0% found this document useful (0 votes)
206 views

BT 2022 Pastpaper

CSEC Building technology past paper 1 MC

Uploaded by

maidenantigua86
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
206 views

BT 2022 Pastpaper

CSEC Building technology past paper 1 MC

Uploaded by

maidenantigua86
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 16
r ] CARIBBEAN EXAMINATIONS COUNCIL CARIBBEAN SECONDARY EDUCATION CERTIFICATE® EXAMINATION Mma nn MNT FILL IN ALL THE INFORMATION REQUESTED CLEARLY IN CAPITAL LETTERS. TESTCODE | 0} 1]/3]7]4]o]2]o SUBJECT — INDUSTRIAL TECHNOLOGY OPTION C = BUILDING AND FURNITURE TECHNOLOGY — Paper 02 PROFICIENCY TECHNICAL REGISTRATION NUMBER SCHOOL/CENTRE NUMBER NAME OF SCHOOL/CENTRE CANDIDATE'S FULL NAME (FIRST, MIDDLE, LAST) DATE OF BIRTH SIGNATURE _ L T a test cope 01374020 FORM TP 2022086 & . MAY/JUNE 2022 CARIBBEAN EXAMINATIONS COUNCIL CARIBBEAN SECONDARY EDUCATION CERTIFICATE® EXAMINATION INDUSTRIAL TECHNOLOGY OPTION C - BUILDING AND FURNITURE TECHNOLOGY Paper 02 ~ Technical Proficiency 2 hours 10 minutes READ THE FOLLOWING INSTRUCTIONS CAREFULLY. 1. This paper consists of FIVE compulsory questions. Use sketches where necessary to support your answers. Write your answers in the spaces provided in this booklet. Do NOT write in the margins. You may use a silent, non-programmable calculator to answer questions. 6. This paper contains metric dimensions only. You should work your answers in the metric system. 7. If you need to rewrite any answer and there is not enoygh space to do so on the original page, you must use the extra lined page(s) provided at the back of this booklet, Remember to draw a line through your original answer. 8. If you use the extra page(s), you MUST write the question number clearly in the box provided at the top of the extra page(s) and, where relevant, include the question part beside the answer. DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO. ppyright © 2021 Caribbean Exai . All rights reserved. 01374020/MI/CSEC 1022 [ ZG 1. (a) _ Define EACH of the following terms. (i) Atmosphere Gi) Ecosystem (4 marks) (b) Identify TWO negative effects of climate change on water resources. ‘DO NOT WRITE IN THIS AREA : | (2 marks) | : i g =] = = < i 4 5 GO ON TO THE NEXT PAGE a 01374020/MI/CSEC 2022 i neo al TINS AREA SET cammies | PONOT WRITE IN THIS AREA THISAREA == DONOT WRITE INT PO NOT WRITE IN. r “ 7 (©) Outline TWO uses for EACH of the following construction documents. (Bill of quantities Gi) Architectural/foor plan (iii) Survey/site location plan (6 marks) GO ON TO THE NEXT PAGE. a) 01374020/MI/CSEC 2022 L r “ 1 (@ Figure 1 shows a diagram of the timber partition frame of a residential building. The frame | is joined with mortise and tenon joints. : 2 ‘Top plate _/~ Cripple stud = =F eS Header: Jack stud ; Noggins King stud Outline SIX steps for constructing the timber partition frame of the residential building in Figure 1 DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA (6 marks) ‘Total 18 marks GO ON TO THE NEXT PAGE 01374020/MI/CSEC 2022 L DONOT WRITE IN Tints AREA | é s iz ig 2 g WRITE IN THIS AREA _PONor! eae 7 2. (a) __State THREE purposes of hoarding. (b) List THREE construction personnel. 01374020/MI/CSEC 2022 i G marks) GO ON TO THE NEXT PAGE, a) r 4 7 (©) Figure 2 shows a construction site which is located next to a public road. There is an open well near the building where workers walk, and a bobeat operates from time to time. Open well Figure 2. Open construction site (i) Suggest SIX measures that could be implemented to ensure the health and safety ndividuals on the construction site shown in Figure 2 (6 marks) GO ON TO THE NEXT PAGE =) 01374020/MI/CSEC 2022 iE SRE py SPPRRAGHNREER ARERR TER RDTE RA RO TS A NT ERETE TA FREER ROD RT IE RITE IN THIS ARES 5 -9- 7 (ii) Outline the first SIX steps for squaring the building foundation in Figure 2 using the 3:4:5 method. _DONOT WRITE IN THIS AREA | (6 marks) Total 18 marks DO NOT Write IN THIS AREA DO NOT WRITE IN THIS AREA GO ON TO THE NEXT PAGE, _l 01374020/MI/CSEC 2022 r “ 1 3. Figure 3 shows a wooden building (10 668 mm x 6096 mm) with door and window openings. All walls are 200 mm thick. The main partition wall is in the centre of the building. 