ANNEX 1
SCOPE OF SERVICE
In addition to those obligations set forth elsewhere in the Agreement, the Services shall include
the following
Part One: Drilling Rig and Associated Services
Attachment-1Responsibility Matrix
Attachment-2 Technical description for drilling rig
Attachment-3 Technical description for relate services
Attachment-4 General requirements
Attachment-5 Acceptance criteria
Attachment-6 Well-site construction drawing
Annex! |
MSATTACHMENT - 1
RESPONSIBILITY MATRIX
Distribution of Supplies and Services between the Company and the Contractor regulated as
follow:
The personnel, eq
ment, materials, consumables and services defined hereinafter shall be
supplied on the site of operations and paid by the party marked with the letter “X” in the
appropriate columns.
DRILLING PART:
er
mamay | supruepay
No. | Designation come, | aman, | cater
iiPredriling Prep
‘Operation Permit License (acing
drilling permits and- access to. well
1 | tocatinandstacking and Location | x |x | hts
preparation, eons roads, tacks,
Cellar.wastepit)
Relationship with Toad goverment and
12 | inhabitants x *
Survey sonsTuaion wad wopewlon OF
13 | welt site *
Ta_| Waterproof material for wane pit x |
15 | iain oF ate ot mater x =
Consruton and minicnance of ond
16 | between well sites 7 x
OtficefclitforCOMPANVrepresniall
1.7 | vecnrasite Clee caravans including x x
offices and rooms for accommodation)
CONTRACTOR'S operation Base
18 Lraciicy 7 x
To [CONTRACTORS —opraton Bar 7 x
ZMoblization and Demobiiation, Move between well
Mobilization & Demabilzation of nig
tad all equfpmenié tools instrament | auatby
21 | and materials between mobilization | COMPANY % *
postion and the fis/as well sie
Cisioms clearance daring tansporaon
of rig and all equipment & fols & | Ausetty
2.2 | instrument and — materials from | COMPANY * x
mmailzation position Tag -
Z3-_[ Rig move between well locations x x
Mobilization, —Demobilization and
Roution of driling and. associoted
24 | services personnel between Ori and 7 x
well ste —
Annex 1-2PAID BY PAID BY
No. | Designation conn | company | Conticron | CONTRACT
Armored vehicles for Contractor's
Personnel transportation among
25 | Contractor's Camp, well-sites and 7 x
Aiport
3. Personnel, equipment, tools and materials
Personnel to perform the serves which
3.1__| contained in this contract a x
Sa | Dilling ig and associated equipment as x 7
per the Drilling rig deseription
Cementing tools & — equipment,
cementing lab, mud lab, mud material,
3.3. | solid control, mud logging equipment, x x
wireline logging equipment, directional
& horizontal drilling tools & equipment
Drill-pipes, Drill-Collars, HWDrill-Pipe,
34 | allnecessaryX-overandiifting subs, x x
‘Weight indicator(MudWatchsystem)
3.5 | Tubing and Casing (including crossover | x
and pup joint)
For 5 production wells,Casing
accessories (including casing float
3.6.1 | shoes/collars, comtralizer, DV etc. for x x
‘each size casing) and liner hanger system
with packer and running tools
For 2 sidetrack wells, Casing accessories
(including casing float shoes‘collars, Compary nas he
3.62 | centralize, DV ete foreach size casing) |X x | maomaue | Caton se
and liner hanger system with packer and onde
running tools
S71 | For5 production wells, Drilling bits and % z
nozzles & accessories
For 2 sidetrack wells, Drilling bits and Soe
372 | poles accesories | |X| res |
one
Se | Well Read, tubing spool and Xemas tee | y 7
assembly
Tay
seg
Mud materials (including barite and | cinta
39° | bentonite) x x
319 [COMPANY'S materials exeess oF Pi
normal consumable
‘COMPANY’s materials used in re-drill
3.11 | well or others related serices jobs caused |X. x
by CONTRACTOR’s negligence
3.12 | Oil well Cement x x | raticwene’ | aos a
pone
Annex! 3Designation
By
company
PAID ay
COMPANY
SUPPLIED BY
Cement additives
x
Diesel fuel for rig, camp, service
equipment (cement unit, logging unit
slick line unit) within project schedule
3s
Diesel fuel for rig, camp, service
equipment (cement unit, logging unit,
slick line unit) beyond project schedule
and other usage such as drilling fluid
‘reatment(if the diesel quantity enough)
316
Purify &Filter equipment for Diesel
37
Lube oils’ grease/ hydraulic fluids!
