0% found this document useful (0 votes)
29 views1 page

Room # Batch # ...........

1. This document contains details of ingredients, weights, moisture contents, and nitrogen contents used to formulate a compost batch. 2. It also includes a phase I process that involves collecting and loosening raw materials, pre-wetting, heap shifting, and mixing materials in preparation for bunker filling. 3. Phase II involves bunker filling and shifting, with the goal of maintaining temperature ranges and moisture content between 75-80% during the composting process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Room # Batch # ...........

1. This document contains details of ingredients, weights, moisture contents, and nitrogen contents used to formulate a compost batch. 2. It also includes a phase I process that involves collecting and loosening raw materials, pre-wetting, heap shifting, and mixing materials in preparation for bunker filling. 3. Phase II involves bunker filling and shifting, with the goal of maintaining temperature ranges and moisture content between 75-80% during the composting process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Room # Batch # ............

FORMULATION - DATE:

Ingredients Actual Fresh Wt. Dry Wt. (Kg.) N (Kg) Total Remarks
Sr. No. Ratio/% Target Moisture % %N Rate
(Kg) (Fresh Wt.X(100-Moisture %)/100 (Dry Wt. X %N)/100 Amount

1 Wheat straw 10% 0.5


2 Wheat bran 10% 2
3 Chicken manure 10% 2.6
4 Urea** 0% 46
5 Gypsum 10% 0
6 Ammonia Sulphate 10% 21
7 Total
N%= …………….% N% should be 1.7% (1.5-1.75%)

PHASE I -

ACTIVITY & OBSERVATIONS Compost Remarks


SR. NO. DATE TIME Moisture %
Temp.°C

RAW MATERIAL COLLECTION & LOOSENING


PRE-WET DAY 1 :
PRE-WET DAY 2 & HEAP AT END OF THE DAY
HEAP SHIFT 1
HEAP SHIFT 2
HEAP SHIFT 3 & MIXING MATERIAL PREPERATION
Higher Range 80 -
Phase I Bunker
Lower Range 75 -

MIXING & BUNKER FILL :

Higher Range 80 -
Phase II Bunker
Lower Range 75 -

BUNKER SHIFT I :

Higher Range 80 75% When squeezed drops of water appear between the fingers.At this stage compost has
Phase I Bunker
Lower Range 75 72% strong smell of ammonia
BUNKER SHIFT II :

LONG HEAP TO COOL COMPOST

FILL IN TUNNEL - DATE: Remarks


TOTAL AREA FILLED : NO. OF PEOPLE :
START TIME: END TIME: Total Hrs.:
COMPOST QUALITY:
COMPOST ANALYSIS : MOISTURE % : pH: N2%: Ash%: NH4%:
COMPOST QUANTITY : M3
CHECKLIST FILLED: Yes / No

You might also like