10.668 mm_ 2286 mm a Bath Bedroom 2 Bedroom 1 Door. Door Door 6096 mm DO NOT WRITE IN THIS AREA Ikitchen Living and dining room J i I Door [ —=I 3048 mm a i Figure 3. Wooden building THIS. (a) Sketch a single line diagram of the front elevation of the building labelled A in Figure 3 to show ONE door and TWO window openings. DO NOT WRITE IN ‘DO NOT WRITE IN THIS AREA (4 marks) GO ON TO THE NEXT PAGE, 01374020/MI/CSEC 2022 L DO NOT WRITE IN THIS AREA : | DO NOT WRITE IN THIS AREA | DO NOT WRITE IN THIS AREA r “m 7 (>) @)_Tdentify the type of roof shown in Figure 3, (1 mark) (ii)__List FIVE members of the framing in the roof outline shown in Figure 3. (S marks) (©) Usesingle line sketches to illustrate the symbol for EACH of the following on a floor plan. (Door (i) Window (2 marks) GO ON TO THE NEXT PAGE 01374020/MJ/CSEC 2022 _l Iz" 7 (4) Calculate the dimensions (length and width) of EACH of the following rooms in Figure 3. (i) Bedroom 1 Gi) Living and dining room (4 marks) GO ON TO THE NEXT PAGE 01374020/MI/CSEC 2022 L i a DO NOT WRITE IN TINS AREA PO NOT WRITE IN THIS AREA “DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA r “e. 7 (©) Figure 4 shows a blank paper 216 mm x 279 mm (letter size). ‘The drawing area is within a. 10 mm border of the paper. 279 mm tH, 216mm te A —— 10mm border Figure 4. Blank paper for scale drawing Identify a suitable scale to represent the building in Figure 3 on page 10 and which also maximizes the use of the drawing paper in Figure 4. marks) Total 18 marks GO ON TO THE NEXT PAGE | 01374020/M/CSEC 2022 L 4. Figure 5 shows a circular saw, -14- Figure 5. Circular saw (a) Identify the SIX numbered parts of the circular saw shown in Figure 5. 1 IV VI 01374020/MI/CSEC 2022 L TL (6 marks) GO ON TO THE NEXT PAGE | DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DONOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA () () SGr 7] Briefly explain the correct way to position your hands when operating the circular saw during EACH of the following processes, to reduce the risk of getting injured, (i) Atthe start of the cut (ii) Halfway through the cut (iii) Completing the cut (6 marks) Outtine the first SIX steps in using the circular saw to produce a piece of cedar measuring 25 mm * 152 mm x 1524 mm long from a larger piece measuring 25 mm * 304 mm x 1524 mm long. (6 marks) ‘Total 18 marks GO ON TO THE NEXT PAGE 01374020/MINCSEC 2022 L | r “ 1 5. (a)__(i)_ Complete the table below by inserting the missing item/aggregate and fraction/portion that is required to produce a concrete mixture for casting a ring beam on a masonry building. Ttem/Aggregate Fraction/Portion Conerete mixture (6 marks) (ii) State TWO methods of curing concrete. @ marks) (iii) State ONE method of testing a concrete mixture, (mark) (>) Explain the function of ONE of the materials that would be used in a batch of mortar. G marks) GO ON TO THE NEXT PAGE, _l 01374020/MJ/CSEC 2022 L DO NOT WRITE IN THIS AREA | | / | : z g E € E : 5 = g DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA DO NOT WRITE IN THIS AREA r 7 (©) (@)_ Outline in sequence the steps for mixing conerete manually. (4 marks) (ii) Name the tools required for each step outlined in (c) (i). (2 marks) ‘Total 18 marks END OF TEST IF YOU FINISH BEFORE TIME IS CALLED, CHECK YOUR WORK ON THIS TEST. 01374020/MI/CSEC 2022 L el

You might also like