cleaning solvents for the rig and
associated equipment
3.18
Dope / lubrication / thread lock lube seal
for casing, tubing, drilling string and
tools, ete
3.19
Drilling water, cementing water and
living water
3.20
‘Consumables for drilling vig and all
‘equipment
3.21
‘Consumables forall COMPANY’s
equipment
322
‘Other consumable materials and spare
parts for solid control system and mud
pump, welding equipment such as shaker
sereens, pistons valves, oxygen,
aceiylene, sieel wire ete
3.23
Down hole tools including directional
drilling tools, 36” hole opener, reamers,
roller reamer, under teamers, near bit
reamer, opener, and stabilizers, drilling
jar, drilling accelerator, MWD, LWD,
‘NMDC, by pass sub, agitator, bump sub,
mud motor, casing scraper, all necessary
X-over, ete. for each hole
328
Float valve and IBOP for each hole size
3.28
‘Conventional /Standard /Special fishing
tools for all down hole tools and
equipment provided by CONTRACTOR
3.26
Fishing tools for COMPANY’s
downhole tools/equipment for each size
of casing and tubing as Drilling program)
3.27
Repair and replacement parts for
CONTRACTOR furnished fishing tools
3.28
BOPs, bell nipple. choke and kill
manifold & lines, burning line remote
‘operated choke, oil and gas separator,
adequate vent lines
Annexl-4SPD] paom | aenmnm | PaDeY
No, | Designation comtesy | COMPAAY | ConTRACTOR | CONTRACT
Replacement rubber goods
elements, Gaskets, seals and all
normal consumables for
CONTRACTOR’s annular ype
3.29 | preventers, ram type preventers, x x
BOP stack and controls. BOP's
handing, installation “and testing
equipment (HP pump, tester cup,
teser stump. testing equipment)
330_[ Rig Camp x ¥
4.31 _| Sinle-ShotInsirament and Muli-Shor x :
Instrument for well inclination survey
T32_| Drilepipe and Casing rubber protectors x ¥
Round-rip equipment (slips, wrenches,
3.33. | elevators, safety clamp ete) for drillpipe x x
and drileollars
Casing and Tubing handling © ronming
equipment forall sizes, automatic casing
53% tongs & services, special tools for 13Cr % =
6-5/8" casing
‘Adaptor between well head & BOPS
335 extended drilling spool x a
TE Tester cups forall easing sizes x x
Mud condition system, liner movion
3.37 | shale shaker, centrifuges, desander, x x
desiter and mud cleaner.
TE_| Shaleshaker's and mud cleaners sreens x x
Equipment for the control & measure
equipment of principal mud
3.39 | Gharatrses (weight viscosity, cake, a 2
water loss, chlorides etc)
“Top drive aw mud saver valves, upperd
3-40 | lower IBOP. x x
Boarding for Stand Back Area (wooden
3a | Boss x x
Ta_| Tanks for fuel, water and mud x x
3.43 | Righelitespump x x
344 | Matting boards for Rig and related x x
equipment base, et.
345] Bit breaker, drift tol for dling ools & z 7
all size casing & tubing
34S] Equipment not mentioned above bat
neeessary for the normal operation of x x
CONTRACTOR 's rigs
347] Equipment not mentioned above bat x z
requested in writing by the COMPANY.
Sag | Vehicle for COMPANY Representative’s 2 2
‘transportation (Two vehicles per rig)
Annexl+5SRD ao
No. | Designation ey | eumey, | sureunney | com
ign: contpany | COMPANY | CONTRACTOR =
Company” Materials exceed of normal
348 | consumable duet Contractor's |X x
negligence |
fed services
“4.1 | GeologicalConirl x x
Ta
“are
42 | Casing shoe depth selection sea x x
‘le
xeon
3 _| Geological Tab equipment x x
La _ | Diling Mids service x x
.5_| Ruming casing & liner and bing x x
4.6 | Camenting service x x
“47 | lasallation service for Wellhead, ting x 7
spool and X-mas tee
Ta_| Wireline fogaing service x x
419 | Mud logging sence x x
“10. | Down Hole ool serves and Dieoonal : :
dling service
TI_| Data recording sence x x
412 | Geological analysis serves x x
4.13 | Fishing service forall own hale tools x x
41g | Communication 5 inert and phone on % z
Tnternet and phone For Mud Toga Real
Aus: ‘Time Data Delivery Service x x
Medical service, first aid” weatnent
416 | medicine and medical evacuation on site S %
TIT | Cuering service x x
Accommodation and meals Tor 12
418. | persons from COMPANY at well site for x x
ach rig
‘ocommodation and meals for over 12
419 | persons frm COMPANY at well site for x x
fac rig
Managenien,milnenance, oading and
4420 | offload of materials, tools and equipment x x
provided by COMPANY at wel ste
‘Any consumables materials, spare part
4.21 | communication items and necessary x x
for operation
Material wansporaiion of G2ME0 | oat yc
duag_| sine, welead tubing spool & X-mas | Sets ¥ z
2 | tee provided by COMPANY becween | COvGAY
COMPANY warchousc and well site stows
Annex! - 6No.
Designation
aE
wy
conrey,
coMPANy
SUPPLIED BY
Coxteicron,
PAD ay
coNTeACT
oe
423
Inspections of CONTRACTOR'S drill
stem and dewa hole tools and repair of
defects by mentioned inspection
x
x
44
Inspections of CONTRACTOR'S drill
stem or down hole required by
COMPANY with defects found
425
Tospections of CONTRACTOR'S dill
stem or dowahole tools required by
COMPANY without any defects.
226
Welding/eutting on site
an
Passports, entrance and exit visas,
work and/or sojourn permits and
‘other necessary permits. health
certificates, ete. for
CONTRACTOR's personnel.
conta
428
Customs and other duties imported
inside Traq for the entryiexit of
CONTRACTOR'S rig and/or equipment
and materials
asta ty
conan
4.29
Fie extinguishers & other Grefighiing
equipment st camp and rig
430
FDS & flammable detection
Equipment&Masks(Self Contained
Breathing Apparatus)
231
Security tearm for well ste, camp
4312
Security team for CONTRACTOR'S
personnel transportation between Basra
airport and working base
432
‘Third Party Inspection for Drilling Rig
and associated equipment, and the third
party should be approved by
COMPANY.
