0% found this document useful (0 votes)
106 views1 page

K88 P5 020G 06 SDW ELE 450 0301 00 Reply

1. The document provides details for maintenance and laundry facility renovations, including dimensions in millimeters and notes on material submittals and electrical installations. 2. Stairs, laundry manager office, dryer maintenance room, and sections for cable trays are labeled on the floor plan. 3. Specifications are given for cable tray sizes and types, as well as installation heights above floor level.

Uploaded by

Wassim Daher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views1 page

K88 P5 020G 06 SDW ELE 450 0301 00 Reply

1. The document provides details for maintenance and laundry facility renovations, including dimensions in millimeters and notes on material submittals and electrical installations. 2. Stairs, laundry manager office, dryer maintenance room, and sections for cable trays are labeled on the floor plan. 3. Specifications are given for cable tray sizes and types, as well as installation heights above floor level.

Uploaded by

Wassim Daher
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 Dryer Maintenance Room 6 Laundry Facility

007 009 007 NOTES : CLIENT :

section 1 section 3 section 4 1. All dimensions are in millimeters


unless otherwise indicated.
MZ
4 MZ MZ 2. No material may be used on site until
a signed material submittal sheet has been
obtained.
STAIRS A
-
51

D
20G LPG1
- - D
15 3-The contractor should respect one “D”
spacing for the main feeders during
1CTG4 1CTG5 1CTG5
installations
CT 436mm HCU LAUNDRY CT 508mm HCU CT 508mm HCU 4-The utilization of the existing incoming PROJECT MANAGEMENT & COST CONSULTANCY :
IL: +320mm MANAGER 1CTG1 IL: +300mm IL: +300mm cables shall be subject to passing the
HOT DIP GALVANIZED 00-001 HOT DIP GALVANIZED HOT DIP GALVANIZED
PERFORATED CABLE CT 123mm
PERFORATED CABLE PERFORATED CABLE
required testing in addition to its
TRAY IL: +3200mm sufficiency to handle the new loads,
TRAY TRAY
HOT DIP GALVANIZED
A 1CTG5 which shall be submitted for Engineer’s A
3
PERFORATED CABLE
CT 508mm HCU
IL: +3200mm
TRAY review and approval in shop drawing

1CTG2
HOT DIP GALVANIZED stage, otherwise existing cables shall
- PERFORATED CABLE be replaced.
TRAY

GF
5-. Spare capacity on cable trays to be indicated as 20%.
SOILED LINEN GF GF
00-002

FHC
2 -
020G-MW01 CONSULTANT DESIGN REVIEWER :

Laundry Facility

052
BOILERS 1CTG4
1CTG2 CT 436mm
007 00-006 CT 220mm HCU IL: +3200
IL: +2500mm HOT DIP GALVANIZED
HOT DIP GALVANIZED PERFORATED CABLE
RECEIVING PERFORATED CABLE TRAY
section 2 TOILET TRAY LAUNDRY
00-004 & SORTING FACILITY
SANITATION SYSTEM 00-003 00-007
MZ 1CTG1
CT 123mm HCU ROOM
00-005

FHC
IL: +2500mm ##
HOT DIP GALVANIZED
PERFORATED CABLE
- S DESIGNER :
- - B
B
TRAY
020G-MW08 020G-MW09
2CTG5
1CTG1 CT 508mm
CT 123mm HCU IL: +3000 & IL: +3200mm DETERGENT
IL: +320mm 1CTG5
HOT DIP GALVANIZED
HOT DIP GALVANIZED DISPENSING CT 508mm
BOILER ROOM
PERFORATED CABLE
PERFORATED CABLE TRAY ROOM IL: +3000mm 00-010
TRAY 00-008 DRYER MAINTENANCE HOT DIP GALVANIZED
2CTG6 ROOM PERFORATED CABLE
TRAY
CT 600mm HCU 1CTG2 00-009
IL: +2300 & IL:+2200mm CT 220mm HCU
HOT DIP GALVANIZED IL: +2500mm
PERFORATED CABLE HOT DIP GALVANIZED
TRAY PERFORATED CABLE CONTRACTOR :
TRAY
GF

