Completion Certificate
32.( 2679-2020)
Habiganj, (Division Office)
Name of Contractor * S. Ananta Bikash Tripura
Name of RHD Office
Name of Contract + Construction of Double Vent 2x4.00m length §.00m
‘height & 10.50 width RCC Box Culvert with U-Typo wing
wall at 35th km Ch.34+400 of
Sarail-Nasimnagar-Lakhai-Habigonj Road R-220 under
PMP Major-Bridge/Culvert of Sylhet Zone under HRD
during the FY 18-19.
4/PMP-Major-8CIEE/HRDI18-19 (277625)
Contract Number
Namo of Project + 4996-92 - PMP Bridges
BudgerHoad
Value of Contract Seventy-one thousand eight
| hundred seventy-eight taka and twenty-nine paisa only)
Value of Work Done TK. 6,563,096.63 (eighty-five lac sixty.three thousand
inety-six taka and sixty-three paisa only)
Commencement Date 21 March 2019,
Planned Completion Date : 18 January 2020
Actual Completion Date: 14 January 2020
Signature of Engineer
Name of Engineer
Designation of Engineer
Date of Signature
Seal of the Office
Signature of Contractor
|a 8
0
Completion Certificat
32(209- 2026)
Name of RHO Office = ‘Habiganj, (Division Offic)
Name of Contractor + $, Ananta Bikash Tripura
Name of Contract Repair rehabilitation of oxisting damaged deck slab
and placement of new deck slab of Paniumda Bridge at
Gh 179+829 (Gap No-180/4) of Dhaka
Katchpur-Bhairab-Jagadishpur-Shaistagon}-Syihat-Tam
abil-afiong Road N2 FY 13-19
Contract Number 2/PMP-Major-BC/EE/HRD/2018-2019 (305135)
Name of Project 4936 -32- PMP Bridges
Budget Hoad Revenue
Valuo of Contract Tk.24,008,531.81{two crore forty loc eight thousand five
hundred thirty-one taka and ninety-one paisa eniy)
Value of Work Done “TK. 23,848,944.31 (two crore thirty-eight lac forty-six thousaria
nine hundred forty-four taka and thirty-one pais only)
Commencement Date = 04 July 2018
Plannod Completion Date : 30 April 2020
Actual Completion Date: 25 March 2020
Gortified that the Gontractor has completed execution of the works of the contract
mentioned in this Certificate, based on the final measurement recorded in CMS on 25
March, 2020, -
Signature of Enginaar
Name of Engineer
Designation of Engineor
Date of Signature,
Seal of the Office
‘Signature of ContractorRHD Office
Contractor
Conteact
sncament Date
Complation Date
pletion Date
F Engineer
fom of Engineer
Signature:
Completion Certificat2
Manikganj, (Division Office)
MIS, ZAMAN ENTERPRISE-S.ANANTA
BIKASH TRIPURA JV.
Construction of 1 (One) no. Footover Bridge (-h.1#300)
including Footpath and Busbay at Pollybiddu of
Nabinagar-Chandra Road {N-540) under Mani ganj Road
Division during the year 2048-2019
Odle-GPMAkg.Rd/PMPI2019-2020 (e-GP T. ID ns. 343248)
4936 -32- PMP Bridges
Revenue
Tk.39,4167.399.26{three crore ninety-one lac si: 3y-seven
thousand throg hundred thiry-nine taka and t “enty-six
paisa only}
TK. 38,138,297.54 {thro crore ninety-one lac t rty-cight
thousand two hundred ninaty-seven taka and. fty-one paisa
only)
18 October 2019
43 January 2020
12 January 2020Completion Certificace
2 efRHO Ollice — Manikgan), (Division omcey