4x3
Inspection, maintenance and Keeping
‘good condition of drilling rig and ali
associated equipment, batite, bentonite,
hematite and other chemicals &
cementing additives
aM
TWCF of TADC well control, HS, Fist
aid, CPR, firefighting, HSE related
emergency measures, and other
required waining for relevant RIG
CONTRACTOR'S personnel
COMPANY’ personnel (Five COMPANY
parsons per rig for TWCF well control
certificate taining in a good reputation
international tezining center)
COMPANY representative as Dalling
supervisor, Geology & Wireline logging
A Test supervisor
Annex!-7SrA oe
No. | Designation ree | eee | SERIES | caer
Storing and managing
gg | CONTRACTOR'S equipment &
436 | materials in the area provided by * x
COMPANY during the deiling work
Cleaning of sanitary waste & industal
a waste after rig moving out x x
Well site recovery and Waste
438 | management (include cutings, wasted x x
mud) ater rig maving out
TIP] Transponation for CONTRACTOR'S z
P x
material& personnel
TAO_| Transporation for CONPANY's z %
inatrial between wel sites
yar | Loading offloading of any COMPANY 2 z
or CONTRACTOR's item on wel site
Ensurance, management and supervision
Tisurance for well control and
|_$:1__| COMPANY’s personnel and equipment | _™ x
Insurance for CONTRACTOR'S rig,
5.2_| personnel equipment and other kinds of x x
53_[ Drilling service management x x
5.4 | Drilling crew management x x
All Kinds of operation & logs report as
55_| company requirement * %
‘AnnexI-8
MSATTACHMENT-2TECHNICAL DESCRIPTION FOR DRILLING RIG
EQUIPMENT AND MATERIAL INFORMATION FOR UC-1 RIG AND UC-2 RIG
Drilling rig and its
equipment
Designation equipment
COMPANY’s Minimum
Requirements
CONTRACTOR's Proposition
(GENERALDESCRIPTION
Drilling Rig Name To be detailed UCLUC2
Type Bleetre SCR/AC of VFD. VED.
Later than 2006, ifthe rig manufacture
— year is later than 2004, the main
‘Year Of Construction ‘quipment has been rfteshed in the | Brand-new, 2013,
Last two year |
Producer should have official | Consructed by Kerui, all
Constructed By
cerification of production
Ceriicats willbe available
Drilling RigOwner To be detailed ucD ra
[Two 26004? rigs, Brand-new, built in
Current Location To be detailed | 2013, stacked in Khour- alzoubair
| Freezone)
Last up grade dace ‘To be detailed Brand new
[Next periodical survey To be detailed Ace.To APL
Estimated petiod to Mobilize to
first location aferaward
How long could star mobilization and
hhow long could the first well spudsin
after signing the Contract?
Four (4) months of mobilization
duration forall the fst rig & erew and
associated equipment & materials from
Contract effective date to the first well
spudding
‘A2 | CERTIFICATION
Require production centication for the
rig and al the equipment. Related [Al ertifieateso be provided
Issuing Authorities Ceniticaton ist shall be atached.
‘API. 180, OEM, quality ceticates,
Typeot Centcation ——_| Te bedetalled L EX verifies, TPL
‘OPERATING
AS |capapmiries :
Maximum Drilling Depth with
Standard 5°DP | Nomina drilling depth 6000m Rating depth 6000m with S"DP
| Maximum Hook Load Minimum 450MT 450M.
‘MaximumTop Drive Load | Minimum working load 450MT ‘Min 4SOMT
Pressure af ereulate motor __| Minimum working pressure 000psi__| $000 psi
4 | MAIN” DIMENSIONS OF
7 WELLSITE,
Overall widvlengthofte | To be detailed 15m x 1300
verall Dimensions of Dri
Sree Dt Dring | Fy be deuied 30m Amn
Rig Pad - |
Annexl-9
prs‘AE __ | SFORAGECAPACITIES
Fl nina [Brana Company iene
C | Drilling water Minimum200 m3 200m3
Tring water Minima 8 it
Liga iearana)—| Minima Ninn
Bk igi id M80 in
Sais geal Wing and wong
rence commey ih
ne | mtee an frekmakedcion and fe
sini cai ry
Thenirsononr sh beable
$5antomen tpera
Tipe fis Minima ne i
Mu ak Pa Of Suet eu ofan
Tests Comm TE :
change Ro imam oe 7
Clinic with Sleeping Quarters | 4 sauen one 1
Tr Mei i: _
Mesing Room 1
i ‘Single room(bullet-proof) Minimum four Shall meet Company requirement
2 an See iin oe ie
‘Min Sesps Vina 96 2
ToslBedsaKigCanp | Minin de bat
Aa [MAIN CAMP Toe dns
: Main enpinimunlibes | Cons mala amp
Tule nie aloCormt To be detailed “Accommodate 86 personnel
Ti Gap Tal Svage [oe deta 2m
L Main Camp potable Water | Minimum 100m3 100m
: On oping or ke
Alay Genes Mima ———
Tice ities atch Tho fiche
Pym [iin -
Resaion Roa Mim oe i
Chile Tote ded i
Rese nina oe fr ing ew | Ong a BUTE
Dining room as bullet-proofed and another one proofed and another one foe the local
For the local crew. a I
