STRUCTURAL DESIGN CRITERIA & REQUIREMENTS
GENERAL
© AL FRAMN es sm eR BUTI ve RET
2 Tai each WMS Bagge: fr
» Heine brine arias Be
SEISMIC. ZUNE ~ AS PER BNBC=2006
FQUNDATION
> THE ALLOWABLE BEARING CAPACITY AS PER SOIL TEST REPORT
CONCRETE
Ganctere sitencty Sanu. 8c ‘Veniried Peow THE TEST RESULTS OF THE
REPRESENTATIVE. SEEETNENS
1"
DIAMETER, D = 4" W HEIGHT, H = 8
‘SSEWUATE wOseabILIT 2.
TIME MINIM 14 Days
13,
Congserg. oma, comacreD vane, vaeerae viol 9,70
COARSE AGGREGATE
© 12son AND enn DOVN WELL CRUSHED OVER BRUNT BRICK PICKED SHOULD
vo COARSE AGoWECATE MUST BE” SATURATED SURFACE DRY CSSD> CONDITION
co “COARSE AGGREGATE WUST BE WASHED HEFORE USING CONCRETE
FINE AGGREGATE
Sven, “SHALL HE USED
14
CEMENT:
‘HALL pe USED, ”
WATER
LAP LENGTH
8, STEEL REINFORCEMENT 16.
© ALL REDEDRCENENT aR REFORWED BAR WADE FROM BILLET STEEL
vy VIEL STeNTH OF STEEL Py = o15 tpo 000
© TSMEL BE CONDUCTED AT BLET AS PER BIS 19 1991
> Nevina. tis
CORNER REINFORCEMENT (CR)
UNLESS OTHER WISE WENTIONED IN THE DRAVINGS LAP LENTH OF Ba
Foe Tension 40
1 Fos depewescto 29» 17, CONCRETE CLEAR COVER FOR REINFORCING
2 Ps Te bioutes BP ne oa
HOOKS OF BAR eam
© FOR ALL RE-BAR » PROVIDE 90% STANDARD HOOKS ¢L-BENTD IF NT fr we
Sho Ie bene cate wh Ol
SPACER BARS oars Face Ton
TO SUPPORT SECIND LAER ARS IN BEAM / SLAB, USE SPACER BARS sum filet Btn
ide otton
CHAIRS
USE CHAIRS OF NECESSARY BIMENSION MADE FLO 8 / 12¢ 7 160 BAR TO
LAP LOCATION
FOR BEAM BOTTOM Bee, LAP SHOULD NOT TO BE PROVIDED IN MIDBLE THIRD .
UA SeLiogs see To" be COWFINED BY HPS VITH WeNIMUM SPACING OR
OF a/4 OR sn WHERE a 1S THE EFFECTIVE DESTH OF THE BAM
18, MAXIMUM BARS IN BEAMS IN SINGLE LAYER
SiON NOWHER OF BARS AS SINGLE LAYER OW BEAM
a ee 19, MAXIMUM BARS SPACING DN
wen se LONGITUDINAL BARS”
DEVELOPMENT LENGTH
IKTa THE SOPPORT LATO TEVELOPVENT LENGTH
CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHALL NOT BE
MR tin 7 “
ADMDXTURE
BETER APPROVAL BY THE ENGNEER IN CHARGE.STRUCTURAL DESIGN CRITERIA & REQUIREMENTS
24, EN RRUP!
STEEL paw IN
26, CONFINEMENT REQUIREMENTS OF COLUMN &.
BEAM
OPENINGS»,
Openi|
I
=
I
|
|
i/
|
|
|
7h
\
GRID LAYOUT PLAN
ROADa ancanpeanasanaeaane cannsennoeassaansaaaccsso!
