The document outlines the manpower requirements and costs for a design/feasibility survey project. It lists 14 key staff positions needed, including team leaders, engineers, experts in various fields, with minimum qualifications and monthly salaries ranging from Rs. 600000 to Rs. 1000000. It also lists 7 non-key staff positions needed such as junior engineers, CAD operators, and survey helpers, with salaries ranging from Rs. 60000 to Rs. 250000. The total cost for manpower is estimated to be Rs. 25,940,500 for the duration of the project.

Uploaded by

ShamsUlislam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views6 pages

Remuneration of Design COnsulatnt

The document outlines the manpower requirements and costs for a design/feasibility survey project. It lists 14 key staff positions needed, including team leaders, engineers, experts in various fields, with minimum qualifications and monthly salaries ranging from Rs. 600000 to Rs. 1000000. It also lists 7 non-key staff positions needed such as junior engineers, CAD operators, and survey helpers, with salaries ranging from Rs. 60000 to Rs. 250000. The total cost for manpower is estimated to be Rs. 25,940,500 for the duration of the project.

Uploaded by

ShamsUlislam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

MAN POWER (KEY PERSONAL) REQUIREMENTS FOR DESIGN/FEASIBILITY, SURVEY

Monthly
Minimum Academic Duration
S.No. Position Qty. (No) Salary
Qualification (Months)
(Rs.)

i. Key Staff

Team leader/Senior Design Expert


1 M.Sc Civil 1 3 1000000
(Sewerage)

2 Sewerage Expert M.Sc Civil 1 3 900000


3 Geotechnical Engineer M.Sc Geo-Technical 1 2 900000
4 Topographic Expert M.Sc Civil 1 2 800000
MS Environmental
Engineering /
5 Environmental Expert 1 1.5 600000
Environmental
Sciences
M.Sc Structural
6 Structural Design Expert 2 3 600000
Engineering
7 Social Expert MS Socialogy 1 2 600000
8 GIS Expert 1 2 600000
M.Sc
9 Hydrologist 1 2 600000
Hydraulic/Hydrology
10 Material Expert 1 2 600000
11 Contract Specialist B.Sc Civil 1 2 450000
12 Mechanical Expert 1 1.5 450000
13 Electrical Expert 1 1.5 450000
ii. Non Key Staff
1 Jr. Engineers B.Sc Civil 2 3 250000
2 Jr. Architects B.Arch 1 1.5 200000
DAE Civil / B.Tech
3 CAD Operators 2 3 90000
Civil
DAE Civil / B.Tech
4 Quantity Surveyor 2 3 100000
Civil
DAE Civil / B.Tech
5 Chief Surveyor 1 3 100000
Civil
DAE Civil / B.Tech
6 Surveyor 3 3 90000
Civil
DAE Civil / B.Tech
7 Assistant Surveyor 3 3 60000
Civil
8 Survey Helpers Intermediate 3 3 34500
9 Documents Controller Bachelors 1 3 50000
10 Office Manager Masters 1 3 80000
Total (I)
LITY, SURVEY

Amount

(Rs.)

3000000

2700000
1800000
1600000

900000

3600000

1200000
1200000

1200000

1200000
900000
675000
675000

1500000
300000 0.45

540000
450000

600000

300000

810000

540000

310500
150000
240000
25940500
25.9405
Description of services Amount
S.No to be rendered under Unit Timeline %age
TOR
(Rs.
Million)
Within one week after
i Inception Report % signing of Contract 5% 1.297
Agreement.
Feasibility Study
Within one month after
including Topographical
ii % signing of Contract 20% 5.188
Survey & Geotechnical
Agreement.
Investigations
Submission of PC-I
Within one month after
(including BOQ,
iii % signing of Contract 20% 5.188
detailed estimate,
Agreement
drawings, etc.)
Within 02 Months after
Draft Detailed Design
iv % signing of Contract 15% 3.891
Report
Agreement.
Final Detailed Design
Report Within 2.5 Months after
v along with the % signing of Contract 15% 3.891
Specification Agreement.
Manual

Tender & Construction


Drawings (alteration,
modification, addition Within 03 months after
vi or amendments in the % signing of Contract 15% 3.891
relevant documents Agreement.
deemed necessary by
the client).

Within 2.5 Months after


Submission of IEE/EIA
vii % signing of Contract 5% 1.297
Report
Agreement.
Within 03 months after
Approval of IEE/EIA
viii % signing of Contract 5% 1.297
Report
Agreement.
x 25.941
On completion of pre-qualification of contractors, contractor’s bid
evaluation, tender assistance payment devices and certification