigging 30. NDT
9. Cutting, Welding and Brazing 31. Isolation/lockout/hold tag
10. Demobilization 32. Materials handling
11. Driving/vehicle safety 33. Mechanical Equipment
12. Dust control 34. Painting and coating
13. Electricity safety 35. Fall prevention/protection
14. Emergency Response 36. RTR Pipe Joining
15. Excavation and shoring
16. Work at heights
17. Fire prevention/firefighting
18. PPE
19. Portable power tools
20. Scaffolding
21. Steel erection
22. Transportation
Note: HIP Topics may differ according to project scope of work
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 10 of 90

7. ATTACHMENTS

I. Hazard Identification Plan

HAZARD IDENTIFICATION PLAN

No. Activity Location Potential Hazard Hazar Preventive Actions


d
Classif
ication
1 Pre- Planning From KM 0.0 to 49 Lack of reference / A 1.1 Initial Site planning, usage shall be arranged according to
experience exact scope of work stated in Work method statement.
1.2 Only experience personnel should be involved in the task,
personnel qualification & competency shall be observed &
documented.
1.3 AL ESSA project management should identify the craft
competency before deploying on the job site.
1.4 All al Essa equipment and its sub-contractors shall be
inspected by a competent person prior to mobilization to
ensure that it is suitable for the safe and efficient
performance of the work.
1.5 Drivers, operators and banksmen/spotters for machinery
and equipment shall be trained and be competent. Only
authorized operators with SAG license and SAUDI
ARAMCO Certificate shall be allowed to operate
machinery and equipment.
1.6 Preventive Maintenance Program shall be established to
ensure that all machinery and equipment are thoroughly
inspected, serviced, repaired and maintained as necessary.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 11 of 90

1.7 AL Essa management will establish safety responsibility for


all personals on the project.
1.8 Al Essa management will ensure that all site activities are
supervised by qualified supervisory personnel, and they
must present at job site while work is in progress.
1.9 Al Essa shall provide maintained and enforce use of PPE to
all personals on project
Obtain Work permit From KM 0.0 to 49 Language barrier / A 2.1 Only ARAMCO certified Work Permit Receiver should
2 miscommunication obtain work permit that can easily communicate with
issuer and shall be fluent in English & Arabic.
Work Permit Violation
2.2 Work permit issuer & receiver should conduct Joint Site
inspection prior to issue permit.
2.3 Work permit should be present in the site before any work
begins.
2.4 Al Essa management and SAPMT will ensure that correct
permit(s) shall be issued for the job: proper Job
descriptions and equipment to be used shall be clearly
stated on the permit(s). Permits shall be issued for specific
tasks at specific locations.
2.5 Prior to the start of work, the work permit receiver shall
communicate the hazards and precautions for the job, as
well as other requirements on the permit, to all workers
working under the permit.
2.6 In the event of an emergency, all active permits shall be
immediately cancelled, and work activities stopped.
2.7 No work activities may start until a Work Permit has been
issued.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 12 of 90

2.8 Safety requirements stated on the work permit


must be available in site and strictly followed.
2.9 WPR to ensure competent personnel should be
allowed to be involved in the task.
2.10 Toolbox Talk should be conducted in
understandable language on site and documented
1 before start of work.
2.11 Both Saudi Aramco and Internal work permit
system is applicable to all low, medium and high-
risk activities (Housekeeping, right of way
cleaning, loading & unloading, vehicle entry,
water and diesel tanker and land surveying)
2.12 All internal work permit shall be communicated
with SA Proponent.
3. Site From KM 0.0 to 1. Miscommunication A
Preparation activities 49 / understanding
prior to start work 3.1 Toolbox talks daily to address activities planned for
the day, including hazard identification, control
measures implemented.
3.2 Emergency Rescue plan to be clearly
communicated with the work force.

2. Gas Release, fire,


3.3 Provide adequate SA approved portable fire
explosion, bomb threats
and other emergencies from extinguisher and other firefighting equipment.
nearby existing operating 3.4 Site Safety Supervisor and WPR to maintain proper
facilities
communication with Proponent and Issuer in the
case of emergency.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 13 of 90

3.5 Multi gas detector and Personal H2S detector shall


be available at site.
3.6 Wind sock to be installed at site to follow the cross
wind direction during emergency.
3.7 Emergency Response Plan / Procedure shall be
followed by ALL affected personnel and sub-
contractors in case of any emergency
3.8 Work location shall have a designated Assembly
Area in case of any emergency.
3.9 All employees must be forwarded to the Master-
Point (Located at 7840 Road) In case of Gas
Release, fire, explosion and other emergencies
from nearby existing operating facilities.

3. Personal Injury. 3.10 Provide / use complete PPE to all personnel.


3.11 Provide necessary tools and equipment.
3.12 Use the right tools for the right job.
3.13 Ensure all tools / equipment are properly
inspected & color coded by competent / qualified
personnel.
3.14 Ladder to be placed at no less than 7.5-meter
travelling distance.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 14 of 90

4. Dust 3.15 Measures shall be taken to prevent dust from


impairing visibility by the use of water spray on the
(ROW) and if practicable

5. Unsafe working
condition 3.16 If the condition is unsafe, stop work and report it
to your supervisor. “Stop work Authority” signage
to be posted at site.

3.17 Beware of snakes and scorpion at the site .if found


6. Biological hazards
don’t try to kill .

3.18 Maintain proper housekeeping.

7. Extreme weather 3.19 Provide effective Rest shelter and follow heat
conditions stress plan as applicable

4. Site Survey From KM 0.0 to 4. Miscommunication A 4.1 Obtain the relevant work permit for site survey works
49 as well as approved IFC drawings in order to set out
centerline.

5. Heavy equipment / From KM 0.0 to 1. Movement of A 3.1 Drivers, operators and banksmen/spotters for
Vehicle Mobilization) 49 Heavy Mobile Machinery machinery and equipment shall be trained and be
competent. Only authorized operators with SAG license
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 15 of 90

and SAUDI ARAMCO Certificate shall be allowed to


operate machinery and equipment.

3.2 Drivers and operators shall be trained not only in


the correct operation of the machinery and equipment but
also in the limitation of its use and the hazards that exist if
not used properly.

3.3 Preventive Maintenance Program shall be


established to ensure that all machinery and equipment
are thoroughly inspected, serviced, repaired and
maintained as necessary.

3.4 Non-essential personnel shall be kept well away


from the area of operation and trained flagmen/spotters
shall be provided where it is necessary.

3.5 All mobile machinery shall be fitted with a


reversing alarm.

where appropriate.

3.6 All personnel working in the vicinity of the earth


moving operations shall wear full Personnel Protective
Equipment (PPE) – e.g., hard hat, safety glasses, dust
mask, earplugs/earmuffs, coverall, safety shoes.

6. ROW construction / From KM 0.0 to 1. Danger to existing A 5.1. Obtain from operation the as built drawing of the
maintenance , 49 A/G & U/G facilities work site to identify all existing A/G & U/G
facilities.
5.2. If necessary, obtain countersign on work permit
from the concern department / personnel.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 16 of 90

5.3. Keep heavy equipment at least 3 meters away


from existing facilities.
5.4. Existing line shall be clearly identified by visible
marking i.e. Flags
5.5. Only Manual tools i.e., Shovels shall be used to
expose existing berm or pipe.
5.6. Hard barricades shall be provided along the A/G
pipeline sections while cleaning of ROW will be
ongoing.
5.7. Trained flagmen with reflective vest shall be
assigned with each heavy equipment to ensure
safe distance between equipment and existing
line maintained.
5.8. continues effective supervision shall provide to
ensure comply all above requirements.
5.9. Heavy equipment must be equipped with
proximity warning alert system (PWAS)
5.10. Metal detectors must be used prior to starting
excavation.
5.11. Reverse / back alarms shall be audible at a level
10 DB above ambient noise on all heavy
equipment.
5.12. Drivers and operators shall be trained not only in
the correct operation of the machinery and
equipment but also in the limitation of its use and
the hazards that exist if not used properly.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 17 of 90

7. Waste From KM 0.0 to 1. Hazardous /toxic waste B 1.1 All employees who handle hazardous materials shall
49, Site Offices be trained regarding such material and shall wear all
Disposal and Camp. manufacturers’ suggested safety equipment.

1.2 Man camp waste will continue to be placed in the


approved Saudi Aramco disposal area
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 18 of 90

8. Non- Km 00,01,05,06, 1. Radiation Exposure/ A 6.1 All work with ionizing radiation shall be performed under the
11,29, 34,35,37 control of an appointed Radiation Protection Officer (RPO).
destructive test Electric shock
, 39, 44, 46, 49. 6.2 No employee shall be permitted to use/operate ionizing
radiation equipment without being adequately trained and
Fabrication yard competent in the safe use and handling of ionizing radiation
and Abqaiq Plant. sources related to their job responsibilities.

6.3 Wear safety protective equipment and take protective


measures.

6.4 Employees shall be provided with and use the necessary


personal monitoring (Dosimeters) and protection measures (e.g.,
personal protective equipment) while using/handling ionizing
radiation equipment.

6.5 All portable radiation sources shall be surveyed before and after
use or movement using proper and calibrated radiation survey
equipment.

6.6 Access to controlled areas (high radiation areas) shall be


restricted to authorized personnel only.

6.7 Radiographic work shall immediately stop if unauthorized


personnel enter a controlled area.

6.8 Any vehicle used to transport radioactive material shall be


roadworthy and well maintained.

6.9 Ensure the driver is aware and understands that no other


passengers can travel in the vehicle other than the driver and
where applicable the driver’s assistant.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 19 of 90

6.10 Emergency response procedure shall be developed to guide


the drivers and operators in case of exposed radioisotopes due to
machine failure or vehicle accidents.

6.11 Ensure the driver of the vehicle is able to read and understand
the emergency response plan.

6.12 Ensure that the driver is aware that the vehicle carrying
radioactive material cannot be left unattended unless it is locked in
a safe and secure location.

6.13 Radiation sources shall not be transported in vehicles at


speeds exceeding 90 km/h.

6.14 Storage facilities shall be kept locked at all times with limited
distribution of keys.

6.15 When radiation sources are used on a daily basis at a


construction site, a temporary radioactive source storage facility
shall be constructed to minimize transportation risks associated
with the sources.

6.16 Temporary storage pit is not permitted if the radius of the


distance between the job site and base is within 30 km.

6.17 Only qualified and trained personnel can conduct non-


destructive test.

6.18 Wear insulated PPE correctly to prevent from electric shock.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 20 of 90

Heavy From KM 0.0 to 1. Injury to Pedestrians or 7.1 Provide escort when moving cranes around the plant.
49, Laydown A
9. Equipment yard. Construction Personnel 7.2 During travel, crane hooks must be anchored to the crane body
to avoid swinging freshly.
Operation Damage to property
7.3 When excavation, CONTRACTOR shall set barrier block at
heavy equipment working areas to prevent other worker close to
excavation areas.

7.4 Barricades shall have protective lighting, when necessary.

7.5 CONTRACTOR shall ensure that anyone shall not sleep or rest
under or near heave equipment.

7.6 Heavy equipment tires shall be deflated before repairing them.

7.7 Heavy equipment operation shall not be carried within 3 meters


of any underground facilities.

7.8 No heavy equipment operation shall be performed without a


permit considering as low risk or not required permit activities.

1 7.9 All heavy equipment operation shall be considered as high risk


even loading and unloading.

7.10. All of al Essa equipment and its sub-contractors shall be


inspected by a competent person prior to mobilization to
ensure that it is suitable for the safe and efficient
performance of the work.
7.11. No heavy equipment shall be operated, used or mobilized
on site without written authorization by Contractor Project
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 21 of 90

manager. Verification to be performed by contractor safety


manager on site in conjunction with valid work permit.

1.1 Caught in between A 1.1 Never stand between any equipment handling materials, Never
Heavy Equipment. place yourself between a loads, any vehicle and always have an
exit route when moving materials, always maintain eye contact with
equipment operator.