oof Contractor * M/S. M.A. ENGINEERING-S.ANANTA,
BIKASH TRIPURA J
> of Contract ‘Construetion ef 1 (Gne) no, Faotaver Bridge {ch 4+800)
including Footpath and Bushay at Bolivedr: Bus Stand
‘of Nabioagar-Chandra Road (N-540} under b anikganj
Road Division during the year 2016-2019
vast Number £ OGfe-GPIMicg. Rel PMPI2019-2020 (e-GP T. 1D x0. 343250)
=e of Project + 4936 -32- PMP Bridges
Revenue
1 Tk-d,634,002.59(four crore six lac thirty-fow: thousand Iwo
taka ang fifty-nine paisa oniy)
‘TK, 40,607,344.41 [four crore six lac seven ti ausand thee
hundred forty-four taka and forty.cne paisa « aly)
lencoment Date —: 15 October 2019
-oed Completion Date : 13 January 2020
si Gomplction Date: 12 January 2020
fied that the Contractor has completed execution af the warks of the coniract ax
oneed in this Certificate, basod on the final measurement recorded i: CMS on 12
wary, 2020,
ature of Engineer
Engineer ;
nation of Engineer :
of Signature
a) of the Office£ egp-11/PMP MajoriCOXRD! 2019-2020 (8. Ananta Bikash
Tipura) (WO. Memo No. 275) i
+ M836-52 PMP Bridoss
Revenue
Valuo of Contract
rors a ty-hne lac fifty-five thousand
\ ify-s>>sp take and eighty palsa ot
+ TK, 46,152 938.58 (one crore sizty-ane lac fifty-two thousand
five bund: 2 sixty-eight tsi and fifty-aix paisa omly)
Gommencement Date = 30-Januany 2020
"Planned Completion Date = 30 March 2020
_ Actual Completion Date; 29 March 2020
Waiue 6f Work Done
_ Coriified that the Contractor has completed execution of the works of the contract as
“mentioned ir this Goritcale, aed on te Fel measurement recorded in CMS on 29| peer Payment Sentcate
© ace ine ‘Soper sono
a IDOTMegey ROD G0
serine sae Enereng Benen Ws oy Feouhng Fitog erg 2G Pl Ce Wa tt gre
aha MDiGeAny cess and oats % Som pes Toe fe Tote to
Bi chou smu Bospoas Rat Rd uy Serer Bas Coes
‘Siege aw sot co
Pevarue
1895-21 - Rei Makterance
5. Aone Bah Tete
Ba 2008
2 A, 200
Aoaorin Payor Coreen ff
Moenorement upto
Date of Mesauremect :
uthorined Date
Pierce ae Wao
[A enren nine oe) Tae om ae
ites £05. Vato maces imo, tease4a9"|
‘oaivae Sas oon snare
1B Annes a Tt ase ska soe |
“-Wecony com aetna Bat mse a er space. sean an ns Ronen att
fie catey a
ssi hae ey coo Mane BE
WSR a: a mses Soe te war ay masta cf recto
tierce ta va ofr ot 2a EOE ea nani i Ta Ty na ot Be hoard igh andes
sewer abana and tony Se see o
SE tAO
Soe coe oe
werner
oeWs Sa [oh fpa2n f
ee Patera tes tee aacGoseenmen «the Poupte’s Republic of Bangladesh
Office al the Ua
Hatioaudba, Lalo
68-15/20
pus “Wlotlaco
‘econ «pn Var, (6-H
x Totals avanti
3 cinta of Vt Nl SBFBGPRF Pie Ae
1 ep
i Aye MEMS ENA 2018
Teese
Sate Boh Teper
: F MipurSalat Khai aBrachar
Fntaien teppartios Dei
iia tues ges SpA
+ 26-07-2019
8 Chin damental oe
fig Com waa wars seco aa 7H
{ebaeestin eats Ram
[fib tneahure wares :
ca wt aon a
tne oe Sal Apnea
We ‘ha i Bu i
1 LD i Dead Compa Oe
paint
ae,
oS i 2-920Government ofthe People’s Republic of Bangladesh
Local Government Engineering Department 40-19 [20