Laundry room Ho be detaitea 1 i
1a__| SAFETY EQUIPMENT
‘Ri [ Pesce Sy Eames
Amex!= 10ree NRFac kaw near
Gloves. DustMasks. EarPlugs | To be detailed are OSI EH BOGS
snl aa
De Tanai ag
Dicks tate ‘| Tobe El emt
[Bape ine Tobe deted ~T Geroinoesaptine
KAS Bag Son
oNOATRERONEZ
ConserNr bn a eT:
USE ston ie
PANO Mask with 6.8L carbon
SalFConinedBrehingSas
einer
Quan nina 56 sets
Treating Appar Toeaton C . :
Trig Poor Minima ts as
Tool Pushes Office nimi ee ta
COMPANY Repsofce Minimum Ten
Mdtank stem Ninimam ee os
[Ps sins Minimo 8s —
Backup Minimum 4s se
Bekap tlk nina Aes te
Recharging device for the
bottles
Minimum one recharging unit in
suitable location for reffesh
Pressure rate 3000p
High pressure breathing air
compressor, 100% meet the
Requirement, 3000 psi
A83 | Fire fighting Pump
Make China
Diesel model: [N4T00Q Pump
Pe ‘model: XBC104/26-125W
Quantity “Minimum 2 sets 2 sets diesel
Capacity Minimum 200m3¢h 200m3
‘A83.1_| Water Tank Capacity Minimam 100m3 ‘Rig water tanks 20003,
A84 | Firestation — —
Location Three stations, to bedetailed “Two for gt one for camp
Hose Length Minimum70m 75m
Nozzle Type Minimum two types 2
Spes x 12kg chemical +20 pes x
6.$CO2 + 3pesx75Ke chemical +
ABS | Fire Extinguishers Tobe detailed a |
foam
ASG | Fite Fihtng S ‘To be dated ee
‘ABT _| Fite Blankets [To be detailed “Type CW380 Imx Im
Annex1- 11
MS‘Minimum one eeatal control system, One eenteronrigiloor, can be
the alarm can bs visible in ig Hoon. visible
Maketeype: Tobe dewiled Chine
; ‘om Required wo be set in MCC rooms,
Fire detection Engine room! floor end VFD room.
ABS | Fire/Smioke Detections in sig,
‘Yes as company requirement
Smoke doo Tobe deal Vinofocnrer DYSK
Location To be dete * Celingistalaon
| Alarms: ‘Horn and flash Hght alarm: | Horn and fash light alarm
TARD Rescue
[ARO Resuscistor "Mum one set Ta
I Make Tobe denied China
I Spe Tobe deailed Past NoNS.t50
REDE Striches ‘inmum one Se eet
* Sik Room Cabin ‘Tobe dele Wir team
AEIO Fist Aide Equpmew
Emergency Showsr ston" Minin wo és nudiank Mud winkrand mining awiem
‘Bye Wash Sains ini two ets at mud tank and one
tmore set nig or, sets
ABIL | Safety Zones
Specific Lighting For Safe
| Muster Arete Tobe deities Two sets
t Wind indiouos Viole a
Night
Suan Tobe deaied a _
* Location Tote desed Rig oor sd ake lana
: Muster pont
i * escape Routes Maing Muse "Two Escape Routes marked ie Mister
I | Points, To be detailed Point
| ABI2 | Procedures
Safety operation procedures.
i ‘emergency action procedures and Ok, UCD have Emergency’ action
| Todividual Information Leaflets. Televant taining program forthe crew procedure and training program for
| About Risks, Hazards shall be in place, all levels of Rig crew
Specific 128 Training To be detailed For all rig evew with velid ceviticates
- To coverail the emergency actions
Emergency Procedure sMunual To be detailed atcherg ste
i 4 . ao :
- - To be sosialled were necessary at
i Safery Inseuetion Poster Tobe detsiles Therig ste
Annexl- 12
pd‘AL: Wing equipment shall meet the
working requirement of fel, desert
ané place around — mountain.
will ne provided according to the
international standard All certificates
i shall be provided
AS. | LIFTING EQUIPMENT
i a Cenifieated Ting equipment (sings,
shackles, ete) shall be provided by
i _ CONTRACTOR, :
i SWE displayed. Equipped with Shall filow Company's requirement
i protection grid fie extinguisher »
Ag) | Cranes installed, Mashinglight. back-uplignt
i ‘and backup alarm device. Oparator
shallbe authorized
| wan Z Minin ¥ auto erane for day raul teleseopin,
Quanity oferane a3¢ pee eaten Hyerentic telescoping
‘ ‘Minion distance Max ium
5 i Minimure 45M Bion
‘oat urn 45
| Masimum distance Maxiiours
Minimum 3M St
| oad L
‘Working distant 330m Ee
: Valid cenfication for inspection and
ast inspection orcertiica ‘Valid test cerifeate
‘ostinspection Nes Tea by qualified authority. "
A92 | Fork Lit Tobe detaied Toberenedorpurskases
: Minimurel a
| Maximum lend Minimum SMT iui
: Valid cerifcation for iuspoetion and
| Las inspeosion orcenitice! Vali cericate wilt provide
Tastinsp Hesies Tesrby qualities authori ass r
‘ileld ks Ambulance —
A93 | Other vehicles “Ta be det pickuped> Minibus 4) to be
Rented when needed
‘Aid| GASDETECTIONSYSTEM
FIXED HSE
aiar | COMBUSTIBLEGAS
DETECTIONS ALARM
SYSTEM
Make Tobe deviled MBA
“oe dni Flanmabl gas! DFT500
Tire fo he desl 25: Prima
Sensors location
‘Well head, rigiloor, shale Saker area,
mud tank area. ete.