B 1 X CTGYC
B

1 A
GROUND FLOOR PLAN_LAYOUT B C D D1
Receiving & sorting F G H SUBCONTRACTOR :
201 Scale 1:50
003

4 Boilers room
section 5
1CTG1 006
E SETRAA ADVANCED TECHNOLOGY CO.
MZ CT 123mm
IL: +2600mm
HCU-Electrical room P.O. BOX 53008 RIYADH 11583 KINGDOM OF SAUDI ARABIA
HOT DIP GALVANIZED TEL : +966 (1) 4736292 - FAX : +966 (1) 4736291
PERFORATED CABLE M-002 Email : [email protected]
TRAY
section 7

MZ LEGEND :
Section 8

1CTG2
3 FHC
RF
1CTG6
1CTG1 CT 600mm HCU
CT 220mm HCU
CT 123mm HCU IL: +2600mm
IL: +2500mm
IL: +2500mm HOT DIP GALVANIZED
HOT DIP GALVANIZED
HOT DIP GALVANIZED PERFORATED CABLE
PERFORATED CABLE
1CTG6 PERFORATED CABLE TRAY
TRAY
CT 600mm HCU TRAY
HCU TERRACE
IL: +2600mm
ELECTRICAL 1CTG2
2 ROOM
HOT DIP GALVANIZED
PERFORATED CABLE
CT 220mm
IL: +2600mm
HCU
TRAY
GF M-002 HOT DIP GALVANIZED

B20G-TL-PP3 GF
PERFORATED CABLE
TRAY

20G LPM1 HVAC TECHNICAL ROOM


M-001
1CTG6
CT 600mm HCU
C Dryers' room B20G-TL-PP2 IL: +2600mm
HOT DIP GALVANIZED
C
PERFORATED CABLE

B20G-TL-PP1 B20G-TL-AC11CTG6
CT 600mm HCU
MZ
TRAY

section 6 IL: +2600mm


HOT DIP GALVANIZED
MZ 1CTG2
PERFORATED CABLE
TRAY
CT 220mm
IL: +2500mm
HCU
B20G-DBM1 B20G-TL-AC2 1CTG1
CT 123mm
TERRACE
BOILER
HOT DIP GALVANIZED IL: +2600mm
PERFORATED CABLE HOT DIP GALVANIZED ROOM
TRAY PERFORATED CABLE 1CTG1C
TRAY CT 123mm HCU
IL: +300mm 02
1CTG2 HOT DIP GALVANIZED
CT 220mm HCU PERFORATED COVERED 01
IL: +2600mm 1CTG1C CABLE TRAY
2CTG6 FIRST ISSUE
HOT DIP GALVANIZED CT 123mm HCU 00 10-01-2023
CT 600mm HCU PLUMBING PERFORATED CABLE AIR FILTER ROOM IL: +300mm
IL: +2300 & IL:+2200mm TRAY REV.
TECHNICAL - HOT DIP GALVANIZED DESCRIPTION DATE
HOT DIP GALVANIZED PERFORATED COVERED NO.
PERFORATED CABLE ROOM CABLE TRAY
TRAY M-003

GF
1 TYPICAL WALL MOUNTED CABLE TRAY INSTILLATION DETAIL.
TYPICAL CEILING CABLE TRAY INSTILLATION DETAIL.
DETAIL -02
DETAIL -01

A B C D D1 E F G H

951.750
405.000
2 MEZZANINE PLAN_LAYOUT TYPICAL SURFACE MOUNTED PANEL BOARD DETAIL.
DETAIL -03 TYPICAL SURFACE MOUNTED SWITCHBOARD DETAIL.
DETAIL -04 SHOP DRAWING
Roof Floor
201 Scale 1:50
Section 9 4
D A ROOF CABLE TRAY INSTALLATION DETAIL
D
- SCALE: NTS