Oltiee ofthe Melandak Pourashuva es
‘Upazila: Melondah, District: Jamalpur, 0 ~!9/ 20
“Mioao Nox Maks Preah] Era: Dap: aeig-hyeG
COMPLITION CERTIFICATE
Te earoneat oa haa he TTT
erm neh 80 |
bi amcenaet af Sather Has & Offer Roc Mo 2
ere Rand,
€liprommars of Tube! er Suge Hie, et, Lent
Date: 29-72 2015
[a Recetas
‘tre unde ect hast cnc ome
rapa 3 inc wi Se
petted of Oe Crrine Inebig al an dag dries i Ul
Steaks ed ices ef me Eager cups AN eke eae a
‘eras ue teddy ome
‘Sooner: Thy we ec satan
Se nseet aigfe aan eae
41-19/20
Memova-€. AY-PBY pateds 23-07 / 220
Completion Certificate
Name of RHD Office Khagrachari, (Division Office)
Name of Contractor ©, Ananta Bikash Tripura
Name of Contract + Supplying of Pea Gravels Stane Chips Local Sand Fire
Wood Empty Gunny Bags Road Marking Paint.&thiner
for use in Road Maintenance work at differant Raada at
RHO K-K-D Stack-yard under Khagrachari Road
Division during the year 2019-2020
e-GP/27IEEIKHAG/2019-2020
Contract Number
Name of Project, 5 4936 21 - Routine Maintenance
Budget Head = Revenue
Tk.1,553,733.25(fifteen lac fifty-three thousand seven
hundred thirty:threo taka and twenty-five paisa only}
Value of Work Done + TK. 1,549,339.29 (fifteen lac forty-eight thousand three
Hundred thirty-nine taka and twenty-nine paisa only)
Commencement Date = Od June 2020
Planned Gompletion Date : 14 June 2020
Actual Completion Date: 12 June 2020
Value of Contract
‘Certified that the Contractor has completed execution of the works of the contract as
‘mentioned in this Cortificate, baged an tho final measurement recorded In CMS on 12
June, 2020,
Signature of Engingor —;
ec) sy ene
Name of Engineer =
* emertet
et Ehotiew one
Designation of Engi ee ts,
Date of Signature tela, aint
Sate
‘Seal of the Office =
Signature of Contractor‘ J2-19 20
Tae coRarreT were ti
Terr 2 aang | 2—-p/20
“neem comet nonin sm elena fe
“erent ataca”
S$.Ananta, Bikash Tripurs.M Sedat Khagrachari, Khagcachari 9 oofane eer ots te
Erba ee aoat- labo tascaede st Sor ax et Ee Ar Sper eves we me ae
mond rate! eeaniy SUE
\~ a ae Fer eitsen | Rae arerada a eek rae ieee awe
x ay wr |e
{A peace “at AR PTET
Oe Rona Fran SWouaoie | manege aaa
Salona Mare te |
iat” Communder | fevSR er | exeicce | ataes
(ce okie zagerzea
soni 3
manent uf GRYEROAA | erase Shedd «dase not sects
fer House 8 | “saa fe
(Office Has Nave
Costa Ra CE
lecirmsmet ok |
Tateeua fo Slavhier
seme act aenese
gers | A | tae
Anse (rt tang |
Ii a inca a
Kon
Mesa
etna” |
Jevalpat” soar 19, |
wivouiaaus gem
= —
Sasa aay
. nla he ae
fereawrsremes) ae
spars caleerst coo ST
ory oe
ty
Seung aftearr a Saree, Ce. Sa, aE
2 ote Ear as cae ariced ers, enbn ahs,
2) aferCompletion Certificate
Name oF RHD Office
Name of Contractor
Name of Contract
Contract Number
Name af Project
Budget Head
Value of Contract
Value of Werk Done
Commencement Date
Plannod Completion Date
Actual Completion Date
Signature of Engineer
Name of Engin
er
Designation of Engineer
Date of Signature.
