(DO-CYT-T1-16) - KASSAHUN Comparision

This document is an interim certificate of payment for measurement certified number 6. It certifies that the contractor is entitled to Birr 2,038,318.50 for work completed on the Mekdela Amba University dormitory project. It provides details of the total project cost, previous payments made, deductions, and the net amount payable.

Uploaded by

Mohammed Adane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views126 pages

(DO-CYT-T1-16) - KASSAHUN Comparision

This document is an interim certificate of payment for measurement certified number 6. It certifies that the contractor is entitled to Birr 2,038,318.50 for work completed on the Mekdela Amba University dormitory project. It provides details of the total project cost, previous payments made, deductions, and the net amount payable.

Uploaded by

Mohammed Adane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 126

INTERIM CERTIFICATE OF PAYMENT- 2

FOR MEASUREMENT CERTIFIED NO - 2

Amount in Birr
Project: - Mekdela Amba University Main Contract Err:509
Location: - Tulu Awliya Supplementary Contract No 1 -
Employer: - Mekdela Amba University Supplementary Contract No 2 -
Contractor: - Kassahun Zerihun B.C Variation Order No.1 (Water and Generator)
Consultant: - RBDCSWE 10% contengency -
Block Type: - DO-CYT-T1-16 & painting of all blocks SUM Err:509
Phase: - NEW/Phase three 15% VAT Err:509
Total SUM 121,768,479.40

የገንዘቡ ልክ /ብር/
Amount in /Birr/
1. As per attached statement the value of work executed and /or materials supplied to date is Birr: 24,575,074.83
Advance payment Deduction Amount (Birr)
No Date Amount VAT 2.Previous payment 12,188,395.85
Advance payment 9/19/2014 16,970,987.53 2,545,648.13
3. Rebate
Previous Interim Payment 4. Retention 5% 1,228,753.74
Date Amount VAT 5. Penalty
6. Advance Repayment
IPN-1 2/3/2015 12,188,395.85 1,949,577.19 {100%} 4,829,002.20
7. MOE Material cost
IPN-2 Deduction -
IPN-3 8. Total Deduction 18,246,151.80
IPN-4
IPN-5
IPN-6
Total previous payments 12,188,395.85 1,949,577.19 ● Price Escalation
● Material on site
● Total Addition
20 % ADVANCE PAYMENT CHECK

NO Amount VAT 9. Net Payable for this payment due contractor 6,328,923.04
Total Advance Taken: 16,970,987.53 2,545,648.13
Total Advance Re-paid: 4,829,002.20 724,350.33
Outstanding Advance 12,141,985.33 1,821,297.80
VAT PAYMENT CHECK
10. Total Executed Amount(1) 24,575,074.83
11. MOE material cost deduction(7) -
12. Executed Amount after MOE material deduction(10-11) 24,575,074.83
13. Total 15% VAT (15%*(12)) 3,686,261.22
14. TOTAL Previous VAT Paid (TPPV+6*15%) 2,673,927.52
15. Net payable VAT for this payment (13-14) 1,012,333.70
16. Total payment due to the contractor including 15% VAT (15+9) 7,341,256.74
We certify that the Contractor is now entitled to the sum of Birr:- 7,341,256.74

Certified By consultant RE:- Approved by Consultant PC:- Verified By Client PM:-

------------------------- ---------------------- ----------------------

Date Date Date


INTERIM CERTIFICATE OF PAYMENT- 6
FOR MEASUREMENT CERTIFIED NO - 6

Amount in Birr
Project: - MEKDELA AMBA UNIVERSITY (MEKANE SELAM CAMPAS) Main Contract 21,554,340.42
Location: - Mekane Selam Supplementary Contract No 1
Employer: - Ministry of Education Supplementary Contract No 2
Contractor: - TIKS COSTRUCTION Variation Order No.
Consultant: - Misganaw Alem Engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-066) SUM 21,554,340.42
Phase: -1 (one) 15% VAT 3,233,151.06
Total SUM 24,787,491.48

የገንዘቡ ልክ /ብር/
Amount in /Birr/
1. As per attached statement the value of work executed and /or materials supplied to date is Birr: 17,956,153.29
Previous Payment Deduction Amount (Birr)
No Date Amount VAT 2. Previous payment 11,177,770.58
IPN-1 2,306,411.90 345,961.79 3. Rebate
escalation 1 4. Retention 2.5% 448,903.83
material on site-1 5. Penalty
6. Advance Repayment
IPN-2 1,127,037.40 169,055.61 {25%} 4,310,868.08
7. MOE Material cost
IPN-3 1,221,454.19 183,218.13 Deduction 4,056,929.30
IPN-4 4,235,337.53 635,300.63 8. Total Deduction 19,994,471.79
IPN-5 2,287,529.56 ● Price Escalation

Total previous payments 11,177,770.58 1,333,536.15 ● Material on site 0.00


● Total Addition 17,956,153.29

25 % ADVANCE PAYMENT CHECK 9. Net Payable for this payment due contractor (2,038,318.50)
Total Advance Taken: 4,310,868.08
Total Advance Re-paid: 4,310,868.08
Outstanding Advance -
VAT PAYMENT CHECK
10. Total Executed Amount 17,956,153.29
11. MOE material cost deduction(7) 4,056,929.30
12. Executed Amount after MOE material deduction(10-11) 13,899,223.99
13. Total 15% VAT (15%*(12)) 2,084,883.60
14. TOTAL Previous VAT payed 1,980,166.37
15. Net payable VAT for this payment (13-14) 104,717.23
16. Total payment due to the contractor including 15% VAT (15+9) (1,933,601.27)
We certify that the Contractor is now entitled to the sum of Birr:- -1,933,601.27
( Eighty Nine Thousand Three Hundred Sixty Three birr & 4/100 birr).

Certified By: - Verified By : -


_________________ ____________________
Project: - MEKDELA AMBA UNIVERSITY (MEKANE SELAM CAMPAS) MISGANAW ALEM engineering
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - DEBEBE KINFE B.C
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Material Deduction Grand Summery

loading RECEIVED
Itm.No UNIT Transport CONSUMED
DESCRIPTION UNIT and Total cost QUANTIT BALANCE AMOUNT REMARK
. PRICE cost QAUNTITY
unloading Y

A Cement1 Qut 215.65 - 4.00 219.650 800.00 (800.00) 175,720.00


A Cement2 Qut 224.87 - 4.00 228.870 8,810.00 (8,810.00) 2,016,344.70
B Mild Steel Reinforcement
a)Dia 6 mm Plain bar Kg 19.910 1.400 0.05 21.360 9,853.80 (9,853.80) 210,477.17
b)Dia 8mm deformed bar " 16.220 1.400 0.05 17.670 12,736.37 (12,736.37) 225,051.66
c)Dia 10 mm deformed bar " 15.700 1.400 0.05 17.150 8,543.70 (8,543.70) 146,524.46
d)Dia 12 mm deformed bar " 15.500 1.400 0.05 16.950 25,457.24 (25,457.24) 431,500.22
e)Dia 14 mm deformed bar " 15.390 1.400 0.05 16.840 24,029.62 (24,029.62) 404,658.80
f)Dia 16 mm deformed bar " 15.490 1.400 0.05 16.940 28,077.58 (28,077.58) 475,634.21
g)Dia 20 mm deformed bar " 15.390 1.400 0.05 16.840 6,445.58 (6,445.58) 108,543.57
g)Dia 24 mm deformed bar " 16.300 1.400 0.05 17.750 - - -
TOTAL AMOUNT /BIRR/ 4,194,454.79
Submitted by Contractor: Checked by: Verified by:
Proj/Site Engineer: ___________ Assistant Resident Engineer:_______________ Client Proj. Eng.:______________

Signature:_______________ Signature&Date:__________________ Signature:_______________

Date:_______________ Resident Engineer:__________________ Date:_______________

Signature&Date : _______________

Page 3 of 126
Client :Mekidela Amba University
Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise

Contractor:-Kassahun Zerihun B.C.

Type Of Block:-Dormitory(D0-CYT-T1-16) & printing of all blocks

Location:- Tulu Awliya Title=Grand Summery

Item Block Name Block Number Contract Amount (BIRR) Previous payment Current payment Tot. to date payment

1 Dormitory Do-CYT-T1-016 Err:509 8,476,952.99 9,479,200.30 17,956,153.29

2 Painting of all blocks 7,571,173.71 6,618,921.54 6,618,921.54

TOTAL Err:509 15,095,874.53 9,479,200.30 24,575,074.83

Submitted by Contractor: Checked by: Verified by:


Proj/Site Engineer: _________ Assistant Resident Engineer:________ Client Proj. Eng.:___________
Signature:__________________ Signature&Date:_________________ Signature:________________
Date : _____________________ Resident Engineer:_______________ Date : __________________
Signature&Date:_______________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Summary
Summary Of Statement
Details of works excuted
It. No. Description Contract Amount Prev. Payment This Payment Total To Date Amount

A.Sub Structure
1 Excavation and earth work. Err:509 - 2,629,888.11 -
2 Concrete work.. Err:509 - 5,451,141.32 5,451,141.32
3 Masonary work.. Err:509 - 303,383.90 303,383.90
Total A Err:509 8,476,952.99 8,384,413.32 5,754,525.22
B.Super Structure
1 CONCRETE WORK Err:509 - 1,094,786.98 1,094,786.98
2 BLOCK WORK Err:509 -
3 ROOFING Err:509 -
4 CARPENTRY & JOINERY Err:509 -
5 METAL WORK Err:509 -
6 PLASTERING AND POINTING Err:509 -
6 FINISHING Err:509 -
7 GLAZING Err:509 -
8 PAINTING Err:509 -
9 SANITARY INSTALLATION Err:509 -
10 ELECTRICAL INSTALLATION Err:509 -
Total B Err:509 - 1,094,786.98 1,094,786.98
Grand Total (A+B) Err:509 8,476,952.99 9,479,200.30 17,956,153.29

Submitted by Contractor: Checked by: Verified by:


Proj/Site Engineer: _________ Assistant Resident Engineer:________ Client Proj. Eng.:___________
Signature:__________________ Signature&Date:_________________ Signature:________________
Date : _____________________ Resident Engineer:_______________ Date : __________________
Signature&Date:_______________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRUCTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

A-SUB STRUCTURE 1.07….. Ditto as item No 1.02


1. EXCAVATION & EARTH WORK but in Hard Rock

1 1233.63 A=1394.68-161.05=1233.63m2
0.00 d=0.00m
1.01…… Clear and remove top 0.00 m3 (item 1-1.07)
soil to an average depth of
200mm. 1.08…… Pit excavation in
1 1394.68 A=1394.68m2 ordinary soil to a depth not
1394.68 m2 (item 1-1.01) exceeding 1500 from Reduced
1.02…. Bulk excavation in ground level.
ordinary soil to reduce level to F1----4 pcs
debth not exceeding 1500mm. 4 2.90 L=2.40+0.25+0.25=2.90m
N.B:- Area of Bulk excavation by 2.90 w=2.40+0.25+0.25=2.90m
Considering 0.50m work space and 1.50 d=1.50m
Excluding pavement and half dich.
50.46 m3
1 986.16 A=986.16m2 F2----28 pcs
1.30 d=1.30m 28 2.70 L=2.20+0.25+0.25=2.70m
1,282.01 m3 2.70 w=2.20+0.25+0.25=2.70m
N.B:-excavation of green area inside 1.50 d=1.50m
the block to bottom of grade beam. 306.18 m3
1 161.05 A=161.05m2 F3----24 pcs
0.85 d=1.69+0.5-1.34=0.85m 24 2.20 L=1.70+0.25+0.25=2.20m
136.89 m3
N.B:-excavation of Pavement block 2.20 w=1.70+0.25+0.25=2.20m
to bottom of grade beam and 0.40 1.50 d=1.50m
soil replacement. 174.24 m3
1 247.47 A=247.47m2 F4----2 pcs
1.25 d=1.69+0.5-1.34+0.4=1.25m 2 3.00 L=2.50+0.25+0.25=3.00m
309.34 m3 3.00 w=2.50+0.25+0.25=3.00m
1,728.24 m3 (item 1-1.02) 1.50 d=1.50m
1.03….. Ditto as item No 1.02 27.00 m3
1 986.16 but exceeding 1500mm but not
A=1394.68-161.05=1233.63m2 F6----8 pcs
exceeding 3000mm.
0.54 d=0.54m 8 2.00 L=1.50+0.25+0.25=2.00m
533.54 m3 (item 1-1.03) 2.10 w=1.60+0.25+0.25=2.00m
1.04…… Ditto as item No 1.02 1.50 d=1.50m
but exceeding 3000mm but not 50.40 m3
exceeding 4500mm.
1 1233.63 A=1394.68-161.05=1233.63m2
0.00 d=0.00m 608.28 m3 (item 1.08)
0.00 m3 (item 1-1.04)
1.05…… Ditto as item No 1.02
but in weathered rock.
1 1233.63 A=1394.68-161.05=1233.63m2
0.00 d=0.00m
0.00 m3 (item 1-1.05)
1.06…… Ditto as item No 1.03
but in weathered rock.
1 1233.63 A=1394.68-161.05=1233.63m2
0.00 d=0.00m
0.00 m3 (item 1-1.06)
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

1.09….. Ditto as item 1.08 but F3----24 pcs


exceeding 1500mm but not 24 2.20 L=1.70+0.25+0.25=2.20m
exceeding 3000mm. w=1.70+0.25+0.25=2.20m
2.20
F1----4 pcs 0.00 d=0.00m
4 2.90 L=2.40+0.25+0.25=2.90m 0.00 m3
2.90 w=2.40+0.25+0.25=2.90m F4----2 pcs
0.61 d=2.11-1.5=0.61m 2 3.00 L=2.50+0.25+0.25=3.00m
20.52 m3 3.00 w=2.50+0.25+0.25=3.00m
F2----28 pcs 0.00 d=0.00m
28 2.70 L=2.20+0.25+0.25=2.70m 0.00 m3
2.70 w=2.20+0.25+0.25=2.70m F6----8 pcs
0.61 d=2.11-1.5=0.61m 8 2.00 L=1.50+0.25+0.25=2.00m
124.51 m3 2.10 w=1.60+0.25+0.25=2.00m
F3----24 pcs 0.00 d=0.00m
24 2.20 L=1.70+0.25+0.25=2.20m 0.00 m3
2.20 w=1.70+0.25+0.25=2.20m
0.61 d=2.11-1.5=0.61m 0.00 m3 (item 1-1.10)
70.86 m3
F4----2 pcs 1.11…… Ditto to item No
2 3.00 L=2.50+0.25+0.25=3.00m 1.10 but exceeding
3.00 w=2.50+0.25+0.25=3.00m 1500mm but not exceeding
0.61 d=2.11-1.5=0.61m 3000mm.
10.98 m3
F6----8 pcs
8 2.00 L=1.50+0.25+0.25=2.00m 0.00 m3 (item 1-1.11)
2.10 w=1.60+0.25+0.25=2.00m
0.61 d=2.11-1.5=0.61m
20.50 m3 1.12…… Ditto as item No. 1.09
but in Hard rock.
247.37 m3 (item 1.09)