BD
oamen: -
Fecoaae — 993)
WOODEN SHORE PILE
PROPERTY LINE | GE
WOODEN SHORE PILE LAYOUT PLAN.
ar
ROAD
fr
20-0"
LONG SECTION OF
‘WOODEN PILEROAD
COLUMN LAYOUT PLANott
oO
oF |
ROAD
PILE LAYOUT PLAN,8-16mra
r /—10966"e/e
. Stirup
on ]_—s*cLaRCcOvER
pue
7 ehSrive LeveL
/
a
A
avomnce
6
g
8
ASTIN SITU PILE
8-t6mmo
LONG SECTION
OF2©°DIAPILE
te @
10 SPIRAL OF PITCH”
PILE SCHEDULE
name | No | 1A |ToTALLENGTH |POORCONCRETE |aorrom
[TO BE BROKEN OFF.
pr | ee | ze To" Pe 10
(CAST-IN-SITU PILE
NoTeEs:
1) CONCRETE MIX PROPORTION: MIX RATIO SHOULD BE,
111.53 = CEMENT:SAND:SHINGLES ( fc= 3000 psi)
CEMENT. : USE SLOW SETTING & BEST QUALITY CEMENT
SAND: 100% SYLHET
SHINGLES 3/4" DOWN GRADED
2) REINFORCEMENT:
'3) 60 GRADE DEFORMED MAIN BAR, (= 60 ksi)
b) 60 GRADE DEFORMED GAR FOR SPIRAL, (= 60 ksi)
3) SLUMP: ALLOWABLE SLUMP IS AT LEAST 6" OR 150 mm
4) TREAMY PIPE: IT SHOULD BE PLACED AT LEAST 6° BELOW THE
CONCRETE MASS DURING CASTING OF PIER.
5) STEEL CASING:CIRCULAR STEEL CASING OF LENGTH 15°0" SHOULD BE.
FIXED AT LEAST 2:6" HIGHER THAN THE EXISTING GL
6) BORING: VERTICAL ALIGNMENT OF AUGER BORING MUST BE
ENSURED 100%
7) ADJACENT BORING: NEAREST BORING OF ANOTHER PIER UNDER A
PILE CAP MUST NOT BE EXECUTED BEFORE 24 HOURS.
'8) CASTING PERIOD: TOTAL CONCRETE CASTING PERIOD OF A PIER
‘SHOULD BE 2 HOURS & 30 MINUTES.
9) CAVING: CAVING OF SAND & SQUIZING OF LOOSE CLAY MUST BE
(OBSERVED CAREFULLY.
10) DEPTH: AS PER DESIGN DEPTH SHOULD BE ENSURED,
11) INNER RING: 5/8” DIA INNER RING AT 5" INTERVAL TO PREVENT
‘TWISTING OF REINFORCEMENT CASING.
12) CLEAR COVER: AT LEAST 3°
18) SLURRY: IT MUST BE DENSED BY USING RED MUD OR BENTONITE,PILE CAP LAYOUT PLAN
ROAD| CE a |18
LIFT CORE
Low 80"
t
ea"
13"
ae
7-8"
LIFT CORE PLAN
emote
180 8200+ 816 Ober
omaeree
ee eh
200 ba + =
6 0bx
4.20 0bar+ B16 Oba
For} ana" Te
LIFT CORE REINFORCEMENT
20 aber
e160
sean 00a
tesa
tee gece u =
“ew i See
mages:
mm ee ,
oo
4620000
LIFT CORE REINFORCEMENT
owegrss
cocoa
480ba
ana"
LIFT CORE REINFORCEMENTGROUND FLOOR SLAB
FB
3
=|
ESL, em 10mm @ @ 8" CIC
Vy ol [12mm @ @ 6" cic bl
| I—12mm @ @ 6" CIC a
a.
Ae
el Zs 8" R.C.C BASEMENT WALL
in) [2
/— 6" Water Stopper.
Pase4f ]/— Construction Joint. TOP OF BASEMENT
: * T=
4 ES jae 5 Lee =
inf ie
Nb " BRICK WALL
| @ WATER PROOFING MEMBRANE
PROPERTY LINE) 5" BRICK WALL
WOODEN _/
SHORE PILE
BASEMENT WALL
SECTION: A-AGROUND FLOOR SLAB
128@6'"clc.(top)
128 @8"clc.(bottom)
TOP OF BASEMENT
ia
I]
lI
a
5" BRICK WALL
|ATER PROOFING MEMBRANE
5" BRICK WALL
108@6"cle—“
28" C.C(1:3:6 WITH BRICK CHIPS)
4.5 mmTHICK WATER PROOFING MEMBRANE
2 €.C(1:3:6 WITH BRICK CHIPS) + Js" PLASTER
SINGLE LAYER POLY THENE SHEET
16mmB@S"clc.