2. Unqualified operators A 2.1 Operators shall be allowed to only, the specific type of
equipment of which they are certified to operate. Saudi Arabian
Government certificate & Saudi Aramco certificates shall remain
valid available for inspection at all time.

2.2 Operator shall check at the start of the work shift the Oil, Fuel,
Water, and Hydraulic Levels & Gauge of his Equipment and ensure
that they are properly operating.
2.3 Instruct operators of heavy equipment do not to operate
equipment near excavations inside.

2.4 Operators shall dismount from equipment while maintenance or


repair work is being performed, unless otherwise instructed.

2.5 Personnel shall not ride in or work off any part of the equipment,
unless it is specifically designed for such work.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 22 of 90

3.1 Remove keys and / or disconnect battery cables, ensure


equipment is correctly parked, e.g. crane booms lowered, parking
3. Defective auxiliary A brakes applied.
equipment
3.2 Lifting operation of heavy equipment, structural steel sections,
etc, shall be witnessed by SAUDI ARAMCO representative, as
required.

3.3 Survey site for utility hazards such as buried cables and
develop special operating procedures for working in their vicinity.

3.4 Post back-up spotter for all heavy equipment.

3.5 360-degree clear view required for all vehicles.

Heavy equipment operations Sunshades obstructing clear views


are prohibited.

3.6 Daily Pre-Operational Inspection for hydraulic leaks, breakage,


tires, brakes, etc.

3.7 All lights and warning devices operate properly.

3.8 Slings and other lifting equipment shall have “S.W.L” Safe
Working Load clearly marked.

Approved for all lifting equipment / Accessories shall undergo


inspection by Safety Officer to comply with G.I.7.029 requirements.

3.9 All heavy equipment shall have in good working conditions and
installed PWAS or audible back-up alarm. ( As needed)

3.10 Hose and pipe connections checked for wear and cracks.
Defective hoses/pipes shall be replaced or repaired.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 23 of 90

4. Blocking traffic A 4.1 Clear work areas of personnel in & around heavy equip.

4.2 Provide designated parking area in and around job site.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 24 of 90

10. Work at height Abqaiq plant, Km 1.Fall hazard A 1.1 Develop a fall protection plan for the specific work at heights.
00, 01,
05,06,11,29, 34, 1.2 Selection of appropriate anchor points.
35, 37, 39, 44,
1.3 Protection from falling objects.
46, 49.
1.4 Ensure that fall protection equipment is available and in good
working condition before commencing work.

1.5 Make reasonable arrangement and reduce the height operation


at largest.

1.6 Personnel shall be with safety level rope when walking on the
steel girder or pipe, and proper use of safety belt.

1.7 CONTRACTOR shall ensure that personnel working at height


shall be all the time tie-up.

1.8 A temporary structure of scaffolds used to provide access or for


supporting workmen and/or materials at any height.

1.9 Special scaffold shall have a plan, including:

(1) Any access scaffold also supporting loads greater than


240kg/m2 50 psf) shall formulate a plan.

(2) Any scaffold over 38 meters (125 feet) tall.

(3) Any scaffold cantilevered (extended outward) by more than 3


meters (10 feet).

(4) Any scaffold (except tank bracket scaffolds) with a total platform
area over 30 square meters (320 sq. ft.).
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 25 of 90

2.Falling objects injury A 2.1 The workers shall take the tool bags to carry the tools.
other personnel
2.2 The material shall be stacked in a good condition.

2.3 Cross operation shall be prohibited.

2.4 Not personnel are allowed below any work done at height by
providing signs and proper barricades.

2.5 Personnel shall not carry tools or materials in their hands when
climbing a ladder and always maintain three points of contact.

2.5 Small Tools and materials shall be carried on special tools


belts. Small tools and materials shall be raised and lowered by
using pulleys and ropes.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 26 of 90

11. Use of PPE Entire work site, 1.Do not use PPE A 1.1 Employees must wear Hard Hats to protect the head.
Laydown yard correctly
and Abqaiq Plant 1.2 Safety shoes/boots only allowed on site.

1.3 Safety glasses shall be ANSI & Z-87.

1.4 Body harnesses are required when working in areas when no


guardrail exists at heights above 1.8 mtr.

1.5 All personal protective equipment shall be ANSI Std.

1.6 Safety Posts illustrating the proper use of PPE’s shall be


displayed to all workers to increase their safety awareness.

12. Scaffolding and Abqaiq plant, Km 1. Workmen may fall from A .1 Workers shall properly use fall protection equipments(safety
Work Platforms 00,01,05,06, the Scaffold or platform harness and lanyards, etc)
11,29, 34,35,37, resulting in injury to the
39, 44, 46, 49. one that fell. 1.2 Scaffolds are for Personnel use only and must not be used for
any other purpose.

1.3 Scaffolds and work platforms shall be erected in strict


accordance with the requirements of the Saudi Aramco Safety
Handbook and Saudi Aramco Construction Safety Manual.

1.4 All components of the scaffolding or work platform must be in


good condition and inspected regularly for damage or wear.

1.5 All ladders shall be safely secured.

1.6 Scaffolding shall only be erected on a sound base.

1.7 scaffolding erection, modification and dismantling will be carried


out only by the Saudi Aramco approved contractor.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 27 of 90

2. Improperly constructed A 2.1 Scaffold between 6 feet and 40 feet are not required to submit a
or unsecured ladders will scaffold plan. If exceed 40 feet height, scaffold plans are required to
result in falls while submit for review by Loss Prevention.
climbing to the platform.
2.2 Scaffolds and work platforms shall be erected in strict
accordance with the requirements of the Saudi Aramco Scaffold
Safety Handbook Section II-9 Saudi Aramco Construction Safety
Manual. Tower scaffolds have special construction requirements.

2.3 All components of the scaffolding or work platform must be in


good condition and inspected regularly for damage or wear.

2.4 All ladders shall be safely secured.

2.5 Scaffolding shall only be erected on a sound base.

2.6 System scaffolds shall have the proper component parts


compatible with the system being used and component parts from
another system must not be “adapted or cannibalized” for use with
the system

3. Materials or tools may A 3.1 On all scaffolds there must be provision for guard rails, toe
fall from the scaffold or boards, ladders, diagonal scaffold bracing (horizontal as well as
platforms vertical), use of support members and accessories which are of
appropriate strength to carry to the imposed loads, and use of
approved scaffold boards for platform. Minimum dimensions for
timber sole plates are 9’’ wide x 1.5’’thick.

3.2 The materials or tools should be stacked in good condition on


scaffold or platforms to prevent falling.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 28 of 90

4.No warning signs A 4.1 Warning signs and barriers shall be used to keep unnecessary
personnel away from the base of scaffolds.

4.2 Any scaffold which is being erected, but not completed shall
have Saudi Aramco Red Tag—“Do Not Use Scaffold”. Scaffold
checklist is to be used as a guide to ensure erected scaffold is safe
to use.

4.3 After the acceptance of the erected scaffolding a green scaffold


Tag “Scaffold pass inspection” shall be place on the scaffolding for
the user’s reference

5. Mobile scaffolds are A 5.1 Mobile scaffolds will not be moved with equipment, or materials
moved improper riding anywhere on the scaffolds.

5.2 Mobile scaffolds will only be moved through areas that have
been thoroughly cleaned of materials or constriction debris.

5.3 When mobile scaffolds are being moved, a workman shall be


posted to watch for interference between the scaffold and any
portion of the structure above and be aware of overhead conduits,
instrument tubing, instruments and utility piping.

6. No adequate lighting B 6.1 Adequate lighting shall be provided in all locations where
scaffolds and work platforms are used.

13. Material Handling Lay down 1.Improper maintained A 1.1 Perform daily inspection of storage yard.
yard,Abqaiq Plant warehouse
and From KM 0.0
to 49 2.Unqualified fork truck A 2.1 Only use the fork truck as per the marked capacity of the
operators equipment.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 29 of 90

3. Improper use equipment A 3.1 Use equipment only in accordance with the manufacturer’s
recommendations.

4.Untrained personnel B 4.1 Only trained personnel to work around equipment.

14. Manual handling Lay down yard, 1. Pinch point/sharp edge A 1.1Keep your hands, feet and body away from areas which could
Abqaiq plant and suddenly come together and severely injure you.
From KM 0 to 49
2. Hand/feet/back pain & A 6.1 During a course of manual handling observe proper positioning.
injury
6.2 Make a suitable and sufficient assessment of the risk of injury
from any hazardous manual handling operations that cannot be
avoided.

3. Improper manual lifting B Avoid hazardous manual handling operations as far as is


reasonably practicable, by redesigning the task to avoid moving the
load, by automating, or mechanizing the process.

4. Carrying loads that are A Reduce the risk of injury from those operations so far as is
too large or heavy reasonably practicable. Where possible, provide mechanical
assistance, for example, a sack trolley or hoist. Where this is not
reasonably practicable then explores changes to the task, the load
and the working environment.

Make a suitable and sufficient assessment of the risk of injury from


any hazardous manual handling operations that cannot be avoided.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 30 of 90

15. Mechanical
. Lay down yard, 1.Unstable ground A 1.1 Provide sufficient outrigger pad and position the lifting
Handling Abqaiq Plant and equipment in a compacted or stable ground condition.
From KM 0.0 to
49 2.Dropping the load B 2.1 Operator shall check all material straps before moving to
location, Rigger should inform operator after the load is safe.

3.Uncontrolled load / A 3.1. Use taglines to maintain control of load, Taglines should be
hitting someone with the long enough to keep riggers at least 3 M from load, Barricade &
load / Unbalanced load signage shall be provided, ONLY! ONE! Person to give hand
signals to equipment operator, Riggers to keep foot traffic away
from equipment travel path during equipment movement

4. Staying under the A 4.1 Never let anyone stand under the suspended load.
suspended load

5. Struck by and crushed A 5.1 Equipment Failure may cause Crushing Injuries, maintain good
by injuries body position, keep hands & feet away from lifted load, never work
under a suspended load. Check all equipment before use.

6.Overloading capacity of A 6.1 Do not exceed the SWL of lifting gears as recommended by
the lifting gears and manufacturer.
equipment
6.2 Valid third-party inspection certification shall be available

16. Mobilization of Lay down yard, 1. Unqualified personnel to A 16.1 Only authorized drivers and operators with SAG
mechanical Abqaiq Plant and operate equipment license and Saudi Aramco Certified shall be allowed to
equipment From KM 0.0 to operate machinery and equipment.
49
2. Equipment belts and A 2.1 Equipment belts and gears should be guarded.
gears are not guarded.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 31 of 90

3. Equipment Breakdown A 3.1 Keep records for all equipment pertaining to the maintenance.

3.2 Only qualified mechanics shall be authorized to make repairs.

4. PPE is not provided to A 4.1 Use the approved PPE for all employees involved with the
employees equipment.

5. Fire fighting A 5.1 Keep fire extinguishers in proper place and cause to be
inspected by authorized persons once a month.

6. Without locking pins A 6.1 Make sure the locking pins are used to minimize the potential
utilized on airline/hose for accidents Or personal injury.
connections

17. Use of power tools Lay down yard, 1. Untrained personnel A 1.1 Only those persons who are qualified are allowed to use power
Abqaiq Plant and tools.
From KM 0.0 to
49 1.2 Foreman shall make sure that his labors are familiar with the
use of the tools in a safe manner.

2.Defective tools and A 2.1 Before any electrical tools are used, a careful check shall be
equipment made by the supervisor to ensure that they are maintained in a
good condition.

2.2 CONTRACTOR shall provide dead man switch for all portable
tools and make sure that all personnel do not by-pass them.

