$R892ZF2
$R892ZF2
APPD
(DCC)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NATIONAL GRID. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DESCRIPTION
PROPOSED 132kV OHTL FROM LOOPING POINT TO EXISTING 132kV OHTL 8760-8708 UPTO
THE NEW S/S 8768
LAYLA
AJEC
AJEC
BY
19/04/2022
02/12/2023
DATE
NO.
REVISIONS
DRAWN
BY: H.B.A
DATE: 02/12/2023
CHECKED
BY:- M.A.K
DATE:- 02/12/2023
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:
DATE:-
CERTIFIED
BY:
DATE:- AS BUILT BY - DATE 09/11/2023 DWG CONTROL SHT.CE-1064788
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR ROCK PIER FOUNDATION DESIGN CALCULATION FOR LATTICE 1 of
CONSTRUCTION OR
STEEL TOWER TYPE - 'D132A1' - LINE-A-002,006,007,008
FOR ORDERING A KJ3003 CA-1064793 1
MATERIALS UNTIL
PROPOSED 132kV OHTL FROM LOOPING POINT TO EXISTING 132kV
CERTIFIED AND 2
DATED OHTL 8760-8708 UPTO THE NEW S/S 8768
LAYLA SAUDI ARABIA JOB ORDER NO 1-2031057.01 CONTRACT NO. 4400014565
DRAWING COMPLETION CERTIFICATE
APPD
(DCC)
TABLE OF CONTENTS
CHKD
B. ATTACHMENTS
B.1 TOWER REACTIONS
ISSUED FOR APPROVAL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NATIONAL GRID. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B.3 ROUTE PLAN AND PROFILE
B.4 TOWER STRUCTURE LIST
B.5 BORHEOLE LAYOUT PLAN
B.6 TOWER STUB SETTING AND TEMPLATE
B.7 SP COLUMN DESIGN OUTPUT
AJEC
AJEC
BY
19/04/2022
02/12/2023
DATE
NO.
REVISIONS
DRAWN
BY: H.B.A
DATE: 02/12/2023
CHECKED
BY:- M.A.K
DATE:- 02/12/2023
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:
DATE:-
CERTIFIED
BY:
DATE:- AS BUILT BY - DATE 09/11/2023 DWG CONTROL SHT.CE-1064788
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.