Erosion Control Project Plan
Erosion Control Project Plan
N ig e rp e t
s t r u c t u r e s l t d .
ID Task Name
2020 2021
July August September October November December January February March April May June July August September October November December January February March April May June July August
E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E
1 THE CONSTRUCTION OF 568.63 days?
EROSION/FLOOD CONTROL WORKS AT
ADUMU / OGUGU EROSION SITE,
OLAMABORO LGA, KOGI STATE
2 SITE MOBILIZATION 139.88 days?
28 SITE CLEARING
Page 1
THE CONSTRUCTION OF EROSION/FLOOD CONTROL WORKS AT ADUMU / OGUGU EROSION SITE, OLAMABORO LGA, KOGI STATE
N ig e rp e t
s t r u c t u r e s l t d .
ID Task Name
2020 2021
July August September October November December January February March April May June July August September October November December January February March April May June July August
E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E
32 Site Survey to generate base line 15 days
Site Survey to generate base line
33 Clearing, Shaping and compaction of Exisitin gully 30 days
haed Clearing, Shaping and compaction of Exisitin gully haed
34 Setting out and Excavation of Outfall drain 40 days
Setting out and Excavation of Outfall drain
35 Concrete blinding, concrete base and construction of 90 days
concrete drain walls Concrete blinding, concrete base and construction of concrete drain walls
36 Installation of Reno Mattressess and Gabion baskets 60 days
Installation of Reno Mattressess and Gabion baskets
37 Construction of Conrete Toe Retaining Structures 20 days
Construction of Conrete Toe Retaining Structures
38 Backfilling of Drains and Side Slope Stabilization 40 days
Backfilling of Drains and Side Slope Stabilization
39 CONSTRUCTION OF ADUMU ROAD 396 days
40 CONCRETE WORKS
1/4
41 Setting out and Excavation of Side Drain Adumu Rd 90 days
Setting out and Excavation of Side Drain Adumu Rd
42 Concrete blinding, concrete base and construction of 150 days
concrete drain walls Adumu Rd Concrete blinding, concrete base and construction of concrete drain walls Adumu Rd
43 Concrete Drain Slab for Access Adumu Rd 80 days
Concrete Drain Slab for Access Adumu Rd
44 EARTHWORKS AND ROAD SURFACING
1/4
45 Shape and Compaction of Subgrade Adumu Rd 90 days
Shape and Compaction of Subgrade Adumu Rd
46 Earth Filling to Sub Base Level Adumu Rd 150 days
Earth Filling to Sub Base Level Adumu Rd
47 Stone Base to Road Base Level Adumu Rd 110 days
Stone Base to Road Base Level Adumu Rd
48 Bituminous Prime Coat Adumu Rd
50 CONCRETE WORKS
1/4
51 Demolition and Removal of Existing Concrete Drain 90 days
Sabon gari Demolition and Removal of Existing Concrete Drain Sabon gari
52 Setting out and Excavation of Outfall drain Sabon gari 90 days
Setting out and Excavation of Outfall drain Sabon gari
53 Concrete blinding, concrete base and construction of 150 days
concrete drain walls Sabon gari Concrete blinding, concrete base and construction of concrete drain walls Sabon gari
54 Concrete Drain Slab for Access Sabon gari 60 days
Concrete Drain Slab for Access Sabon gari
55 EARTHWORKS AND ROAD SURFACING
1/4
56 Shape and Compaction of Subgrade Sabon gari 90 days
Shape and Compaction of Subgrade Sabon gari
57 Earth Filling to Sub Base Level Sabon gari 90 days
Earth Filling to Sub Base Level Sabon gari
58 Stone Base to Road Base Level Sabon gari 80 days
Stone Base to Road Base Level Sabon gari
59 Bituminous Prime Coat Sabon gari 15 days
Bituminous Prime Coat Sabon gari
60 CONSTRUCTION OF ALASHA ROAD 403.13 days
61 CONCRETE WORKS
1/4
62 Demolition and Removal of Existing Concrete Drain 20 days
Alasha Rd Demolition and Removal of Existing Concrete Drain Alasha Rd
63 Setting out and Excavation of Outfall drain Alasha Rd 50 days
Setting out and Excavation of Outfall drain Alasha Rd
Page 2
THE CONSTRUCTION OF EROSION/FLOOD CONTROL WORKS AT ADUMU / OGUGU EROSION SITE, OLAMABORO LGA, KOGI STATE
N ig e rp e t
s t r u c t u r e s l t d .