2.3 CONTRACTOR shall ensure that Ground Fault circuit


Interrupters or ground isolation system shall before all portable
tools, temporary wiring and in potentially damp areas used in
portable.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 32 of 90

3. Users do not use PPE A 3.1 All operators shall use eye, head, ear and hand protection.

4. All guards improperly A 4.1 All guards shall be installed/ maintained properly.
installed/maintained

18. Abrasive Blasting Km 00,01,05,06, 1.Noise A 1.1Ensure that operators and personnel in the vicinity of noisy
11,29, 34,35,3, equipment in use uses earplugs and other required personal
39, 44,46,49, protection devices.
Fabrication yard
and Abqaiq Plant. 1.2Continuous visual inspection and check of the equipment and
accessories, especially the air supply hose. Damaged hose must
not be used.

2.Dust pollution A 2.1 Both operator and helper shall wear full protective suit designed
for abrasive blasting operations, approved air supply as per CSM
including full face shield with respirator, helmet, heavy gloves,
boots, and long sleeve grit blasting coveralls.

2.2 Frequent watering of the area will be performed to minimize


dust. Respirators will be used by workers which must continue to
work where dust cannot be eliminated.

2.3 Accumulations of grit shall be frequently removed.

2.4 Workers shall use silica abrasive approved by SA EPD.

2.5 CONTRACTOR shall establish a quarterly certification program


for breathing air compressors.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 33 of 90

2.6 Inspection plan for breathing air filter and approved supplied-air
respirator are also needed.

2.7 CONTRACTOR shall ensure abrasives blasting activities do not


create health hazards personnel in the vicinity.

3.Without safety signs A 3.1 Safety Signs during abrasive blasting work such as: “NO
ENTRY”,” SAND BLASTING IN PROGRESS – KEEP AWAY”,
“HEARING PROTECTION REQUIRED” shall be made available at
all time of work.

4. Slipping hazard if grit A 4.1 Other workers in the vicinity shall be kept away upwind as far as
accumulates on concrete is possible from the operation by barriers and appropriate signs.
slabs, hard ground of
walkways.

5. Hazards associated with A 5.1 Ensure that the air supply machine is monitored by another
compressed air person to continuously observe the pressure of the supplied air.
equipment.
5.2 Ensure that all those connections are secured by strong wire.

5.3 Nozzle control shall be with a “dead man” type valve, so that if
the operator releases the nozzle, it will automatically shut off. The
nozzle shall be properly grounded.

6.Operation incorrectly A 6.1 In restricted areas, abrasive blasting shall be conducted in


accordance with GI 2.100. Abrasive blasting is considered HOT
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 34 of 90

WORK and gas tests shall be performed per GI 2.709 prior to


initiating abrasive blasting operations.

6.2 All operators of abrasive blasting equipment shall be instructed


and trained in the correct use and hazards associated with abrasive
blasting equipment and abrasive materials.

6.3 Abrasive blasting operators for industrial coatings applications


shall be tested.

6.4 The use of silica sand for abrasive blasting operations shall be
prohibited at all facilities and SA project and construction sites.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 35 of 90

19. Painting &Coating Km 00,01,05,06, 1. Storage A 1.1 Paint thinner should be stored enough safety distance from fire.
11,29, 34,35,37,
39,44,46,49, 1.2 Paint thinner shall be kept safety distance from fire and ignition.

Fabrication yard 1.3 Spray painting shall not be performed within 23 m (75 ft) of
and Abqaiq Plant. ignition sources (e.g., welding, flame cutting, smoking areas and
electrical generators).

1.4 Electrical lighting and power tools/equipment shall be explosion


proof.

1.5 Fire extinguishers shall be available in the work area and be


protected from overspray.

1.6 Work areas shall be cleaned after every shift, including removal
of discarded paints, coatings and other materials.

1.7 The quantity of paints and solvents stored at the job site shall be
limited to the amount required for one day’s usage.

1.8 The size of portable containers (e.g., paint cans/containers)


shall not exceed 19 L (5 gal) for flammable or combustible liquids.

1.9 The size of metal drums used to store flammable liquids shall
not exceed 227 L (60 gal).
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 36 of 90

2. Paint thinner leakage A 2.1 Use the proper metal container with lid and drip trays for storing
paints and thinner.

2.2. Dispose of the spills properly as per G.I 430.001 to prevent


environmental contamination.

2.3 Always close the paint containers when not in use

3.Without using required B 3.1 Other than mandatory PPE’s, use the required PPE’s such as
PPE respiratory protection, Aprons, Chemical-Resistant gloves while
paint activity is being performed.

4. Warning sign is not B 4.1 Adequate warning signs shall be posted in painting areas.
sufficient/ Injure personnel
4.2 Spray or airless painting work areas shall be barricaded to
prevent entry by unauthorized personnel.

4.3 Chemical cleaning agents, such as solvents, shall not be used


for personal cleaning of hands, arms, etc.

4.4 Spray guns or nozzles shall not be pointed at personnel or any


part of the user’s body.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 37 of 90

20. Chemicals(Painting Abqaiq Plant, 1. Inhalation of chemical B 1. 1 Ensure that enough ventilation is continuously maintained.
& adhesives) Laydown Yard vapors and gas that paints
and from Km 0.0 generate. 1.2 Only Aramco approved chemicals shall be utilized on the site
to 49 and Paste CHB on each Container.

1. 3 Personnel protective equipment will be used as specified by


manufacturer MSDS and CHB.

2. Harm to the skin and B 2.1 Use of hand/skin protection during handling and application.
eyes.

3. Slip caused by spilled B 3.1 Quick removal of spilled material and the use of warning signs
material. in such cases.

4. Improper/unsafe B 4.1 Both material and application equipment must be stored


practices for storing properly in suitable temperature storage. The chemical shall be
material stored away from the fire hazards and sources of ignition.

4.2 Chemical hazard bulletin shall be posted in areas where such


chemicals are stored and available

5. Bad housekeeping of B 5.1 Maintain good housekeeping.


material and equipment
during application.

6. Fire hazard from B 6.1 Keep fire extinguisher nearby when using materials which have
flammable substances. a low flash point.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 38 of 90

21. Welding, Cutting Km 00,01,05,06, 1. Leaving of welding rods A 1.1 The leaving of welding rods or stubs of welding rods in the
and Brazing or stubs welding holder unattended is prohibited even if the machine is
11,29,34,35,37,39 turned off.
,
1.2 When welding from scaffolding which has a wood decking, the
44,46, 49. decking shall be covered with a fire resistant non-asbestos blanket
and all hot stubs of welding rods shall be deposited in a metal
Fabrication yard
container and not discarded onto the decking or dropped from the
and Abqaiq Plant.
scaffolding.

2. Operation fault A 2.1 Approved welding lighters shall be used instead of cigarette
lighter.

2.2 The worker shall be trained and qualified.

3.Compressed gas A 3.1 Provide warning signs.


cylinders
3.2 All compressed gas cylinders shall be used in a chained vertical
position and when not in use shall be capped, chained an stored in
a vertical position as far as is practicable from the area of activities.

3.3 Each cylinder must have the label/Sticker of it content at the


shoulder.

3.4 Saudi Aramco color-coding of cylinders shall be recognized by


welders and other workers.

3.5 Protection from temperature extremes.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 39 of 90

3.6 Store oxidizers away from flammable cylinders at least twenty


(20) feet.

3.7 Grease and oil must never be used near oxygen.

3.8 At the end of every shift, the hoses dismantled and returned to a
safe location. Valves turned-off and cylinder caps secured in place.

3.9 Flashback arrestors of O2 / acetylene cylinder will be installed


as per requirement.

4. Defectives welding , A 4.1 All electric and gas welding equipment shall be examined
cutting and brazing device immediately before use.

4.2 All welding and cutting equipment shall be of Saudi Aramco


approved type and operated with latest Saudi Aramco industry
safety procedures.

4.3 All equipment shall be examined immediately before use and


regularly maintained. Presence of leaks in high pressure system is
often indicated by hissing sound on unusual changes in the Torch
Flame.

5.Fire hazard A 5.1 Provide fire extinguisher with each welding or cutting equipment
set.

5.2 Provide a qualified standby man for fire watch during welding or
cutting operations.

5.3 Cover all operating process valves and drains in the vicinity with
(non – asbestos) fire blanket and use water deluge or wet the area
to quench sparks that may land.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 40 of 90

6. Injure nonrelated A 6.1 Barricade the welding area to prevent unauthorized entry.
personnel
6.2 Post the warning signs around the work area to alert the
people.

6.3 Allow only the authorized personnel to work location and keep
others at safe distance;

22. Abqaiq Plant, 1. Placement Procedure A A mixer equipped with 0.75 cm. or larger loading skips shall be
Concrete, Concrete
Laydown Yard equipped with mechanical device to clear the skip of concrete.
Forms & Shoring

2. Erection of form work B 2.1 Form work and shoring shall be designed, erected, supported
braced and maintained.

3. Removal of form work B 3.1 Remove and stockpile form work promptly after stripping.

3.2 Area for de nailing the form shall be designated, and de-nail all
dismantled from work materials to maintain good housekeeping.

3.3 Chains, gears, revolving shafts and other moving parts shall be
properly guarded.

3.4 Empty cement bags shall not be allowed to accumulate in the


work area.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 41 of 90

4. Working over rebar A 4.1 Employees shall not be permitted to work above vertically
protrusions protruding reinforcing steel unless it has been bent over or capped
or otherwise protected. Rebar caps shall be used for this purpose.

4.2 Use only ANSI approved personal protective equipment.

5. Hazards of the A 5.1 Review hazards of the operation with all involved personnel
operation
5.2 Use only ANSI approved personal protective equipment.

5.3 Telescoping concrete truck should have the valid Aramco


approved third party certification.

5.4 Wire mesh rolls will be secured at each end to prevent


recoiling.

5.5 Riding concrete buckets will be forbidden.

5.6 When using mixer truck, proper personal protective equipment


such as respirators, hearing protection and goggles.

5.7 Safety chains, catches and lifting mechanisms shall be in good


operating condition.

5.8 When using telescopic mixer truck, ensure all connections are
in good condition and also safety warning signs shall be used to
keep nonrelated personnel away from working areas.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 42 of 90

23. Concrete Abqaiq Plant, 1. Skin and Eye irritation B 1.1 Use of hand, ear and eye protection devices.
Laydown Yard
Placing & 1.2 Use boots to protect your feet.

Finishing 1.3 Use of warning signs at freshly placed concrete.

1.4 Proper handling of concrete and avoiding random application.

1.5 Removal of spilled concrete.

24. Confined KM 36,KM 37,KM 1. Presence of A 1.1 Before entering into the excavation a gas test shall be
38,KM 39,KM 44, Hazardous performed.
Space Entry KM 46,KM 47.
Gases/Oxygen 1.2 If required, regular gas monitoring shall be done inside the
All road, pipe line
(Excavations deficiency excavation.
and FOC
deeper than 1.2M
crossings
Depth) 1.3 Gas monitor shall be calibrated and done by certified people.

1.4 Trained stand by man shall be assigned outside the excavation.

1.5 Emergency evacuation procedure shall be implemented


in case of any emergencies.

1.6 All the personnel engaged in the activity shall be CSE trained.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 43 of 90

2. Lack Of A 2.1 Appropriate access/egress shall be provided.


Access/Egress
2.2 If access ladders are provided, the ladders shall be ANSI/EN
standard and placed in such a way that the employees will assess
at the maximum of 7.5 m lateral travelling distance.

2.3 Ladder shall be extended at least 3 ft above the landing area.

2.4 Ladder shall be secured and fixed in 4:1 (Horizontal to


vertical) ratio.

2.5 Ladder shall be inspected before each use.

2.6 Broken / altered / painted ladders shall not be used.

3. Unauthorized Entry A 3.1 All authorized personnel entering the confined space shall sign
a log sheet upon entering and exiting the confined space to
account for all personnel.

3.2 Prevent the unauthorized entry by install barricades around the


excavation and assign a trained standby man at each entrance.

4. Untrained attendants 4.1 Use only the Trained and certified CSE Supervisor, Standby
and entrants. man, and rescue personnel.

