059-B01-PD1B2P2 - Basement 02 Floor Partial Plan Part 2 of 3

This document is a project summary for a healthcare planner consortium. It lists the procurer and project name, along with the consortium names. It also lists the design team. The document includes a diagram showing the layout of pipes for drainage and plumbing in different areas, labeled with sizes and materials. It directs the reader to another document for continuation of project details.

Uploaded by

omar nasrallah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

059-B01-PD1B2P2 - Basement 02 Floor Partial Plan Part 2 of 3

This document is a project summary for a healthcare planner consortium. It lists the procurer and project name, along with the consortium names. It also lists the design team. The document includes a diagram showing the layout of pipes for drainage and plumbing in different areas, labeled with sizes and materials. It directs the reader to another document for continuation of project details.

Uploaded by

omar nasrallah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROCURER

PROJECT

?
?

CONSORTIUM

FOR CONTINUATION REFER TO:059-B01-PD1B2P1

Lobby
*SERB201 TAMASUK – ALGHANIM CONSORTIUM

HEALTHCARE PLANNER

UN-09
Ø50mm PRESSURIZED PIPE F/B & T/A

Ø50mm PRESSURIZED PIPE F/B & T/A

AREA DRAIN AREA DRAIN AREA DRAIN AREA DRAIN


300X300 300X300 300X300 300X300 DESIGN TEAM

Ø110mm WP US

Ø110mm WP US • FOR GENERAL SOIL, WASTE & STORM


Ø110mm WP US WATER DRAINAGE SUSPENDED AT
Ø110mm WP US Ø110mm WP US
HIGH LEVEL PIPES SHALL BE SILENT
ACOUSTIC PPR
CO
Public Lobby CO
Ø110mm SP F/A & T/B
Ø110mm WP F/A & T/B
*Park12 CO
• FOR GENERAL SOIL, WASTE & STORM
UN-08 WATER DRAINAGE RUNNING INSIDE
Ø110mm WP US SHAFTS, UNDER TILES, SUSPENDED
Ø110mm WP US
Ø110mm WP US
Ø110mm WP F/A & T/B AT HIGH LEVEL IN BASEMENTS,
CO CO RUNNING EXTERNALLY ON ROOF AND
VENT PIPES SHALL BE UPVC

• LAB DRAINAGE PIPE SHALL BE FRP


Ø110mm WP US

Ø110mm WP US
• KITCHEN DRAINAGE PIPE SHALL BE
CAST IRON
Ø110mm WP US

Stair Ø110mm WP F/A & T/B

*STA018
UN-07
Ø110mm SP F/A & T/B
AREA DRAIN AREA DRAIN AREA DRAIN
300X300 300X300 300X300
Ø110mm PRESSURIZED PIPE F/B & T/A

Ø110mm PRESSURIZED PIPE F/B & T/A

UN-06

CO
CO
AREA DRAIN
300X300
AREA DRAIN AREA DRAIN
300X300 300X300
Ø110mm WP US Ø110mm WP US

Ø110mm WP US Ø110mm WP US
Ø110mm PRESSURIZED PIPE F/B & T/A

UN-05 Ø110mm SP F/A & T/B

Ø110mm WP F/A & T/B

Lobby
*SERB404

N
KEY PLAN

Stair
*STA017

UN-04
Ø160mm PRESSURIZED PIPE F/B & T/A Ø110mm PRESSURIZED PIPE F/B & T/A

Ø110mm RWP US Ø110mm RWP US

4000X350X350
CO TRECNH

AREA DRAIN
AREA DRAIN
300X300
PART 2
300X300
AREA DRAIN
300X300

Ø110mm RWP US Ø110mm WP US Ø110mm WP US

Ø110mm WP US

Ø110mm WP US
Ø160mm RWP F/A

UN-03
Ø110mm WP US
CO CO

Ø110mm WP US Ø110mm WP US
Ø110mm WP F/A ELEC.RM.

N
*MEP62
DISCIPLINE MECHANICAL
FOR CONTINUATION REFER TO:059-B01-PD1B2P3
SHEET TYPE DRAINAGE LAYOUT
BASEMENT 02 FLOOR
SHEET NAME
PARTIAL PLAN PART 2 OF 3
DATE 07/12/2023
UN-A UN-B UN-C UN-D
BASEMENT 02UN-E
FLOOR PARTIAL PLAN PART 2 OF 3 UN-F UN-G UN-H UN-I UN-J
DESIGNED BY M.T SCALE 1 : 100
1
SCALE 1 : 100

CHECKED BY Y.H SHEET NO.

APPROVED BY H.H 059-B01-PD1B2P2