0% found this document useful (0 votes)
27 views1 page

CFD - PBP Timeline

The document outlines a proposed project timeline with 3 stages: Concept Design from February to April, Design Realization from May to mid-June, and Design Implementation from June to August go-live. Key dates include concept launch and design pass review meetings, drafting beginning in May, design package handoff to shop in mid-June, build beginning in mid-June, and installation from mid-July to August go-live.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

CFD - PBP Timeline

The document outlines a proposed project timeline with 3 stages: Concept Design from February to April, Design Realization from May to mid-June, and Design Implementation from June to August go-live. Key dates include concept launch and design pass review meetings, drafting beginning in May, design package handoff to shop in mid-June, build beginning in mid-June, and installation from mid-July to August go-live.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROPOSED PROJECTTI

MELI
NE

St
age1
:ConceptDesi
gn
Feb1
st-6t
h-Pr
ojectl
aunchmeet
ing(
zoom orcal
l
)

Feb6t
h-1
0th-Secondcal
ltogooverpul
li
mager
y(z
oom orcal
l
)

March13th-Fi
rstDesi
gnPass-Cal
ltogooverf
eedbackonf
ir
stdr
aftoft
hedesi
gn
(
zoom orcal
l
)

Apr
il3r
d-SecondDesignPass-Cal
ltogooverf
eedbackonmor
ereal
i
zeddr
aftof
t
hedesign(
zoom orcal
l
)

Apri
l24t
h-Fi
nali
zedConcept-Cal
ltogooverf
eedbackonmor
efi
nal
draf
toft
he
desi
gn(z
oom orcal
l
)

St
age2:Desi
gnReal
i
zat
ion
May1
st-Dr
aft
ingbegi
ns(
Maybegi
near
li
erdependi
ngonpr
evousmeet
ingf
eedback)

May1
5th-Cal lt
ogooveranyf
inal
changest
othedesi
gn.
RoughDr
aft
ingsentt
oshop
f
orbi
d/budget
ing

St
age3:Desi
gnI
mpl
ement
ati
on
June1
st-Desi
gnpackagehandedovert
oshop.
Budget
ingbegi
ns.

June1
2th-Bui
l
dbegi
ns.

Jul
y17t
h-I
nst
all
begi
ns(
upt
oshop’
sschedul
eti
ming)

Go-
Live:
August1
st,
2023