4.2 Confined space entry training should be provided to all people


before entering in to the confined space.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 44 of 90

5. Collapse of A 5.1. Protective system to be used (i.e., benching, sloping or


excavation shoring).
5.2. Only competent and SA Certified Operators operate heavy
equipment.
5.3. Safe distance shall be maintained from excavation edge.
5.4.

6. Lighting A 5.1 Ensure adequate lighting. All electrical lighting shall be


explosion-proof in areas where flammable environments are likely
to be present. Lighting systems rated at 25 volts or less are
preferred.

25. Steel Erection Laydown Yard 1. Trapped in Between B 1.1 Care must be taken while placing the steel structures on the
and from Km 0.0 foundations.
to 49
1.2 Do not hold under the Structure.

1.3 Alignments shall be done by holding above the bottom of the


structure or using taglines.

2. Crane Tip over A 2.1 Crane shall be placed on level firm ground.

2.2 Outriggers shall be fully extended.

2.3 Use only the third party inspected and certified cranes.

2.4 SWL Shall be checked before lifting.

2.5 Lifting plans shall be prepared by the rigger I shall be available


for critical lifts.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 45 of 90

2.6 Prevent unauthorized entry by proper barricading and


signboards.

3. Lifting Gear Failure A 3.1 Appropriate lifting capacity lifting gears shall be used.

3.2 Lifting gear shall be inspected and certified.

3.3 Lifting gear inspection log shall be maintained.

3.4 Critical Lifts shall be physically supervised by rigger I.

3.5 Damaged lifting gear shall be immediately removed from the


site.

4. Unsecured permanent A 4.1 Secured permanent connection (bolting/welding) between steel


and temporary members precuts panels will have been completed before the
connections crane releases the lifted load.

26. Sanitation and Site Offices / 1.Drinking Water C 1.1 Will provide water, paper cups & trash can for disposal off used
Housekeeping Abqaiq Plant, /Disposable paper cups & paper cups as per require.
Hygiene Laydown Yard Trash can
and from Km 0.0
to 49 2. Toilets C 2.1 One Toilet for every 15 employees shall be provided.

3. Eating facility C 3.1 Eating facilities shall be provided, if required.

4. Rubbish Containers C 4.1 Provide Rubbish containers with proper marking and self-
closing lids clean on a daily basis.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 46 of 90

5. Resting areas C 5.1 Provide enough resting areas for work in order to relieve fatigue
at site.

5.2 The resting areas shall be kept clean.

5.3 Smoking areas shall be provided at site and camp.

5.4 All personnel shall pay attention to around biological hazards.

27. Use of slings & Abqaiq 1. Wire rope slings A 1.1 Wire rope slings shall be provided properly identified for SWL
rigging gear Plant,Laydown improperly identified and manufacturer.
Yard and from Km
0.0 to 49
2. Without inspections A 2.1 Authorized personnel shall do inspections and the Safety Dept.
performed on all slings shall keep the records.

3. Sling log is not A 3.1 Sling log maintained by the Safety Dept. on a monthly basis.
maintained

4. Shackles improperly A 4.1 Maintained/inspected and records retained by the Safety


maintained and inspected Department.

5. Damaged slings not A 5.1 All damaged slings and rigging gear shall be marked and taken
taken out of site out of the project site.

28. Vehicle driving Abqaiq Plant, 1. Speeding A 1.1 Restrict vehicle speed to the posted limit for light vehicles and
Laydown Yard less than that for other types of moving equipment.
and from Km 0.0
to 49 2. Driving after drunk A 2.1 It is prohibited strictly.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 47 of 90

3. Fatigue driving A 3.1 Ensure that drivers are having enough rest.

3.2 Instruct them to Take regular breaks during the driving usually
every 2hrs.

3.3 If possible, add more work in single trip.

3.4 Avoid the use of medicines which may cause drowsiness.

4. Driving Without license A 4.1 Driver shall have an available license.

4.2 All drivers shall immediately report any changes in license status
or ability to drive to their supervisor.

4.3 Drivers who operate SA vehicles shall have Current Driver


Improvement Program certification.

4.4 Drivers shall be trained before driving.

5. Vehicle condition B 5.1 Inspect vehicle condition before driving.

5.2 Drivers shall perform a 360-degree walk-around before getting


into the vehicle.

5.3 Drivers shall inspect the vehicle’s safety equipment (e.g., spare
tires) before using the vehicle.

5.4 Drivers shall ensure vehicles have a valid inspection sticker and
are maintained in a safe operating condition.

5.6 Drivers shall ensure adequate supplies and communication


equipment are available for remote area driving.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 48 of 90

6.Drivers and other A 6.1 Drivers shall report all vehicle collisions and moving violations
occupants’ responsibilities immediately, no matter how minor.

6.2 Drivers shall not leave vehicles unattended while the engine is
running.

6.3 Drivers who operate vehicles in remote locations shall attend


off-road driver training.

6.4 Wear seat belts at all times and ensure that all Passengers
wear their seat belts.

6.5 Using a cell phone, eating, or drinking is prohibited.

6.6 Always set the parking or emergency brake when the vehicle is
parked.

6.7 Reduce vehicle speed under hazardous weather or road


conditions.

6.8 Only Park in designated parking areas. Parked vehicles shall


not obstruct other vehicles, roadways, access ways or fixed
firefighting installations.

6.9 Not transport passengers in the rear of pickups or on truck


beds.

6.10 Not transport more passengers than the number of seat belts
provided in the vehicle.

6.11 Drivers shall report any unsafe conditions immediately.

6.12 All occupants shall wear seat belts.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 49 of 90

6.13 All personnel transportation vehicles must in good condition.

6.14 All personnel in vehicle shall have seats and be provided


safety belt.

7. Off the road driving A 7.1 Off-road vehicle operators shall receive specific training
in off-road driving and survival techniques.

7.2 Off-road vehicle operators shall inform their immediate


supervisors of their destination, route and expected time of
return.

7.3 A sign-in/sign-out logging system shall be used.

7.4 Personnel lost or stranded in the desert shall stay with


the vehicle.

7.5 Drivers should be trained in off-road driving procedure


and search/rescue management plan prior to operating
vehicle in a remote-area or off-road.

7.6 Off-road vehicles shall be in good condition with rescue


equipment and mode of communication. Including:

(1) Compass and/or global positioning system (GPS) unit


and appropriate maps.

(2) Adequate spare fuel and oil.

(3) Communication equipment.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 50 of 90

(4) Tools and equipment for emergency use (shovel, sand


boards/mats, rope, sling, shackles, etc.) and two properly
inflated spare sand tires.

(5) Sufficient food and drinking water to last until rescue


occurs, if stranded.

(6) Sufficient materials to create shade.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 51 of 90

29. Heat stress Abqaiq Plant, 1.Heat stress/Heat A 1.1 Prior to performing work during hot weather, conduct a
Laydown Yard and Stroke/Heat Cramps thorough heat stress evaluation to identify tasks and
from Km 0.0 to 49 conditions that present potential heat stress hazards.

1.2 Develop and implement a written heat stress


management program based on the results of the heat
stress evaluation, as well as SA’s heat stress
requirements.

1.3 Heat stress evaluation and management program will


address the following:

(2) Work Duration and Schedule-Frequency at which the


task is performed and how much time and effort is required
to perform the work.

(3) Environmental Conditions-Procedures to monitor air


temperature and humidity and immediately communicate
changing heat stress conditions to workers.

1.4 Designated shaded break/rest areas shall be provided


at a distance not greater than 100 m (330 ft) from
personnel working in direct sunlight for extended periods of
time.

1.5 When the air temperature is less than 37 °C (99 °F),


fans or portable air movers may be used to reduce heat
stress by increasing the air flow in the work area.

1.6 Portable blowers with built-in air chillers shall be used


as needed (e.g., when confined spaces and enclosed work
areas have ambient temperatures exceeding 43 °C
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 52 of 90

[110 °F]) to provide cooling for confined spaces and similar


enclosed work areas.

1.7 Schedule work for the cooler times of the day,


especially during the month of Ramadan if it falls in the
summer.

1.8 Deliberate acclimatization shall be used to expose new


employees to work in a hot environment for progressively
longer periods.

1.9 Workers shall be encouraged to drink plenty of water


prior to the start of each shift. Ample supplies of cool
drinking water shall be located within 100 m (330 ft)
walking distance of each worker and in all designated
break/rest areas.

1.10 Work and rest rotations shall be based on the actual


heat index at the work site. (See Attachment II).

1.11 Employees shall work in teams and shall observe


each other for signs of diminished capacity and heat-
related illness and report it to immediate supervisor.

1.12 Workers exhibiting symptoms of serious heat-related


illness shall immediately seek medical attention and be
allowed to fully recover before returning to work.

1.13 No person shall work alone (i.e., isolated) while a red


heat stress danger category IV condition exists at the work
site.

1.14 Commercially available ice vests, neck/wrist wraps,


etc., may be provided to employees as needed (e.g., who
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 53 of 90

work for extended periods inside a confined space during


hot weather).

1.15 Light colored, lightweight, breathable clothing that


covers as much of the body as possible, including the
head, shall be worn when working in direct sunlight.

1.16 During periods of high heat stress potential,


employers are to provide employees with wetted terry cloth
towels and/or allow them to wet their normal work clothes
as necessary to provide cooling for their body.

1.17 Heat stress awareness training shall be provided just


before and during the hot summer months to all applicable
personnel (e.g., who work outdoors) and those who
manage personnel and have responsibilities for
establishing heat stress mitigation measures.

1.18 CONTRACTOR will follow government regulations to


perform outdoor working during extreme high temperature.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 54 of 90

30. Excavation Abqaiq Plant and 1. Personnel falls in A 1.1 Determine the size and purpose of excavation.
From Km 0.0 to 49 excavation
1.2 Place signs “DANGER – DEEP EXCAVATION” and
use warning tape. For deep excavations, temporary
barricade will be required. “Excavation work signage” shall
also be provided aside from the type of sign board.

1.3 Provide walkways over excavations, with handrails,


where required for pedestrian traffic or to access
equipment such as valves, pumps, motors, etc. The
number of walkways shall be as per the requirements of
Aramco Representative

a. All excavations shall be considered dangerous


regardless of soil type
b. No excavation shall be started until daily
1 excavation checklist completed by excavation
competent person
c. No site supervisor is allowed to complete and sign
the daily excavation checklist if done so, it shall be
considered as violation and disciplinary action shall
be taken against the violator.
d. Permit issuer and receiver shall not initiate any
permit until verified that cave in protection system
like slopping, shoring or benching provide to protect
the excavation.
2. Cave in A 2.1 Suitable protective systems such as benching, sloping
or shoring shall be planned for if the excavation is at a
depth of 1.2 m (4 ft) or more in soil other than stable rock.

2.2 Excavations less than 1.2 m (4 ft) deep may also


require protective systems if sidewall cave-in hazards exist.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 55 of 90

3. Access and egress A 3.1 Provide ladder for access and egress in trenches not
exceeding twenty-five (25) feet in distance and ensure the
ladder extends 3 feet above step-off point.

4. Avoid spoil bank A 4.1 Spoil bank to be kept two (2) feet back from edge of
plunging into a pit deep excavations.

5. Traffic A 5.1 Spoil material (soil) not to block roadways, sidewalks,


etc. Haul to safe Saudi Aramco approved dump area daily.

5.2 Backfill those portions of the excavation where work is


completed as soon as it is inspected.

5.3 During excavations, qualified watch men will be


positioned to alert traffic and workers to potential dangers
or excavations and traffic detours. Flagman shall be
identified with orange vests and directional traffic paddies.

6. Confined space A 6.1 Provide approved shoring on all excavations over 4’


deep per Saudi Aramco Construction Safety Manual.
/Ventilation Excavation over four feet (4’) deep must also comply with
confined space requirements.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 56 of 90

7. Break other facilities A 7.1 Locate above ground obstructions such as pipes and
cables prior to excavation.

7.2 Mechanical excavators shall not be used within 3 m (10


ft) of underground utilities or installations. Pneumatic
breakers shall only be used where necessary to break
concrete or other hard materials.

