0% found this document useful (0 votes)
116 views42 pages

035 - # Shrem, Bavdhan - Scan Report

Uploaded by

Balraj Shevade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
116 views42 pages

035 - # Shrem, Bavdhan - Scan Report

Uploaded by

Balraj Shevade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 42
GEOTECHNICAL INVESTIGATION REPORT CLIENT: M/S. SHREM TRADING LLP. SITE ADDRESS: KEKARAV, S. NO. 171, BAVDHAN, KHURD, PUNE ARCHITECT: M/S. VK: U URBAN RCC CONSULTANT: M/S. G.A. BHILARE CONSULTANT PVT. LTD.. SITE ADDRESS: KEKARAY, S. NO. 171, BAVDHAN, KHURD, PUNE Contents INTRODUCTION. saan vod METHODOLOGY OF INVESTIGATION 1 SOIL PROFILE... 2 ROCK TEST RESULTS. v2 WATER TEST RESULTS... 3 FOUNDATION ASPECTS. wae 5 RECOMMENDATIONS... ListofAnnexures A. Bore hole location plan B, Bore hole logs C. Sub surface profile D. Rock test results E. Water test results F, Photographs BE 2. Geotechnical Engineering Consultants fee GG/22-23/05/SI/035 Date: 26% May, 2022 GEOTECH! 4 V, S. NO. 17: URD, Pl OR M/S. SHREM INTRODUCTION M/s. Shrem Trading LLP proposes to construct ground plus two upper floors Anciallary cum Commercial structure at Kekarav, S, No. 171, Bavdhan, Khurd, Pune. M/s. VK: U Urban are the architects and M/s. G.A. Bhilare Consultant Pvt. Ltd. are structural consultants for the project. The soil investigation work comprising nine number of trial boreholes has recently been carried out on site. The sub soil profile revealed by the completed trial boreholes is described in the following paragraphs followed by discussion on foundation aspects and recommendations. It may please be noted that the detailed structural design of foundation is not contemplated in the report. The report is aimed at providing general information regarding the geotechnical aspects of subsoil formations from safe bearing capacity and settlement point of view. METHODOLOGY OF INVESTIGATION The work in general was carried out in accordance with the following Indian standard specification. a. 1S.- 1892 - Code of Practice for Sub Surface Investigations for Foundations. b. LS. Purpose. ¢. LS.-2131 - Method for Standard Penetration Test for Soils. 1498 - Classification and Identification of Soils for General Engineering d. LS. - 6926 - Code of Practice for Diamond Core Drilling for Site Investigation. €. 1S.-5313- Guide for Core Drilling Observations. £, LS.-12070- Design and construction of shallow foundation on rock. Head office A/202-20, Swati Manor CHS, N.C Kelkar Road, Pune Office: Office 0.61 314 Foo, Lab: 127, Kalandas Udyog Bhavan, ‘pp shiva Mare Dar (West Mumbal- 400028, Pat cade, Neo Sharoda Cet Near Century azar Work, Mumba - 400025, Bron aasta sve s91 2224016040 (Ff Karve Road andar, Pune 11.006 +91.222422 2021, 1G ‘gobsigeotecrnie@ymaiizem * info@sgectechcom Eemenggeotecheom Ge) SOIL PROFILE Nine boreholes were taken on the plot. The generalized soil profile revealed by the borehole logs is as follows; The top overburden layers comprise brownish sandy clay and highly weathered rock with clay seams (murrum formation) till 3.00 m to 7.00 m below existing ground level. Table 1:- Borehole logs summary BHNo, | Groundwater | Rockstriking Total Borehole level (m) depth (m) depth (m) BH-01 6.00) 4.50 12.00 BH-02 4.50 3.00 12.00 BH-03 5.50 6.00 12.00 BH-04 5.00 6.50 12.00 BH-05 Water-loss 5.50) 12.00 BH-06 7.00 7.00, 12.00 BH-07 Water-loss 5.50 12.00 BH-08 6.00 5.50 12.00 BH-09 7.00 5.00 12.00 ‘The greyish basaltic rock encountered from 3.00 m to 7.00 m depth. At ‘commencement, the Core Recovery (CR) values noted to be 20% to 40% and Rock Quality Designation (RQD) values from NIL to 20%. The CR and RQD values improve as drilling progressed. The bore was terminated in the rocky strata upon establishing its continuity. Total depth drilled was around 12.00 m below existing ground level. ‘The ground water was seen at 4.50 m to 7.00 m depth