Seal of the Office
‘Signature of Contractor
ae oe
K
>
Rajbari. (Division Otfice)
8. Ananta Bikash Tripuire
Maintenance of Flexible Pavement with Seal Goat
including necessary repair of pavement distrass at 14th
km (p) and 15th km (p) of
Goalanda(Jamtala}-Gaderbazar-Pangsha-Habaspur
Road (2.7108) under Rajbari Road Division during the
FY 2019-2020,
1G/e-GPIRRD/2019-2020 Tender Id No: 393843,
4936 - 33 - Periodic Maintenance - Reads and Sridges
Revenue
‘Tk.1,103,268.56(eleven imc: three thousand two hundred
sixty-eight taka and fifty-six paisa only)
‘TK. 1,101,304.10 (eleven lac one thousand three hundred four
taka and ten paisa only)
20 January 2020
19 February 2020
18 February 2020ATER MATOS ASAT
{ite reece ese son
feet exteette exter
“ipa ear cam
ors asd son
TENS M-BE.0%.8b00.500.38.000.20- FRO
wre 5 RLEISE2..,
|. Name of Work with Address & Contract 0: $,Anontn Bika’ Tripura. Miles Pat
Sadar, Khagrachani
2. Name of Work : lnyprovement af Marikchari Union HQ Mohamond Hniimara Bazar Ros via
‘Gaiden Reed eh. 2020-4020m Under Manikshari Upazila Package Ne: WDVRIDPCHT.2/
KHAGRA/MANIK(UNRW-S6
Sources of Fund : GOR
Status of week: Conmplote
Role of Contractor: Prime
(a) NOA No: 705
(6) Tie Extension Approval (Decursent =
4) Incended Date of Completiow Time allowed : 80° 1201
(@) Latest die of Commencement
S Type/Noture of Wark : Parenteart work TR, 135,
8. Total Bll Amount (BEVT)® 135,1,004i=
10, Finansial Year> fiom 208.2020
Papinent Detailc and Lact Bate of Pyrmenn asin Payment Certificate |
Z
4) Contract Smgting Dane; 0490602018
me
O06°2018 (1) Actual Date of Compliatica 3001 1/2019
a) Awatded Contrast Valu (BIT 136,91.934(b) Final Contact Value (BDDT) 1,38.91.004%
Taachee ke | Pama Tn | Crs | ERaler | evarT | Cabmetm ) Tonite
Te Bait Tk
i Por aan ae
Ioana i
Tema sat — Senza | — Sar cre
ssaqtat9
TER | — aR STE Tana cr
Y Tse: cr
sh 30H8
Sg teal tal | ane | —— RE Tia] — ana
Tee a Tae
Eames apices
UGB Rngrtor
Phone saan
neSpeen
——
HAATER TTT FASS x
cette reese fees a
Sah erenetre acer /
“enagey ater cam | Nd
seonulgsgov hd
FAS FR-Bb, 62. BeR.2.28,000.25- Fale wares BEE,
Work Completion Experience Certificate with Payment Details”
Name of Work with Address & Contract no: §,Anania Bikash Tripara Miler Par
Sodar,Khagrachar,
Name of Work :Constrction of 48,00 Lang RCC Ginder Bridge on logy Banas Ratna
[inion HAQ Road via curl tzar a cl. 1280m Under Manikeberi Upsala Package No:
WORIDECHT-KHAGRAMAMK BRIDGE W32
Soarees of Fund = GOB
Sertus of work: Complete
Role ef Costar: Prime
{a} NA No [224 (§) Contract Singing Dates 1941072087
{@} Time Extexsion Appecval (Document: (018/201
4) tended Dut of Completica/Time allowed : 10082019
{ej Latest date of Commencement 08/0.2017 (7) Actual Dae of Compiation :10505i30(9
A729, 595
17.) Avanded Coairaet Value (BDT}: 2,03, 68,483. (Final Contract Value (BDT)
8. Type’Nanute of Werk : Bridge work : Th 209,668,183
9, Toeal BIN] Amourt (BDT) = 2.07,29,395%-
18, Fieanial Year from 2017-18,2018-19,201%-2020-
Payment Details. and Last Dale of Payment as in Payment Cectifcate |
[Romane Fae i | cscs | Oma | veTe | lake Te
1 T
wa eat] aaa | aaa
Tare] San Tae | ata
juan
Ssuaei | HIS | TARTS
s0G0m Under Manica Upazila Package No: WDIRIDPCHT-2/ KHAGRA/MANIKAUNTUW=1
Souroes af Fund GOB
Status of wok: Rusmbag
Role ef Contrast : Prime
QPROA No: 210 ) Contract Singning Date: 17/02/2020
{¢) Time Extension Appeowsl /Docunent =
4) Interaed Hite af CompleticnTime allowed ; 16/08/2021
(@) Latest dee of Commencement 24°02/2020 (f)-Acual Date of Compliatioa
7. a) Awarded Consracs Value (DT); 9,02,06,007"(0) Final Comact Value (BDT) :
A. Type'Nature of Work : Pavement work Th, 9,03,06,090
9, Total Bill Amount (HDT) | 74.97,9277-
10, Financial Year : from 2019-2020
Payment Details and Last Date of Payment we in Payment Certificane
Toate [Pam | OSoriy | Oka] Tava | Tab ee
Ome Th | eet
ext —| ara] — =] a] a a
[emesne |
Tee SE set a
ie
le As ed
Bere BlessStoesaedt abetted FE,
seh aren eater fer
Pret) cesta arte
semrgrefs fer com
weld bd
Sat 2.84, 28. 8400,009,28,090.80- FRE
Work Completion ‘Experience Certificate with Payment Details”
1. Name of Work with Address d& Contract no: §,Anmnta Bikash Tripura Milon Pur,
Sauar, khsgrachar.