“F channel Rammmable ens sensors)
and H28 (sensors ales system to
be used wo complete detection and
alarm for
On ig floor. wellhead, shakers(2),
7 Visual, erase lan jocation
Wind direction device
Tobe detaled__
Tobe deniled
Annexl- 13
Dusy room
DBF.07 Standard! Wind Socks‘arog | Porable HBSE Combusible
GasDetecton
‘Quantity Minimam 4 sets Tsets 1
Realtime eadings of up Toor
Type Tobe detiled sacs
: Honeywell. 54-183 19
AML COMMUNICATIONS: 7
verry) Tlepbone system /Deling oy gtey Poona EX acral Soran
Rig Inercom
NumberofLines: To be detailed 9 stations
Rig floor, driller’s cabin, monkey
eaters aieaaiiel board, choke, comen, sale shaker
| tank, mud Ib, BOP hoomy, VFD
| ose
‘Communication Beoween Rig i
pe To be dasiled By ratio
Peat ‘Telephone System / Satellite | Tobe detailed shall be provided
Commenieaton System
; ‘Minimamy one sc of Iniersom for
‘A113 | DeiskMan Communication Winvnu ove so tet
Alias _| CCTV SYSTEM To be dstiled Camera nem cameras
Tobe detsled
ALLS | Walky-talkies ‘Should provide 4sets tor COMPANY eae see
atleast
AMZ OTHERE QUIPMENT
121_| Air Compressors —— nl
CMake To be detailed SULLAIR
| Model To be detailed LS16-6011H
Quant Minimum 2 seis Sts rer]
i Capacity To be desiled 69 mimin
Sup Pressure To be deiled MPa
___| Motor Details ‘To be detailed Electrical4SKweach
Reducing Capabilities Tore dewiled 69min.
Refrigeration Details To be desiled | Alder. Model SRE-380_
| Nolume Air Receivers To be detailed “| 2) x1.5m3 + (2x33
A122 | Welding Equipment |
Electric Welding Machines To be detailed eee ed
RE-600
CrgiAcaylene Cuting set | Tobe deed sats
Work shop wih al fines Equipped
A.12.3 | Workshop and Repair Facilities | To be detailed ‘Mi benckvlon rinks Sesh dh,
band tolsete
[A124 High Pressure Wash Down Uni
Annex1- 14~ Karcher. ModeLIDSS58 -
A125 | igtagn Pps Tobedeuel sige pe ling
Pasi i -e
Taina Hae al
so frovanar Sehr
Seren i eae and be
ran | beaten corr. The in gol pne at | Cae 38128 O00 HP
: Unibet ee
co No se an a
I Make (Caterpillar or equivalent [ Caterpillar, USA,
[Tee Tobe ip
east | Tobedoh Ac inmae er
pena siti RPM
‘us dos eso he
| ‘hours, alarm& shutdown functions,
| oc py Tobe deel ti od aay Ur
| coolant level alarm, high oil
ar mate Saat sam. Ov
Seti Sdn
Ti ake Can OSA
Cat (80508 Toe Ter 87
ana | accom | rove dea fad Voage 0 fd cae
| {haa
|
ACC aon obec 2
akan sel prmaaT Wb | gsc cscumoms
ene er op pe oeth Mae AT 8 cot
sna | emenenetover tnt | race The ey dt ni | HE TTA
cremate eecnie | RSA
Tina ponerse
eas te im -
Toes Ta CAPER
vient 59
Annex 15
A SfMinimum power required for [rhe emergency power unite ean supply
Mi igmen operteg Pietbene lighs*BOP accumulator or BOP accumulator ful pump
inom eaiment ores mp iecmpsnens casos Te pena
pump * rig eamp
Annext- 16ms
= A Heeaulpement COMPANY 's minimum CONTRACTOR'S Proposition
Ref, Designation Equipment Requirements.
DERRICK AND
{Bt SUBSTRUCTURE.
fraataion” [°° SNE A KS aay passin a, To APF and
Bhd DERRICK. Derrick should conform to API suitable for installing ether TDS or Kelly
Specification standard
Make and ype “To be detailed Keni, S045.
Height 149.1'(45.46m) |
eight size andbase To be detailed ‘Top af mast 825722 bas of
mast 32.8 |
Butt | Loading
Nominal eaaciy 30M “Mr |
Satie ook load with 12 | |
ities 450M 450Mr |
Pipe setback load _ 220 MT [20mT.
[B12 _ | Maxi racking capac
Suunbof DP ano) | ssuorsDRerszpr | san DP re os
Gud oF DC 4 stands of 10"DC.