below existing ground level in the boreholes during investigation. Water-loss reported in BH-05 And BH-07. Seasonal variation is expected in water levels. ROCK TEST RESULTS Rock samples from boreholes were sent to the laboratory for determining their unconfined compressive strengths. The results show that the value of this parameter varies from 154 kg/cm? to 1452 kg/cm?, Point Load Strength on smaller samples varies from 1.84 kg/cm? to 21.02 kg/em2. Head Office: A/202-203, Swati Manor CHS, N.C. KelkarRoad, | Lab 127, Kalendes Udyog Bhavan, (Opp Shiv Mand, Dadar (West) Mumbai - 400028. ‘Near Cetury Bazar Wore Mumba = 400025 lor gasts ans +91 2224236000 osu ze aga 2001 |S ‘gobaigaotechncs@ymalicem # inlo@ggeotechcom “vom ggeotech com Ge ‘Table No.2: -Rock classes with respect to Dry density and Porosity (IAEG (Anon 1979a) Class Roe Description Tipe Description 1__| lessthan180 | Verylow | Over30 | Veryhigh 2 1.80-2.20 Low 30-15 High 3 2.20-2.55 Moderate 15-5 Medium 4 2.55-2.75 High 5-1 Low 5 over 2.75 Very high | less than | Verylow ‘The IAEG (Anon 1979a) has proposed a table grouping the strata on strength of dry density and porosity in five classes (Refer Table No.2). As per this table the rock at the site has low to very high dry density (2.117 gm/cc to 2.967 gm/cc) and low to high porosity (1.91 % to 17.32 %). wat! RESULTS The chemical tests on the water reveal that the water has pH alkaline in nature (pH=7.62 to 7.73). The chlorides (20 ppm), sulphates (25 ppm to 30 ppm) and organic matter (15 ppm to 40 ppm) are within the permissible limits as per 15-456. FOUNDATION ASPECTS The clients wish to construct ground plus two upper floors Ancillary cum Commercial structures. Loads on the individual columns shall be medium heavy. ‘The open foundation can be rested on the murrum formation at shallower depths of around 1.50 m to 2.00 m depth below existing ground level. The foundations can be designed with Safe Bearing Capacity of 30 t/m? on murrum formation. The settlement under such loading intensity won't be more than 25, which is within limit from serviceability point of view. Alternatively, if client opts for basement construction or if the above-mentioned SBC is not adequate to rest foundations, the foundation can be rested on weathered rocky formation with 80 t/m? SBC. The expected settlement under 80 t/m? loading intensity will not exceed more than 12mm and such settlement is negligible and it is needless to say that it is well within the tolerance limit of the structure from serviceability point of view. The foundation depths at each borehole location is tabulated in table 3 below; Head Office: A/202-203, Sati Mance CHS N.C Kellar Road, Lab 127, Kalandas Usog Bhavan, (Ope Sivas Mandi Deda est Mortal - 400028 ‘Nea Century Baza Wels Moma 400 025 hist ezeis aso 991 2224210000 (Ceeuze 2az2 2001 1 slobageotechnicsymal com »[email protected] ‘Epannuggeotacheom Go Table 3:- Foundation Parameters at each borehole location ri | Rock Foundation | 54 | Expected BHNo. | (jm) | striking | Foundation Strata | _ Depth (m) (t/ms | Settlement depth (m) From | To (mm) Murrum Formation | 1.50 | 2.00 | 30 25 BH-O1 [3334 | 450 "Weathered Rock | 4.50 | 5.00 | 80 12 Murrum Formation | 1.50 | 2.00 | 30 25 Here een al eee Weathered Rock | 3.00 | 350 | 80 12 Murrum Formation | 150 | 2.00 | 30 25 BHO | 3136 | 600 F Weathered Rock | 600 | 650 | 80 12 Murrum Formation | 1.50 | 200 | 30 25 BH-O4 |3152/ 650 | Weathered Rock | 650 | 7.00 | 100 12 Murrum Formation | 1.50 | 200 | 30 25 : 5. BHOS | 3145 | 550 | Weathered Rock | 550 | 600 | a0 12 bios |3101| 700 |-MutrumFormation | 1.50 | 2.00 | 30 25 Murrum Formation | 3.00 | 400 | 40 25 Murrum Formation | 1.50 | 2.00 | 30 25 BH-O7 [3044] 550 [Weathered Rock | 550 | 6.00 | 20 12 Murrum Formation | 150 | 2.00 | 30 25 BH 5.50 08 | 3082 Weathered Rock | 5.50 | 6.00 | 80 12 Murrum Formation | 1.50 | 2.00 | 30 25 -09 | 3162] 5. eee 5.00 _[ [weathered Rock | 5.00 | 550 | a0 12 Precautions for use of excavators Nowadays hydraulic excavators are used for mass excavations and the present case is not likely to be any different. It is however recommended to exercise caution while using the hydraulic excavators so as not to disturb the founding stratum by its sharp edged teeth. In case adjacent footings have to be placed at different levels, precaution shall be taken that distance between two footing edges must be 1.5 times greater than the level difference between two footings. This is illustrated in the figure 2 below. Head Office: A/202.203, Swati Manor CHS, N.C. KelkarRosd, | Lab: 127, Kalandes Udyog Bhavan (Opp Sa} Mandi, Dade (est), Mumbai - 400028 Near Ceuty Baza Wert, Mumba - 400025 Clot gan 17s «291 222621 6040 (Coan z22az2 aa 1G globalgeoterhnies@ymas com ® inlo@ggeotecncom “Bvmauggeotechcom Ge is a Pressure 1 " Level Ditence \ een fogs ee Figure 1: - Adjacent footing placed at different levels. Side slope stability The safe slope of 45° (1H:1V) shall be adopted in top overburden soil layers for conventional open excavation. For highly weathered rock & good basaltic rock 60° & 70° (wrt Horizontal) slope respectively shall be kept. The feasibility of a conventional open excavation to the required depths shall be verified in view of available open space. If deemed infeasible in view of available physical and geotechnical conditions, some sort of temporary excavation enabling system shall be adopted. RECOMMENDATIONS 1. The open foundation may be designed with designed parameters mentioned in table 3. The expected settlements are within the limit serviceability point of view. 2. The precaution regarding the use of hydraulic excavators & maintaining of side slopes should be followed. 3, Itis recommended that the foundation strata be confirmed by a competent geotechnical professional prior to laying the foundation PCC. The enclosed bore logs and laboratory test report complete the report. bee x (ANIRUDHA V. SHARMA) B.E, (Civil) M.Tech (Geotech) BLE. (Civil) M. Tech (Geotech) ‘ead Office: 4202-203, Swat Manor CHS, N.C Kelkar Road, Lab 127, Kalandas Udyog Bhavan, ‘Ope. Shiai Mend, Dadar Ces, Mumbai ~ 400028, ‘Near Century Banos Werks Mua - 400 625 Ghez ease tnero = v9i 202424 e000 Senza aaa 2021, G alotagecteciics@yaiicom sinlo@ggeotechcom | ‘mwuggectecncom ANNEXURE A: BOREHOLE LOCATION PLAN Séd AapaPeD © exmoreecn5 “alund ‘Panuy ‘Weypaed ‘TZ1 “ON’S ‘ABIEHON : OUg ATTONIGVYL WAHS 'S/W AuaTID ANNEXURE B: BORE HOLE LOGS Dia. of Borehole: Nx Ga BORE LOG aS {As per IS : 1892 - 1979, 4453 - 1980, & 4464 - 1967) Page No.: 1 of 1 Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building ‘Client : M/s. Shrem Trading LLP cordate: Bore Hoe Ho: 04 re Dept of Bore Hal: 12m Location: Ketaray, 5. No. 171, Bovdhan hurd, Pune. Dept ot Casha: 15m Date of Commencement : 07-05-22 Dept of GWT: 6m Date of Compton = 08-05-22 |Scale} RL |Sample| Depth (m) SPT 'N' Value CR RQOP.A.| Remarks! m Pal n_(° eee No. |* [Frm | to [TSS [15 [15] 0] & | x |v] Ober Teste Tigh weathered srg rock wth ly sane os font] o | 15 |= 1 foera} 1s | 155 fs ETc Resa] ws ore} 155] 3 S 2 |sPt-2} 3 | 304 [aA a |No Recovery| ws | ona] a0 | 45 4s (450m) Wodeaay vaatiared bovin i] amygdaloid Basak spi fora] 45] 6 ar |e wr 210 |OR5| 6 75 w]7 n120| ons] 25 | 9 as |i 3.00 (450m) Sighiy weahared gey ampgdaloidal Basalt avzr|on7] 9 | 105 aln ze20| one | 105 | 12 0 | 20 200] (3.00) The Bore Holes Tesmineted a 1200mdepth DS batt! Same DS : Undtrbed Sample A ‘SPT: Standard Pension Test OR : Darran Wes : Wash Saree VST: Vane Shen Tt LOT: Grou Water‘ “GLOBAL seetoo | Omwnby | cmad.by | Cesttert |e). ia Le rushikest | Snehal PPS. “ello 022 6555 9920 Emad Tab ie 26-036 Gu Bone Les a6 1-28 (As per IS : 1892 - 1979, 4453 - 1980, & 4464 - 1967) Page No.of Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building