7.3 Mechanical excavators shall not be used until all


underground utilities and installations have been exposed
by hand digging.

7.1 Overhead 7.1.1Any Overhead hazards (electrical, pipe rack, etc.)


Hazards/Damaged to shall be identified by using Goal Post, Warning Barricades
Underground Utilities (Live A or other means.
electric power lines,
Service pipelines). 7.1.2 Conduct GPR (Ground penetrating Radar) survey
inside the Abqaiq plant and other process area to identify
buried services hazards (live electrical power lines,
services pipe line and FOC cables) at areas to be
excavated.

7.1.3 On suspicion of an unidentified underground utility,


excavation shall stop immediately and immediately notify
the Foreman/Supervisor.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 57 of 90

8. Excavation procedures A 8.1 The need for initiating the required excavation
checklist shall be carried on all excavations being done
inside Saudi Aramco facilities.

8.2 Obtain relevant work permit before excavation work is


started.

Steps to be Taken:

(1) As-Built drawing review by Saudi Aramco and


CONTRACTOR.
(2) Request for relevant dept. for joint site inspection.
(3) Site review by SAUDI ARAMCO and CONTRACTOR.
(4) CONTRACTOR utility detection test. Saudi Aramco will
witness the Test.
(5) Request for Work Permit.
(6) Pre-Job Safety meeting.
(7) Begin Manual excavation.
(8) Barricade & Clean-up / illuminate
(9) Close Permit.

9.Backfilling operations A 9.1 Only excavating and backfilling equipment are


permitted within 2m of the edge of an excavation.

9.2 Ensure the areas be free of roots, trash, snow, ice or


other unsuitable material.

9.3 Backfilling and removal of shoring shall be


accomplished first by backfilling up to a level allowing for
the removal of the lower braces.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 58 of 90

9.4 Another layer of backfill shall be positioned in the


excavation up to the next layer of braces to be removed.

9.5 Removal of shoring shall progress together with the


backfill from the bottom to the top of the excavation.

9.6 In unstable soil, ropes shall be used to pull out the


jacks or braces from above after all employees have exited
the excavation.

9.7 All excavations shall be backfilled and the surface left


in good condition

9.8 All sand and marl required for the work from the source
approved by SA

10. Side wall collapse due A 10.1 Heavy equipment shall not be operated within 1.8 m
to equipment operation (6 ft.) of any excavation.

10.2 Workers shall not inside a trench or excavation when


heavy equipment is performing excavation.

11. Dust C 11.1 Water shall be sprayed in order to minimize the dust

11.2, If possible, the sand shall be removed from the area


to minimize the dust

11.3 The traffic and heavy equipment speed shall be kept


minimum

11.4 Employees shall be provided with required PPEs like


N95 dust mask, etc.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 59 of 90

From KM 34 to 49. 12. Rock Breaking A 12.1 Before performing the rock breaking conduct the
inspection for stability of the nearby structures.

12.2 Remove unauthorized people from the area.

12.3 Assign a trained flagman to guide the operator for


safe operation.

12.4 Person nearby the area should wear N95 dust mask
to protect from the inhalation of silica dust.

12.5 Keep all workers on safe distance to protect from the


flying particles.

12.6 Only use trained and experienced operator for rock


breaking.

12.7 Area around the rock breaking should be barricaded


and warning signage’s posted.

13. Excavation close to A 13.1 Any road closure or excavation works around
proximity of emergency gates or security lighting system shall be
road/Emergency approved in writing by the area industrial security operations
Gates/Road Closure department and all other relevant Saudi Aramco
departments.

13.2 In those cases where a closure will impact local


communities such as on major Saudi Aramco public roads,
the Area Government Affairs Office will be contacted and
through them local Government entities will be advised.

13.3 Each site must be evaluated as to its particular


conditions including, but not limited to, physical culture of
the area, sight distance, traffic volumes, speed limit,
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 60 of 90

duration of the closure, and anticipated weather conditions.


From these considerations, the type of detour will be
determined and the requirements for surfacing and/or
illumination decided.

13.4 Signs will be maintained in a clean and legible


condition.

13.5 Signs shall be made of reflective sheeting conforming


to current Ministry of Transport and Saudi Aramco
standards.

13.6 Detours for long-term projects should be paved with


hot mix asphalt for heavy traffic volume, and / or stabilized
with emulsion for low traffic volume.

13.7 Road Closure areas shall be illuminated during hours


of darkness.

13.8 Upon completion of the closure activity, all excess


materials, spoils; debris and traffic control signs will be
removed from the area immediately. Shoulders, side slopes,
ditches and back slopes will be re-graded, compacted &
restored to meet Saudi Aramco standards.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 61 of 90

31. Working on live Abqaiq Plant, and 1. Working on live A 1.1 Only qualified trained electricians will be allowed to
equipment From Km 0.0 to 49 equipment work on energized electrical equipment.

1.2 Protective equipment shall be used correctly.

1.3 The work must be correctly planned before starting.

1.4 Do not allow any employee to work on live equipment


alone.

1.5 Lock out/tag out procedures are required per G.I. 6012
or approved plan.

1.6 Non-conductive tools only to be used near energized


equipment.

32. Pressure testing Abqaiq Plant, 1. Blinds and flange class A 1.1 Ensure that blinds to be inserted have the same
Laydown Yard and miss match ratings as the flanges.
from Km 0.0 to 49 1.2 If leakage build-up from the valve is observed,
retighten the valve and refer the matter to plant
operation.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 62 of 90

2. Pressure Testing A 2.1 Use of pressure relief valves during testing.

2.2 Relief valves shall be properly located in the system to


be tested, including near the test pump.

2.3 Over pressure by installing relief valves with proper set


points.

2.4 Nobody can inspect or get close to equipment/line


being tested until it is depressurized.

2.5 Set watchman and warning signs when pressure


testing.

2.6 All relief valves shall be tested, dated, and tagged


within one week prior to the pressure test.

2.7 The test area shall be marked and warning signs shall
be posted to alert approaching personnel, where practical.

2.8 Personnel shall be posted at plant sites to keep the


test area clear of all people not connected with the test, if
necessary.

2.9 Where a pipeline being tested crosses under a road,


the traffic shall be diverted or stopped during the test, if
practical. If this is not practical, personnel shall be posted
at the crossing to control traffic in the event of an incident
affecting traffic safety.

2.10 Where a road parallels within 30 m (100 ft.) of an


aboveground pipeline being tested, traffic shall be diverted
or stopped during the test.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 63 of 90

2.11 The pressure test relief valve shall be accompanied


with a calibration certificate that includes the cold
differential test pressure (CDTP), test date and the spring
range. The CDTP shall be within the spring range.

3. No Inspection condition A 3.1 Ensure that pipe end, connections and all fittings are in
good condition to avoid point ruptures.

3.2 Inspect and check visually the testing equipment and


associated accessories, i.e. hoses, fittings, etc. and ensure
their good condition before testing and meet test pressure
requirements.

4. No warning signs A 4.1 Erect barrier tapes and post warning signs, etc.

5. Trapped air might A 5.1 Inject at the lowest point in the system when filling
cause risk for lines. testing fluid to eliminate the entrapped air by keeping open
all the air vents.

6. Over pressure from A 6.1 Avoid pressuring pipe beyond test package limit.
pump will cause injuries
and damage to properties. 6.2 Use only calibrated pressure gauges and relief valves.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 64 of 90

7. Failure of hoses and 7.1Ensure that whip-checks are fitted to another point.
fittings.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 65 of 90

33. Material Storage Laydown Yard 1.Storage area is not meet B 1.1 Assign qualified person to control the materials
standards handling operation. Re-route the pedestrian and vehicle
, warehouse, site traffic if required during the materials handling by providing
offices, Temporary barricades and warning signs.
Storage area At KM
5, KM 28 and 1.2 Material Safety Data Sheets must be available for
KM34. employee which includes:

Personnel Protection.

Procedure for spills.

Physical data and properties.

1.3 Prepare a plan for storage area showing proposed


location. Access ways, location of firefighting equipment,
and type of material to be stored shall be submitted to
Saudi Aramco.

1.4 Flammable and toxic materials must be stored in


secure areas separate from other materials and signs
shall be posted stating the nature of the hazards.

1.5 Adequate firefighting devices and equipment must be


provided in all storage areas.

1.6 Every storage facility shall be provided lifting equipment


such as forklift which shall have a valid inspection sticker

1.7 Forklifts shall be equipped with overhead protection,


seatbelts, a fire extinguisher and a backup warning alarm.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 66 of 90

1.8 Loads shall not exceed the manufacturer’s rated lifting


capacity.

1.9 Personnel other than the operator shall be prohibited


from riding on the forklift, including on the forks.

1.10 Forklifts shall not be left unattended with the engine


running. When forklifts are parked the forks shall not be in
a raised position.

1.11 Flammable and combustible material storage areas


within materials storage yards shall be clearly marked and
adequate in size and layout.

1.12 Material storage yards shall not be closer than 15 m


(50 ft) to any other structure.

1.13 For tractors and trailers, safety chains or wire ropes


shall be attached between the towing vehicle and trailer to
allow the towing vehicle to bring the trailer to a controlled
stop if the towing connection breaks or becomes separated

34. Use Electrical Abqaiq plant, 1. Unqualified electricians A 1.1 Ensure that only qualified electricians use electrical
Equipment and Laydown Yard and completing electrical work. equipment.
Flexible from Km 0.0 to 49
2. Electrical equipment not A 2.1 Grounding of portable electric equipment checked
Cords grounded. regularly. All generators must be grounded.

3. Electric circuits have no A 3.1 Check for ground fault circuit interrupts on all site
GFCI breakers. outlets.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 67 of 90

4. Damaged Receptacle. A 4.1 All receptacle outlets shall be in good condition


equipped with RCD or GFCI and should be either 110V or
220V.

4.2 Don’t plug bare wires on receptacles.

4.3 Test the receptacle every month by qualified


electrician.

5. Damaged cords or A 5.1 Visual inspection of portable cord and plug connected
plugs are used. equipment and flexible cord sets.

5.2 Extension cables must be connected to junction boxes


of molded rubber.

6. Defective electrical A 6.1 Inspect electrical equipment and tools that will be
equipment is used. used, remove from site any damaged ones.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 68 of 90

35. Crane Lifting Abqaiq Plant, 1. A defective lifting A 1.1 Inspection of equipment must be done by Saudi
/Lifting Equipment Laydown Yard and device or crane. Aramco Crane Inspection Unit every ninety (90) days or
From Km 0.0 to 49 after major repairs. Crane shall have valid inspection
sticker.

1.2 All cranes shall be possession of documents and shall


be made available to any Aramco representation during
inspection.

2. Unqualified equipment A 2.1 Only licensed, qualified persons will be permitted to


operator operate cranes or other lifting equipment per G.I.

7.025.

2.2 Only trained and Saudi Aramco Certified Riggers shall


be allowed to attach slings to loads being lifted. This shall
be strictly enforced per Saudi Aramco G.I. 7028.

2.3 While cranes are traveling, loads shall not be permitted


to be attached to the hook.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 69 of 90

3. Defective lifting A 3.1 Special custom designed hook, clamp or other lifting
accessories, clamps, accessories shall undergo Inspection from a person
hooks, slings, etc. authorized by Saudi Aramco Crane Inspection Dept. to
comply with G.I. – 7.029 requirements.

3.2 The safety requirement which pertain to the crane


operator’s daily inspection checklist to comply with section
5.4 “Inspection and Testing requirements” of G.I. – 7.030.

3.3 Conduct frequent and periodic inspection of lifting


equipment, lifting accessories and slings. Damaged or
unsafe accessories and slings shall be immediately
removed from the site. When slings are not in use, they
shall be stored in a location safe from possible damage or
misuse.

