0% found this document useful (0 votes)
134 views1 page

Headbox Dilution Control System Testing - Flyer

The document discusses testing of a headbox dilution control system to determine maintenance needs. Testing measures components like valves, actuators and the control system to identify issues affecting end product quality. The results help estimate maintenance requirements and minimize unplanned downtime over the next 4 years. The 10-12 hour testing is done during shutdowns.

Uploaded by

Ammar Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views1 page

Headbox Dilution Control System Testing - Flyer

The document discusses testing of a headbox dilution control system to determine maintenance needs. Testing measures components like valves, actuators and the control system to identify issues affecting end product quality. The results help estimate maintenance requirements and minimize unplanned downtime over the next 4 years. The 10-12 hour testing is done during shutdowns.

Uploaded by

Ammar Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Headbox dilution control

system testing
To accurately estimate maintenance and update requirements

The condition of the headbox dilution control systems has a major effect on
machine runnability and end-product profiles and quality. Good end-product
quality is not attainable without the proper functioning of these systems.

Benefits Scope of service

• Identifies reasons profile problems Measurements and inspections of:


• Accurate maintenance estimation
• Air purge system
• Power supply
• Minimized unplanned shutdown
• Valves, torques and wear
• Control system
Service description • Actuators
The purpose of headbox dilution control system
testing is to determine the condition of the system 4 years or
Recommended service interval need-based
and actuators. The test findings facilitate the reliable
© Valmet Corporation, SER42258 V1 EN 06/2020.

evaluation of the near-term maintenance needs and 10–12


Duration of full service
the preparation of longer-term maintenance plans for hours
the system. 10–12
Performed during shutdown hours

Performed during operation –

For more information, contact your local Valmet office.


valmet.com/solutionfinder, e-mail: [email protected]
Specifications in this document are subject to change without notice.
Product names in this publication are all trademarks of Valmet Corporation.

You might also like