Client : M/s. Shrem Trading LLP connate : = Bore Hale Wo. : 02 Depth of Bore Hole : 12m Location: Ketaray, S.No 171, Savahn,Xturd, Pine. ‘Depth of Casing 1.5m (a. of Borehal: Ne Date of Commencement : 07-05-22 Dep at GAT: 4m Dato of Completion : 10-05-22 [Scalefbepth] F.L. i: [Sample] ‘Depth (im) SPT N'Value [CR RQOPA,| Remaiks/ ao] m{m eer No. | ¥* From [ to [15] 15] 15 [15 [Nx | x [mvt Other Tose BYR Fishy weathered sitogrotedrock wth clay — DS | ORT} 0 18 1 [sPra) 15 | 1.57 INo Recover WS | OR2] 1.57] 3 (3.00m } | Moderately weathered brown amygdaloidal Basalt 17 fora] 3 | 45 20 | eer 848 | OR4| 45 6 23 | NE (3.0m) ‘Slightly weathered grey, anygcelodal Basak 1922] 0AS| 6 75 2 Nil 23-28 | ORG | 75 9 3135 zas| oar} 9 | 108 ar | 54 4650} DAB] 105] 12 min (6,00m) The Bore Hole is Terminated 21200 m dpth uns: Unstrod Sarese ‘ST: Sted Peet Test WES : Wash Sample Orawn By Chad. By Hrushicesh[ Snehat PPS ‘Date | 05-11-22 BORELOG aa Ge (As per tS : 1892 - 1979, 4453 - 1980, & 4464-1967) [Papen tft Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building Client : M/s. Shrem Trading LLP Bore Hol No. (ep of Bore Hole: 12m ‘Location: Kekaray, S.No, 171, Savahan, hurd, Pune. ‘Depth of Casing: 6 m ate of Commencoment Date of : [Saree] Desthin)_[_ SPT WVabe Peer wo. |" [Fem | To [75] 18] 1515 BAH High weathered BY cinrtegraed rock with clay seams os Jor} o | 18 1 [sera] 1s | 158 HPP ic Recover} ws |onz| tes] 3 | we [BHP) ate | 3B BT LN Recove ws |ors| a5] 4 ws Jors| 4 | 45 ~ [> 3 |srrs] 45 | 455 INo Recover ws |ons| 455] 6 calles gon {6.00m) i eratey weathered Bown ‘nyodaoidal Baral sp for7} 6 | 75 23|Ni (1.50) Sighiy weathered fractured ‘rey Basat 13 ora} 75 | 9 40) 35 410 ors] 9 | 105 73 | 64 sig forio| tos | 12 53/31 | (4.50m } | _ |The Bore Hoes Terminated 212.00 m depth Sane OR CaaS [UO : Unietbed Sola ROD : Reck Cty estrtion ‘SPT: Standard Penetration Test PR: Re of Fane Rock Sade SE: Ve Show Test Swat anor CS, Fventesn | Snenat [ps Sng a5 bs a aa Web No GWE Ga BORE LOG ae (As per S : 1892 - 1979, 4453 - 1980, 8 4464-1967) Pageno.stoft Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building (Client : M/s. Shrem Trading LLP Co-Ondinate : ‘Bore Hole No. 04 RL: Depth of Bore Hot ‘Locaton : Ketaray, S.No. 171, Bavdhan,Churd, Pune. Depth of (in. of Borehole: Wx Date of Commencement: 10-05-22 Dep ot GWT: 5m ate of Compleion : 12-05-22 SealefDepth] AL. [Sample] Depth (mn) SPTIN'Vaue [CR ROOPR| Remarks? eee No. | [From | To[15]15] 15 [15 [W] x | [avin] Other Tess Tigh weathered ai) disegrated rock wih clay seams os Jon] o | 15 ee vs |S543) 48 | 18 Noe > io Recove ws [ora] 2 | 25 ~|- ws |ors| 25} 2 ve [SAP] ate | 3B & ple ects ws [ors| 35 | 4 =|= ws |on7| 4 | 45 tle 3 |sprs} 45 | 456 FE—]—TWeBecove| Mowr ws |ors| 458] 6 -|- - (6.50m)| wh |B] & | 88 E a lo Flecoved Sighihy weathered raced sre Basa 13 |orto) es | 75 x {a0 46 orn} 75] 9 36 |19 zo fornia] 8 | 108 as |e 1144 Jona] 105 | 12 |r (5.500) The Bare Hol Teminated 12.00 m dopth Saree Tor rtaet [U0S : Unettbid Sle ROD : Rock Guty sition FFT: Packer Perms Tet {SPT Std Poneto Tet PR: Rate af Pent Rack oR: Oat Ran ae ‘VST! Ve Show fst GWT: Grund Water te ‘Ormwen By | Cha By | Cae GLOBAL OTECHINCS 0a, Swattanar cS, Opp Sted Mand © Ket Road Dada Mi, Mbt Snenal 5 "io 1625 0 920. Eames coer coat Te 2a G_OBE Ga BORE LOG mee (As perS : 4892 - 1979, 4453 - 1900, 8 4464-1967) | Fagen. sa oft Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building Client : Mis. Shrem Trading LLP df Bore Hol Wo. : 05 Depth of Bore Hote: 12m Locate: Kekaray, S.No. 171, Bavdnan Xnura, Pune. Deh ofCoaing: 55m Di, of Berle Dole of Commencement: 13-05-22 Depth of CWT: Water Loss Date of Completion : 15-05-22 [Scale|penth] RL [Sample] Depth (mi) SPT N'Value _ P.R.