KHAGRAMANIKUNR/W-12
‘Souress af Fund ; GOB
Status of work: Running
Role of Comrastor : Prime
(a) NOA No: 3056
{e) Time Extension Approval (Document
«dy Intended Date of Completion’Time allowed : 20°08 2021
{6} Latest date of Commencensent - 08/11/2019 (fy Actual Date of Compliation :
[Name of Work: Improvemens oF khagrabill OC Manikelari GC via Batatoli Bazar Rod 1B
Ranga Par ch.5750.7200en Under Raragart Sadar Upazila Packaye No; WD'RIDPCHT-2°
¢h) Contac Singning Dae: 2910/2019"
7. a) Awarded Contract Value (BDT}:7,46,23.204/-(b) Final Contract Value (B07)
& Typehure of Wark: Fansment work: Tk, 74623.204"
9. Tora Bill Aroant (HEFT) : 39.86.1951
1 Financial Year: om 2019-2020
Papen: Dewi and Last Dae of Payment asi Payment Cotes
Votre | Pacer | CySiaiy | Cikoier [Cava] Tabet] Tea Te
tae | kon
iret | aaa] FT =} RE a]
wore | al
ta aes — ear
Aan
Sar ae
seuitotngeee
Eps
Perera
Emleutgonmgasontsaaron aor ator
Pree) ects rere
segels ore com
sunt lge. goed
"HIE *4-B8,032,8400,000,28,000,20- Fath
veifeu 1 EMEE LE
* Work Completion /Experience Certificate with Payment Details”
1. Name of Work with Address & Contract no:S,Asasta Bikach Tripurs Milon Pur,
Sadar, Lnagrachar
2. Name of Work : Construction of 64 06m Bridge on Gumti GC-Bhaibonchaca GC road st cl. 4.00m
Under Mtiranga Upavila Package No: WDYRIDPCHT-KHAGRAMATV/BRIDGE/W-21
Sources of Fund : GO
Status-aF wok: Runs
Roke-of Cantractor
(a) NOA Nox $56
{¢) Time Extension Approval ‘Document 3005/2020
Prime
tb) Contract Singning Date: 1695/2017
4d) laiended Date of Completions Time allowed : 2210822018
(¢} Latest date of Commencement: 25/05/2017 (f)Actual Date of Compliation
7, a),Amarded Comtruct Value (BDMT):2,$8.31,8180 (bp Penal Contract Value (HDT)
8. TypoNatune of Wok: Bridge work = Tk2,5,8:81 818.
9, Toca Bill Amount (BLT): 2.19.78, 990%-
10, Financial Year: fons 2017-18,2018-19,2019-2020
Payment Details and Last Date of Payment asin Payinent Certificate |
Figen Tk] (Secu | CSivur | va TK | Labi Te
Th T
Tainan | 4a Taupe: Ta
TE | __RIE T=
TRA a Hae] i ETT
stim,
PRART Taian] Ea] aes Tam
2owauiy |
FWA ba wae) aT aie Tee
sung
RARE ROE | SE 2a Te | ESE
211205 i
Rall Teta | — Sasa co Wwe]
yeni 7
To Th Tan Ese
a amy ete
Executive Engineer
LLGED Jtngeachari
Phone-cets saree
SeeSB
aT eS ta
seen a
lorererreratt STE FAT
pit meate are ere oP
eft agethe et Xx
eregely Tay cot ?
sso ed grb oe
TIES M84, oh Bo9.000,8,000.80- F2k- wie RP /deze. Ba
“Work Completion /Experience Certificate with Payment Details”
1, Name of Work with Address & Contract no: 8 Ananta Bikash Tripura Milon Por,
Sadar, agrachar.