20mmB@4"clc.
SECTION:
5:0" 1.9"
+
3.6"
B
TH
TYPICAL REINF, PLAN OF PILE CAP PC5
GROUND FLOOR SLAB
o-
T=32"
12@@6"clc.(top)
(—120@8"cle.(bottom)
12"
pe
100 @6"clc.
}- 5° BRICK WALL
INTER PROOFING
AY arvce wats
20"
136 mH BRK CHS)
SINGLE LAYER POLY THENE SHEET
— 20mm@@ 5"clc.
pra 20mmZ@ 5"ele.
ro
aa
ro
TYPICAL REINF. PLAN OF PILE CAP PC2(GROUND FLOOR SLAB
os"
‘TOP OF BASEMENT SLAB
7
102@6"clo. 4
3a"
r:
Te
TTVPIGAL REE. PLAN O
LE CAPPCSROUND F.OOR SLAB
t6mm@@srele
1omma@srcle.
5-6"
__5'6"
5:6"
, 3-6"
ROUND FLOOR SB
20mmB@s"el. (battom)
nF
CQ
©
09-9b
©RAFT BOTTOM MESH REINF.LAYOUT
ROADRAFT TOP MESH REINF.LAYOUT.
ROADPLAN OF UNDER GROUND WATER RESERVOIR
& SEPTIC TANK
ROAD©
Oy
UNDER GROUND
WATER RESERVOIR
14°-8"x10'-2"
(VARIABLE)2° ROC WALL
PLAN OF SEPTIC TANK
I 1ST FLOOR
To
GROUND FLOOR
Basement Wall >vrcewan —L J)
Oo
&
ROAD
75-0"
ott J 1
MAT OUTLINE
‘8" R.C.C BASEMENT WALL
5" BRICK WALL. BASEMENT LAYOUT PLAN¥ +
i
4ST FLOOR
U LI LI
Ground Floor nnn er —
= eee = \,
z Py und Fo Ray
J Lets lq | : aI J
3 a zl 3|
: q soe
® ke
BASEMENT E BASEMENT
L 912 @ 4" C/C (T&B)
'— 612 @ 5" C/C (T & B)
OF RAMP DETAILS
RAMP THICKNESS= 8"
L
=
1ommoeste/e
20mm.
L 912 @ 4" C/C (T&B)
— 612 @ 5" C/C (T &B)ss a 1st FLOOR
LU Li a
a
l tere 9
mela M
exoino noon
oo r [Sexe Ground Foc Ramp ounce
. ) “e
4 . a ;
4 ms a A L
4 Septic Tan }—easerons wan,
q ba BASEMENT
GROUND FLOOR RAN
—— @12 @ 5" C/C (T &B)
SECTION (M:M) OF RAMP DETAILS
RAMP THICKNESS= 8"Level +40" | 51
Iz
: 1
O |
ob
18.2"
| guar |
ar
GROUND FLOOR BEAM PLAN
ROAD2-20mmas
2-16mma ST.tep
226mm STbattom
L
oamBes ce
LONG SECTION OF BB-1 (15"X12"
6-20mm0 st
6-20mm3 St
65"
2-20mmo+ 2-20mma+ ©
26mm Sttep 2-15mmB ST 0p
2-20mma 2-20mmo
2.16mm® Stittom 2.6mm ST.botom
L L
Tommaere
2-20mmo+
Femmo ST.top
be
lommaes'c/e
5 i"
“— 2-20mmo+
SECMM_2-16mmO ST.bottom
6-20mmé ST. -6-20mma ST. o
.6-20mma ST. 6-20mm8 Sr.