1.10….. Pit excavation in


Weathered Rock to a depth not
exceeding 1500 from Redused
ground level.
0.00 m3 (item 1-1.12)

F1----4 pcs
4 2.90 L=2.40+0.25+0.25=2.90m
2.90 w=2.40+0.25+0.25=2.90m
0.00 d=0.00m
0.00 m3
F2----28 pcs
28 2.70 L=2.20+0.25+0.25=2.70m
2.70 w=2.20+0.25+0.25=2.70m
0.00 d=0.00m
0.00 m3

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

1.13……. Trench excavation in 1 3.61 On axis 6 b/n axis I & H


ordinary soil to a depth of 0.55
1500mm from redused ground
level. 0.6
1.19 M3
2 4.51 On axis 1 b/n axis D & F 1 4.71 On axis H b/n 6' & 7
0.75 0.45
0.75 0.65
5.07 M3 1.38 M3
1 1.20 - On axis F b/n axis 1 & 1'
1.00 - 1 18.09 On axis 7 b/n axis H & D
1.30 - 0.75
1.56 M3 0.75
1 4.51 - on axis 1' b/n axis F & G 10.18 M3
1.00 - 2 0.80 On axis D & B b/n axis 7 & 7'
0.95 - 0.75
4.28 M3 0.75
1 4.51 - On axis 1' b/n axis G & H 0.90 M3
0.95 - 1 9.92 On axis 7' b/n B & D
0.90 - 0.75
3.86 M3 0.75
1 1.20 - On axis H b/n 1 & 1' 5.58 M3
0.75 - 1 3.56 On axis 7 b/n axis A & B
0.75 - 0.95
0.67 M3 0.90
1 3.56 - On axis 1 b/n axis H & I 3.04 M3
0.95 - 1 5.13 On axis A b/n 7 & 6
0.9 - 0.95
3.04 M3 0.90
1 5.13 - On axis I b/n axis 1 & 2' 4.39 M3
1.15 - 1 13.48 On axis A b/n axis 3 and 6
1.1 - 0.65
6.49 M3 0.65
1 4.46 - On axis I b/n 2' & 3 5.70 M3
0.75 -
0.75 - 63.53 m3 (item 1-1.13)
2.51 M3
1 4.51 - On axis I b/n axis 3 & 4
0.55 -
0.55 -
1.36 M3
1 4.81 - On axis I b/n axis 4 & 5
0.45 -
0.45 -
0.97 M3
1 4.51 - On axis I b/n axis 5 & 6
0.5 -
0.6 -
1.35 M3
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________

Project: - Mekdela Amba (Mekane Selam) Universty


Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

1.15…… Fill Around


1.14….. Fill Around foundation
foundation and building in non
and building in non expansive
expansive selected material
selected material from quarry
from site well rolled and
waste well rolled and compacted
1.15…… Fill Around
1.14….. Fill Around foundation
foundation and building in non
and building in non expansive
expansive selected material
selected material from quarry
from site well rolled and
waste well rolled and compacted
compacted in layeres not
in layeres not exceeding
exceeding 200mmthick.
200mmthick.

Back fill From grade beam Bottem to N.B:- we don't have the excuted work.
RGL
1 986.16 A=986.16m2 0.00 m2 (item 1-1.15)
1.19 d=1.19m
1,173.53 m3
N.B:-Back Fill of Pavement block to 1.16….. Fill under hard core
bottom of grade beam and 0.40 soil with imported selected material
replacement. from quarry waste well rolled
1 247.47 A=247.47m2 and compacted in layers not
exceeding 200mm thick.
0.40 d=0.40m
98.99 m3
608.28 m3 (item 1.08) Axis b/n A-B and 7-6
247.37 m3 (item 1.08) 1 3.56 L=3.56m
0.00 m3 (item 1-1.10) 5.13 W=5.13m
0.00 m3 (item 1-1.11) 18.26 m2
0.00 m3 (item 1-1.12) Axis b/n B-C to E-F and 7-6
63.53 m3 (item 1-1.13) 4 4.51 L=4.51m
4.91 W=4.91m
2,191.70 m3 88.58 m2
Total excuted structure Axis b/n F-G and 7-6
1 4.46 L=4.46m
12.98 m2 (item 2-2.01a) 4.91 W=4.91m
40.62 m2 (item 2-2.01b) 21.90 m2
3.50 m2 (item 2-2.01c) Axis b/n G-H and 7-6
133.07 m3 (item 2-2.02a) 1 4.56 L=4.56m
22.44 m3 (item 2-2.02b) 4.91 W=4.91m
33.60 m3 (item 3-3.01) 22.39 m2
Axis b/n B-C and 7-cant
246.21 m3 1 4.51 L=4.51m
0.90 W=0.90m
1,945.49 m3 (item 1-1.14) 4.06 m2
Axis b/n C-D and 7-cant
1 4.51 L=4.51m
0.90 W=0.90m
4.06 m2
Axis b/n D-E and 5'-6'
1 4.51 L=4.51m
2.81 W=2.81m
12.67 m2
Axis b/n E-F and 5'-6'
1 4.51 L=4.51m
2.81 W=2.81m
12.67 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

Axis b/n E-F and 5'-6' Axis b/n A-B' and 4-5 and mirror
1 4.46 L=4.46m 2 4.51 L=4.51m
2.81 W=2.81m 4.86 W=4.86m
12.53 m2 43.84 m2
Axis b/n B'-C and 4-5 and mirror

Axis b/n A-B and 1-2' 2 4.51 L=4.51m


1 3.56 L=3.56m 2.86 W=2.86m
5.13 W=5.13m 25.80 m2
18.26 m2 Axis b/n A-B' and 3-4 and mirror
Axis b/n B-C to E-F and 1-2 2 4.51 L=4.51m
4 4.51 L=4.51m 4.86 W=4.86m
4.86 W=4.86m 43.84 m2
m2 Axis b/n B'-C and 3-4 and mirror
87.67
Axis b/n C-D and 1-2 2 4.51 L=4.51m
1 4.46 L=4.46m 2.86 W=2.86m
4.86 W=4.86m 25.80 m2
21.68 m2 Axis b/n A-B' and 2'-3 and
Axis b/n B-C and 1-2 2 4.51 mirror
L=4.51m
1 4.56 L=4.56m 4.86 W=4.86m
4.86 W=4.86m 43.84 m2
Axis b/n B'-C and 2'-3 and
22.16 m2 mirror
Axis b/n F-G and 7-cant 2 4.51 L=4.51m
1 4.51 L=4.51m 2.86 W=2.86m
0.90 W=0.90m 25.80 m2
4.06 m2
Axis b/n G-H and 7-cant 672.59 m2
1 4.51 L=4.51m
0.90 W=0.90m 1 672.59
4.06 m2 0.10
Axis b/n D-E and 5'-6' 67.26 m3
1 4.51 L=4.51m
2.81 W=2.81m 67.26 m3 (item 1-1.16)
12.67 m2
Axis b/n E-F and 5'-6'
1 4.51 L=4.51m
2.81 W=2.81m
12.67 m2
Axis b/n E-F and 5'-6'
1 4.46 L=4.46m
2.81 W=2.81m
12.53 m2
Axis b/n A-B' and 5-6 and mirror

2 4.71 L=4.71m
4.46 W=4.46m
42.01 m2
under the stair case and mirror
2 3.01 L=3.01m
4.78 W=4.78m
28.78 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

1.17…… Load and cart away 1.18…… 250mm thick basaltic


surplus excavated material to an stone hardcore well rolled,
appropriate tip. consolidated and blinded with
crushed stone .

278.94 m3 (item 1-1.01)*0.20 Axis b/n A-B and 7-6


1,728.24 m3 (item 1-1.02) 1 3.56 L=3.56m
533.54 m3 (item 1-1.03) 5.13 W=5.13m
0.00 m2 (item 1-1.04) 18.26 m2
0.00 m3 (item 1-1.05) Axis b/n B-C to E-F and 7-6
0.00 m3 (item 1-1.06) 4 4.51 L=4.51m
0.00 m3 (item 1-1.07) 4.91 W=4.91m
608.28 m3 (item 1.08) 88.58 m2
247.37 m3 (item 1.09) Axis b/n F-G and 7-6
0.00 m3 (item 1-1.10) 1 4.46 L=4.46m
0.00 m3 (item 1-1.11) 4.91 W=4.91m
0.00 m3 (item 1-1.12) 21.90 m2
63.53 m3 (item 1-1.13) Axis b/n G-H and 7-6
1 4.56 L=4.56m
3,459.90 m3 (item 1-1.17) 4.91 W=4.91m
22.39 m2
Axis b/n B-C and 7-cant
1 4.51 L=4.51m
0.90 W=0.90m
4.06 m2
Axis b/n C-D and 7-cant
1 4.51 L=4.51m
0.90 W=0.90m
4.06 m2
Axis b/n D-E and 5'-6'
1 4.51 L=4.51m
2.81 W=2.81m
12.67 m2
Axis b/n E-F and 5'-6'
1 4.51 L=4.51m
2.81 W=2.81m
12.67 m2
Axis b/n E-F and 5'-6'
1 4.46 L=4.46m
2.81 W=2.81m
12.53 m2

Axis b/n A-B and 1-2'


1 3.56 L=3.56m
5.13 W=5.13m
18.26 m2
Axis b/n B-C to E-F and 1-2
4 4.51 L=4.51m
4.86 W=4.86m
87.67 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

Axis b/n B'-C and 3-4 and mirror

Axis b/n C-D and 1-2 2 4.51 L=4.51m


1 4.46 L=4.46m 2.86 W=2.86m
4.86 W=4.86m 25.80 m2
21.68 m2 Axis b/n A-B' and 2'-3 and
Axis b/n B-C and 1-2 2 4.51 mirror
L=4.51m
1 4.56 L=4.56m 4.86 W=4.86m
4.86 W=4.86m 43.84 m2
m2 Axis b/n B'-C and 2'-3 and
22.16 mirror
Axis b/n F-G and 7-cant 2 4.51 L=4.51m
1 4.51 L=4.51m 2.86 W=2.86m
0.90 W=0.90m 25.80 m2
4.06 m2
Axis b/n G-H and 7-cant 672.59 m2 (item 1-1.18)
1 4.51 L=4.51m 2. CONCRETE WORK
0.90 W=0.90m
4.06 m2 2.01…….50 mm lean concrete
Axis b/n D-E and 5'-6' quality C-5, with minimum
1 4.51 L=4.51m cement content of 150 kg /m3,
2.81 W=2.81m of concrete;
12.67 m2 a) Under Footings
Axis b/n E-F and 5'-6'
1 4.51 L=4.51m F1----4 pcs
2.81 W=2.81m 4 2.40 L=2.40m
12.67 m2 2.40 w=2.40m
Axis b/n E-F and 5'-6' 23.04 m2
1 4.46 L=4.46m F2----28 pcs
2.81 W=2.81m 28 2.20 L=2.20m
12.53 m2 2.20 w=2.20m
Axis b/n A-B' and 5-6 and mirror 135.52 m2
2 4.71 L=4.71m F3----24 pcs
4.46 W=4.46m 24 1.70 L=1.70m
42.01 m2 1.70 w=1.70m
under the stair case and mirror 69.36 m2
2 3.01 L=3.01m F4----2 pcs
4.78 W=4.78m 2 2.50 L=2.50m
28.78 m2 2.50 w=2.50m
Axis b/n A-B' and 4-5 and mirror 12.50 m2
2 4.51 L=4.51m F6----8 pcs
4.86 W=4.86m 8 1.50 L=1.50m
43.84 m2 1.60 w=1.60m
Axis b/n B'-C and 4-5 and mirror 19.20 m2
2 4.51 L=4.51m
2.86 W=2.86m 259.62 m2 (item 2-2.01a)
25.80 m2 b) Under beam and floor slab
Axis b/n A-B' and 3-4 and mirror
2 4.51 L=4.51m
4.86 W=4.86m
43.84 m2
1 812.4 A=1093.32-280.96=812.40m2
812.35 m2 (item 2-2.01b)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

On axis H b/n 6' & 7


c) Under masonry wall Along axis A,From 4-5 and
1 4.71 mirror
L=4.51m
Along axis 1 B/n Axis D & F 0.50 w=0.50m
2 4.51 L=4.51m 2.36 m2
0.50 w=0.50m
4.51 m2 On axis 7 b/n H & D
1 18.09 L=4.46m
0.50 w=0.50m
9.05 m2
Along axis F b/n axis 1 & 1'
2 1.2 L=4.46m On axis D & B b/n 7 & 7'
1 0.50 w=0.50m 2 0.8 L=5.43m
1.20 m2 0.50 w=0.50m
0.80 m2
Along axis 1',b/ f & g 1 9.92 On axis 7' b/n B & D
2 4.51 L=4.52m 0.5
1 0.50 w=0.50m 4.96 m2
4.51 m2 1 3.56 On axis 7 b/n A & B
0.5
Along axis 1',b/ g & h 1.78 m2
2 4.51 L=4.51+0.685=5.20m 1 5.13 On axis A b/n 7 & 6
1 0.50 w=0.50m 0.5
4.51 m2 2.57 m2
1 13.48 On axis A b/n 3 & 6
On axis H b/n 1 & 1' 0.5
2 1.2 L=4.96m 6.74 m2
1 0.50 w=0.50m 69.97 m2 (item 2-2.01c)
1.20 m2
Along axis 1,b/n H & i
2 3.56 L=4.96m
1 0.50 w=0.50m
3.56 m2
On axis I b/n 1 & 2'
2 5.13 L=0.694+3.56=4.25m
1 0.50 w=0.50m
5.13 m2
On axis I b/n 2' & 4
2 4.46 L=4.66m
1 0.50 w=0.50m
4.46 m2
On axis I b/n 3 & 5
2 4.51 L=3.66m
1 0.50 w=0.50m
4.51 m2
On axis I b/n 5 & 7
2 4.51 L=4.46m
1 0.50 w=0.50m
4.51 m2
On axis 6 b/n I & H
2 3.61 L=4.51m
1 0.50 w=0.50m
3.61 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

