INSTALLATION REPORT
Installation
Installation Date Branch
Report No.
Machine Serial
Model Meter Reading
No.
Customer Name Contact Person
Branch / Deptt. Key Operator
Room No. / Floor /
Telephone No.
Level / Wing
Address Email ID
Business Hrs.
Weekly Off
Software CD received by
Name Contact No. Signature
Accessories Installation Key Operator Training
Product Code Description Serial No. Control Panel Operation
Paper Loading in Tray & Bypass Tray
Paper Size Setting
Paper Jam Removal
Waste Toner Removal
Call Logging
DO's & Don’ts
Engineer's Signature & Date We certify that the installation has been done satisfactory.
Engineer Name & Code Customer Signature & Stamp