3, Name of Work River Bank Protection work # Panchari GC Baibonchara GC via Skartipur
Aru yakutie roach. 1420-1 Sean Package No; WekhaPan-U ZRF
3, Souses of Fund : GOB
44. Status of work: Running,
5. Role of Consractor Prime
& ()NOA No: 3110 {h} Contract Simgning Date: 13° /2019
{c)Time Extension Approval Mocssment :
i) Intended Date af CampletioeFime allowed - 3406/2020,
{eb Latest date of Coonmancement : 20/11/2019 (f} Ack Date of Ceanpliaton
7, a} Awarded Contract Value (BEIT) :2:36:80,227H (ti
E. Type’Natury of Work : Protection Wark Te. 2,36,80.2271-
9, Tata Bill Amoune(BDT) :2,13:99,979/-
10, Fisaneial Year froen = 2089-2000
9s) Contract Value (BOT)
Payment Demis and Last Date of Payment as in Payment Cenifisale
‘Wouchar No | Payment Tk ‘Seoarity Salvage [io ¥a Th | Labfe Th | Total Th.
Da Tk Tk i =
TWABM) JSS79HE] 412115 =] asinaee | anor aa as
na/01.2020 |
Pia pit | 61077 | NAR azI =| Saisie TORO | 74.8 F1%
|__wo22020 _ |
“RAD| @87LI8H-| RAR SSR T]GReaT | SOaOOT | BaNsS6Ir
203.2000 |
SRA BA] Toes aTI LSD =) Free Fan) 1508
sioe2020 |
Total Tk | 1,75,0630 | 2ES0SOR | =| aoa oor aoe |
ere
: ‘a
Exceaive Engineer
GED KhgeacharL
Phone-o0's-inbes
aeIEW M-B4.02 Bln0.0n0.38.000.80- (24 sat
* Work Completion ‘Experience Certificate wit
ogy men aster ise
Seth rein ertere
-ahigrey ater en
sowelged gon
Payment Details”
Name of Work with Address & Contract no: §,Anante Bikash Trigura Miton Pwr .
Saar, Mhayrachasi
Name af Work : Construction of Upazila Muktijoddia Complex Hbabsn at Manikchari Upazila
Package No: UME/kha/ManikSiC.190
Sources of Fund ‘GOB
Smuts of mor Running.
ole of Coanrastor Prime:
3) NOA No: 349 (b) Cesrrese Singwing Date: 161032016
{) Time Extension Approval (Document = 200062020
‘iy tmended Date ef Completin’Time allowed : 3405/2019
{e) Lawst dite of Commenesiment | 234032016 if} Actuel Dae of Complintin : 15/06/2020
8} Awarded Comact Value (BDT); 2,39, 19,596 (b) Final Cocaract Value(BDT):
8465121
“TypeeNanare of Work: (a) Building moi : Th: 2.87,24.080, (by Sanitary and water Supply
svar 13,85,7161 (6) Daewp eabe wel 3,30,48%0- (ch Hosoi Wall: 21 24,878
9. Total Bill Amount (EIST) = 2.19.78, 660".
10, Financial Your hom 2017-18,2014-19.20119-2020
Payment Details and Last Date oF Payment as in Payment Certfiste |
Vouter ne [Farmer Th | CiSeanly | Ciaingr | CVT | Labia Te
Th.
Due is
TRA BAT Ss ne * ema
| eeotie
TABI TSR ae * cay
Taner ;
Tae rs ame
Ss aS = Te wae)
2008
hab | — eI] [a] a a
bene
do TARE] SARE |_|
aie aE = Spee | esas aa
BS fg. Oe
pitta AOU
resin Eng
Lor hagractsd,
meneeass.steas
ade ota eit
aon
"Rear e
area
srrereredt
rR | “isis | mo
C= cha seme atosrOtetera aici aaa
fa ieee ent: ‘
ang em tee
Te neta. aase OTE: oaAb-RNoS
Rica. oe keene aw go.bd
seers canteen QI wes. D9 0bf 202° BF? Rs
Payment Certificate With Detalls
| sme otcamce vom alates & Cute ts -Exseuto aglmer PHD Bisel, Khagrachon. Phe. asrt- teed
Mame of seat wih aoa § Coe! Ne: Anarks Blkaah Tenor, Mierper,Ktagroghwel. Phane-treeios
5 Meow olmote eaiiehment 682 modol masque ar saris Culms Camara w2en analpal of eighadests HO al Malin
{Upazta int Wiatret Riagrachot fulsinad: Consrucionw Breed Naiaega Usa Ada true opie ven Stra
euntion Tys0 Bh. TeideID-2968H8, During the yar 2018 2615
Seucenal Fant GOB 5 Stes Meck Orci
sa et ero Reine
5) Cora Nek Tare INGA: nm 20 R-20%6) ey Greract Sipnn tae 0S a0N9
15 Tem Eeetsin Aspen! Oonumerts Nol ApsCable<)-bckc Dohnst Cooke Tame wed 18 Ranh
6) Ae ala of Cerplestee Oagsing osoee
al voedad Cecrme Wate (ROT Te 12/83. 9RFaR—b) Pal OonvUEL Mave BOT) Th, TRAaoE.sas