2.02….. Reinforced concrete c) In grade beams


quality C-25, 360 kg of cement/m3
filled in to form work and
GFB-1 on axis cant and mirror
vibrated around rod
reinforcement. (Formwork and 2 9.92 l=9.92m
reinforcement measured 0.30 w=0.30m
separately)
0.40 d=0.40m
a) In footings 2.38 m3
GFB-2 on axis 6' and 7 and mirror
F1----4 pcs 4 28.86 l=28.86m
4 2.40 L=2.40m 0.30 w=0.30m
2.40 w=2.40m 0.40 d=0.40m
0.65 d=0.65m 13.85 m3
14.98 m3 GFB-3 on axis 2'' and mirror
F2----28 pcs 2 14.68 l=14.68m
28 2.20 L=2.20m 0.30 w=0.30m
2.20 w=2.20m 0.40 d=0.40m
0.55 d=0.55m 3.52 m3
74.54 m3 GFB-4 on axis B and C and mirror
F3----24 pcs 4 6.11 l=6.11m
24 1.70 L=1.70m 0.30 w=0.30m
1.70 w=1.70m 0.40 d=0.40m
0.40 d=0.40m 2.93 m3
27.74 m3 GFB-5 on axis D and mirror
F4----2 pcs 2 9.22 l=9.22m
2 2.50 L=2.50m 0.30 w=0.30m
2.50 w=2.50m 0.40 d=0.40m
0.65 d=0.65m 2.21 m3
8.13 m3 GFB-6 on axis E,F and G and mirror
F6----8 pcs 6 7.72 l=7.72m
8 1.50 L=1.50m 0.30 w=0.30m
1.60 w=1.60m 0.40 d=0.40m
0.40 d=0.40m 5.56 m3
7.68 m3 GFB-7 on axis H and mirror
2 5.21 l=5.21m
133.07 m3 (item 2-2.02a) 0.30 w=0.30m
0.40 d=0.40m
b) In foundation columns 1.25 m3
GFB-8 on axis 6 and mirror
C-1----68 pcs 2 4.71 l=4.71m
68 0.40 L=0.40m 0.30 w=0.30m
0.30 w=0.30m 0.40 d=0.40m
2.75 h=2.75m 1.13 m3
22.44 m3 (item 2-2.02b) GFB-9 on axis 3,4, and 5 and mirror
6 5.21 l=5.21m
0.30 w=0.30m
0.40 d=0.40m
3.75 m3

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

GFB-10 on axis A and mirror


2 24.87 l=24.87m
0.30 w=0.30m
0.40 d=0.40m
5.97 m3
GFB-11 on axis B' and mirror
2 13.48 l=13.48m
0.30 w=0.30m
0.40 d=0.40m
3.24 m3
GFB-12 on axis B' and mirror
2 10.97 l=10.97m
0.30 w=0.30m
0.40 d=0.40m
2.63 m3
GFB-13 on axis B' and mirror
2 4.46 l=4.46m
0.30 w=0.30m
0.40 d=0.40m
1.07 m3
GFB-14 on axis 1 and mirror
2 3.86 l=3.86m
0.30 w=0.30m
0.40 d=0.40m
0.93 m3

50.42 m3 (item 2-2.02c)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRUCTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

d) In 100mm thick ground floor


slab. b) To foundation columns

N.B:- this Item is equals to (item C-1----68 pcs


1-1.18) 68 1.40 (L+w)*2=1.40m
2.75 h=2.75m
672.59 m2 (item 2-2.02d) 261.80 m2 (item 2-2.03b)

2.03…. Provide, cut and fix in c) To grade beams


position sawn structural wood or
steel formwork which ever is Along axis 7 cant and mirror
appropriate; 2 9.92 L=9.92m
a) To footings 0.40 D=0.40m
7.94 m2
F1----4 pcs Along axis 7 cant and mirror
4 9.60 (L+w)*2=9.60m 2 9.02 L=9.02m
0.65 d=0.65m 0.40 D=0.40m
24.96 m2 7.22 m2
F2----28 pcs Along axis 7 and mirror
28 8.80 (L+w)*2=8.80m 2 32.12 L=32.12m
0.55 d=0.55m 0.40 D=0.40m
135.52 m2 25.70 m2
F3----24 pcs Along axis 7 and mirror
24 6.80 (L+w)*2=6.80m 2 30.62 L=30.62m
0.40 d=0.40m 0.40 D=0.40m
65.28 m2 24.50 m2
F4----2 pcs Along axis 6' and mirror
2 10.00 (L+w)*2=10.00m 2 27.06 L=27.06m
0.65 d=0.65m 0.40 D=0.40m
13.00 m2 21.65 m2
F6----8 pcs Along axis 6' and mirror
8 6.20 (L+w)*2=6.20m 2 27.96 L=27.96m
0.40 d=0.40m 0.40 D=0.40m
19.84 m2 22.37 m2
Along axis 6 and mirror
258.60 m2 (item 2-2.03a) 2 7.12 L=7.12m
0.40 D=0.40m
5.70 m2
Along axis 6 and mirror
2 12.53 L=12.53m
0.40 D=0.40m
10.02 m2
Along axis 5' and mirror
2 13.48 L=13.48m
0.40 D=0.40m
10.78 m2
Along axis 5' and mirror
2 14.48 L=14.48m
0.40 D=0.40m
11.58 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

Along axis 5 and mirror


2 15.74 L=15.74m Along axis E and F and mirror
0.40 D=0.40m 4 7.72 L=7.72m
12.59 m2 0.40 D=0.40m
Along axis 5 and mirror 12.35 m2
2 15.44 L=15.44m Along axis E and F and mirror
0.40 D=0.40m 4 7.72 L=7.72m
12.35 m2 0.40 D=0.40m
Along axis 4 and mirror 12.35 m2
2 15.44 L=15.44m Along axis G and mirror
0.40 D=0.40m 2 14.33 L=14.33m
12.35 m2 0.40 D=0.40m
Along axis A and mirror 11.46 m2
2 15.15 L=15.15m Along axis G and mirror
0.40 D=0.40m 2 13.88 L=13.88m
12.12 m2 0.40 D=0.40m
Along axis A and mirror 11.10 m2
2 14.10 L=14.10m Along axis G' and mirror
0.40 D=0.40m 2 8.97 L=8.97m
11.28 m2 0.40 D=0.40m
Along axis B and mirror 7.18 m2
2 6.43 L=6.43m Along axis G' and mirror
0.40 D=0.40m 2 8.97 L=8.97m
5.14 m2 0.40 D=0.40m
Along axis B and mirror 7.18 m2
2 5.81 L=5.81m Along axis H and mirror
0.40 D=0.40m 2 4.91 L=4.91m
4.65 m2 0.40 D=0.40m
Along axis B' and mirror 3.93 m2
2 8.97 L=8.97m Along axis H and mirror
0.40 D=0.40m 2 5.33 L=5.33m
7.18 m2 0.40 D=0.40m
Along axis B' and mirror 4.26 m2
2 9.27 L=9.27m Along axis I and mirror
0.40 D=0.40m 2 8.97 L=8.97m
7.42 m2 0.40 D=0.40m
Along axis C and mirror 7.18 m2
2 10.32 L=10.32m Along axis I and mirror
0.40 D=0.40m 2 9.72 L=9.72m
8.26 m2 0.40 D=0.40m
Along axis C and mirror 7.78 m2
2 10.77 L=10.77m
0.40 D=0.40m 348.47 m2 (item 2-2.03c)
8.62 m2
Along axis D and mirror
2 8.92 L=8.92m
0.40 D=0.40m
7.14 m2
Along axis D and mirror
2 8.92 L=8.92m
0.40 D=0.40m
7.14 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

2.04…… Mild steel


reinforcement according to Along axis 4 and mirror
structural drawings. Price includes 2 15.44 L=15.44m
cutting, bending, placing in 30.88 ml
position,tying wire and concrete Along axis A and mirror
spacers.
2 14.10 L=14.10m
a) Dia 8 mm deformed bar 28.20 ml
#REF! kg (item 2-2.04a) Along axis B and mirror
c) Dia 12 mm deformed bar 2 6.43 L=6.43m
#REF! kg (item 2-2.04c) 12.86 ml
d) Dia 14 mm deformed bar Along axis B and mirror
#REF! kg (item 2-2.04d) 2 5.81 L=5.81m
e) Dia 16 mm deformed bar 11.62 ml
#REF! kg (item 2-2.04e) Along axis B' and mirror
2 8.97 L=8.97m
2.05….. 10x100mm Styrofoam 17.94 ml
expansion joint filler between Along axis B' and mirror
ground beam and floor slab. 2 9.27 L=9.27m
18.54 ml
Along axis C and mirror
2 10.32 L=10.32m
20.64 ml
Along axis 7 cant and mirror Along axis C and mirror
2 9.02 L=9.02m 2 5.90 L=5.90m
18.04 ml 11.80 ml
Along axis 7 and mirror Along axis D and mirror
2 9.00 L=9.00m 2 5.81 L=8.81m
18.00 ml 11.62 ml
Along axis 7 and mirror Along axis D and mirror
2 30.62 L=30.62m 2 6.52 L=6.52m
61.24 ml 13.04 ml
Along axis 6' and mirror Along axis E and F and mirror
2 27.06 L=27.06m 4 7.72 L=7.72m
54.12 ml 30.88 ml
Along axis 6' and mirror Along axis E and F and mirror
2 18.34 L=18.34m 4 7.72 L=7.72m
36.68 ml 30.88 ml
Along axis 6 and mirror Along axis G and mirror
2 7.12 L=7.12m 2 7.72 L=7.72m
14.24 ml 15.44 ml
Along axis 6 and mirror Along axis G and mirror
2 12.53 L=12.53m 2 13.88 L=13.88m
25.06 ml 27.76 ml
Along axis 5' and mirror Along axis G' and mirror
2 13.48 L=13.48m 2 8.97 L=8.97m
26.96 ml 17.94 ml
Along axis 5 and mirror
2 15.74 L=15.74m
31.48 ml
Along axis 5 and mirror
2 15.44 L=15.44m
30.88 ml
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekane Selam) Universty
Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TiKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

On axis 1 b/n axis H & I


1 3.56 0.4
2 8.97 L=8.97m 0.9
17.94 ml 0.6 h=0.9M
Along axis H and mirror 1.92 M3
2 4.91 L=4.91m 0.8M
9.82 ml On axis I b/n axis 1 & 2'
Along axis I and mirror 1 5.13 0.4M
2 8.97 L=8.97m 1.1 h=1.1M
17.94 ml 0.6
3.39 M3 0.8M
662.44 ml (item 2-2.05) 1 4.46 On axis I b/n 2' & 3
0.7
3. MASONRY WORK 0.4
1.25 M3
3.01…… 500mm thick hard 1 4.51 On axis I b/n axis 3 & 4
trachytic or equivalent stone 0.5
masonry foundation wall bedded
0.4
in cement mortar mix ratio (1:3).
0.90 M3
2 4.51 On axis 1 b/n axis D & F 1 4.81 On axis I b/n axis 4 & 5
0.7 0.4
0.4 0.4
2.53 M3 0.77 M3
1 1.2 On axis F b/n axis 1 & 1' 1 4.51 On axis I b/n axis 5 & 6
1.3 0.55
0.4 0.4
0.62 M3 0.99 M3
1 4.51 on axis 1' b/n axis F & G 1 3.61 On axis 6 b/n axis I & H
0.95 0.55
0.4 0.4 0.79 M3
1.71 M3 1 4.71 On axis H b/n 6' & 7
On axis 1' b/n axis G & H 0.6
1 4.51 0.4m 0.4
0.9 0.9m 1.13 M3
0.6 0.8m 1 18.09 On axis 7 b/n axis H & D
2.44 M3 0.7
1 1.2 On axis H b/n 1 & 1' 0.4
0.7 h=0.7m 0.4 5.07 M3
0.6 2 0.8 On axis D & B b/n axis 7 & 7'
0.50 M3 b= 0.8 0.7
0.4
0.45 M3
1 9.92 On axis 7' b/n B & D
0.7
0.4
2.78 M3
1 3.56 On axis 7 b/n axis A & B
0.9
0.4
1.28 M3

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________

Project: - Mekdela Amba (Mekane Selam) Universty


Location: - Mekane Selam
Employer: - Ministry of Education
Contractor: - TIKS COSTRACTION
Consultant: - MISGANAW ALEM engineering Title :Take off
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-66) sheet
DESCRIPTION
DESCRIPTION

1 5.13 On axis A b/n 7 & 6 1 4.81 On axis I b/n axis 4 & 5


0.9 0.3
0.4 0.4
1.85 M3 0.58 M3
1 13.48 On axis A b/n axis 2 and 6 1 4.51 On axis I b/n axis 5 & 6
0.6 0.3
0.4 0.4
3.24 M3 0.54 M3
1 3.61 On axis 6 b/n axis I & H
33.60 m3 (item 3-3.01) 0.2
0.4 0.29 M3
3.02….. Ditto, but for the part 1 4.71 On axis H b/n 6' & 7
exposed above ground and one 0.2
side left for pointing 0.4
1 4.51 on axis 1' b/n axis F & G 0.38 M3
0.35 2 2.5 to the side of steps
0.4 1.6
0.63 M3 1.6m
On axis 1' b/n axis G & H 0.40
1 4.51 0.4m 3.20 m3 2.5m
0.7 0.7m
0.6 0.8m
1.89 M3 7 5.00 steps
1 1.2 On axis H b/n 1 & 1' 0.20
0.9 h=0.9m 0.4 0.30
0.6 2.10 m3 (item 3-3.02)
0.65 M3 b= 0.8 18.91 m3 (item 3-3.02)
On axis 1 b/n axis H & I
1 3.56 0.4
1.4
0.6 h=1.4M
2.99 M3
0.8M
On axis I b/n axis 1 & 2'
1 5.13 0.4M
1.2 h=1.2M
0.6
3.69 M3 0.8M
1 4.46 On axis I b/n 2' & 3
0.6
0.4
1.07 M3
1 4.51 On axis I b/n axis 3 & 4
0.5
0.4
0.90 M3