3.4 Crane Operator’s daily inspection checklist.

3.5 Crane maintenance inspection logbook.

4. Non – stable crane A 4.1 Determine the soil condition and soil compaction tests
positioning, i.e. soft soil, before levelling the crane.
improper outrigger mats.
4.2 Crane shall be levelled in accordance with
manufacturer’s Specification and shall be located on a
properly compacted foundations prior to perform any lift.

4.3 Out rigger pads must be place before extended crane


out riggers

4.4 Critical Lifting plans shall be completed by rigger-I and


made available on-site prior to any critical carne lift.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 70 of 90

5. Non – use of personal A 5.1 Enforce use of personal protective equipment.


protective devices, i.e.
hard hats, gloves,
goggles, safety harnesses,
etc.

6. Improper rigging A 6.1 Open mouthed hooks, e.g. “C,” “S” or half link hooks
are prohibited to use one site.

7. Improper signaling A 7.1 Only Saudi Aramco Certified Rigger shall be allowed to
between the rigger guiding signal the crane operator when loads are being lifted and
the load and the lifting moved into place. The crane operator shall be made aware
operator. exactly who the rigger is and shall not take instructions
from anyone else.

8. Failure to follow critical A 8.1 Lift plans approved for all heavy lifts (i.e. Compressors,
Transformer, and Foundations) per G.I.7.028. Critical lift
Lift procedures plans approved by certified for the type of working. Load to
be lifted shall be submitted for review by Saudi Aramco to
comply with the requirements mandated in GI- 7.028

8.2 Operator is not to leave his position at controls while


load is suspended.

8.3 When the boom starts moving and load or hook


approaches personnel, the warning horn signal shall
sound. Where Crane Work is to be performed near
Energize power lines, the following absolute limit of
approach or minimum clearance from power lines shall be
observed without exception. 20feet (6.10meters) for
250,000 volts or under 25feet (7.62 meters) for near
250,000 volts.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 71 of 90

8.4 Cranes are to be refueled outside the operating plant,


preferably in the lay down yard.

8.5 Cranes may not be operated inside Plant if wind speed


is over twenty (20) miles per hour (17.4 knots). Man
baskets are restricted to twenty (20) kilometers per hour
(11 knots).

8.6 Cranes shall have SAFE LOAD INDICATORS fitted on


the cranes per G.I. 7.028.

8.7Load chart shall be posted inside cab or lifting


equipment.

8.8 All lifts in lost areas of Plant require a crane lift plan. Lift
plans are not required in yards and away from any process
areas or power lines.

9. No warning signs A 9.1 Provide warning signs of clearance limit.

9.2 Barricade the area during lifting operation and redirect


traffic/personnel.

9.3 Cranes shall be provided with a 30 m (100 ft) tape measure to


assist with crane positioning and determining the crane’s exact
working radius.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 72 of 90

10. Cranes traveling A 10.1 Carrying people on the load is strictly prohibited.

10.2 A positive locking device shall be engaged to prevent the


boom from swinging during travel.

10.3 For cranes fitted with retractable suspension units, the


suspension shall be level before traveling.

36. Traffic Abqaiq plant, 1. Plant access by A 1.1 Develop a traffic plan for each excavation activity crossing
Laydown Yard and pedestrians, motor plant streets, which restricts access to operating plants and
From Km 0.0 to 49 vehicles, construction emergency equipment. The plan will include proposed detour
equipment, emergency routes, approved road warning signs, flagman, barricades, blinking
services. lights, and directional arrows. This plan will be reviewed by project
manager and submitted to Saudi Aramco for approval prior to the
start of construction activity.

1.2 Install crosswalks to plant equipment for safe access by


operators and barriers to prevent personnel from falling into
excavations.

2. Speeding A 2.1 Restrict vehicle speed to the posted limit for light vehicles
and less than that for other types of moving equipment.

3. No warning signs A 3.1 Post construction signs in each area identifying contractor
and BI number.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 73 of 90

4.Detour is not meet SA A 4.1 Detours for long-term projects (30 days or more) should be
standards paved with hot mix asphalt for heavy traffic volume, and / or
stabilized with emulsion for low traffic volume.

4.2 All detours plans will follow SA G.I.1021.000.

4.3 Road construction shall set barriers and warning signs at


both ends.

37. Electricity Abqaiq Plant, 1. Outlets without Ground A 1.1 Outlets supplying portable Electric power tools shall be
(including the Laydown Yard Fault Circuit Interrupters equipped with a functioning ground fault circuit interrupter
use of Gen. and From Km 0.0 (GFCI) and be limited to no more than 240 volts.
to 49
Sets & Utility 2. Grounding of Equip. A 2.1 Grounding shall be provided on all equipment for protection
of workers.
Tie-ins)
3.Use of Lockout & Hold A 3.1 Use of lockout & hold tags as necessary per GI 6.012.
tags

4. Properly qualified A 4.1 Only Qualified Electricians shall maintain temporary and
Electricians permanent electrical cords and wiring. Inspections of tools and
equipment shall be done on a weekly basis.

5. Coordination of tie-ins A 5.1 Co-ordination of tie-ins shall be properly scheduled and


in new facilities with POD approved by the concerned Saudi Aramco at least two weeks
prior to tie-ins. Written procedure for Tie-Ins to existing lines is
required indicating isolation etc.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 74 of 90

6. Review hazards of the A 6.1 Review the Hazards of operations with all personnel. Use
operation with all proper PPE, GFCI. 6.2Tools to be inspected prior to the start at
involved personnel any job.

6.2 Properly barricade the working area and use warning signs
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 75 of 90

38. Overhead Abqaiq Plant, and 1. Special emphases A 1.1 Overhead lines are usually not insulated. Therefore, any
Power Lines From Km 0.0 to (warning signs) given to kind of metallic object coming near or contact with them can
49 all overhead power lines. cause a hazardous situation keep the considerable distance
from Power line minimum 20 feet.

1.2 Use warning signs “DANGER OVERHEAD POWERLINE”


to minimize the hazards.

1.3 The overhead power lines to be protected by barriers and


timber or wire “goal posts,” so that no part of any mobile crane,
earth moving equipment etc. can approach the live cable.
Clearly distance shall be agreed upon with Saudi Aramco.

1.4 Access below the power lines shall be restricted by barriers


to where the “goal posts” are located.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 76 of 90

39. Existing Abqaiq Plant, Km 1. Cables and Piping A 1.1 Site supervisor will ensure that Pre-Excavation Checklist
0,Km 1,Km 2, ,Km unknown/ suspected shall be properly completed and Approved/ Signed by
Above/Under 5,Km
concern organizations prior to start excavation
6, ,Km,Km11,Km
Ground 1.2 Locate, identify all the underground cable with the Cable
12,Km 18,Km
30,Km 32,Km Detector in the presence of SA representative i.e. SA
Utilities
33,Km 34,Km operation or SAPMT
36, ,Km 37,Km 1.3 Review plant drawings for location of known utilities
39, ,Km 40,Km obtain excavation permit from plant.
42,Km 43,Km
1.4 In all cases Metal detector will be utilized to determine
44,Km 47,Km 49
possible of underground piping facilities and shall be
calibrated. Only qualified operator to be used prior for
detection.
1.5 Mechanical excavators shall not be used until all
underground utilities and installations have been
exposed by hand digging.
1.6 Mechanical excavators shall not be used within 3 m (10
ft) of underground utilities or installations.

2. Cables Existing & A 2.1 Locate, identify and clearly mark all underground utilities or
marked hazards with spray paint or another visible method.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 77 of 90

40. Usage of Abqaiq Plant, 1. Fall from height A 1.1 Portable and step ladder shall be inspected before each
ladder Laydown Yard use.
and from Km 0.0
to 49 1.2 Ladders shall meet the applicable ANSI or European
Standard with proper labelling and markings.

1.3 The ladders can’t be moved when someone is using the


ladder.

1.4 Worker shall maintain three point contact while working on


ladder.

1.5 It is prohibited to use a ladder for more than one person at


the same time.

1.6 Portable ladders and stepladders shall be maintained in


good condition at all times.

.7 Place ladder only on stable ground.

1.8 If person working more than 1.8Mtrs shall use fall protection
system such as full body harness with proper anchorage point.

2. Falling objects A 2.1 The operators shall take the tool bags.

2.2 Working areas below keep no personnel.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 78 of 90

3 Defective ladders A 3.1 Portable ladders and stepladders shall be inspected before
each use.

3.2 Wood and aluminum portable ladders and stepladders shall


not be painted.

3.3 Side rails shall have smooth surfaces (without slivers) with
no projections.

3.4 Ladder rungs (or steps) shall be parallel, level and be


uniformly spaced. Rungs shall be between 25 cm (10 inches)
and 36 cm (14 inches) on center. A rung spacing of 30 cm (12
inches) is preferable.

3.5 Ladders shall be maintained free of oil, grease or other


potential slipping hazards.

3.6 Stepladders shall not exceed 6 m (20 ft) in length.

4 Using ladders A 4.1 Straight ladders and extension ladders shall be


incorrectly placed at a slope of 4:1 (i.e., for every 4 m [12 ft] of
vertical rise, the base is set 1 m [3 ft] out).

4.2 Ladders shall extend at least 1 m (3 ft) above the


landing surface to which the ladder is used to gain
access (e.g., platform, eave or roof).

4.3 Straight ladders and extension ladders shall be


placed vertically only if both side rails are rigidly attached
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 79 of 90

to a supporting structure (e.g., scaffold) at the top,


middle and bottom of the ladder.

4.4 Bottom rungs of ladders shall not be more than 30


cm (1 ft) above the lower level used to mount the ladder.
The area at the base of a ladder shall be kept clear.

4.5 Ladders shall not be used in a horizontal position as


platforms, walkways or scaffolds.

4.6 Metal ladders or ladders with metal reinforced or


conductive side rails shall not be used near electrical
equipment.

4.7Ladder sections shall not be spliced, lashed, tied or


fastened together to provide longer sections.

4.8 Only one person shall be on a portable ladder or


stepladder at a time.

4.9 Personnel shall face the ladder and maintain three


points of contact with the ladder at all times.

4.10 If the work is more than 1.8 m (6 ft) above the


ground/lower surface and is long term in nature or
requires heavy physical exertion, other methods such as
a scaffold or personnel lift shall be used instead of a
ladder.

4.12 Portable metal ladders shall have a warning notice


attached stating that the ladder shall not be used near
electrical equipment.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 80 of 90

4.13 Wooden or fiberglass ladders shall be used for


work near electrical equipment.

4.14 Aluminum ladders shall not be used where there is


a likelihood of contact with materials that chemically
react with aluminum, such as caustic liquids, damp lime,
wet cement, acids, etc.

4.15 Ladder sections shall not be spliced, lashed, tied or


fastened together to provide longer sections.

4.16Ladders shall not be loaded beyond the maximum


intended load for which they were built, nor beyond the
manufacturer’s rated capacity.

4.17 CONTRACTOR shall arrange other workers to hold


ladder when ladder is used with wet/ humid area and
make sure the ladder not slide. Forbid using ladders in
wet/humid area without measures on skid prevention.

4.18 Make sure the ground is in good condition when


use ladders.( ground should be level).

4.19 When using ladders at corner or gateway,


CONTRACTOR shall set watchman and warning signs
there to avoid ladder knocked down by others.

4.20 When moved the ladder in substation, two people


should put down the ladder and keep enough safe
distance to move.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 81 of 90

41. Horizontal Direction Road Crossings 1. Untrained Craft B 1.1 Operators of HDD machine shall be competent and
Drilling (Thrust at Km 1,Km 10 fully trained.
Boring)Operation and rail
Crossings at Km 1.2 Craft competency shall be ensure and documented
4 ,Km 14 prior to start HDD operation at work site.