5013 2 450 020G 301 0_00


PROJECT CODE PHASE TRADE BUILDING DOC. NUMBER REVISION
1CTG2C
CT 220mm HCU
IL: +300mm CIVIL/LS ARCHITECT STRUCTURAL
HOT DIP GALVANIZED 1CTG2C
PERFORATED COVERED CT 200mm
CABLE TRAY IL: +300mm
B
-
DISCONNECT SWITCH INSTALLATION DETAIL
SCALE: NTS - - -
HOT DIP GALVANIZED

3
PERFORATED COVERED
RF CABLE TRAY ELECTRICAL MECHANICAL ICT

- - -

Roof Floor
Section 10 2
IJ dar al-handasah
lhair il1lf partnm
C
-
DISCONNECT SWITCH INSTALLATION DETAIL
SCALE: NTS
DRAWN BY

S.M
CHECKED BY

S.M
APPROVED BY

S.M

SITE KEY PLAN : PROJECT TITLE :

0 CON l: APPROVED
1CTG2C 0 C®£ I: APPIOVED AS NOTED K88_PROJECT
CT 220mm
1CTG2C
-Approved panel boards shop drawings to be provided IW MY IIICIIIIIIlKTlO
IL: +300mm
HOT DIP GALVANIZED
HCU
Roof Floor CT 220mm HCU -Approved shop drawing layouts to be provided [LTG, PWR, MECH.] IIICOIINMtll Of EIIOIIID N
IL: +300mm
PERFORATED COVERED
CABLE TRAY Section 12 HOT DIP GALVANIZED -Approved material submittal for each load/equipment on the layout to be provided matching the approved panel co.um. BUILDING NUMBER & NAME :
PERFORATED COVERED

RF
CABLE TRAY SDW D conE c: RlYISIAaiiSUBIIT 020G
-Reference approved material submittal for the mentioned items on the layout to be provided e.g. trays, supports, IOIIIIAY lOTPIOCUD
cables, BMS cables…etc. D COD! DI RE-JECTED BUILDING 020G
MAIN LAUNDRY FACILITY
1CTG1C -Provide table of cable tray size calculation showing number of cables, cross section area, VD, overall diameter
CT 123mm HCU 1CTG1C for each cable [approved material to be provided], weight, spacing and the spare percentage as specified By:WGhasoup D•te: 22/1/23 BUILDING KEY PLAN : DRAWING TITLE :
IL: +300mm
Roof Floor CT 123mm HCU
HOT DIP GALVANIZED 1CTG2C
CT 220mm HCU IL: +300mm associated. ~ ......... Centrlctor

--............
PERFORATED COVERED
HOT DIP GALVANIZED
Section 11 CABLE TRAY IL: +300mm
-Cross sections showing cables on trays and spacing for each section/run to be provided of., of 1111 IJIIItils- the N

E
RF
HOT DIP GALVANIZED
PERFORATED COVERED
PERFORATED COVERED
CABLE TRAY
-Sectional details for tray connection to panels, equipment, change levels ...to be provided Colltract. Clllllfllllllllltallall BUILDING 020G E
CABLE TRAY
-Stick to specification for supports/fastenings to the structure, to carry the greater of the calculated load multiplied of..., . . . " Cenlract Deaalls. GROUND FLOOR
by a safety factor of 4. Contrlctoris,...... .. MEZZANINE FLOOR&ROOF
1CTG2C -Install expansion connectors where cable trays runs that exceed 27m as specified.
CT 220mm HCU
-Deflection between supports is not to exceed 1/350 under full loading capacity as specified
CABLE TRAYS
IL: +300mm
HOT DIP GALVANIZED
withotJ.trMn.
PERFORATED COVERED
CABLE TRAY

RF 1 I
SCALE - SHEET SIZE DATE CAD FILE

3 I
ROOF PLAN_LAYOUT
1/50 10-01-2023 K88-P5-020G-06-SDW-ELE-450-0301-00

DOCUMENT NUMBER :
201 I Scale 1:50
A B C D D1 E F G H K88 P5 020G 06 SDW ELE 450 0301 00
I PROJECT PROGRAM BUILDING PHASE DOC. TYPE DISCIPLINE TRADE DOC. NUMBER REVISION

1 2 3
I 4 5 6

You might also like