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________

Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering


Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

B-SUPER STRUCTURE FB 7
2 19.80 L=19.54 m
1. CONCRETE WORK 4 0.20 w=0.20m

0.48 d=0.48m
1.01….. Reinforced concrete quality C-25, 360 15.21 m3
kg of cement/m3 filled in to form work and - FB 8
vibrated around rod reinforcement. (Formwork 2 14.58 - L=14.58 m
and reinforcement measured separately)
4 0.20 - w=0.20m
0.48 - d=0.48m
11.20 m3
a) In Elevation columns FB9
-
2 4.71 - L=4.71 m
C-1----68 pcs 4 0.20 - w=0.20m
68 0.40 L=0.40m 0.48 - d=0.48m
w=0.30m
5 0.30 3.62 m3
2.59 d ave=2.59m - FB10
105.67 m3 (item 1-1.01a) 2 9.81 - L=9.81m
4 0.20 - w=0.20m
b) In Floor beams 0.48 - d=0.48m
7.53 m3
FB1 - FB11
2 6.71 L=6.71m 2 18.89 - L=18.89 m
4 0.20 w=0.20m 4 0.20 - w=0.20m
0.48 d=0.48m 0.48 - d=0.48m
5.15 m3 14.51 m3
- FB2 - FB 12
2 9.82 - L=9.82 m 2 11.50 - 11.5m
4 0.20 - w=0.20m 4 0.20 - w=0.20m
0.48 - d=0.48m 0.48 - d=0.48m
7.54 m3 8.83 m3
- FB3 FB 14 & FB 15 FB 13
-
8 8.62 - L=8.62m 4 4.71 - L=4.71m
4 0.20 - w=0.20m 4 0.20 - w=0.20m
a 0.48 - d=0.48m 0.48 - d=0.48m
26.48 m3
7.23 m3
- FB 4 - FB16
- L=6.71 m
6 6.71 2 8.65 - L=8.65m
4 0.20 - w=0.20m 4 0.20 - w=0.20m
0.48 - d=0.48m 0.48 - d=0.48m
15.46 m3 6.64 m3
- FB5
- FB17
2 6.25 - L=6.25m 2 4.56 - L=4.56m
4 0.20 - w=0.20m 4 0.20 - W=0.2m
- d=0.48m d=0.48m
0.48 0.48 -
4.80 m3 3.50 m3
- FB 6 - All pensies
2 9.82 - L=9.82m 1 1.32 - A= 1.323m2
4 0.20 - w=0.20m 4 0.48 - d=0.48m
0.48 - d=0.48m 2.54 m3
7.54 m3
147.78 m3 (item 1-1.01b)
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

c) InTop tie beams RB13


6 8.12
0.20
2 6.71 RB1 0.30
M3
0.20 2.92
0.30 2 8.32 - RB14
0.81 M3 0.20 -
2 10.04 - RB2 0.30 -
0.20 - 1.00 M3
0.30 - 2 8.02 - RB15
1.20 M3 0.20 -
RB3
6 8.84 - 0.30 -
0.20 - 0.96 M3
0.30 - - Linten beam Above door
3.18 M3 16 1.20 - L=1.20m
RB4
2 5.51 - 0.20 -
0.20 - 0.30 -
0.30 - 1.15 M3
0.66 M3
2 9.52 - RB5
0.20 - 28.00 m3 (item 1-1.01c)
0.30 -
1.14 M3 d) In 150mm thick Floor slab
2 23.15 - RB6
0.20 - Along axis b/n B-C and 6'-C and mirror
0.30 - 2 4.61 L=4.61m
2.78 M3 4 6.02 D=6.02m
2 18.44 - RB7 222.02 m2
0.20 - - Along axis b/n C-D and 6'-C and mirror
0.30 - 2 4.61 - L=4.61m
2.21 M3 4 6.02 - D=6.02m
RB8
2 18.44 - 222.02 m2
0.20 - -0.02
0.30 - 444.04 m2 (item 1-1.01d)
2.21 M3 e) In stair case
RB9
2 11.34 -
0.20 - landing and mirror

0.30 - 2 2.61 L=2.61m


1.36 M3 4 3.02 w=3.02m
4 19.44 - RB10 0.18 d=0.18m
0.20 - 11.35 m3
0.30 - - Flight slab and mirror
4.67 M3 2 2.96 - L=2.96m
2 9.62 - RB11 4 1.38 - w=1.38m

0.20 - 0.18 - d=0.18m


0.30 - 5.88 m3
1.15 M3 - Flight steps and mirror
2 5.01 - RB12 19 2.96 - L=2.96m
0.20 - 4 0.28 - w=0.28m
0.30 - 0.55 - d=0.55m
0.60 M3 34.64 m3

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

Staire beam and mirror


2 2.81 L=2.81m 1.03…...Provide, cut and fix in position sawn
structural wood or steel formwork which
4 0.30 w=0.30m
ever is appropriate.
0.40 d=0.40m
2.70 m3 a) In Elevation columns
C-1----64 pcs
54.57 m3 (item 1-1.01e) 68 1.50 (L+w)*2=1.40m
5 2.59 d=2.59m
1320.90 m2 (item 1-1.03a)

1.02…… Ribbed slab for suspended floor slab b) In Floor beams


made of 60 mm thick concrete slab in C-60x120
mm one way concrete girder with c/c spacing
of 600mm ,220x515 mm hollow concrete Along Axis 1' and mirror
ribbed block and all according to the structural
2 9.82 L=9.82m
drawing.
4 0.48 d=0.48m
37.71 m2
Axis b/n D-E and 5'-7 and mirror - Along Axis 1' and mirror
2 4.61 L=4.61m 2 9.92 - L=9.92m
4 8.22 w=8.22m 4 0.20 - d=0.20m
303.15 m2 15.87 m2
- Axis b/n E-F and 5'-7 and mirror - Along Axis 1' and mirror
2 4.61 - L=4.61m 2 8.92 - L=8.92m
4 8.22 - w=8.22m 4 0.33 - d=0.33m
303.15 m2 23.55 m2
- Axis b/n F-G and 5'-7 and mirror - Along Axis 1 and mirror
2 4.56 - L=4.56m 2 8.92 - L=9.82m
4 8.22 - w=8.22m 4 0.18 - d=0.18m
299.87 m2 12.84 m2
- Axis b/n G-H and 6'-7 and mirror - Along Axis 1 and mirror
2 4.71 - L=4.71m 2 19.24 - L=19.24m

4 5.31 - w=5.31m 4 0.48 - d=0.48m


200.08 m2 73.88 m2
- Axis b/n G-I and 6-5 and mirror - Along Axis 1 and mirror
2 7.90 - L=7.90m 2 27.56 - L=27.56m
4 4.56 - w=4.56m 4 0.20 - d=0.20m
288.19 m2 44.10 m2

- Axis b/n G-I and 4-5 and mirror - Along Axis 1 and mirror
2 7.90 - L=7.90m 2 26.96 - L=26.96m
4 4.61 - w=4.61m 4 0.18 - d=0.18m
291.35 m2 38.82 m2
- Axis b/n A-B' and 4-5 and mirror - Along Axis 2 and mirror
2 4.91 - L=4.91m 2 26.96 - L=26.96m
4 4.51 - w=4.51m 4 0.18 - d=0.18m

177.15 m2 38.82 m2
- Axis b/n A-C and 4-5 and mirror
2 8.22 - L=8.22m
4 4.66 - w=4.66m
306.44 m2

2,169.38 m2 (item 1-1.02)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

Along Axis 2 and mirror Along Axis J


2 27.56 L=27.56m 1 15.44 L=15.44m
4 0.20 d=0.20m 4 0.18 d=0.18m

44.10 m2 11.12 m2
- Along Axis 2 and mirror - Along Axis J
2 26.96 - L=26.96m 1 14.84 - L=14.84m
4 0.18 - d=0.18m 4 0.20 - d=0.20m
38.82 m2 11.87 m2
- Along Axis H and mirror - Along Axis J
2 6.82 - L=6.82m 1 15.44 - L=15.44m

4 0.48 - d=0.48m 4 0.18 - d=0.18m


26.19 m2 11.12 m2
- Along Axis H and mirror - Along Axis 4 and mirror
2 6.76 - L=6.76m 2 9.72 - L=9.72m

4 0.18 - d=0.18m 4 0.48 - d=0.48m


9.73 m2 37.32 m2
- Along Axis H and mirror - Along Axis 4 and mirror
2 11.71 - L=11.71m 2 9.17 - L=9.17m
4 0.20 - d=0.20m 4 0.20 - d=0.20m
18.74 m2 14.67 m2
- Along Axis H and mirror - Along Axis 4 and mirror
2 12.55 - L=12.55m 2 8.97 - L=8.97m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
18.07 m2 12.92 m2
- Along Axis 3 and mirror - Along Axis A and mirror
2 13.33 - L=13.33m 2 6.81 - L=6.81m
4 0.18 - d=0.00m 4 0.48 - d=0.48m
19.20 m2 26.15 m2
- Along Axis 3 and mirror - Along Axis A and mirror
2 13.73 - L=13.73m 2 5.71 - L=5.71m

4 0.20 - d=0.20m 4 0.20 - d=0.20m


21.97 m2 9.14 m2
- Along Axis 3 and mirror - Along Axis A and mirror
2 14.13 - L=14.13m 2 5.81 - L=5.81m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
20.35 m2 8.37 m2

- Along Axis I and mirror - Along Axis 5 and mirror


2 15.74 - L=15.74m 2 4.51 - L=4.51m
4 0.00 - d=0.00m 4 0.18 - d=0.18m
- m2 6.49 m2
- Along Axis I and mirror - Along Axis 5 and mirror
2 14.84 - L=14.84m 2 4.61 - L=4.61m
4 0.20 - d=0.20m 4 0.20 - d=0.20m

23.74 m2 7.38 m2
- Along Axis I and mirror - Along Axis 5 and mirror
2 15.44 - L=15.44m 2 4.81 - L=4.81m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
22.23 m2 6.93 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

Along Axis B and mirror Along Axis F and mirror


2 5.81 L=5.81m 2 7.62 L=7.62m
4 0.18 d=0.18m 4 0.18 d=0.18m

8.37 m2 10.97 m2
- Along Axis B and mirror - Along Axis F and mirror
2 10.32 - L=10.32m 2 6.61 - L=6.61m
4 0.20 - d=0.20m 4 0.48 - d=0.48m
16.52 m2 25.38 m2
- Along Axis B and mirror - Along Axis F and mirror
2 4.91 - L=4.91m 2 10.87 - L=10.87m

4 0.48 - d=0.48m 4 0.20 - d=0.20m


18.85 m2 17.39 m2
- Along Axis B and mirror - Along Axis F and mirror
2 5.81 - L=5.81m 2 13.83 - L=13.83m

4 0.18 - d=0.18m 4 0.18 - d=0.18m


8.37 m2 19.92 m2
- Along Axis C and mirror - Along Axis 5 and mirror
2 5.81 - L=5.81m 2 8.97 - L=8.97m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
8.37 m2 12.92 m2
- Along Axis C and mirror - Along Axis 5 and mirror
2 3.21 - L=3.21m 2 9.12 - L=9.12m
4 0.48 - d=0.48m 4 0.20 - d=0.20m
12.33 m2 14.59 m2
- Along Axis C and mirror - Along Axis 5 and mirror
2 8.42 - L=8.42m 2 8.97 - L=8.97m
4 0.20 - d=0.20m 4 0.18 - d=0.18m
13.48 m2 12.92 m2
- Along Axis C and mirror - Along Axis G and mirror
2 1.00 - L=1.00m 2 5.51 - L=5.51m

4 0.48 - d=0.48m 4 0.18 - d=0.18m


3.84 m2 7.93 m2
- Along Axis C and mirror - Along Axis G and mirror
2 7.72 - L=7.72m 2 4.71 - L=4.71m
4 0.18 - d=0.18m 4 0.20 - d=0.20m
11.12 m2 7.54 m2

- Along Axis D and E and mirror - Along Axis G and mirror


4 7.72 - L=7.72m 2 4.81 - L=4.81m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
22.23 m2 6.93 m2
- Along Axis D and E and mirror - Along Axis 4 and mirror
4 7.42 - L=7.42m 2 9.02 - L=9.02m
4 0.20 - d=0.20m 4 0.18 - d=0.18m

23.74 m2 12.99 m2
- Along Axis D and E and mirror - Along Axis 4 and mirror
4 7.72 - L=7.72m 2 9.22 - L=9.22m
4 0.18 - d=0.18m 4 0.20 - d=0.20m
22.23 m2 14.75 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

Along Axis 4 and mirror 2 28.16 RB6


2 4.91 L=4.91m 0.30
4 0.48 d=0.48m 16.90 m2

18.85 m2 2 27.76 -
0.30 -
1,064.74 m2 (item 1-1.03b) 16.66 m2
2 27.06 -
c) InTop tie beams 0.20 -
10.82 m2
3.00 6.71 RB1 2 19.29 - RB7

0.30 0.30 -
6.04 m2 11.57 m2
3.00 6.31 - 2 18.49 -
0.30 - 0.30 -

5.68 m2 11.09 m2
3.00 5.71 - 2 18.14 -
0.20 - 0.20 -
3.43 m2 7.26 m2
4.00 9.22 - RB2 - RB8
0.30 - -
11.06 m2 2 19.04 -
2.00 8.22 - 0.30 -
0.20 - 11.42 m2
3.29 m2 2 18.44 -
### 8.04 - RB3 0.30 -
0.30 - 11.06 m2
28.94 m2 2 18.04 -
6.00 7.64 - 0.20 -
0.20 - 7.22 m2
9.17 m2 - RB9

2.00 5.41 - RB4 4 11.44 -


0.30 - 0.30 -
3.25 m2 13.73 m2
2.00 5.01 - 2 10.64 -
0.30 - 0.20 -
3.01 m2 4.26 m2

2.00 4.61 - 2 19.44 - RB10


0.20 - 0.30 -
1.84 m2 11.66 m2
2.00 9.87 - RB5 6 18.44 -
0.30 - 0.30 -
5.92 m2 33.19 m2
2.00 9.52 - 4 18.04 -

0.30 - 0.20 -
5.71 m2 14.43 m2
2.00 9.87 - 2 9.80 - RB11
0.20 - 0.30 -
3.95 m2 5.88 m2
2 9.22 -
0.30 -
5.53 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

2 9.12 d) In 150mm thick Floor slab


0.20 Along axis b/n B-C and 6'-C and mirror
3.65 m2 2 4.61 L=4.61m
RB12
4 4.61 - 4 6.02 D=6.02m
0.30 - 222.02 m2
5.53 m2 - Along axis b/n C-D and 6'-C and mirror
2 4.51 - 2 4.61 - L=4.61m
0.20 - 4 6.02 - D=6.02m
1.80 m2 222.02 m2
12 8.22 - RB13 -0.02

0.30 - 444.04 m2 (item 1-1.03d)

29.59 m2
6 7.42 - e) In stair case
0.20 -

8.90 m2 landing and mirror


- RB14 2 2.49 L=2.61m
2 5.46 - 4 3.02 w=3.02m
0.30 - 60.16 m2
3.28 m2 Flight slab and mirror
2 4.86 - 2 2.97 L=2.97m
0.30 - 4 2.59 w=2.59m
2.92 m2 61.54 m2
2 4.51 - Flight risers and mirror
0.20 - 20 1.35 L=1.35m
1.80 m2 8 0.16 d=0.16m
2 9.97 - RB15 34.56 m2
0.30 - Staire beam and mirror
5.98 m2 2 2.90 L=2.9m
2 9.42 - 4 0.72 P=0.72m
0.30 - 16.70 m2

5.65 m2 -0.01
2 8.92 - 172.96 m2 total (item 1-1.03e)

0.20 -
3.57 m2
- Top linten beam
-

16 1.20 - L=1.20m
0.80 - p=(0.20+0.30+0.30

15.36 m2

372.00 m2 (item 1-1.03c )

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-72) Title :Take off sheet
DESCRIPTION
DESCRIPTION

1.06….. Mild steel reinforcement according


1.04….. Pre-cast elements (PB1) to the size of to structural drawings. Price includes
4770x120x80mm made of 0.040m3 of concrete cutting, bending, placing in position , tying
in C-25 withe minimum cement content of wire, concrete spacers and chairs.
360kg /m3 beam. and Price including formwork
and renforcement bar.

a) Dia 6 mm plain bar


(a) Dia 6mm plain bar (2.78pcs ) #REF! kg (item 1.05a)
(b) Dia 12 mm deformed bar ( 0.44pc ) b) Dia 8 mm deformed bar
(c) Dia 14 mm deformed bar ( 0.8 pc ) #REF! kg (item 1.05b)
to be placed in position. c) Dia 10 mm deformed bar

#REF! kg (item 1.05c)


No of pricast 60 pcs and mirror d) Dia 12 mm deformed bar
4 2 #REF! kg (item 1.05d)
60 e) Dia 14 mm deformed bar

480.00 pcs (item 1-1.04) #REF! kg (item 1.05e)


f) Dia 16 mm deformed bar
1.05….. Pre-cast elements (PB2) to the size of #REF! kg (item 1.05f)
4820x120x80mm made of 0.046272m3 of
g) Dia 20 mm deformed bar
concrete in C-25 withe minimum cement
content of 360kg /m3 beam. and Price including #REF! kg (item 1.05g)
formwork and renforcement bar.
2.0 BLOCK WORK
(a) Dia 6mm plain bar (2.81pcs )
(b) Dia 12 mm deformed bar ( 0.44pc ) 2.01….. Class C, 190mm thick HCB wall
(c) Dia 14 mm deformed bar ( 0.81 pc ) with the designed compressive strength ,
bedded in cement mortar (1:3).
to be placed in position.