8 Typeset toe: Bung
sm Memeee of Sey armas, ire ewsgten ONTO
2 Diao Coreie: 38 Pi an pi Base 02,60 wm
19, Taal Auer Th 1.38 89.00%
1) (Byisirucae We TA. 92899, 90108 tne Sioa aed Banka at
1 Elche Mechanica Wom Ear, es & sunny waa:
11 FeneiaYeFrem 2010-2020. tina Mums S45, hs Oats: eae.
apron ea adele af Papier rite
a
taasais
Seki |
La
bono
areEEE TE AL
SOS erehets one
seg Peer ante
TR. behave © aA eanbatenn
Rae. en thanpnd gent
mendtoohmeenionn 29K oie Do ObpZee Fig? xo
Payment Coriicate With Details 0
é
hast ORs ueh Comat Ee an PC nl Hapa ene ceaion OFS
deem ent ett sh ore a hs ee
etarper ongeaehie Pane caT-04!
27 Nang fw Enablement Sa mes! moequae an ls Cunefl Coote in Zs sh Upset of Bladen Yeon) Mam ehes
\Gemcn m ne t Resprachar HSunoteed: Cansucton 2 Dare Minoan Upacta cc MSEUR Gorges wih tes
uumiaon Type 8). Tamdor ZTE, Dang dha yur- 24182018
4 Sovcmnct fied oth 1 Sie ale Ogatng
Fs of Baracir 8 Aaaren Maa Tp « PE Sever NS aig 8 Beuc 0%(TAy
Taj Dunnaeth Ted IDRCAN OY ABEHEROHH) Cues Spi Do 12008
Tema Seerace Asp! Creamers Net Anlesbie sl neéac Da oon lea Tee owed Mores
ua Dat cf Oomgnaren ogy ce
Es kant Corner aati T#2
4 Tehama ek Rag:
ies oP By ORT i Mrme antion: Tne
Bla tee 28 pa sen arn
(anim Commas mie TT A Ate
1 Toa ca azo Te 442.05,
5 CimiSnecs Hane 1.128 gH ae Sane Sean ee
f Sraven Meron en: (EDM Read Bouncy Ha
14. nance You Fe S082 thee ont 6,
rs Onte 9.013028
Pope dB of Pao anc Pyar Coste
:Boowdiy | La Ta
eae} Sas
Toh eae eae | TTT
hg ape SE
sa ett Reorae rene;
‘Ase, sey |semcoradl Temi mest
fi hee ater
sare feom, |
TUR detb-ibute OTE vas baa
ape ce_bngra pad gor bd
9
serrata! 29D wen DAMMEA 20RD Karr or
P: it Ce icate With Details ae
‘1H rireaa!ONen Nan Acanes & Cosiset No -Exocutee Engines, PWD Onision, Whograchan Phone. O378-GHE41 5
48 furaulGatce maaacens atest Banana ig air nna, Rasch Panwa
2 ate: 6 ed ong eine acl ara ae Up fae oa oe
{pmlunme act a: Carer 03s Sri at nnn C ame a3 ie
“109 re EAS ne OTS
& Scott of Fung’ Gob oh Bakus oftek Oegning:
1 Ron Serato
Cre Tran OE 02 (MIRAI 9 Saag Sa AEN
{The Ener At urs No Apia ena fc orennmae ao GN
Sc Die Srna Seg eae
‘tunes esna aa EDT) Te RSME oF Cte ve EO OgaRRLED
Bre de aig
re Sy eae smo:
oan Orc: a ‘oprnana ner Wong ok
1 Yi eianoee re banat
er me
6 Setion wah Sank Ras Rese ck
(8 Fart eae RHBOH eng teh Mana 208
xr one i it Py nie
(yermeecta 7 ata r
rai : cos
oa | Swarts} —— irr |
wate
eo
ap
Smeg
Beiter oRT,
Fermrgn, reeeared eT eT
i arate te
spied Fas ang |
TTR goth ible € UTE cot-abiod
TPR: ee anges @purd gow ba so?