L
OamBE TCE
LONG SECTION OF BB-2 (20"X12"
Notes:
fo= 3500 psi, fy= 72500 psi
CASTING RATIO
CEMENT : SAND : AGGREGATE: 1:1.5:3
CLEAR COVER FOR F8 = 1.5
L L
Tommoercie Tommpasrere
620mm ST.top
Liommaes*c/c
20" ——¢.20mm@ ST.bottom
SECN-N®
{2009 soo ‘200m 299 42000 1388
4-20mmg ST.bottom 420mm ST-bottom 420mm ST.bottom
L L L
oamBes Cie Toembarge Teamaee Ce
LONG SECTION OF BB-3 (15"X12"
4-20mm® ST.top
}
ee Liommees*c/c
ist
“— 4-20mm@ ST.bottom
SECMM
4-20mmg@ ST.top 7-20mm@ ST.top
piommaesrc/e
Ph : +
Liommoes.stc/c
as" 4-20mm@ ST. bottom 7-20mm® ST. bottom
Inverted Beam (IB. Stair Beam ($B-15°x12") Section NoTES:
fe = 3600 psi ty = 72500 pi
CASTING RATIO
CEMENT : SAND : AGGREGATE: 1:1.5:3
CLEAR COVER FOR FB = 1.5YY
a
ob
18.2"
| gar | sutot
ar
5.
FB2
B.
Bu
Ful
TYPICAL FLOOR BEAM PLAN
ROAD20mm ST.
2ommBext.
3-20mm0 ST.
Ir 20mm.
320mmo st] G9
3-20mm@ ST.
[penne 220mmBex |
: | FL ! |
] E ue & E rr Te E Te
j [Eetsmmoet. | Tp PMH [Lo rsmmaone La-s5mmaext. eS
5-20mmost. + ua [S2omm@ sr. us us S20mmost. ue
onmaer'cic sonmess'se rommaaerce| | sommeercic —sommgascye —ommBeWCC] fommoeecic _sonmg@stee Jommaas'c/e
LONG SECTION OF FB-1 (12"X20"
;——— 3-20mmest
| <——3-20mme ST.
inl = ghey
7 2-20mm@ext. 7
z z —10mmg@s*c/c
Rg 1ommB@4"C/C x "
t¢}-—2-16mmgext.
NoTEs: i. -20mm@ ST. i. 3-20mm@ ST
fe = 3800 psi, y = 72800 psi 12"|
CASTING RATIO SECA-A
CEMENT : SAND : AGGREGATE: 1:1.5:3,
CLEAR COVER FOR FB = 1.5"
SEC.B-B) --4-20mma sr.
[Pere
Lf
4-20mm0 sr.
[penne
EI
Fl
= —a 5 —a Zt z |
[Lesomeee — | ait} [A Pe eT
sume | ita wa} Lszonmost
Lomoerge ioomagece somoerce| [imaercc’ iommpeecie fomaaesae] famearce 1omgecce lemaerr
‘i
LONG SECTION OF FB-2 (15"X18"
NOTES:
fe = 3500 psi, fy = 72500 psi
CASTING RATIO.
CEMENT : SAND : AGGREGATE- 1:1.5:3
CLEAR COVER FOR FB = 1.5"
> 4-20mmg ST.
5"
+
18"
3-20mm@ext.
1OmmB@4"C/C
+——3-20mm@ ST.
SEC.M-M
;———4-20mmg ST.
in|
——10mm@@6"c/c
{—2-20mmgext.
+——3-20mm ST.ROADI
=
45-0"
1ST FLOOR SLAB REINFORCEMENT
ROADTypical Detall of Slab10-3"
[RESERVOIR BOTTOM
27 norroxe name)
8" RCC WALL
SECTION (<-X)
‘OVERHEAD.
WATER TANK
bor
PLAN OF OVERHEAD RESERVOIRte a P
f a '
; i 3 th
| lw Zl
rH |
fs | |
| Cd!
: = {ao i _J
E ¥ SLAB LEGEND
; LIFT BOTTOM SLAB LEGEND ‘SLAB LEGEND
ee eee 1) 10mm @ bar @ 6" c/c TOP & BOTTOM
(1) 12mm @ bar @ 5" c/c Top & bottom. (2 Tom @ bar @ 2" clea ced
FE 5 ; SLAB THICKNESS= 8” *rSLAR THICKNESS= 5
SECTION :Y-Y