4 2 No of pricast 39 pcs and mirror Ground floor


39 External Waling
312.00 pcs (item 1-1.05) Along Axis 1
L=4.61m
4 4.61
1.06…… Pre-cast elements (PB3) to the size of 2.62 h=3.10-0.48=2.62m
4720x120x80mm made of 0.045312 m3 of
concrete in C-25 /beam.Price includes beam 48.31 m2
errecting, bending, placing in position,welding - Deduction of W-1 Along Axis 1
of reinforcement bar and mould. according to L=1.20m
structural detail drawing. -4 1.20 -
1.60 - w=1.60m
m2
(7.68)
- Along Axis F
1 1.21 - L=1.21m
(a) Dia. 6mm plain bar(2.78pcs) 2.62 -h=3.10-0.48=2.62m
(b) Dia. 12 mm deformed bar(.43pcs) m2
3.17
(c) Dia. 14 mm deformed bar (0.79pcs) - Along Axis 1 and cantiliver
to be placed in position. 1 9.42 - L=9.42m
h=3.10-0.48=2.62m
No of pricast 9pcs and mirror 2.62 -
4 2 24.68 m2
9 - Ddt of TW1 Along Axis 1 and cantiliver
72.00 pcs (item 1-1.05) -3 0.60 - L=0.60m
0.60 - w=0.60m
(1.08) m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Den of TW3 Along Axis 1 and cantiliver Along Axis D


-1 3.20 L=3.20m 1 1.21 L=1.21m
0.60 w=0.60m 2.62 h=3.10-0.48=2.62m
(1.92) m2 3.17 m2
- Along Axis H - Along Axis 9 and cantiliver
1 10.63 - L=10.63m 1 9.42 - L=9.42m
2.80 - h=3.10-0.30=2.80m 2.62 - h=3.10-0.48=2.62m
29.76 m2 24.68 m2
Deduction of D1 Along Axis H Deduction of TW1 Along Axis 9 and
- - cantiliver
-1 1.60 - L=1.60m -3 0.60 - L=0.60m
2.80 - h=3.10-0.30=2.80m 0.60 - w=0.60m
(4.48) m2 (1.08) m2
Deduction of W-1 Along Axis H Deduction of TW3 Along Axis 9 and
- - cantiliver
-1 1.20 - L=1.20m -1 3.20 - L=3.20m
1.60 - w=1.60m 0.60 - w=0.60m
(1.92) m2 (1.92) m2
- Along Axis 2 - Along Axis B
1 6.20 - L= 6.2m 1 10.63 - L=10.63m
2.62 - h=3.10-0.48=2.62m 2.80 - h=3.10-0.30=2.80m
16.24 m2 29.76 m2
- Deduction of W-1 Along Axis 2 - Deduction of D1 Along Axis B
-1 1.20 - L=1.20m -1 1.60 - L=1.60m
1.60 - w=1.60m 2.80 - h=3.10-0.30=2.80m
(1.92) m2 (4.48) m2
- Along Axis I - Deduction of W-1 Along Axis B
4 4.61 - L=4.61m -1 1.20 - L=1.20m
2.62 - h=3.10-0.48=2.62m 1.60 - w=1.60m
48.31 m2 (1.92) m2
- Deduction of W-1 Along Axis I - Along Axis A
-4 1.20 - L=1.20m 4 4.61 - L=4.61m
1.60 - w=1.60m 2.62 - h=3.10-0.48=2.62m
(7.68) m2 48.31 m2
- Along Axis b/n 8' and 8 - Deduction of W-1 Along Axis A
1 6.32 - L=6.32m -4 1.20 - L=1.20m
2.62 - h=3.10-0.48=2.62m 1.60 - w=1.60m
16.56 m2 (7.68) m2
- Along Axis 9 External cortyard walling
4 4.61 - L=4.61m
2.62 - h=3.10-0.48=2.62m Along Axis C
48.31 m2 1 10.94 L=10.94m
- Deduction of W-1 Along Axis 9 2.62 h=3.10-0.48=2.62m
-4 1.20 - L=1.20m 28.66 m2
1.60 - w=1.60m - Deduction of W-1 Along Axis C
(7.68) m2 -3 1.20 - L=1.20m
1.60 - w=1.60m
(5.76) m2
- Along Axis D
1 2.71 - L=2.71m
2.62 - h=3.10-0.48=2.62m
7.10 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Along Axis G
1 10.94 L=10.94m Deduction of D1 Along Axis 4
2.62 h=3.10-0.48=2.62m -1 1.60 L=1.60m
28.66 m2 2.62 h=3.10-0.48=2.62m
- Deduction of W-1 Along Axis G (4.19) m2
-3 1.20 - L=1.20m - Along Axis 2'
1.60 - w=1.60m 1.00 17.29 - L=17.29m
(5.76) m2 2.62 - h=3.10-0.48=2.62m
- Along Axis F 45.30 m2
1 2.71 - L=2.71m - Deduction of D-5 Along Axis 2'
2.62 - h=3.10-0.48=2.62m -4 0.80 - L=0.80m
7.10 m2 2.70 - w=2.70m
- Along Axis 6 (8.64) m2
1.00 2.71 - L=2.71m - Axis b/n 2 and 1
2.80 - h=3.10-0.30=2.80m 1 28.66 - L=28.66m
7.59 m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 4 80.25 m2
1.00 2.71 - L=2.71m - Deduction of D-5 Axis b/n 2 and 1
2.80 - h=3.10-0.30=2.8m -5 0.80 - L=0.80m
7.59 m2 2.70 - w=2.70m
Along axis 7 (10.80) m2
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
2.62 H=3.1-0.48=2.62M
29.92 m2
Deduction of W1 along axis 7
-3.00 1.20 L=1.20m
1.60 - w=1.60m - Along Axis B
-5.76 m2 1.00 19.04 - L=19.04m
- Internal walling 2.80 - h=3.10-0.30=2.80m
- Axis b/n 8' and 9 53.31 m2
1 28.66 - L=28.66m - Deduction of D-5 Along Axis B
2.80 - h=3.10-0.30=2.80m -4 0.80 - L=0.80m
80.25 m2 2.70 - w=2.70m
- Deduction of D-5 Axis b/n 8' and 9 (8.64) m2
-5 0.80 - L=0.80m - Along Axis B'
2.70 - w=2.70m 1.00 17.89 - L=17.89m
(10.80) m2 2.80 - h=3.10-0.30=2.80m
- Axis b/n 8' and 8 50.09 m2
1 17.29 - L=17.29m - Deduction of D-5 Along Axis B
2.80 - h=3.10-0.30=2.80m -3 0.80 - L=0.80m
48.41 m2 2.70 - w=2.70m
- Deduction of D-5 Along Axis b/n 8' and 8 (6.48) m2
-3 0.80 - L=0.80m - Along Axis C
2.70 - w=2.70m 1.00 5.61 - L=5.61m
(6.48) m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 6 15.71 m2
1.00 13.03 - L=13.03m - Along Axis D
2.80 - h=3.10-0.30=2.80m 1.00 8.51 - L=8.51m
36.48 m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 5 23.83 m2
1.00 5.61 - L=5.61m - Along Axis E
2.62 - h=3.10-0.30=2.62m 1.00 11.22 - L=11.22m
14.70 m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 4 31.42 m2
1.00 10.32 - L=10.32m
2.62 - h=3.10-0.30=2.62m
27.04 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Deduction of TW3 Along Axis 1 and
cantiliver
Along Axis F
1.00 8.51 L=8.51m -1 3.20 L=3.20m
2.80 h=3.10-0.30=2.80m 3 0.60 w=0.60m
23.83 m2 (5.76) m2
- Along Axis G - Along Axis H
1.00 7.23 - L=7.23m 1 10.63 - L=10.63m
2.80 - h=3.10-0.30=2.80m 3 2.80 - h=3.10-0.30=2.80m
20.24 m2 89.29 m2
- Along Axis G' - Deduction of D1 Along Axis H
1.00 8.97 - L=8.97m -1 1.60 - L=1.60m
2.80 - h=3.10-0.30=2.80m 3 2.80 - h=3.10-0.30=2.80m
25.12 m2 (13.44) m2
- Deduction of D-5 Along Axis G' - Deduction of W-1 Along Axis H
-1 0.80 - L=0.80m -1 1.20 - L=1.20m
2.70 - w=2.70m 3 1.60 - w=1.60m
(2.16) m2 (5.76) m2
- Along Axis H - Along Axis 2
1.00 9.22 - L=9.22m 1 3.16 - L=3.16m
2.80 - h=3.10-0.30=2.80m 3 2.62 - h=3.10-0.48=2.62m
25.82 m2 24.84 m2
- Deduction of D-5 Along Axis H - Deduction of W-1 Along Axis 2
-2 0.80 - L=0.80m -1 1.20 - L=1.20m
2.70 - w=2.70m 3 1.60 - w=1.60m
(4.32) m2 (5.76) m2
- - Along Axis I
- 1st,2nd,3rd floor Walling 4 4.61 - L=4.61m
- External Waling 3 2.62 - h=3.10-0.48=2.62m
- Along Axis 1 144.94 m2
4 4.61 - L=4.61m - Deduction of W-1 Along Axis I
3 2.62 - h=3.10-0.48=2.62m -4 1.20 - L=1.20m
144.94 m2 3 1.60 - w=1.60m
- Deduction of W-1 Along Axis 1 (23.04) m2
-4 1.20 - L=1.20m - Along Axis b/n 8' and 8
3 1.60 - w=1.60m 1 6.32 - L=6.32m
(23.04) m2 3 2.62 - h=3.10-0.48=2.62m
- Along Axis F 49.68 m2
1 1.21 - L=1.21m - Along Axis 9
3 2.62 - h=3.10-0.48=2.62m 4 4.61 - L=4.61m
9.51 m2 3 2.62 - h=3.10-0.48=2.62m
- Along Axis 1 and cantiliver 144.94 m2
1 9.42 - L=9.42m - Deduction of W-1 Along Axis 9
3 2.62 - h=3.10-0.48=2.62m -4 1.20 - L=1.20m
74.04 m2 3 1.60 - w=1.60m
Deduction of TW1 Along Axis 1 and cantiliver m2
- (23.04)
-3 0.60 - L=0.60m
3 0.60 - w=0.60m
(3.24) m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Along Axis G
Along Axis D 1 10.94 L=10.94m
1 1.21 L=1.21m 3 2.62 h=3.10-0.48=2.62m
3 2.62 h=3.10-0.48=2.62m 85.99 m2
9.51 m2 - Deduction of W-1 Along Axis G
- Along Axis 9 and cantiliver -3 1.20 - L=1.20m
1 9.42 - L=9.42m 3 1.60 - w=1.60m
3 2.62 - h=3.10-0.48=2.62m (17.28) m2
74.04 m2 - Along Axis F
Deduction of TW1 Along Axis 9 and cantiliver L=2.71m
- 1 2.71 -
-3 0.60 - L=0.60m 3 2.62 - h=3.10-0.48=2.62m
3 0.60 - w=0.60m 21.30 m2
(3.24) m2 - Along Axis 6
Deduction of TW3 Along Axis 9 and cantiliver L=2.71m
- 1.00 2.71 -
-1 3.20 - L=3.20m 3 2.62 - h=3.10-0.30=2.62m
3 0.60 - w=0.60m 21.30 m2
(5.76) m2 - Along Axis 4
- Along Axis B 1.00 2.71 - L=2.71m
1 10.63 - L=10.63m 3 2.62 - h=3.10-0.30=2.62m
3 2.80 - h=3.10-0.30=2.80m 21.30 m2
89.29 m2 along axis 7
- Deduction of D1 Along Axis B 3 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
-1 1.60 - L=1.60m 2.62 H=3.1-0.48=2.62M
3 2.80 - h=3.10-0.30=2.80m 89.76 m2
(13.44) m2 Deduction of W1 along axis 7
- Deduction of W-1 Along Axis B -3.00 1.20 L=1.20m
-1 1.20 - L=1.20m 1.60 - w=1.60m
3 1.60 - w=1.60m -5.76 m2
(5.76) m2 - Internal walling
- Along Axis A - Axis b/n 8' and 9
4 4.61 - L=4.61m 1 28.66 - L=28.66m
3 2.62 - h=3.10-0.48=2.62m 3 2.80 - h=3.10-0.30=2.80m
144.94 m2 240.74 m2
- Deduction of W-1 Along Axis A - Deduction of D-5 Axis b/n 8' and 9
-4 1.20 - L=1.20m -5 0.80 - L=0.80m
3 1.60 - w=1.60m 3 2.70 - w=2.70m
(23.04) m2 (32.40) m2
- External cortyard walling - Axis b/n 8' and 8
- 1 17.29 - L=17.29m
- Along Axis C 3 2.80 - h=3.10-0.30=2.80m
1 10.94 - L=10.94m 145.24 m2
3 2.62 - h=3.10-0.48=2.62m - Deduction of D-5 Along Axis G
85.99 m2 -4 0.80 - L=0.80m
- Deduction of W-1 Along Axis C 3 2.70 - w=2.70m
-3 1.20 - L=1.20m (25.92) m2
3 1.60 - w=1.60m - Along Axis 6
(17.28) m2 1.00 8.51 - L=8.51m
- Along Axis D 3 2.80 - h=3.10-0.30=2.80m
1 2.71 - L=2.71m 71.48 m2
3 2.62 - h=3.10-0.48=2.62m - Along Axis 5
21.30 m2 1.00 11.22 - L=11.22m
3 2.62 - h=3.10-0.30=2.62m
88.19 m2
- Along Axis 4
1.00 8.51 - L=8.51m
3 2.62 - h=3.10-0.30=2.62m
66.89 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis 2' Along Axis G