| Remarks? mi] mim Les) Dersler No. Tee From | To _|15| 15] 15715] N | % | % |mshu] Other Tests Zg ‘Highly weathered ddertegated eck wih ey sears os Joni} o | 15 - 1 sera} a5 | 150 5 No Recoven| ws Jorz| tse] 3 s 2 |sera] 3 | a02 z “Worecoves} ws | ona] a02 | 4s 3 [sera] 4s | 456 fa 5 INoRecoven} ws | ona] 454 | ss ae 5.50 {5.50m } Wesderaiy weathered brown aye idal Basalt 12 | ORS] 55 6 40 | Nil ses|ons| 6 | 75 a |i 50. {2.00m ) “| Sighy weathered factued ovep Basat | 47 |on7| 75 | 9 34 [25 ei fons] 8 | 108 83 ]36 1926] ons] 105} 12 5 |e 12.09) (4.50m ) The Bore Hols Terminated Jat 12.00 m depth A PT: Pacer Perel Tet OR Oa Rim 9 : Wack See VST: Vane Shar Tet GWT: Grond Water te jsietno: | Drawn By | Cia By | Cheat Rept. GEOTECHNICS ‘Swati Manor CHS, N.C Kelis Road Dadar W, =e ; = 22, Swat oe Mumbai Pes “ello : 022 6585 $500 Ema eb Re. BSA Ga BORE LOG eo (As per tS : 1892 - 1979, 4453 - 1980, & 4464-1967) [Pagetio-t oft Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building Cfent : M/s. Shrem Trading LLP ce tediiles 5 Bore Hoke Ho: 06 4 Dept of Bore Hols Location: Kekaray, S.No. 17, Bavdhan,Xhurd, Pune Depth of Casing 6.5:m in. of Borehote x ote of Commencement : 13-05-22 Depth of GWT: 7m Date of Completion : 15.05.22 ScaleDeot] AL [Senot] Depihin) | _ SPT N'Vave [CA POOPA] Renata mn a m [9 ee No. | "°° Fon [ to_[15]15]18 [15[ | x alee thes Tests Tighh weaned aintogiated rock wth clay seams os Jont] o | 15 - 1 sera] ts | 16 [OR loRecoven ws |on2] 16 | 3 2 |ser2} a | 319 [ia A loRecover ws | ona] 319 | 45 3 |srral 45 | 455 Thon ws | ors] 455] 6 i 4 [sera] 6 | 600 A o Recoves ws | ors] 60s} 7 | (7.000) Moderaeh weatered Bown | Mamas yosber 13 |ons} 7 | 75 30 [Na 45 |on7| 75] 9 3 Ni 610 |ore] 3 | 105 35/15 (350m) Slighily weathered fractured ey Besah mar | ong] 108 | 12 55 [45 (150m) The Bare Hele Teiminated 12.00 depth a Roar Rare Undated Sore ROD Rock Cay Desion FT: Pacer Pome et Standard Peet Tat FR: Ree of Pec Rock Pan YS: Me Show st (GWT: Grand Wor ase Drm y | Coty [cet ot Ta yas anor CS, pp Send Hea € Rr od Dar ana dobalyeotechicbyent com ae LEE ete BORE LOG e052 (AS per IS : 1892 - 1979, 4453 - 1980, & 4464 - 1967) Page No.: 1 of 1 Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building ‘Client : M/s. Shrem Trading LLP connate : 207 RL: Depth of Bore Hate: 12 m Location : Kekaray, S.No. 171, Bavehan,khurd, Pune. Depth af Casing : Sm Dia. of Borchae : x Date of Commencement : 16-05-22 ‘Depth of GWT: Water Loss Date of Completion : 12-05-22 Scale|Depth] FL. [Sample] Depth (m) SPT N'Vaue CR RQO]PAL] Remarks? m| om || __ Devainon No. |" [From [ To [8]16] 16 [15 [A] x | x [vl Other Tots High weathered dantograted rock wth lay seams os Joni] o | 15 = 1 |spra] 1s | 159 2 No Recover ws |on2} 159] 3 : 2 |spra] 2 | 305 E INo Recover ws | ona} 305 | 45 3 [SPT-3] 45 | 458 r JNo Recovery ws | ora} 458 | 55 - 550, {5.50m ) {] Sighty weathered fractured | eo dot 12 [ors] 55] 6 22 [Na 35 fons} 6 | 75 ahi 6a |on7] 75 | 9 a {Na 314 | ons} 9 | 105 38/16 1522] ons] 105] 12 {6.50m } The Bore Holes Teiinated 21200 m depth Ta ROO : Rock Quality Desgraon PR: Ral of Penton Roce VST: Vine Shem Tot GWT: Grund Wer Tate Saetnge | Drown by | Cha By | Cente GLOBAL GeoTECBecs ee anes | Snenal [PFS “elo 0226885 6820 Emad’ gocteinseymal com ob Wo BG Ga BORE LOG penal (As pers : 1892. 1979, 4453 - 1980, 84464-1967) [ Fagen tant Project : Proposed Ground Floor + 2 Floor Ancillary cum Commercial Building ‘Glent : M/s. Shrem Trading LLP RL Depth of Bore Hts: 12:m Locaten :Kekary, SN, 171, Bavdhan,khurd, Pune Depth of (of Borel i ate of Commencement Dep ot GWT: 6m Date at Sealebenth] FLL = Eenee] ,,, [ Deshi) | SPT N'Vabe [CR fQU]PA| remana? ae n | Dees No. | Fon [ To [15] 15] 15 [15] | x | 1 [avin] Other Teste q Tigh weathered shtgroted ck wth clay sears os fort] o | 15 - 1 spta} 15 | 1.54 A] INo Recover ws Jor} 1s¢] 3 2 |sr2} 9 | ar a io Revove ws Jona} a1 | 4s ele 3 |seral as | 45s foBa- Ep} io recoven| ws fons] 455 | 55 ele (5.50m)| | Siar weathered