x
¥
sees iain vw Daf 08f 202 [arr
Pay Cer ih
oP
31) Nome afoitce¥ier Asse & Bono! No: Exuousve Englosee-FAVD Bison, Khaqrochoe Pte 03721643
GE Name et Cenvenaram aatres@ Geriar ha: Samana naan Tnpwe Maen Mhaarathan Phere THEE
3. Mane atwirhy- Viral atonion of 2" Fico of haya Croll Mower Unda the pojck Naso Vera msn. CHUA
Houta oc of Banana Tender I-ZBER2% ung tyra 20AB 2H
stan seve Grain
7 ap Somcrni Tenses OW Ns OF PETAANNS) oy) Cane Sag Dane: aaa
ct Tomtecies Aspoml Sommers Mm Attia) ronedae Da of ComplcrenTereaioved OF Mar,
ifitenl Dal & Corpcaien Ogning proeees
1 ot Reg Cee Valo (ET) TH, 37019,608° bal Coa Wo BOTH Te, TOT AOR
5 Tyoanae of Nok Bulg
eso Bly 81TH by rier ct Feuroston
igs ol Cece 24 2) area Foor
1m Ter et are Te Ron. c0
5) Chien aaa Anat lpbvve Sugary me any ters
5 Sn Meena Sherk Ft ‘seam Rous 8 euraaty Wo
411 Praia Fis 018-288, Meme Harb 238 were uw 28 a
Faynest Dee andor Da
‘Youier No Baie
a]
arene te ‘
Haat Nese pee),
fies. eguarmed Seer HT
fai ecient acter
cog Fen, att
De ous ababe ST ethno
saiceseaei sips wo syeraa Ay &
Payment Certificate With Details ’
Haier
eect etre te
reser ayomtag a = ohotcactopaslopele ae
Sees
oe ae
os,
Ce en ee ereocune
piscina dae: stp ahi
peencennrt
EO inacuipssi
Felonies
Be
a Monee of ey Oats) i Mert Fossey au Fame
uta of Canes 2 sree peter
‘Tan utara Ta, aongea
1) CoS sn 2 eR ORO by Was Sarpy ant ary
legen oe T 08,00" |) can Beat vor
M1 FrwzaYea” Foes ROUEN Manis ue HI Mae te BN
Premera teem
|
I ‘ragaeas | apie | >|
coca
ome
rr re er ab
er nee
cnt Hore (aheire;,
Foes, oreaH tat ee .
cord er, ore
RR ConeaiBY 6 ATE octane
reinsneynenctemeasht 202 he Pafebfrere fan x
Payment Certificate With Detalts ¢
32. terme cniinue Acme & Canta eeutva Erg, PMD Sision Rhagrac han, han GUT-ANEAS
ewe orcas les Emer tr Artis Saas Top, Mongar, Ragin Prana AE
SR, Sormectuste Comueton state) sar Administrative Builting wi 6 snes onan ince Sanh ant
Shentewenweree in APBN (Iahaichati) Petes tine, syothon Taneert)- 3707, Casing th por. 20+63579
6 Sceomst ne G08 S samisotok Dogo
5 Roles Goraorat Pre
Ys) Cortact No" iGRa Ne OB YaIRaiIa) Corrs ong ie ROLAND
Tete verach gota Doman: Hel Area nha eC eaian Tine toed #2 Noth
‘ac Due of Cece Ogg races,
8 Bde Cate Yin IBOT: ThAgB.N a 2) Fw Cova in BF) TRAAROR LAB
2 ypu Won Bling
a) Maar ey art) Sumber o Foun: apn)
stat of Coenen a 6) los aa eo =
0 Taullanarest Te: a6 ano
1) Gkasmouie en! De tagaapeRe vk Bayo Sey sts
1 cheat testacalto 6) 9, oe aout
11 Pca Yew: Fon 227MEM Were roe 216 Mn Oe 38-0621)
aoe a eatin of Fee in Pape Ga
i: io A Bat 2 Tan Ve.
is ee 15m E ei
sina | aaa
seed ROR)
a | Ta
rad
eae ine