1.00 17.29 L=17.29m 1.00 7.23 L=7.23m
3 2.62 h=3.10-0.48=2.62m 3 2.80 h=3.10-0.30=2.80m
135.90 m2 60.73 m2
- Deduction of D-5 Along Axis 2' - Along Axis G'
-4 0.80 - L=0.80m 1.00 17.99 - L=17.99m
3 2.70 - w=2.70m 3 2.80 - h=3.10-0.30=2.80m
(25.92) m2 151.12 m2
- Axis b/n 2 and 1 - Deduction of D-5 Along Axis G'
1 28.66 - L=28.66m -3 0.80 - L=0.80m
3 2.80 - h=3.10-0.30=2.80m 3 2.70 - w=2.70m
240.74 m2 (19.44) m2
- Deduction of D-5 Axis b/n 2 and 1 - Along Axis H
-5 0.80 - L=0.80m 1.00 19.04 - L=19.04m
3 2.70 - w=2.70m 3 2.80 - h=3.10-0.30=2.80m
(32.40) m2 159.94 m2
- Along Axis B - Deduction of D-5 Along Axis H
1.00 19.04 - L=19.04m -4 0.80 - L=0.80m
3 2.80 - h=3.10-0.30=2.80m 3 2.70 - w=2.70m
159.94 m2 (25.92) m2
- Deduction of D-5 Along Axis B
-4 0.80 - L=0.80m 4th floor waling
3 2.70 - w=2.70m
(25.92) m2 External Waling
- Along Axis B' Along Axis 1
1.00 17.89 - L=17.89m 4 4.61 L=4.61m
3 2.80 - h=3.10-0.30=2.80m 2.70 h=3.10-0.40=2.70m
150.28 m2 49.79 m2
- Deduction of D-5 Along Axis B - Deduction of W-1 Along Axis 1
-3 0.80 - L=0.80m -4 1.20 - L=1.20m
3 2.70 - w=2.70m 1.60 - w=1.60m
(19.44) m2 (7.68) m2
- Along Axis C - Along Axis F
1.00 5.61 - L=5.61m 1 1.21 - L=1.21m
3 2.80 - h=3.10-0.30=2.80m 2.70 - h=3.10-0.40=2.70m
47.12 m2 3.27 m2
- Along Axis D - Along Axis 1 and cantiliver
1.00 8.51 - L=8.51m 1 9.42 - L=9.42m
3 2.80 - h=3.10-0.30=2.80m 2.70 - h=3.10-0.40=2.70m
71.48 m2 25.43 m2
Along Axis E Deduction of TW1 Along Axis 1 and
- - cantiliver
1.00 11.22 - L=11.22m -3 0.60 - L=0.60m
3 2.80 - h=3.10-0.30=2.80m 0.60 - w=0.60m
94.25 m2 (1.08) m2
- Along Axis F
1.00 8.51 - L=8.51m
3 2.80 - h=3.10-0.30=2.80m
71.48 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Deduction of TW3 Along Axis 1 and cantiliver
Along Axis D
-1 3.20 L=3.20m 1 1.21 L=1.21m
0.60 w=0.60m 2.70 h=3.10-0.40=2.70m
(1.92) m2 3.27 m2
- Along Axis H - Along Axis 9 and cantiliver
1 10.63 - L=10.63m 1 9.42 - L=9.42m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
28.70 m2 25.43 m2
Deduction of D1 Along Axis H Deduction of TW1 Along Axis 9 and
- - cantiliver
-1 1.60 - L=1.60m -3 0.60 - L=0.60m
2.80 - h=3.10-0.30=2.80m 0.60 - w=0.60m
(4.48) m2 (1.08) m2
Deduction of W-1 Along Axis H Deduction of TW3 Along Axis 9 and
- - cantiliver
-1 1.20 - L=1.20m -1 3.20 - L=3.20m
1.60 - w=1.60m 0.60 - w=0.60m
(1.92) m2 (1.92) m2
- Along Axis 2 - Along Axis B
1 3.16 - L=3.16m 1 10.63 - L=10.63m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
8.53 m2 28.70 m2
- Deduction of W-1 Along Axis 2 - Deduction of D1 Along Axis B
-1 1.20 - L=1.20m -1 1.60 - L=1.60m
1.60 - w=1.60m 2.70 - h=3.10-0.40=2.70m
(1.92) m2 (4.32) m2
- Along Axis I - Deduction of W-1 Along Axis B
4 4.61 - L=4.61m -1 1.20 - L=1.20m
2.70 - h=3.10-0.40=2.70m 1.60 - w=1.60m
49.79 m2 (1.92) m2
- Deduction of W-1 Along Axis I - Along Axis A
-4 1.20 - L=1.20m 4 4.61 - L=4.61m
1.60 - w=1.60m 2.70 - h=3.10-0.40=2.70m
(7.68) m2 49.79 m2
- Along Axis b/n 8' and 8 - Deduction of W-1 Along Axis A
1 6.32 - L=6.32m -4 1.20 - L=1.20m
2.70 - h=3.10-0.40=2.70m 1.60 - w=1.60m
17.06 m2 (7.68) m2
- Along Axis 9 - External cortyard walling
4 4.61 - L=4.61m -
2.70 - h=3.10-0.40=2.70m - Along Axis C
49.79 m2 1 10.94 - L=10.94m
- Deduction of W-1 Along Axis 9 2.70 - h=3.10-0.40=2.70m
-4 1.20 - L=1.20m 29.54 m2
1.60 - w=1.60m - Deduction of W-1 Along Axis C
(7.68) m2 -3 1.20 - L=1.20m
1.60 - w=1.60m
(5.76) m2
- Along Axis D
1 2.71 - L=2.71m
2.70 - h=3.10-0.40=2.70m
7.32 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Along Axis G
1 10.94 L=10.94m Along Axis 2'
2.70 h=3.10-0.40=2.70m 1.00 17.29 L=17.29m
29.54 m2 2.70 h=3.10-0.40=2.70m
- Deduction of W-1 Along Axis G 46.68 m2
-3 1.20 - L=1.20m - Deduction of D-5 Along Axis 2'
1.60 - w=1.60m -4 0.80 - L=0.80m
(5.76) m2 2.70 - w=2.70m
- Along Axis F (8.64) m2
1 2.71 - L=2.71m - Axis b/n 2 and 1
2.70 - h=3.10-0.40=2.70m 1 28.66 - L=28.66m
7.32 m2 2.70 - h=3.10-0.40=2.70m
- Along Axis 6 77.38 m2
1.00 2.71 - L=2.71m - Deduction of D-5 Axis b/n 2 and 1
2.70 - h=3.10-0.40=2.70m -5 0.80 - L=0.80m
7.32 m2 2.70 - w=2.70m
- Along Axis 4 (10.80) m2
1.00 2.71 - L=2.71m - Along Axis B
2.70 - h=3.10-0.40=2.70m 1.00 19.04 - L=19.04m
7.32 m2 2.70 - h=3.10-0.40=2.70m
along axis 7 not include 51.41 m2
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
2.70 H=3.1-0.40=2.7M -3 0.80 - Deduction of D-5 Along Axis B
30.83 m2 2.70 w=2.70m
Deduction of W1 along axis 7 (6.48) m2
-3.00 1.20 L=1.20m - Along Axis B'
1.60 - w=1.60m 1.00 17.89 - L=17.89m
-5.76 m2 2.70 - h=3.10-0.40=2.70m
- Internal walling 48.30 m2
Axis b/n 8' and 9 - Deduction of D-5 Along Axis B
1 28.66 L=28.66m -3 0.80 - L=0.80m
2.70 - h=3.10-0.40=2.70m 2.70 - w=2.70m
77.38 m2 (6.48) m2
- Deduction of D-5 Axis b/n 8' and 9 - Along Axis C
-5 0.80 - L=0.80m 1.00 5.61 - L=5.61m
2.70 - w=2.70m 2.70 - h=3.10-0.40=2.70m
(10.80) m2 15.15 m2
- Axis b/n 8' and 8 - Along Axis D
1 17.29 - L=17.29m 1.00 8.51 - L=8.51m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
46.68 m2 22.98 m2
- Deduction of D-5 Along Axis G - Along Axis E
-4 0.80 - L=0.80m 1.00 11.22 - L=11.22m
2.70 - w=2.70m 2.70 - h=3.10-0.40=2.70m
(8.64) m2 30.29 m2
- Along Axis 6 - Along Axis F
1.00 8.51 - L=8.51m 1.00 8.51 - L=8.51m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
22.98 m2 22.98 m2
- Along Axis 5
1.00 11.22 - L=11.22m
2.70 - h=3.10-0.40=2.70m
30.29 m2
- Along Axis 4
1.00 8.51 - L=8.51m
2.70 - h=3.10-0.40=2.70m
22.98 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis G 2.02...Ditto as item 2-01 but 90mm thick


1.00 7.23 L=7.23m
2.70 h=3.10-0.40=2.70m
19.52 m2 In the toilete area
- Along Axis G' Along Axis 1 and mirror
1.00 17.99 - L=17.99m 2 9.23 L=4.62+4.61=9.23m
2.70 - h=3.10-0.40=2.70m 5 2.00 h=2.80m
48.57 m2 184.60 m2
- Deduction of D-5 Along Axis G' - Deduction of D-6 Along Axis B
-3 0.80 - L=0.80m -10 0.70 - L=0.70m
2.70 - w=2.70m 5 2.00 - w=2.80m
(6.48) m2 (70.00) m2
- Along Axis H - Internal partition and mirror
1.00 19.04 - L=19.04m 16 1.41 - L=1.41m
2.70 - h=3.10-0.40=2.70m 5 1.80 - h=1.80m
51.41 m2 203.04 m2
- Deduction of D-5 Along Axis H - Around Urinals and foot wash walling
-4 0.80 - L=0.80m 2 1.78 - L=2.18m
2.70 - w=2.70m 5 2.00 - w=2.80m
(8.64) m2 35.60 m2
Deduction of D-6 Around Urinals and foot
- - wash walling
- Above top tie beam walling -2 0.90 - L=0.90m
- Along the colidor 5 2.00 - w=2.80m
- Along Axis 8' and mirror (18.00) m2
2 26.04 - L=26.04m - Around Urinals and foot wash walling
1.60 - h=1.60m 2 2.80 - L=2.80m
83.33 m2 5 2.00 - w=2.80m
- Along Axis B' and mirror 56.00 m2
2 19.88 - L=19.88m - Around Urinals and foot wash walling
1.60 - h=1.60m 2 0.89 - L=0.89m
63.62 m2 5 2.80 - w=2.80m
Along the Guble side 24.92 m2
- in the toilete internal
Along Axis 2 and mirror 12 0.80 - L=0.80m
0.5 6.42 L=3.21+3.21=6.42m 0 1.20 - w=1.20m
2 1.60 h=1.60m - m2
5.14 m2
- Along Axis B and mirror 416.16 m2 (item 2-2.02)
0.5 12.22 - L=12.22m
2 1.60 - h=1.60m
9.78 m2

4,948.95 m2 (item 2-2.01)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

3.0 ROOFING 3.05….. a) Ditto item 3.02 but dev. length.


of 700mm for flashing
3.01…… Roof cover in pre coated EGA - 400,
0.4mm thick fixed to wooden purlin.Price
includes G-28 flat sheet dev. Length 330 ridge 1 92.62 P=92.60m
cap and UV resistance washers. (Purlin
92.62 ml (item 3-3.05a)
measured separately and roof measured in
horizontal projection).

1 896.31 A=1118.08m-221.77m
896.31 m2 (item 3-3.01)

3.02…... Supply and fix G-28 galvanized flat


metal sheet gutterin accordance with the
Architectural detail drawing. Price shall include
all necessary accessories, metal bracket
suspenders, one coat of antirust paint and two
coat of synthetic enamel paint.

Development. length =720mm


Along Axis A and mirror
2 20.26 L=20.26m
40.52 ml
Along Axis 1 and mirror
2 30.04 L=30.04m
60.08 ml
Cortiyared
1 60.68 P=60.68m
60.68 ml

161.28 ml (item 3-3.02)


3.03….. Ditto item 3.02 but copping with
flashing dev. length 850mm.
Along Axis 2 and mirror
2 26.04 L=3.21+3.21=6.42m
52.08 ml
- Along Axis B and mirror
2 20.27 - L=12.22m
40.54 ml
Guble side
Along axis 2 and mirror
2 9.42 l=(3.71+0.5)*2=9.42m
18.84 ml
Along axis B and mirror 0
2 13.03 L=(0.2+5.11+1.2)*2=13.03m
26.06 ml

137.52 ml (item 3-3.03)


Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

4.0 CARPENTRY & JOINERY 4.03…… Supply, fabricate and mount wood
truss according to the structural drawing.
Price shall include two coats of anti-termite
4.01 ...... Supply and fix 8 mm thick chip wood treatment and all other necessary
ceiling on and including 40 x 50 mm structural accessories. The connection joints shall be
wood battens placed c/c 600 mm both ways approved by the responsible engineer.
suspended to steel truss lower member. Price
includes 40x40mm decorated hard wood corner
list and all other necessary accessories

4.03.1…… Eucalyptus wood upper & lower


members.Dia. 100mm.