actaed | Ss sp Jons| 55] 5 Nl | Sow 14 [ors] 6 | 7s ati sii forz| 75 | 9 a2 |i rata] ons] 9 | 105 a}ra zo2e| one | 105 | 12 7517 i (650m) The Bare Hales Teimnied 212.00 depth Or sad Se ota : 7 U0e: Undobel See RD: Rak ty Design FT: Par Petty Tt ‘Said enctato at PR: Rae of ence feck OR: Oa an wg. Wes See var: vow Ses et ra use [Senge | Drawn Sy | Chis Gy | Glenn irushixesh | Snenal Ps “Telli: 022 6555 9320 Emad. ‘GLOBAL GEOTECHBOCS 202, Swell bkenor CHS, Opp Shiv Mend, NC Keitar Road Dader-W, Mumbei tobaigeutechnics@ymad com a GS Go BORE LOG ame B (As per IS : 1892 - 1979, 4453 - 1980, & 4464 - 1967) ‘Page No.- 1 oft Project : Proposed Ground Floor + 2 Floor Ancillary cum Commer ‘Chient : M/s. Shrem Trading LLP Co-ordinate : = RL: Location: Ketaray, S.No. 171, Bavdhan,Khurd, Pune. ‘Dia. of Borehole : Nx Depth of GWT: 7m [Scaleepth] F.L aaa [Samo] Depth in SPT NVaue [CR RQQPR] Remake? | mi eee No. | 9° [From [ To [TS]1S [15] 15 [| x | x [avin Other Teste a Fighy weathered aerated rock with clay seams os fort] o | 15 1 [sera] 1s | 153 lo Recover ws |or2| 153] 3 = 2 [spr2) 3 | 301 fie Gs (o Recovery| ws |ona| ai | 45 si Bo Res (5.00m)| WS [BHP] 45 | 495 INoRecoveny "| Stghty weathered hactued sry Basak spa }ons} 5 | 6 20 {Ni 23 |ors| s | 75 2478! | Sew 47 Jor7| 25] 9 a e10 fora) 9 | 105 an aig | ona] 105] 12 73 | 48 12.00] (7.00) The Bore Hole is Terminated at 12.00 m depth 3 oR car UDS : Undstabed Saree ROD : Rk Cutty Destin ‘ST: Stand Penton Test PR: Rete of Penton Rock Same ST: Naru Shar Test Dewey | coud. | aent et Toe. swateno CHS, Cop Sve esa ear Rood Dado, anes ‘Snehal PPS “elo : 022 6555 9220 Eat: [email protected] ANNEXURE C: SUB SURFACE PROFILES 9€0 9 Eeze © ON Gor Bupying je}sewwW0D tno Areyyouy 40014 Z + 400}4 punoig pesodoig 2 Refatg ie weseg Mai ponjoey! | 4 paroyreom Mny6ys| Low yese dun fat pono A yeseg| [7 secon Sal [3] aIayieaH Aorerapoy sweos ej Uy yo! payeSaquisip| oIeyeon ABH 10°20 SON 810} a10g Buoyy aqyoig yeuonD9g S50ID oozi 00 0L- 00's oor 00'€- 007 oo se0'9 €zez * oN Gor $0 €0 SON 210} s10g Buoy aqyoig jeuoNDag 8501p Suypuing jeyosouw07 a ool: tung Arerouy 20014 Z + Hee 400]4 punosg pesadoig hr oLwa MIRENOIS : ease %] cua el ate + woofs Le e+ i ool sees [yt] sua sua ee be we be e+ seele+| cua sua a e+ 008 Lea “fet wr Iz sua dua 008 1leseg A016. pamper mor sua 1a Paxeyyeom A464 S ‘sya = Pelee nee elds fot poiuon pane S| Fe weseg] (7 oor: rpopecive Sse) | no areueo% foreopon eo siamo oe sweas Ae Yim] yoo! payewauion zua arayyeor AybiH| 002: belds eS SEO 9 €zzz : NGO Gurpying jersewwo> wing Arey s00]4 z+ 40014 punoiy pasodoig 2 along yereg 4016 panjory aroureon dubs yR8eg [epLOpePE Awe [210 poioyiwom Aus} yeorg pPIIPH RUE UiNoIa| fs | parayieam Aoyeiapoyq) sweas de yy ce 90°70 SON 8)0} 10g Buoyy ayaig jeuoRDEg Ss0ID oo'zi- OOH 00'01- 00 00's full tbyubu illu Lusualut) oor 009° 00's: oor 00'e- 001 5€0°9 Ezez = ON Gor Supyng je1.2wWwo> youY JOO} Z + 40014 punoiy pesodoig afi yeseg Mor6 pamjoey atouiear diyys ese jepiojepbiue| [f216_paroyyeom A465 yeseg RPIOPB Aue UMoIG Pavaxream Aovelopoy) sue9s eo YH YP! payeausip payee AOI ‘80°20 SON @I0} a10g Buojy ayaig jeuonseg Ss01D oo z= OO LE 008 ood 00's 00's: 00'e- 00% 00% ANNEXURE D: ROCK TEST RESULTS ROCK CORE COMPRESSIVE STRENGTH TEST REPORT (UCS) ‘Test Report No. : GGL/22-23/RK/08 /24 Report Date : 16/05/2022 Client Name : M/s. Shrem Trading LLP Sample Tested : In Laboratory Project* + Date of Receipt: 14/05/2022 Site: Bavdhan, Khurd, Pune Job Ref. No. : GGL/22-23/RK/05/24 OfeRef.No. : 223.035 Ref. 1S Code: 1)159143:1979 (RA 2016), : 2)18 13030: 1991 (RA 2016), Date of Testing : 14/05/2022 aasiizeae7ensaiay Bore Hole No.* BH-01 BH-02 BH-02 Piece No.