Excavating thrust Road Crossings 1. Collapsing of Pit A 1.1 Suitable protective systems such as benching,
42. pit and receiving pit at Km 1,Km 10 sloping or shoring shall be planned for if the excavation
and rail will be at a depth of 1.2 m (4 ft) or more in soil other than
Crossings at Km stable rock.
4 ,Km 14
1.2 Excavations less than 1.2 m (4 ft) deep may also
require protective systems if sidewall cave-in hazards
exist.

1.3 Install safety warning sign boards at reasonable


distance.

1.4 Stand by man shall not allow unauthorized personnel


to come near the edge of excavation.

1.5 Sides of pits shall be secured by posting hard


barricades.

2. Personnel or A 2.1 Hard barricade set-up minimum of 2 meters from the


equipment falling in edge of pit & signage at each face
the pit
2.2 Provide competent equipment spotter while Heavy
Equipment is in use.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 82 of 90

3. Accidentally cutting A 3.1 identify all utilities and notify appropriate parties
of live underground beginning any digging or clean-up work.
cables, pipes etc.
3.2 Underground cables must be detected prior to
commencement of the job.

43. Drilling Road Crossings 1.Loading of rods for pilot A 1.1 Only qualified & certified operators are allowed to
at Km 1,Km 10 bore by HDD machine operate the machine.
and rail
Crossings at Km 2. Distraction during the A 2.1 Do not use electronic devices such as mobile phones
4 ,Km 14 drilling activity leads during the drilling operation.
accidents

3.Crossing roads A 3.1 Traffic needs to be controlled while tracking on roads,


Flagman need to be used while tracking on road.

4.Damaging underground A 4.1 Profile of underground utilities need to be taken prior


to start any operation
utilities

44. Pipeline pull back Road Crossings 1.Stringing out the pipe B 1.1 Proper welding must be done to pipeline string&
at Km 1,Km 10 pulling head.
and rail
Crossings at Km 2. Failures of Pipe joint B 2.1 All the connections must be strong enough to bear the
4 ,Km 14 pullback force.
2.2 Manufacturer’s recommended torque and pull back
capacity shall not be exceeded.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 83 of 90

Housekeeping Entire work 1.Sprain / Slip / Fall B 1.1 Obtained the required Cold Work, Hot Work and
location Confined Space permit.
45.
1.2 Provide proper supervision.

1.2 Proper manual handling techniques when moving


materials.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 84 of 90

46. Fall protection Abqaiq Plant, 1.Fall from height A 1.1 Training shall be provided to all workforces that
Laydown Yard involves in the work at height task.
and From Km
0.0 to 49 1.2 Working platform shall be as per Saudi Aramco
Standard

1.3 More than 1.8. Meter (6 feet) height full body safety
harness with double lanyard shall be used.

1.4 Snap hook of Safety harness lanyard must be


anchored appropriately above shoulder height.

1.5 Damage harness and lanyard shall be removed from


service.

1.6 Competent employees shall be deployed to work at


height.

1.7 Platform should be stable and secured with guard


rails and toe board.

1.8 Entry and exit shall be thru ladder only and do not
take short cuts to climb on top.

1.9 Appropriate PPE shall be worn by employees.

1.10 Fall protection work plan for the specific work at


heights shall be developed prior to performing the task.

2.Fall of materials 2.1 Toe board must be provided on the platform to


B prevent falling objects.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 85 of 90

2.2 Avoid carrying material I tools while climbing on a


ladder.

2.3 Avoid overloading the platform and debris shall be


cleaned appropriately.

2.4 Tool strap must be provided to prevent the tools from


sudden fall.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 86 of 90

47. Isolation/lockout/hold Abqaiq Plant, 1.Sudden start-up of A 1.1 Saudi Armco Issuer shall confirmed the tie ins area
tags Laydown Yard equipment are locked and tagged out. All necessary isolation and
and From Km blinding equipment devices (locks, tags, properly rated
(LOTO) 0.0 to 49 blinds etc.) shall be made ready and inspected before
commencing work.

1.2 All forms of isolation (electrical, mechanical or


otherwise) shall use the Lock / Hold Tag (SA Form 525)
at every isolation point.

1.3 LOTO as per the PTW system shall be implemented


when working with contained energy sources i.e. -
Electricity, Pressurized gas and liquids.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 87 of 90

48. Compressed gas Km 1.Explosion of cylinder or A 1.1 Cylinder shall not be struck together, dropped,
cylinder Handling 00,01,05,06, Release of gas thrown, dragged and used as rollers& support.
&Storage 11,29,
34,35,37, 1.2 Cylinder always shall be kept upright, secured and
39,44, 46, 49. with valve cap closed when not in use.

Fabrication 1.3 Cylinder shall never be lifted by its valve or with any
yard and electromagnetic device, chains, slings and ropes.
Abqaiq Plant.
1.4 If cylinders are to be lifted by crane, special
designed bottle carriers with lifting eye shall be used.

1.5 Only the necessary amount of hazardous materials


shall be stored at the job site, usually not more than 1
day supply.

1.6 Reactive substance shall not be stored near


flammable or corrosive materials.

1.7 Driver shall have copies of the MSDS and or CHBs


for the material being transported with them all time.

1.8 All cylinders being transported by vehicle shall have


cylinder valve caps in place, be positioned in an upright
position and be firmly secured to prevent movement.

1.9 Vehicles transporting cylinders shall be equipped


with the required firefighting and first aid equipment.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 88 of 90

2.Fire and explosion A 2.1 Cylinder storage locations shall be a dry, well-
hazard ventilated area prepared and reserved for that purpose.

2.2 Flammable/combustible substances (e.g. oil,


grease, volatile liquids) and corrosive substances shall
not be stored in the same area as gas cylinders.

2.3 MSDS shall be available at storage area.

2.4 Adequate and appropriate Fire extinguisher shall be


installed at storage area.

2.5 Oxygen cylinders and cylinders containing other


oxidizers (e.g., chlorine, nitrous oxide) shall be stored at
least 6.1 m (20 ft.) from flammable gas cylinders or they
shall be separated by barrier at least 1.5 m (5 ft.) high.

2.6 Smoking and other sources of ignition are prohibited


near storage areas.

2.7 Storage areas shall have Arabic and English "No


Smoking" and "Gas Cylinder Storage Area" sign shall be
prominently displayed.

2.8 Cylinders shall be chained or otherwise secured in


an upright position

2.9 Use bottle/cylinder racks wherever possible.

2.10 Cylinders stored in the open shall not have direct


contact with the ground, exposure to extreme weather.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 89 of 90

2.11 The quantity of cylinders shall be kept to a


minimum at job site locations.

2.12 Bulk storage (e.g., large inventories) shall be


located off- site.

2.13 When cylinder not in use regulators shall be


removed from cylinder and valve cap shall be put back
in place.

2.14 Water and dry chemical fire extinguishers shall be


placed mounted within 15 m (50ft) of the storage area.

2.15 Cylinders shall not be stored at temperatures or


locations that exceeding 54°C. (130 F)

2.16 Outside cylinder storage areas shall have


protective enclosures or sun shelters installed as
needed to prevent cylinders from reaching 54°C. (130
F)

2.17 Cylinders shall not be stored in a location where


they would be subject to direct Flames or other heat
sources.

2.18 Cylinder storage shall be arranged in which they


are received from the supplier.

2.19 Empty and full cylinders shall be stored separately


with empty cylinders plainly marked to avoid confusion.

2.20 Cylinders (empty and full) shall be segregated


according to the type of gas they contain.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 90 of 90

49. First aid, Medical Abqaiq Plant, 1.First aid A 1.1 If fewer than 50 people at work site, provide at least
faclility,Hospital Laydown Yard one 10-unit first aid kit /cabinet.
transfer provisions and From Km
0.0 to 49,Site 1.2 If 50 people or more are at a work site, provide at
Offices least one 36-unit first aid kit /cabinet.

Camp 1.3 If work is carried out at a location that are more than
300 m (1000 ft.) apart, a separate first aid kit / cabinet
shall be provided for each group of workers.

1.4 First aid attendant to be responsible for each first


aid kit / cabinet and to ensure there is sufficient stock of
supplies at all times.

1.5 Signs / notices shall be posed near each first aid kit
/ cabinet stating the following. Name of person, who is
charge of the first aid kit/ cabinet. Hospital where injured
personnel are to be transported, telephone numbers of
doctors or first aid attendants. Emergency telephone
numbers.

1.6 First aid supplies shall be kept readily available in a


first aid kit / cabinet designated for those supplies only.

1.7 First Aid supplies shall be kept in sanitary condition


at all times.

1.8 Adequate number of personnel deployed at each


work site that are trained in first aid and BLS, including
those in charge of first aid supplies.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 91 of 90

1.9 AED (Automated External Defibrillator) should be


placed along with the first aid cabinet on all the site
locations and support building facilities.

1.10 Provide necessary training to all first aiders for use


of AED in case of emergency.

1.11 A medical logbook shall be maintained at each first


aid station and medical facility by the first aid attendant
to record all injuries/illness treated.

2.Medical facility and A 2.1 All the employees including sub-contractor


Hospital transfer employees are provided with valid medical insurance
coverage before they enter in to work site

2.2 If 50 or more people employed, one or more work


site clinic(including supply, staff) are established by
contractually arrange with SA medical designated
facility(MDF),or other medical facility recommended in
writing by the SA medical Services
Organization(SAMSO) .

2.3 Each work site medical facility shall be inspected


/audited prior to startup and every six months thereafter
by medically qualified person from contracted medical
facility.

2.4 Medical staff (physicians, Nurse) shall meet


minimum license requirements of Saudi Arabian MOH
Saudi council for health Specialties and possess
necessary experience, training, minimum qualification
and required certifications mentioned in MMSR Manual.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 92 of 90

2.5 Ambulance shall be provided at each work site


medical facility to transport injured/ill personnel to the
nearest hospital.

2.6 Ambulance should have the four-wheel drive for off


road or remote area work locations.

2.7 Ambulance shall be maintained in safe, clean,


sanitary and road worthy condition in compliance with
Saudi Arabian government regulations and SA vehicle
requirements.

2.8 Ambulance driver shall have valid Saudi Arabian


government license.

2.9 Ambulance driver must be trained on first aid/BLS,


site orientation and medical facilities location training.

2.10 The list of the Hospitals shall be readily available


and placed in the clinic.

2.11 The Site Nurse must inform hospital regarding the


condition of the patient and what First Aid has been
given during transfer a patient to the hospital.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 93 of 90

50. Hand Tools Abqaiq Plant, 1. Injuries to hand B 1.1 Appropriate PPE shall be worn at all times when
Laydown Yard body and Face. using hand tools.
and From Km
0.0 to 49 1.2 Homemade and defective Hand tools are prohibited.

1.3 Hand Tools shall be inspected before and after use,


as well as before storage.

1.4 Tools shall be kept clean and store in proper boxes,


racks etc.

1.5 Right tools shall be used for right works. i.e.

Using a dime as screw driver, using screw


driver as chisel, using pipe wrench as hammer, using
pliers as spanner etc. will not be allowed to be used on
site.

Hammer with loose/ split/ crash handle,


mushroom head chisel will not be allowed to be used at
site.

Use of hacksaw blade without frame is not


allowed.

2.Sprain due to B 2.1 Correct working posture shall be adopted.


rapid Movement and
WRULD 2.2 Awareness training shall be provided to minimize
awkward position to work with hand tools.
.
2.3 Job rotation shall be implemented to minimize
duration of exposure.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 94 of 90

51. Hydrogen Abqaiq Plant, 1.Suffocation and fatality A 1.1 Wherever the possibility or the presence of H2S, gas
Sulphide(H2S) and From Km test shall be performed.
0.0 to 49,
1.2 Emergency evacuation procedure shall be
communicated and tested by means of mock drills.

1.3 Calibrated T40 shall be provided to each working


crew.

1.4 If required the SCBA shall be provided.

1.5 Training shall be provided for the SCBA users

1.6 People working near hydro carbon facility shall be


trained for the emergency procedure of H2S leak.