Dormitary
28 4.61 L=4.61m
3.11 w=3.11m Truss T-1 (36 pcs)
401.44 m2 Upper coard
Toilet & Showers Room 36.00 9.84 L=3.763+6.08=9.84m
2 39.79 A=39.79m2 354.35 ml
79.58 m2 Bottem cord
- Corridor 1 36.00 9.66 L=9.66m
2 23.48 - A=23.48m2 347.76 ml
46.96 m2 Vertical cord
- Corridor 2 36.00 7.51 L=7.51m
2 17.15 - A=17.15m2 270.29 ml
34.30 m2 Diagonal member
- Corridor 3 36.00 10.75 L=10.75m
2 37.97 - A=37.97m2 386.93 ml
75.94 m2
Truss T-2 (8 pcs)
638.22 m2 (item 4.4.01) Upper coard
8.00 11.15 L=3.763+7.386=11.15m
4.02...... Supply and fix 40mm thick hollw 89.19 ml
core flush type wooden doors both side Bottem cord
covered with approved quality 4mm thick ply 8.00 10.90 L=10.90m
wood and 40x20x2mm RHS steel frame. Price
87.20 ml
includes approved quality cylindrical lock,
hinges,door stopper, three coats of varnish Vertical cord
paint and all other necessary accessories to 8.00 7.84 L=7.84m
complet the work. 62.75 ml
Diagonal member
8.00 11.70 L=11.70m
93.58 ml
D5 size 807x2035mm Truss T-2' (10 pcs)
Upper coard
156 pcs (item 4.02a) 10.00 8.66 L=1.277+7.386=8.66m
86.63 ml
D5' size 607x1735mm Bottem cord
10.00 8.49 L=8.49m
120 pcs total (item 4.02b) 84.88 ml
Vertical cord
10.00 7.03 L=7.03m
70.34 ml

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Diagonal member Vertical cord


### 9.40 L=9.40m 4.00 5.83 L=5.83m
94.02 ml 23.31 ml
- Diagonal member
Truss T-3 (4 pcs) 4.00 7.74 - L=7.74m
Upper coard 30.96 ml
4.00 6.03 L=6.03m - Truss T-4 (16 pcs)
24.11 ml - Upper coard
Bottem cord 4.00 7.55 - L=7.55m
4.00 5.91 L=5.91m 30.18 ml
23.63 ml - Bottem cord
Vertical cord 4.00 7.20 - L=7.20m
4.00 6.18 L=7.03m 28.80 ml
24.72 ml - Vertical cord
Diagonal member 4.00 5.83 - L=5.83m
4.00 7.14 L=7.14m 23.31 ml
28.54 ml - Diagonal member
4.00 7.74 - L=7.74m
Truss T-3' (4 pcs) 30.96 ml
Upper coard - Truss T-4 (16 pcs)
4.00 7.29 L=7.29m - Upper coard
29.18 ml 4.00 8.80 - L=8.80m
- Bottem cord 35.20 ml
4.00 7.15 - L=7.15m - Bottem cord
28.60 ml 4.00 8.45 - L=8.45m
- Vertical cord 33.80 ml
4.00 6.49 - L=6.49m - Vertical cord
25.94 ml 4.00 5.83 - L=5.83m
- Diagonal member 23.31 ml
4.00 8.09 - L=8.09m - Diagonal member
32.36 ml 4.00 7.74 - L=7.74m
- Truss T-4 (4 pcs) 30.96 ml
- Upper coard - Truss T-5 (8 pcs)
4.00 6.14 - L=6.14m - Upper coard
24.54 ml 8.00 5.42 - L=5.42m
- Bottem cord 43.38 ml
4.00 5.75 - L=5.75m - Bottem cord
23.00 ml 8.00 5.35 - L=5.35m
- Vertical cord 42.82 ml
4.00 5.83 - L=5.83m - Vertical cord
23.31 ml 8.00 3.81 - L=3.81m
- Diagonal member 30.45 ml
4.00 7.74 - L=7.74m - Diagonal member
30.96 ml 8.00 5.43 - L=5.43m
- Truss T-4 (16 pcs) 43.47 ml
- Upper coard - Truss T-6 (2 pcs)
4.00 6.35 - L=6.35m - Upper coard
25.40 ml 2.00 3.30 - L=3.30m
- Bottem cord 6.60 ml
4.00 6.23 - L=6.23m
24.92 ml
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Bottem cord 4.03.2…… Sawn structural wood roof


purlins50x70mm placed at c/c 1200mm.
2.00 3.20 L=3.20m
6.40 ml
- Vertical cord
2.00 2.89 - L=2.89m Axis b/n 2-6 and A-C and mirror
5.78 ml 2 10.00 No of purlin=10pcs
- Truss T-6 (2 pcs) 19.44 L=19.44m
- Upper coard 388.80 ml
2.00 2.40 - L=2.40m Axis b/n 5'-7 and B-D and mirror
4.80 ml 2 11.00 No of purlin=11pcs
- Bottem cord 9.92 L=9.92m
2.00 2.36 - L=2.36m 218.24 ml
4.72 ml Axis b/n 6'-7 and D-H and mirror
- Vertical cord 2 10.00 No of purlin=10pcs
2.00 2.89 - L=2.89m 19.54 L=19.54m
5.78 ml 390.80 ml
- Truss T-6 (2 pcs)
- Upper coard 997.84 ml (item 4-4.03.2)
2.00 1.60 - L=1.60m
3.20 ml 4.04……. Supply and fix 300x25mm
- Bottem cord structural wood fascia board price include
2.00 1.53 - L=1.53m three coats of oil paint
3.05 ml
- Vertical cord
2.00 2.89 - L=2.89m Along Axis A and mirror
5.78 ml 2 20.26 L=20.26m
- Truss T-6 (2 pcs) 40.52 ml
- Upper coard - Along Axis 1 and mirror
2.00 0.75 - L=0.75m 2 30.04 - L=30.04m
1.50 ml 60.08 ml
- Bottem cord - Cortiyared
2.00 0.68 - L=0.68m 1 60.68 - P=60.68m
1.35 ml 60.68 ml
- Vertical cord
2.00 2.89 - L=2.89m 161.28 ml (item 4-4.03.2)
5.78 ml

2,902.78 ml (item 4-4.03.1)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

5.0 METAL WORK Along the flight


16 2.88 L=3.21m
46.08 ml
Along the landing

8 5.37 L=4.70m

5.01....... Door and Windows are 42.96 ml


manufactured from 38x1.5mm LTZ profile and
partially covered with black iron sheet as per
the Engineer's approval and window door ml (item 5-5.02)
89.04
schedule. Unit price includes one coat of
antirust and two coats of synthetic enamel
paint, approved quality. 5.03.... Fabricate, assemble and fix guard
rail to balcony from 50x50x2.5mm RHS top
rail welded to 40x40x2mm RHS post fixed to
concrete slab placed c/c 840mmm,
( H=900mm) including 40x40x2mm RHS
bottom rail and 25 x 25x 2.5mm Horizontal
Doors RHS members placed c/c 140mm .Unit price
includes one coat of antirust and two coats
a) D1 =1607x2020mm
of synthetic enamel paint and all the
necessary accessories to complete the work
13 Pcs (item 5-5.01a)

Window
a) W1 =1207x1505mm

159 Pcs (item 5-5.01b)


Along the flight
Top Window 10 4.60 L=4.60m
46.00 ml (item 5-5.03)
a) TW1 =607x505mm .
30 Pcs (item 5-5.01a)
b) Tw3 =3207x606mm

10 Pcs (item 5-5.01b)

5.02...... Fabricate, assemble and fix hand and


guard rail to stair case made from
50x50x2.5mm RHS top rail welded to
40x40x2mm RHS post fixed to concrete steeps
placed c/c 840mmm,( H=900mm) including
40x40x2mm RHS bottom rail and 25 x 25x
2.5mm Horizontal RHS members placed c/c
140mm .Unit price includes one coat of antirust
and two coats of synthetic enamel paint and all
the necessary accessories to complete the work

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

6.0 PLASTERING AND POINTING Deduction of W-1 Along Axis 2


-1 1.20 L=1.20m
6.01…… Apply three coats of plastering in 1.60 w=1.60m
cement mortar (1:3) up to fine finish. Price (1.92) m2
shall include pre-cleaning and preparation of - Along Axis I
the surface.
4 4.61 - L=4.61m
2.62 - h=3.10-0.48=2.62m
48.31 m2
a) To internal wall surface. - Deduction of W-1 Along Axis I
Ground floor -4 1.20 - L=1.20m
External Waling 1.60 - w=1.60m
Along Axis 1 (7.68) m2
L=4.61m Along Axis b/n 8' and 8
4 4.61 -
h=3.10-0.48=2.62m L=6.32m
2.62 1 6.32 -
48.31 m2 2.62 - h=3.10-0.48=2.62m
- Deduction of W-1 Along Axis 1 16.56 m2
-4 1.20 - L=1.20m - Along Axis 9
1.60 - w=1.60m 4 4.61 - L=4.61m
(7.68) m2 2.62 - h=3.10-0.48=2.62m
- Along Axis F 48.31 m2
1 1.21 - L=1.21m - Deduction of W-1 Along Axis 9
2.62 - h=3.10-0.48=2.62m -4 1.20 - L=1.20m
3.17 m2 1.60 - w=1.60m
- Along Axis 1 and cantiliver (7.68) m2
1 9.42 - L=9.42m - Along Axis D
2.62 - h=3.10-0.48=2.62m 1 1.21 - L=1.21m
24.68 m2 2.62 - h=3.10-0.48=2.62m
Deduction of TW1 Along Axis 1 and cailiver m2
- 3.17
-3 0.60 - L=0.60m - Along Axis 9 and cantiliver
0.60 - w=0.60m 1 9.42 - L=9.42m
(1.08) m2 2.62 - h=3.10-0.48=2.62m
Deduction of TW3 Along Axis 1 and cantver m2
- 24.68
L=3.20m Detion of TW1 Along Axis 9 and canver
-1 3.20 - -
0.60 - w=0.60m -3 0.60 - L=0.60m
(1.92) m2 0.60 - w=0.60m
- Along Axis H (1.08) m2
L=10.63m Deion of TW3 Along Axis 9 and cantiver
1 10.63 - -
2.80 - h=3.10-0.30=2.80m -1 3.20 - L=3.20m
29.76 m2 0.60 - w=0.60m
- Deduction of D1 Along Axis H (1.92) m2
-1 1.60 - L=1.60m - Along Axis B
2.80 - h=3.10-0.30=2.80m 1 10.63 - L=10.63m
(4.48) m2 2.80 - h=3.10-0.30=2.80m
- Deduction of W-1 Along Axis H 29.76 m2
-1 1.20 - L=1.20m - Deduction of D1 Along Axis B
1.60 - w=1.60m -1 1.60 - L=1.60m
(1.92) m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 2 (4.48) m2
1 3.16 - L=3.16m
2.62 - h=3.10-0.48=2.62m
8.28 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Deduction of W-1 Along Axis B Internal walling


-1 1.20 L=1.20m
1.60 w=1.60m Axis b/n 8' and 9
(1.92) m2 1 28.66 L=28.66m
- Along Axis A 2 2.80 h=3.10-0.30=2.80m
4 4.61 - L=4.61m 160.50 m2
2.62 - h=3.10-0.48=2.62m - Deduction of D-5 Axis b/n 8' and 9
48.31 m2 -5 0.80 - L=0.80m
- Deduction of W-1 Along Axis A 2 2.70 - w=2.70m
-4 1.20 - L=1.20m (21.60) m2
1.60 - w=1.60m - Axis b/n 8' and 8
(7.68) m2 1 17.29 - L=17.29m
- External cortyard walling 2 2.80 - h=3.10-0.30=2.80m
- 96.82 m2
- Along Axis C - Deduction of D-5 Along Axis G
1 10.94 - L=10.94m -4 0.80 - L=0.80m
2.62 - h=3.10-0.48=2.62m 2 2.70 - w=2.70m
28.66 m2 (17.28) m2
- Deduction of W-1 Along Axis C - Along Axis 6
-3 1.20 - L=1.20m 1.00 10.32 - L=13.03m
1.60 - w=1.60m 2 2.80 - h=3.10-0.30=2.80m
(5.76) m2 57.79 m2
- Along Axis D - Along Axis 5
1 2.71 - L=2.71m 1.00 5.61 - L=5.61m
2.62 - h=3.10-0.48=2.62m 2 2.62 - h=3.10-0.30=2.62m
7.10 m2 29.40 m2
- Along Axis G - Along Axis 4
1 10.94 - L=10.94m 1.00 10.32 - L=10.32m
2.62 - h=3.10-0.48=2.62m 2 2.62 - h=3.10-0.30=2.62m
28.66 m2 54.08 m2
- Deduction of W-1 Along Axis G - Deduction of D1 Along Axis 4
-3 1.20 - L=1.20m -1 1.60 - L=1.60m
1.60 - w=1.60m 2 2.62 - h=3.10-0.48=2.62m
(5.76) m2 (8.38) m2
- Along Axis F - Along Axis 2'
1 2.71 - L=2.71m 1.00 17.29 - L=17.29m
2.62 - h=3.10-0.48=2.62m 2 2.62 - h=3.10-0.48=2.62m
7.10 m2 90.60 m2
- Along Axis 6 - Deduction of D-5 Along Axis 2'
1 2.71 - L=2.71m -4 0.80 - L=0.80m
2.62 - h=3.10-0.30=2.62m 2 2.70 - w=2.70m
7.10 m2 (17.28) m2
- Along Axis 4 - Axis b/n 2 and 1
1 2.71 - L=2.71m 1 28.66 - L=28.66m
2.62 - h=3.10-0.30=2.62m 2 2.80 - h=3.10-0.30=2.80m
7.10 m2 160.50 m2
- Deduction of D-5 Axis b/n 2 and 1
-5 0.80 - L=0.80m
2 2.70 - w=2.70m
(21.60) m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Deduction of D-5 Along Axis H
Along Axis B -2 0.80 L=0.80m
2 19.04 L=19.04m 2 2.70 w=2.70m
2 2.80 h=3.10-0.30=2.80m (8.64) m2
213.25 m2 along axis 7
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
- Deduction of D-5 Along Axis B 2.62 H=3.1-0.48=2.62M
-4 0.80 - L=0.80m 29.92 m2
2 2.70 - w=2.70m Deduction of W1 along axis 7
(17.28) m2 -3 1.20 L=1.20m
- Along Axis B' 1.60 0 w=1.60m
1.00 17.89 - L=17.89m -5.76 m2
2 2.80 - h=3.10-0.30=2.80m - 1st,2nd,3rd floor Walling
100.18 m2 - External Waling
- Deduction of D-5 Along Axis B - Along Axis 1
-3 0.80 - L=0.80m 4 4.61 - L=4.61m
2 2.70 - w=2.70m 3 2.62 - h=3.10-0.48=2.62m
(12.96) m2 144.94 m2
- Along Axis C - Deduction of W-1 Along Axis 1
1.00 5.61 - L=5.61m -4 1.20 - L=1.20m
2 2.80 - h=3.10-0.30=2.80m 3 1.60 - w=1.60m
31.42 m2 (23.04) m2
- Along Axis D - Along Axis F
1.00 8.51 - L=8.51m 1 1.21 - L=1.21m
2 2.80 - h=3.10-0.30=2.80m 3 2.62 - h=3.10-0.48=2.62m
47.66 m2 9.51 m2
- Along Axis E - Along Axis 1 and cantiliver
1.00 11.22 - L=11.22m 1 9.42 - L=9.42m
2 2.80 - h=3.10-0.30=2.80m 3 2.62 - h=3.10-0.48=2.62m
62.83 m2 74.04 m2
Along Axis F Deduction of TW1 Along Axis 1 and
- - cantiliver
1.00 8.51 - L=8.51m -3 0.60 - L=0.60m
2 2.80 - h=3.10-0.30=2.80m 3 0.60 - w=0.60m
47.66 m2 (3.24) m2
Along Axis G Deduction of TW3 Along Axis 1 and
- - cantiliver
1.00 7.23 - L=7.23m -1 3.20 - L=3.20m
2 2.80 - h=3.10-0.30=2.80m 3 0.60 - w=0.60m
40.49 m2 (5.76) m2
- Along Axis G' - Along Axis H
1.00 8.97 - L=8.97m 1 10.63 - L=10.63m
2 2.80 - h=3.10-0.30=2.80m 3 2.80 - h=3.10-0.30=2.80m
50.23 m2 89.29 m2
- Deduction of D-5 Along Axis G' - Deduction of D1 Along Axis H
-1 0.80 - L=0.80m -1 1.60 - L=1.60m
2 2.70 - w=2.70m 3 2.80 - h=3.10-0.30=2.80m
(4.32) m2 (13.44) m2
- Along Axis H - Deduction of W-1 Along Axis H
1.00 9.22 - L=9.22m -1 1.20 - L=1.20m
2 2.80 - h=3.10-0.30=2.80m 3 1.60 - w=1.60m
51.63 m2 (5.76) m2
- Along Axis 2
1 3.16 - L=3.16m
3 2.62 - h=3.10-0.48=2.62m
24.84 m2
- Deduction of W-1 Along Axis 2
-1 1.20 - L=1.20m
3 1.60 - w=1.60m
(5.76) m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis I Along Axis A