Stands of DC (and) 4.std of PDC 6 stands of °C
B.1.13 | Maximumwind load
with rated set-back imum 3 mi 307m
with no set-back Minimum 40 mis 38.608
ou To bedetailed L {6 So5(36.9mph) |
Bit | Equipment = |
Wing board sad handrails sed to he |The racking platform i equipped with
properly equipped on the2™ derrick, wind protection and complete with
Fall protection and escape devise complete with safety chains on all
ailale for the detckman. All the Singers. Seat and brake
fingers are secured with clampsor Mounting racket 1 accommodate pull
slings, sly winch ae available for back winch
Reckingplatform runing. and. racking the tubular, One (1) pull back air winch (10001
Fingers fither equiremen to tthe | capacity) & tsilchain (with dram guar
Piping needed forte dling wo (2) derrck man bls
Annex 1-17| Adjustable range
Should have 3 working position,
24.5m-26.5m
‘Adjustable 24.5m (804M),
25.5m (83.71), 26,5m (86.99) above
rill oor level
Stabbing platform — for
ceasing /tubing
“To be detailed
Paoumatic Casing stabbing board: Mods
TDQFT200%
‘The distance between the platform and
the drill Noor:7.35m-13.35e
‘The distance between the platform and
the well 0.71.4
Max. Extend of the platform: 0.7m
Lighting specifications
Explosion proof
‘APTRP S00 Recommended practice
fr classification of locations for cletical
installations at petroleum facilities
classified as clasldivision! and division
2, GB3836.2-2000 Part 2: fame proof
‘enclosure "d” (equiv. IEC60079+1:1990
Electrical apparatus
For explosive gas atmospheres)
‘Mast TV Camera system
Covering racking platform and
Stabling platformarea
[Equipped with BOP hoist suitable for
Monitoring system consists of display
system, control system and camera
system Shours'camera video
Can be saved. 1Camera for racking
board
The substructure is equipped with BOP
lifting unit BOP: Model:DZ550,
= aves ‘the BOP. Tobe detailed. 27.5M.ton shoist (SSM.tonscapacity
total)
HOISTING |
Ba
EQUIPMENT.
| et 3 Conforming to API Spee 7K 5* edition
B21 | Draw works conform o AP pein ore ate
200017 cig 1 :
[| Mae To be detailed 1 MFR:KERUT |
‘Type To be detailed DranworksJC7ODB
cue ‘Nominal dling depth 6000m with | 5 99
Main Drum Groove for
| Line Size
Annexl- 18
Grooved for PVAG8um)Sane Tecate in
Wanbaiescn | Tobe dad Tisai
‘iin Tote doe TNA
ais [oem Bek ST tery —
Make To be detailed Lire a
2xent
| T ‘One Electronic system for preventing |
sete shting of em Hose fe
, Ice sor and inter? fe
Grog Bloctsoarer mechanical at drawworks) ‘Two Pneumatic overwind anti-collision
devine oe
ona
3213 | AnomaiDaing Conte bea Aamo
[Yad pe Tote died 1a
Grom Geek Sees me Conforming to API 4F 3rd edition
22 | Crown Blk rniced sco 0 APL
a | spain i API noe
| Make “Tobe detailed Keni _
Te Toe ded res
Rated Capacity 450MT. 4S0MT |
amber OSes Tobe eed of ene
[pinnae 0FStenes—Tone coer Dinofai ene TRAN)
Groove Size To be detailed _ Dia. of drill wireline: 38mm(1-1/2")
Travelin oc ged and
123 | rtngsck | mated aor eee
= ‘pein with AP mao
‘ie Toe deed ran
‘he Toe dale yeas
C Rated Capacity 480MT_ 450M
Somber OSes | Tobe seid Neate
Diameter Of Sheaves “To be detailed | Dia.of sheaves: 60°(1524mm)
Crore Se Toe dee De fines)
Baa | Hye Calas
wake Toke daal a
pe Totedeas weld
raspy Tos dled ves “|
Amex 19B25 | TOPDRIVE
aks Tedd TARCOTTROW
Tipe Tobe daniel TDS-ISA
Electric Electric, VFD VED. "|
‘Working Pressure 5000psi 7 5000 psi
raed Capi 50s ‘son
Brake sem) Tobe dal yelper di aks
Nene organ | Tete dea Singlespeed, double edacon
ng Contos Togs | To sd 7S DAMN)
Maximum RPM. | To be detailed O10 228rpm_
Make De Torus bu re To be detailed 55000f1.1b(74569N.m)
Gear
Pip adler Make kt | Tob dea PASTE. 00 TD Bak wp Tom)
tesa To pede
B26 | H00K One, and acer one At ESDORND
Sahel OBST
Mex ie peciy: 0.006
B27 Swivel One set for backup , to be detailed oon
Max Spee: 30
| ‘Max. Working — pressure: 35MPa_
(ots
B28 | Kelly Spinner ‘One set for backup to bedetailed | Air motor for swivel :Model:FMS-20
"CONTRACTOR — shall provide | -
B29 | Elraortinks lear Links fiteachnomal TW0se
operation phase.