1.7 People shall be Instructed for safe evacuation


route and nearest assembly point.

1.8 H2S Training shall be given to all employees as per


CSM1-10 Hazardous materials.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 95 of 90

52. Transportation of Abqaiq Plant, 1.Road Accidents A 1.1 Only authorized drivers shall operate motor vehicles,
workers and Laydown Yard and drivers shall be held accountable for the safe
materials and From Km operation of the vehicle.
0.0 to 49
1.2 Drivers shall check vehicles daily for serviceability of
such basic equipment as tires, brakes, lights, fluid level,
glass, mirrors, etc. and shall be corrected immediately.

1.3 Report any damage immediately to the supervisor in


–charge.

1.4 Ensure the vehicle is safe to operate and contains all


required safety requirements prior to use.

1.5 Reflective angles shall be used to warn approaching


traffic if a damaged vehicle is blocking traffic or is
stopped on the road.

1.6 Vehicle shall not be left unattended while the engine


is running.

1.7 Driver’s awareness training shall be conducted.

1.8 All Drivers must have valid SAG driving license for
the specific vehicle.

2.Over speeding A 2.1 Follow speed limit on the public road and highway.

2.2 Reduce vehicle speed under hazardous weather or


road conditions.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 96 of 90

2.3 All occupants shall wear seatbelts. Drivers shall


insist that all passengers wear seat belts before starting
the vehicle.

3.Collision with other A 3.1 Drivers shall obey the direction of traffic flow - driving
vehicle on the wrong side of a divided highway is prohibited.

3.2 Drivers shall bring vehicles to a completed stop at


stop signs and Red traffic lights, before proceeding
again.

3.3 Drivers shall use turn signals when changing lanes


and turning.

3.4 Use of Mobile phone, Texting, drinking and eating is


not allowed while driving.

3.5 Tailgating" or following another vehicle too closely is


prohibited and ensure to determine if they are at a safe
distance when following another vehicle.

3.6 Number of passengers shall not exceed


manufacturer's design specification for the vehicle.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 97 of 90

4. Falling of unsecure B 4.1 Materials shall be transport properly and ensure that
loads loads do not exceed the vehicle manufacturers design
load capacity.

4.2 Loads shall be properly secured and tied. Materials


shall not extend over the sides of the vehicle.

4.3 Loads extending beyond the front or rear shall be


marked with a red flag and trailers shall be equipped
with visible brake and taillights.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 98 of 90

53. RTR Pipe Joining KM 0 to 1.Flying Particles B 1.1 wear the Required ppe's such as face sheild and
49,Abqaiq dust mask during the grinding activities.
Plant
1.2 Barricade the area to prevent unauthorized entry

1.3 All electrical tools and machines shall be in good


condition. Ensure that grinders have proper guards in
place.

2.Electrocution/Power A 2.1 Electrical tools and cables shall be of good condition


tools and certified as per CSM (UL/FM/KEMA KEUR).

2.2 Portable power tools shall have “DEADMAN” switch.

2.3 Ensure portable power tools have GFCI and


grounding connections.

2.4 No joints or damage on cables.

2.5 All guards shall be in place.

2.6 Portable power tools shall be used by trained


persons only.

3.Use of adhesives A 3.1 Safety goggles and face shield shall be worn and
/Chemicals shall meet ANSI Z87.1 requirements.

3.2 Wear the proper respiratory protection and meets


ANSI Z88.2

3.3 If chemical splash on eyes immediately flush your


eyes cool tap water for at least 15 minutes.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 99 of 90

3.4 Chemical suits/aprons shall be worn to prevent the


chemical burns.

3.5 Emergency eye wash and body wash facilities shall


be available in the working area

3.6 Remove and dispose the contaminated clothes and


gloves properly.

3.7 Ensure that MSDS available for adhesive and


chemicals being used.

4.Manual Handling C 4.1 Proper ergonomics shall be followed during the


preparation of tools.

4.2 Ensure proper positioning while doing the activity

4.3 Proper lifting techniques shall be followed while


manually lifting tools and wrapping materials.

4.4 Frequent breaks and job rotation shall be provided.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 100 of 90

54. Demobilization Abqaiq Plant, 1.Unsecured Load A 1.1 Loads shall be transported only by approved
Laydown Yard methods
and From Km
0.0 to 49,Site 1.2 Conduct load restrain inspection
Offices
1.3 Use and provide adequate restraining tools and
accessories

1.4 Awareness training for drivers on proper load


restraining

1.5 Comply Saudi Traffic regulations and Saudi


Aramco requirements

2. Dust C 2.1 Assign water truck for road access watering.

2.2 Provide and use of dust mask and eye wear.

2.3 Control to reduce vehicle and equipment speed.

3.Driver Condition (health B 3.1 Wherever possible avoid driving.


and fitness)
3.2, If possible, add more works in a single trip.

3.3, If possible, avoid lone driving

3.4 Drivers shall be trained on journey management and


Safe Driving practices.

3.5 Ensure drivers are having enough rest.

3.6 Eliminate excessive driving


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 101 of 90

4.Vehicle Unsafe B 4.1 Conduct daily checks on the vehicle/trailer


Condition (breakdown)
4.2 Ensure Road worthiness complies Saudi Aramco
requirements of GI 6.030

4.3 Drivers shall be competent enough to do the daily


vehicle checks.

4.4 Preventive maintenance shall be carried out as per


the Manufacture recommendations and logs maintained.

4.5 Tool kit and spare tire shall be available in the


vehicle.

5.1 Wherever possible avoid driving during adverse


weather condition.
5.Adverse Weather
Condition (rain, fog, 5.2 Awareness training on adverse weather condition
sandstorm, heat)
5.3 Do not travel during heavy rains and poor visibility.

5.4 Slow down during wet and slippery road

5.5 Ensure to carry enough food and water during long


journey.

5.6 Only authorized movement shall be allowed.

5.7 Heat stress prevention training shall be provided to


the employees.

5.8 Enough cold drinking water shall be made


available during summer.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 102 of 90

Whenever required, temporary rest shelter shall be


provided

6. Cranes and A 6.1 Provide proper barricading and warning signage


Rigging(lifting of materials
and equipments) 6.2 Only certified and authorized rigger shall direct the
operations

6.3 Check wind speed condition not more 32kph

6.4 Provide lift plan as and when required

6.5 Avoid standing under the load

6.6 Use tag lines to guide the load during loading and
unloading.

6.7 Crane operator must be certified by Saudi Aramco.

6.8 If the spreader beam is used, it must have the valid


inspection sticker.

6.9 Operator and rigger certificates shall be verified to


avoid the duplicate certificates.

6.10 Daily crane check shall be performed.

6.11 Crane shall be placed on level and compacted


ground

6.12 Outrigger pads shall be used.


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 103 of 90

6.13 Crane shall be placed well away from the overhead


obstructions and power lines as per GI 7.028.

55. Fire prevention/Fire Abqaiq Plant, 1.Incompetent fire watch A 1.1 Assign the properly trained fire watch for all hot work
fighting Laydown Yard activities.
and From Km
0.0 to 49, Site 1.2 Fire watch should remain 30mins on the location
Offices after the completion of hot work activities such as
welding and cutting.

2.Spillage of flammable A 2.1 All the flammable liquids must be stored in the metal
liquids container with secured cap on well-ventilated area.

2.2 Appropriate spill kits should be readily available on


the storage location to contain spill.

2.3 All the equipment’s and vehicles should be free from


oil/fuel leakages.

3. Damaged Firefighting A 3.1 All the fire-fighting equipment’s such as fire


equipment. extinguisher, fire hydrant, fire hose reel should be
inspected monthly by competent person.

3.2 Fire detecting system such as smoke detectors, heat


detectors and fire alarms shall be inspected and tested
monthly by competent people.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 104 of 90

4.Damaged electrical B 4.1 All portable electrical tools and equipment must not
equipment’s and exceed 110 volts and shall be checked by competent
overloaded sockets person prior to use.

4.2 Don’t overload the electrical extension cords and


sockets.

4.3 Ensure portable power tools have GFCI and


grounding connections.

4.4 All the electrical installation should be done by


trained and qualified electrician.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 105 of 90

56. Emergency Abqaiq Plant, Fire, serious injury or A 1.1 Emergency Phone numbers will be posted in
Response Laydown Yard death and Release of compliance with SACSM (emergency procedure) &
and From Km toxic gases reporting a fire.
0.0 to 49, Site
Offices 1.2 Adequate fire Extinguisher will be provided.

1.3 Evacuation plan will be prepared and posted entire


facilities.

1.4 Emergency lights will be installed, and function test


will be performed.

1.5 Smoke detectors, Fire Water Sprinkler will be in


place as per SAES, NFPA and national Bldg. code. and
regular functional test will be performed.

1.6 Emergency Action will be prepared and posted


accordingly throughout the site.

1.7 Regular trainings will be given to keep workers


trained.

1.8 Drill practices will be conducted in conjunction of


SAPMT safety adviser.

1.9 Emergency Assembly points / Muster points will be


prepared and installed sign board for the specific areas.

57. Working along Abqaiq Plant, 1.Poor Access B 1.1 Provide the Proper work access (platforms /
pipelines(For and From Km scaffolds) for elevated locations
Excavation, Lifting 0.0 to 49.
Do not use live pipes as access at any one time.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 106 of 90

and heavy 2.Crane boom hit with A 2.1 Assignment of Rigger I for all rigging work.
equipment operation) pipeline
2.2 Approved lift plan by Rigger I

2.3 Use of come-along, chain blocks, etc. and proper


rigging techniques within congested work locations.

2.4 Proper and careful rigging always.

2.5 Hook block never to get in contact with energized


lines (hoisting in between pipes)

3.Equipment struck with B 3.1 Heavy equipment’s should be placed at a safe


pipelines distance from the live pipelines.

3.2 Assign a trained flagman to provide signal to


operator.

3.3 Use only the trained and competent operator.

3.4 Inform all the relevant authorities before the working


nearby live pipelines.
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 107 of 90

58. Pandemic (Corona) Spread from infected A 1.1 Isolate the infected person from others and provide
person/ Spread to healthy the necessary medical care to the infected person.
person
1.2 People arriving from the affected area shall be
isolated and tested for any symptoms.

1.3 Symptomatic person shall be transferred to nearby


hospital for test and further treatment.

1.4 Educate the people about the importance of social


distance and hand washing.

1.5 Establish a proper reporting system to encourage


the employees to report for any symptoms of themselves
or others nearby.

1.5 High touch or high traffic areas shall be cleaned


regularly by using disinfection solution.

1.6 Pandemic emergency drill must be conducted during


the prevailing circumstances.

59. Work during extreme Abqaiq Plant, High wind, dust, rain, fog B Proper work plan in extreme weather, heat index is
weather and From Km and excessive heat provided and to be compliance. (Refer to attached as
0.0 to 49. below)
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 108 of 90

Attachment: II.) Heat Stress Index


Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 109 of 90

8. References

CSM SAUDI ARAMCO Construction Safety Manual

SAUDI ARAMCO Safety Handbook


GI 2.100 Work Permit System
GI 2.709 Gas Testing
GI 2.721 Electrical Arc Flash Hazards Mitigation
GI 6.012 Isolation, Lockout and Use of Hold tags
GI 6.021 Abrasive Blasting
GI 6.030 Traffic and Vehicle Safety
GI 7.025 Operator Testing and Certification
GI 7.028 Crane Lift Types
GI 7.029 Rigging Hardware
GI 8.001 Safety Requirements for Scaffolds
GI 430.001 Hazardous Waste Code
GI 1781.001 Inspection and Testing of Fire Equipment
GI 1780.001 Respirators
Document No.
SAAD ALI AL ESSA GROUP
SEQ-HSE-PR-HIP-001
Replace Raw Water Pipeline – Abqaiq
Contract # 6600045303 Status IFA
Rev. 01 HAZARD IDENTIFICATION PLAN Page 110 of 90