ID Task Name
2020 2021
July August September October November December January February March April May June July August September October November December January February March April May June July August
E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E
64 Concrete blinding, concrete base and construction of 90 days
concrete drain walls Alasha Rd Concrete blinding, concrete base and construction of concrete drain walls Alasha R
65 Concrete Drain Slab for Access Alasha Rd 60 days
Concrete Drain Slab for Access Alasha Rd
66 EARTHWORKS AND ROAD SURFACING
1/4
67 Shape and Compaction of Subgrade Alasha Rd 35 days
Shape and Compaction of Subgrade Alasha Rd
68 Earth Filling to Sub Base Level Alasha 60 days
Earth Filling to Sub Base Level Alasha
69 Stone Base to Road Base Level Alasha Rd 60 days
Stone Base to Road Base Level Alasha Rd
70 Bituminous Prime Coat Alasha Rd
83 CONCRETE WORKS
1/4
84 Demolition and Removal of Existing Concrete Drain 20 days
Amekhu St Demolition and Removal of Existing Concrete Drain Amekhu St
85 Setting out and Excavation of Outfall drain Amekhu St 40 days
Setting out and Excavation of Outfall drain Amekhu St
86 Concrete blinding, concrete base and construction of 60 days
concrete drain walls Amekhu St Concrete blinding, concrete base and construction of concrete drain walls Amekhu St
87 Concrete Drain Slab for Access Amekhu St 40 days
Concrete Drain Slab for Access Amekhu St
88 EARTHWORKS AND ROAD SURFACING
1/4
89 Shape and Compaction of Subgrade Amekhu St 35 days
Shape and Compaction of Subgrade Amekhu St
90 Earth Filling to Sub Base Level Amekhu St 30 days
Earth Filling to Sub Base Level Amekhu St
91 Stone Base to Road Base Level Amekhu St 15 days
Stone Base to Road Base Level Amekhu St
92 Bituminous Prime Coat Amekhu St 15 days
Bituminous Prime Coat Amekhu St
93 CONSTRUCTION OF ALACHA ROAD 345.75 days
94 CONCRETE WORKS
1/4
95 Demolition and Removal of Existing Concrete Drain 20 days
Alacha Rd Demolition and Removal of Existing Concrete Drain Alacha Rd
Page 3
THE CONSTRUCTION OF EROSION/FLOOD CONTROL WORKS AT ADUMU / OGUGU EROSION SITE, OLAMABORO LGA, KOGI STATE
N ig e rp e t
s t r u c t u r e s l t d .
ID Task Name
2020 2021
July August September October November December January February March April May June July August September October November December January February March April May June July August
E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E
96 Setting out and Excavation of Outfall drain Alacha Rd 40 days
Setting out and Excavation of Outfall drain Alacha Rd
97 Concrete blinding, concrete base and construction of 70 days
concrete drain walls Alacha Rd Concrete blinding, concrete base and construction of concrete drain walls Alacha Rd
98 Concrete Drain Slab for Access Alacha Rd 40 days
Concrete Drain Slab for Access Alacha Rd
99 EARTHWORKS AND ROAD SURFACING
1/4
100 Shape and Compaction of Subgrade Alacha Rd 35 days
Shape and Compaction of Subgrade Alacha Rd
101 Earth Filling to Sub Base Level Alcha Rd 60 days
Earth Filling to Sub Base Level Alcha Rd
102 Stone Base to Road Base Level Alacha Rd 60 days
Stone Base to Road Base Level Alacha Rd
103 Bituminous Prime Coat Alacha Rd 15 days
Bituminous Prime Coat Alacha Rd
104 ROAD WEARING COURSE 17.25 days
Page 4