Nake noma ing To dell nov
andconpcion)
L ‘Type Forged and Weldless Forged
| ouantiy set sets :
Sie DIPS DFE
—_| Rated Capacity 450MT. 3501
De Of Suney | Tobe ded ‘Bnew
ake or rung Cs) | Toe deed by CONTRACTOR. | NOV
Tipe Forged and Wel roe
Oven ees det
sie ses" meet
Annex|- 20Rated Capacity 350M 5001
Date OTLaxiSurvey Tobe deed Brande
BL Dilling Line
Type To be detailed ~F 1OSSWROHEIS
Diameter To be dewiled THC
Leng To be deta 73008
~ Maina Uae ull To bedeaiies 58%
“aa ing Line Anchor ~ :
"Make “To edealed TANGHIAN
Type To be detailed * a :
Date ofkasiSoney Ta be detailed
[R212 | Driling Line Gulde : L - ‘
: T Make “Tobederiled “Renu
type “To be detailed KR 3
Dead Une sabiize Tobe dened 3 pin tine
gs PIPE HANDLING
EQUIPMENT
B31! Rory Table :
TNE To bedeutied Kent H
Type Tobe detaied 2p-375 -
ize nas opening Opening sie OSS TU)
~ Powered ordriven ” Rotary table driven by independent '
RPM rnge To bo duied Mix, ota speed 300 pm i
° To be detailed | Max, Static Loa: 3850KN. A
“aaa
“rebecca * RDoNe *
“Tobe cexiled hn ving fle sig
- To be detailed " S.1i*hex Kelly:27-HDP
Set hex Kelly2P ADP
Taos Tetedeaiel Tro bowel srAP1 Bowl No LDR
DAT Casing Bushing Apa Bots
Make Tee ded NFRRUDOH 4
Type oie dried 20st Cashing Tr BP7
Hipsorowie” 7 Tobedeniled Stecrtonsh
B34" Manual Slips-Drilt Pipes
*Quantiy. make and ype Mininwin 2ea manual slip (or each Make: Sait > each 1
Sire range size of Dill ipes$-122"5°2-12". To SDMLS* ‘
be deailed, SDxLS :
spML3t2" i
! SDXL31/2"
‘Annexi- 21Manual Slips — Drill
PMS cotter be
Quanity ikke” ind type. inti 2 focach sizeof rt)! Make Sui 2 cach
Size mage collans” 8.617.404" pesu.n"
To be died / DCS Sia"
Des-noi2"
: i “pesne
36 Neamt Sips Casing
‘un, ale: ype Se, Mins Dea ov cach ove Casing” Nal Sai, 2 cach
' range DW SH.9S87.658" —— CMS.XLO
TFobedeiled exsist
: eS xL98a°CMS-XLe
TENSES
Ba? Sota Cas
Sues Clamps For DC Focal ws
‘Nuc make and pe.” Mian Se ore di of Dall” Mal Sal cach
“Size range Collars 9°, 8°6-12". 4-3 3°58
: Tobe dad Lostipe 58
L2stps 288"
! sips 10-58"
. ‘Safety clamgs for cesing ~ : :
Nubot make nd ge. 7 Minima 2 eal siz of easing Moke Sai Beach
Size rue Tobe detiled ceasing amp)
Fae Bisaton Danes
anit, mak and pe BSGN SWL anal CevwON BrIS” yage, Salt Twocach
Size, Cpacy degree TIDD I Rigprovides¥12" or ppysei3sy
caller DP ig shal be eaupped with ppzse1EU's00
i 250 an SWE manual elevaos for 1S ppp weEL 230
' dyer ofthe same
i For cach size of Drill Pipe.
CONTRACTOR should kop at es
2ea on ste To be die
Slagle Tost Elecir = Mou a fren size oF il
| Dail Poss ripe each for $* and 3°02
| Tobe dele
"9. Hiei Dil Goin po
Annex.(Quantity, make and type, | Minimum2ea for each DC in size 9°, | Make:Saifu. 2 cach
Size 86430" 4" Side-dor elevator
Tobe detailed Suxou2"2007
SLXBA"200T
SLX612"200T
SUXS34"/150T
[Capacity Ta be dialled As mentioned above
B30 | Lifting Subs _|
| Quamtioy He en ae aa iy tr 9" DC Se or BDC, Suir 6
V2 DC, Gea for 4347 DC,
| eC
Threads ‘Tobe dewiled ia Tee
1/465 8Re.
eunatr
343-120F
‘Manual rotay tongs with) Manual roiay tongs forall
Bair indicators CONTRACTOR’s down hole Naiesat
equipment
Quantity, make
type.taw assemblies x
range
2 tongs with jaws BJ model DB or
HIT@5 or equivalent for size range:3-
wir.
Make: Saif: Q31/2"-13°38
«650008.bs
and
2 tongs with jaws BJ model SDD or fake Satu, 2 tongs
© 17100 or equivalent for size range: 4= 17", HTT00
ear.