* 26 28 20 25 47 7 10.50% 10.50% Depth* (m) 9.00 010.50] *1999° |6:00t07.50|7.50t09.00| 10.508 [Specimen Diameter (cm) 5.39 5.43 5a 543 544 Specimen Length (cm) 9.05 9.87 9.22 10.20 851 Length / Diameter Ratio 1.68 1.82 170 1.88 156 Failure Load (KN) 60.30 142.80 35.40 73.00 153.90 ive Strength ne eae 2643 61.66 15.40 3152 66.21 N/mm") correction Factor 097 098 097 0.99 095 (Corrected Compressive 7 25.51 45 1491 3111 [Strength for L/D (N/mm?) 7 S320 Porosity (%) 9.64 621 1199 7.89 8.28 Water Content (%) 2:90 2.06 327 261 2.10 Dry Density (kg/m*) 2406 2650 2415 2524 2610 ores 4. This resus certify the adequacy & representative character ofthe test sample oly 2.Rock core are tested as per submitted by client. 53. Compression testing machines use. Si For Global Geotechnics ROCK CORE COMPRESSIVE STRENGTH TEST REPORT (UCS) Test Report No. : GGL/22-23/RK/05/24 Report Date : 16/05/2022 Client Name: M/s. Shrem Trading LLP Sample Tested : In Laboratory Project* —: Date of Receipt : 14/08/2022 Site* _-Bavdhan, Khuré, Pane. Job Ref. No. : GGL/22-23/RK/05/24 Ofe RefNo. : 223.035 Ref. 1S Code: 1) 189143: 1979 (RA2016), Date of Testing : 14/05/2022 be tesigter premrng [Bore Hole No.* BH-03 BH-04 Piece No.* 2 6 13 1 4 Depth* (m) 7.50 to 9.00 |9.00 to 10.50 ew 6.00 to 7.50 | 7.50 to 9.00 Specimen Diameter (cm) 549 5.49 5.41 544 5.43 ‘Specimen Length (cm) 1043 10.12 9.82 9.94 10.26 Length / Diameter Ratio 1.90 1.84 1.81 1.83 1.89 Failure Load (KN) 178.30 226.90 279.30 | 338.00 27.70 eee Strange 78.41 95.85 121.38 145.24 119.77 Correction Factor 0.99 0.98 098 098 099 Eeeeae unt quae 74.60 94.22 119.92 142.50 118.33 Porosity (2%) 5.1 401 437 199 3.07 Water Content (%) 190 1.73 179 0.96 1.04 Dry Density (kg/m*) 2908 2838 2808 2917 2868 NOTES: 1. This osu erty the adequacy & representative characta ofthe test samples only. 2 Rock core are tested as per submitted by cent ‘3. Compression testing machine is used 7 For Global Geotechnics ROCK CORE COMPRESSIVE STRENGTH TEST REPORT (UCS) Test Report No. : GGL/22-23/RK/05/24 Client Name : M/s. Shrem Trading LLP Project * Site* + Bavdhan, Khurd, Pune. OfeRef.No. : 223.035 Date of Testing : 14/05/2022 Report Date : 16/05/2022 Sample Tested : In Laboratory Date of Receipt : 14/05/2022 Job RefNo. : GGL/22-23/RK/05/24 Ref. IS Code: 1) 15 9143: 1979 (RA 2016), 2) 1S 13030: 1991 (RA 2016), 3) 18 1122: 1974 (RA-2017) Bore Hole No.* BH-04 BH-05 BH-06 BH-07 Piece No.* 7 5 Fr 14 3 70.50 to /Depth* (m) 9.00 to 10.50] 7.50 to 9.00 /9.00t0 10.50] 7090? | 6.00t07.50 ‘Specimen Diameter (cm) 5.43 534 5.44 5.49 5.23 [Specimen Length (cm) 10.45 9.92 7.61 10.03 9.23 Length / Diameter Ratio 192 1.86 1.40 1.83 1.76 Failure Load (KN) 273,50 201.50 184.60 75.10 197.80 ive St eet 118.25 89.86 79.42 31.73 91.96 (N/mm*) Correction Factor 0.99 0.98 0.94 0.98 097 ‘Corrected Compressive Strength for /D (N/mm?) | 11729 88.46 7427 31.13 89.60 Porosity (%) 256 3.87 252 945 3.78 Water Content (%) 121 131 057 290 241 Dry Density (kg/m) 2953 2779 2967 2348 2714 NoTEs: 4. This resus certify the adequacy & representative character ofthe test samples ely 2, Rock coreare tested as per submited by cient. 3. Compression testing machine f zed “¥ For Global Geotechnics ROCK CORE COMPRESSIVE STRENGTH TEST REPORT (UCS) ‘Test Report No. : GGL/22-23/RK/05/24 Report Date : 16/05/2022 Client Name : M/s. Shrem Trading LLP Sample Tested : In Laboratory Project* —: Date of Receipt : 14/05/2022 Sitet Bavdhan, Khurd, Pune. Job Ref. No. : GGL/22-23/RK/05/24 OfeRef.No. : 223.035 Ref. ISCode: 1) 189143: 1979 (RA 2016), 2) IS 13030: 1991 (RA 2016), Date of Testing : 14/05/2022 stsiizeiere mace [Bore Hole No BH-07 BH-08 BH-09 : Piece No." 22 19 27 5 7 5 10.50% 10.50% Depth* (m) To09. [202t0 20.50] 80" | 7.5010 9.00 : [Specimen Diameter (cm) 5.28 5.32 5.32 5.38 7 ‘Specimen Length (cm) 7.86 837 891 10.16 - Length / Diameter Ratio 1.49 157 167 1.89 - Failure Load (KN) 289.90 185.70 62.90 319.50 Z ive Strength compete seme 132.23 83.44 28.26 14037 : (N/mm) Correction Factor 0.94 0.95 0.96 099 Corrected Compressive s 90 : 7.26 z . seven foro tw/mmasy | 122 7987 2 138.65 Porosity (%) 1.99 3.07 2.45 1.93 Water Content (%) 2.55 261 1.84 262 : Dry Density (kg/m*) 2629 2778 2735 2834 Notes: 4 This results certify the adequacy & representative charecer ofthe test samples ony, 2 Rock core are tested as per submited by client 3. Compression testing machine is used t For Global Geotechnics Test Report N ROCK POINT LOAD TEST REPORT (PL) |GL/22-23/RK/05/24 Client Name : M/s. Shrem Trading LLP Report Date: 16/05/2022 Sample Tested : In Laboratory Project* Date of Receipt: 14/05/2022 sitet Bavéhan, Khurd, Pune. Job RefNo, : GGL/22-23/RK/0S/24 OfeRef. No. : 223.035 Ref IS Code: 1) 1$ 0764: 1998 (RA 2014), . 2) 18 13030: 1991 (RA 2016), Date of Testing : 14/05/2022 eee [Bore Hole No.* BH-O1 BH-OS BH-06 BH-07 Piece No* 4 1 2 8 13 Depth* (m) 6.00 to 7.50 | 5.50 to 6.00 | 7.00 to 7.50 |9.00 to 10.50|9.00 to 10.50 specimen Diameter (cm) 534 537 5.35 5.34 531 ISpecimen Width (cm) 540 5.38 535 535 5.32 Diameter/Width Ratio 099 1.00 1.00 1.00 1.00 Failure Load (kN) 20 50 os 40 20 Point Load Strength : 732 1831 184 14.76 744 (sg/em’) Porosity (%) 1199 191 1732 832 9.46 later Content (%) 238 062 650 3.81 344 Dry Density (kkg/m*) 2484 2966 2117 2385 2518 ores: 1. Thisresuls certify the adequacy & representative characer ofthe test sales only 2 Rock cre ae tested a6 fer subited by chet. 5. Point Load testing machines use, 4:DI*= Sample Dissolved For! t, Geotechnics ROCK POINT LOAD TEST REPORT (PL) Test Report No, : G6L/22-23/RK/05/24 Report Date : 16/05/2022 Client Name: M/s.Shrem Trading LLP Sample Tested : In Laboratory Project* Date of Receipt: 14/05/2022 Stet + Bavdhan, Khurd, Pune. JobRet.No. :GGL/22-23/RK/05 /24 Ofe Ref. No. : 223.035 Ref.1S Code: 1) I$ 764: 1998 (RA 2014), 2) 18 13030: 1991 (RA 2016), Date of Testing : 14/05/2022 Bis tiga ova (econ Bore Hole No.* BH-08 BH-09 a ; Piece No* 10 3 B 5 : = 10.50%0 Depth* (mm) 7.50%09.00 | 6.00 07.50 | 1050" : : Specimen Diameter (em) 451 5.10 530 : : [specimen width (cm) 533 5.32 531 - 7 Diameter/Width Ratio 0.85 0.96 1.00 : - Failure Load (KN) 50 10 25 : ‘ Point Load Strength 21.02 3.04 932 : - (g/cm*) Porosity (%) 438 9.64 5.48 : . Water Content (%) 218 3.43 190 - : Dry Density (kg/m*) 2692 2456 2674 : : ores 1. This results cera the adequacy & representative character ofthe tet samples only. 2 Rock core are tested as per submited by lent 3. Point Load testing machines used, 4:DI"= Sample Dissolved “et = For Global Geotechnics ANNEXURE E: WATER TEST RESULTS ‘TEST RESULTS OF WATER SAMPLE. ‘Test Report No, GGL/22-23/W1/05/23 Client Name M/s.Shrem Trading LLP Site’: Bavdhan, Khurd, Pune. Date 23-05-2022 RefNo. 223.035 Sample Type Water Results of Analysis Water Table | pif by Digital pi Sulphate ASSO, | — Organic Matter ‘Sample Details Chloride As cl (ppm : (o) meter (em) | oom (opm) Biko 600 778 20 30 15, iL06 700 762 20 35 0 “Limits as per 15456-2000 650-8.30 2000 PPM “00PEM 200FPM ‘These results are valid only forthe above samples. at for GLOBAL GEOTECHNICS ANNEXURE F: PHOTOGRAPHS Client Name: M/s. Shrem Trading LLP Site Add: Kekaray, S. No. 171, Bavdhan, Khurd, Pune. BH-01 — Box-1 Client Name: M/s. Shrem Trading LLP Site Add: Kekarav, S. No. 171, Bavdhan, Khurd, Pune. BH-02 —_Box-1 Client Name: M/s, Shrem Trading LLP Site Add: Kekarav, S. No. 171, Bavdhan, Khurd, Pune. B Box: sj Client Name: M/s. Shrem Trading LLP A ekarav, S. No. 171, Bavdhan, Khurd, Pune. _ BH-06 B * Client Name: M/s. Shrem Trading LLP &E Site Add: Kekarav, S. No. 171, Bavdhan, Khurd, Pune. BH- 06 Box-2 & Client Name: M/s. Shrem Trading LLP Site Add: Kekarav, S. No. 171, Bavdhan, Khurd, Pune. BH-07 Box-1 Client Name: M/s. Shrem Trading LLP Site Add: Kekarav, S. No. 171, Bavdhan, Khurd, Pune. BH-08 Box-1 Client Name: M/s. Shrem Trading LLP Site Add: Kekaray, S. No. 171, Bavdhan, Khurd, Pune, BH-09 Box-1 BH - 02 BH - 03 BH - 04 BH-05 BH - 07 BH - 08 BH - 09

You might also like