“Torque indicators for manual tongs | Torque indicator for make-up and break
Are required. ewe
Hydraulic power tong for
pan pe
‘Make,Type, Size ange | Tobe dealed RUSH, Model: 20203-125, range
fe
33.13 | Spinning wrench
Make a be detailed RUSH z
Type ‘To be detailed | 9254250
izerange ————_—*| Tobe detled __
(| euantity Minimum set
B14 | Bitbreaker plates
For Tr-Cone bitsizes
[ea or ach Toone 24,17 | Stall meet Compuny'sequrement
V2 Ie, 8, $5"
‘oe deed
Annext- 23[8315 [iam
For bits ‘nimantes AP efor ach
i tas AP stad
Bits
B3.16 Side doorcasing clevator 7
_ ‘Quantity, make and type, Minimum 2ea for each size. to be Teach, make Saifue
Sie Caacig deaied SLXDW RSOTSLXISSA"2807
SLX9SAAS0TSLXT'3SOT
suxs0or
Sige om cae
a elevators:
pa anl p| Minam Dea orale whe | Nake Sats Tech
Siz Copaciy desis
ait | cones decedent
Casing anny
tenga, cing
Ba ‘Torque indicator for air tight
thread casing tubing -
oowetongtecaing |S BAO RSE orthesiae Tod fv 00", Ducts iv other size
TT of alc poner og [2 oT plc powenag ow
cl 2-7/8", 3-2", 4", 4-1/2" 778", 3172", 4", ae |
| Peto ds sto CRA pipe, | estation dis sit CRA pipes
Powertong fortubing like asL80-Cr13 material, (es an 1-80-Cr15 maser
pal ‘unit and torque | I set | se
Cngspie eat
Baa Operated)
| To be detailed Saifu
Tee dei 5650
Te be deed Fase
500 Ten Sion
[Tipe Range 0" 9 Sis 1330S
Oust 1SFTilespierleneloaio ie
Taam | ie sd ing ana For SI A 6S
= 79.16 13370. 20" eng
Maks Toe decid Saf
— Nios ‘To be detailed Q27/8°=133/8"/90,
orssaavies
“Annex|- 24
MSQuantiy
set
Casing and tubing manual
{Chain for 2-78, 31725, 4, 02
B32 | sain tong SI8°,7", 9 S18" 13-38", 20°
[Make To be detailed China
‘Model To be detailed TITAN or equivalent
Quantity ser Tse -
Crossover from DP wo | Tobe detailed All crossover between DP and
casing Company casing will be available
‘At least eo Sets of rotary hand slips
dressed with low penetration dies, sui
Tubing Elevators
likeas L80-Cr13 material. Tubing size
Make To be detailed Saifu -
| 2 ea for cach size tubing 4-1/2". ‘2 each size for each size tubing 4-112",
, "AL least two sels of side door type | 2 sets. to suit CRA for Tubing sizeas of
Make Tobe dead Sale
Model Tobe deiled wr
L Capacity 1507 150t0n
ea foreach se UPPED [yy
Quantiy re 23
Single Joi Tubing
Elevators
C Make ‘To be detailed Saifu
r Type [Tobe deuiled J _
Capacity SMT Sal
Pea aE, Ly an
Quantiy 223.8"
Dea reach weignubing SEO Ty
‘abing Drs U2" A", 312" 2-78" 238"
B26 | Airwinehes
Make To be dad TULING
pe To be died ZIPS
Annext-25
msDrill Noor3; monkey board: 2; eat
Quantity oe id ‘on rigfloor.Imonkey board
Drill floor and cat walk:S0K0 50 Kn an tig Moor, SKn on monkey
Save Monkey board: SKN: board
Location Rig floor, monkey board, catwalk | Rig floor & monkey board
Fill-up tools shall be connected on
Heh _[Senarien eh Top Drive during running casing
Make To be deuiled | Raton
| Type ‘To be detailed Casing FilrapToot
Quantity ea SEO ISSIR. | oe casing 13°3/8 and 9°58
Casing quick-release
3328 | thread protectors
Quanity Minimum 6ea foreach size ‘As per requirement
Make To be detailed Tianhe
Tye To be detailed Ai inaabie
‘Sie Suitable for 20° 13-38" Suitable for 20°, 3" 5",
5 sa” esis"
2.29 | Sabinavingroming or | 208020" Casing cementing ner SO 20 ner sting ring ok
string euning tools
Quantity Minimum 2 set sets
Make Tobe deuiled Weatherford or equivalent
Tyre | To be detailed 30°, 20°
CONTRACTOR shall provide
Ba | MUDSYSTEM euled drawing ofthe complete mad
system -
BAL | Main mud pamps [
Make To be detailed MARRS
. . ‘Nominal power ratings: 1193KW
Model F-1600 orequivalent, ee
Quantiy Seis ses
Sire ofliner available 0"
Deanne | HES rate
| ate
Rated Pump Speed [20pm | Ma toke:1305pm
Suction Sereens | To be detailed provided
Mal Pump Prime Movers
Relief lines shall be seldraining and
straight to mud pits. They must be
Well secured, supported.
Relief ines self-draining to mud tank
Annex1-26
msCant | Motors
Quay psec paw Teach pump
Powe Tee deailed cook
saa Mie Pap Ease Wik
(PA Gehan)! /
i Pressure Relief Vaives ‘Must be shear reliefvalve Pressure relief valves (Restoa type),
' Pataton dawpesr Mek
Discharge Polson" Airchanberichugearconadist 082
Dampeners pressure) MER: SHUANGXI Mansfactured of |
Forget Ral ary: 2glon |
way Wey Tad pump st ne 1 aon
| Danpene Suis of ta dsion
TOO Psp reach TE
rsa Coes somone traspunp COTE wn '
ype |
t ‘Each pump unaitached counter ato” ach pamp have unattached counter, ond
Pump Stroke Counters need tota) stroke counter total stroke counter
Baa cenit pape
27 Suerrng Pape
Mak Tobe dae we
ype Tobsgied Tere is |
Quant, Minimun3 3 ~ |
~ Tippalimeter To bea : 2 (
Discharge Flow Rate To be detailed 255m3sh Head-32m_
end gp.)
Dike 5 ar power TW
DrvekWaRPM Tobe dated ety (EX, Rat Spe
‘ {aso
Safing BS WECSEAL Nisha sat
odd? "MudMaingoms