4 4.61 L=4.61m 4 4.61 L=4.61m
3 2.62 h=3.10-0.48=2.62m 3 2.62 h=3.10-0.48=2.62m
144.94 m2 144.94 m2
- Deduction of W-1 Along Axis I - Deduction of W-1 Along Axis A
-4 1.20 - L=1.20m -4 1.20 - L=1.20m
3 1.60 - w=1.60m 3 1.60 - w=1.60m
(23.04) m2 (23.04) m2
- Along Axis b/n 8' and 8 - External cortyard walling
1 6.32 - L=6.32m -
3 2.62 - h=3.10-0.48=2.62m - Along Axis C
49.68 m2 1 10.94 - L=10.94m
- Along Axis 9 3 2.62 - h=3.10-0.48=2.62m
4 4.61 - L=4.61m 85.99 m2
3 2.62 - h=3.10-0.48=2.62m - Deduction of W-1 Along Axis C
144.94 m2 -3 1.20 - L=1.20m
- Deduction of W-1 Along Axis 9 3 1.60 - w=1.60m
-4 1.20 - L=1.20m (17.28) m2
3 1.60 - w=1.60m - Along Axis D
(23.04) m2 1 2.71 - L=2.71m
- Along Axis D 3 2.62 - h=3.10-0.48=2.62m
1 1.21 - L=1.21m 21.30 m2
3 2.62 - h=3.10-0.48=2.62m - Along Axis G
9.51 m2 1 10.94 - L=10.94m
- Along Axis 9 and cantiliver 3 2.62 - h=3.10-0.48=2.62m
1 9.42 - L=9.42m 85.99 m2
3 2.62 - h=3.10-0.48=2.62m - Deduction of W-1 Along Axis G
74.04 m2 -3 1.20 - L=1.20m
- Deion of TW1 Along Axis 9 and caiver 3 1.60 - w=1.60m
-3 0.60 - L=0.60m (17.28) m2
3 0.60 - w=0.60m - Along Axis F
(3.24) m2 1 2.71 - L=2.71m
- Deion of TW3 Along Axis 9 and caniver 3 2.62 - h=3.10-0.48=2.62m
-1 3.20 - L=3.20m 21.30 m2
3 0.60 - w=0.60m - Along Axis 6
(5.76) m2 1.00 2.71 - L=2.71m
- Along Axis B 3 2.62 - h=3.10-0.30=2.62m
1 10.63 - L=10.63m 21.30 m2
3 2.80 - h=3.10-0.30=2.80m - Along Axis 4
89.29 m2 1.00 2.71 - L=2.71m
- Deduction of D1 Along Axis B 3 2.62 - h=3.10-0.30=2.62m
-1 1.60 - L=1.60m 21.30 m2

3 2.80 - h=3.10-0.30=2.80m - Internal walling


(13.44) m2 -
- Deduction of W-1 Along Axis B - Axis b/n 8' and 9
-1 1.20 - L=1.20m 1 28.66 - L=28.66m
3 1.60 - w=1.60m 6 2.80 - h=3.10-0.30=2.80m
(5.76) m2 481.49 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Along Axis B'
Deduction of D-5 Axis b/n 8' and 9 1.00 17.89 L=17.89m
-5 0.80 L=0.80m 6 2.80 h=3.10-0.30=2.80m
6 2.70 w=2.70m 300.55 m2
(64.80) m2 - Deduction of D-5 Along Axis B
- Axis b/n 8' and 8 -3 0.80 - L=0.80m
1 17.29 - L=17.29m 6 2.70 - w=2.70m
6 2.80 - h=3.10-0.30=2.80m (38.88) m2
290.47 m2 - Along Axis C
- Deduction of D-5 Along Axis G 1.00 5.61 - L=5.61m
-4 0.80 - L=0.80m 6 2.80 - h=3.10-0.30=2.80m
6 2.70 - w=2.70m 94.25 m2
(51.84) m2 - Along Axis D
- Along Axis 6 1.00 8.51 - L=8.51m
1.00 8.51 - L=8.51m 6 2.80 - h=3.10-0.30=2.80m
6 2.80 - h=3.10-0.30=2.80m 142.97 m2
142.97 m2 - Along Axis E
- Along Axis 5 1.00 11.22 - L=11.22m
1.00 11.22 - L=11.22m 6 2.80 - h=3.10-0.30=2.80m
6 2.62 - h=3.10-0.30=2.62m 188.50 m2
176.38 m2 - Along Axis F
- Along Axis 4 1.00 8.51 - L=8.51m
1.00 8.51 - L=8.51m 6 2.80 - h=3.10-0.30=2.80m
6 2.62 - h=3.10-0.30=2.62m 142.97 m2
133.78 m2 - Along Axis G
- Along Axis 2' 1.00 7.23 - L=7.23m
1.00 17.29 - L=17.29m 6 2.80 - h=3.10-0.30=2.80m
6 2.62 - h=3.10-0.48=2.62m 121.46 m2
271.80 m2 - Along Axis G'
- Deduction of D-5 Along Axis 2' 1.00 17.99 - L=17.99m
-4 0.80 - L=0.80m 6 2.80 - h=3.10-0.30=2.80m
6 2.70 - w=2.70m 302.23 m2
(51.84) m2 - Deduction of D-5 Along Axis G'
- Axis b/n 2 and 1 -3 0.80 - L=0.80m
2 28.66 - L=28.66m 6 2.70 - w=2.70m
6 2.80 - h=3.10-0.30=2.80m (38.88) m2
962.98 m2 - Along Axis H
- Deduction of D-5 Axis b/n 2 and 1 1.00 19.04 - L=19.04m
-5 0.80 - L=0.80m 6 2.80 - h=3.10-0.30=2.80m
6 2.70 - w=2.70m 319.87 m2
(64.80) m2 - Deduction of D-5 Along Axis H
- Along Axis B -4 0.80 - L=0.80m
1.00 19.04 - L=19.04m 6 2.70 - w=2.70m
6 2.80 - h=3.10-0.30=2.80m (51.84) m2
319.87 m2 - Axis b/n 8' and 9
- Deduction of D-5 Along Axis B 2 28.66 - L=28.66m
-4 0.80 - L=0.80m 0 2.80 - h=3.10-0.30=2.80m
6 2.70 - w=2.70m - m2
(51.84) m2 along axis 7
3 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
2.62 H=3.1-0.48=2.62M
89.76 m2
Deduction of W1 along axis 7
-3 1.20 L=1.20m
1.60 0 w=1.60m
-5.76 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

4th floor waling Deduction of W-1 Along Axis I


-4 1.20 L=1.20m
External Waling 1.60 w=1.60m
Along Axis 1 (7.68) m2
4 4.61 L=4.61m - Along Axis b/n 8' and 8
2.70 h=3.10-0.40=2.70m 1 6.32 - L=6.32m
49.79 m2 2.70 - h=3.10-0.40=2.70m
- Deduction of W-1 Along Axis 1 17.06 m2
-4 1.20 - L=1.20m - Along Axis 9
1.60 - w=1.60m 4 4.61 - L=4.61m
(7.68) m2 2.70 - h=3.10-0.40=2.70m
- Along Axis F 49.79 m2
1 1.21 - L=1.21m - Deduction of W-1 Along Axis 9
2.70 - h=3.10-0.40=2.70m -4 1.20 - L=1.20m
3.27 m2 1.60 - w=1.60m
- Along Axis 1 and cantiliver (7.68) m2
1 9.42 - L=9.42m - Along Axis D
2.70 - h=3.10-0.40=2.70m 1 1.21 - L=1.21m
25.43 m2 2.70 - h=3.10-0.40=2.70m
- Deion of TW1 Along Axis 1 and cailiver 3.27 m2
-3 0.60 - L=0.60m - Along Axis 9 and cantiliver
0.60 - w=0.60m 1 9.42 - L=9.42m
(1.08) m2 2.70 - h=3.10-0.40=2.70m
- Dtion of TW3 Along Axis 1 and caniver 25.43 m2
L=3.20m Dedion of TW1 Along Axis 9 and caliver
-1 3.20 - -
0.60 - w=0.60m -3 0.60 - L=0.60m
(1.92) m2 0.60 - w=0.60m
- Along Axis H (1.08) m2
L=10.63m Detion of TW3 Along Axis 9 and cantver
1 10.63 - -
2.70 - h=3.10-0.40=2.70m -1 3.20 - L=3.20m
28.70 m2 0.60 - w=0.60m
- Deduction of D1 Along Axis H (1.92) m2
-1 1.60 - L=1.60m -
2.80 - h=3.10-0.30=2.80m - Along Axis B
(4.48) m2 1 10.63 - L=10.63m
- Deduction of W-1 Along Axis H 2.70 - h=3.10-0.40=2.70m
-1 1.20 - L=1.20m 28.70 m2
1.60 - w=1.60m - Deduction of D1 Along Axis B
(1.92) m2 -1 1.60 - L=1.60m
- Along Axis 2 2.70 - h=3.10-0.40=2.70m
1 3.16 - L=3.16m (4.32) m2
2.70 - h=3.10-0.40=2.70m - Deduction of W-1 Along Axis B
8.53 m2 -1 1.20 - L=1.20m
- Deduction of W-1 Along Axis 2 1.60 - w=1.60m
-1 1.20 - L=1.20m (1.92) m2
1.60 - w=1.60m - Along Axis A
(1.92) m2 4 4.61 - L=4.61m
- Along Axis I 2.70 - h=3.10-0.40=2.70m
4 4.61 - L=4.61m 49.79 m2
2.70 - h=3.10-0.40=2.70m
49.79 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Deduction of W-1 Along Axis A Axis b/n 8' and 8


-4 1.20 L=1.20m 1 17.29 L=17.29m
1.60 w=1.60m 2 2.70 h=3.10-0.40=2.70m
(7.68) m2 93.37 m2
External cortyard walling - Deduction of D-5 Along Axis G
-4 0.80 - L=0.80m
Along Axis C 2 2.70 - w=2.70m
1 10.94 L=10.94m (17.28) m2
2.70 h=3.10-0.40=2.70m - Along Axis 6
29.54 m2 1.00 8.51 - L=8.51m
- Deduction of W-1 Along Axis C 2 2.70 - h=3.10-0.40=2.70m
-3 1.20 - L=1.20m 45.95 m2
1.60 - w=1.60m - Along Axis 5
(5.76) m2 1.00 11.22 - L=11.22m
- Along Axis D 2 2.70 - h=3.10-0.40=2.70m
1 2.71 - L=2.71m 60.59 m2
2.70 - h=3.10-0.40=2.70m - Along Axis 4
7.32 m2 1.00 8.51 - L=8.51m
- Along Axis G 2 2.70 - h=3.10-0.40=2.70m
1 10.94 - L=10.94m 45.95 m2
2.70 - h=3.10-0.40=2.70m - Along Axis 2'
29.54 m2 1.00 17.29 - L=17.29m
- Deduction of W-1 Along Axis G 2 2.70 - h=3.10-0.40=2.70m
-3 1.20 - L=1.20m 93.37 m2
1.60 - w=1.60m - Deduction of D-5 Along Axis 2'
(5.76) m2 -4 0.80 - L=0.80m
- Along Axis F 2 2.70 - w=2.70m
1 2.71 - L=2.71m (17.28) m2
2.70 - h=3.10-0.40=2.70m - Axis b/n 2 and 1
7.32 m2 1 28.66 - L=28.66m
- Along Axis 6 2 2.70 - h=3.10-0.40=2.70m
1.00 2.71 - L=2.71m 154.76 m2
2.70 - h=3.10-0.40=2.70m - Deduction of D-5 Axis b/n 2 and 1
7.32 m2 -5 0.80 - L=0.80m
- Along Axis 4 2 2.70 - w=2.70m
1.00 2.71 - L=2.71m (21.60) m2
2.70 - h=3.10-0.40=2.70m - Along Axis B
7.32 m2 1.00 19.04 - L=19.04m
2 2.70 - h=3.10-0.40=2.70m
Internal walling 102.82 m2
Axis b/n 8' and 9 - Deduction of D-5 Along Axis B
1 28.66 L=28.66m -4 0.80 - L=0.80m
2 2.70 h=3.10-0.40=2.70m 2 2.70 - w=2.70m
154.76 m2 (17.28) m2
- Deduction of D-5 Axis b/n 8' and 9 - Along Axis B'
-5 0.80 - L=0.80m 1.00 17.89 - L=17.89m
2 2.70 - w=2.70m 2 2.70 - h=3.10-0.40=2.70m
(21.60) m2 96.61 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Deduction of D-5 Along Axis B
-3 0.80 L=0.80m Along the Guble side
2 2.70 w=2.70m
(12.96) m2 Along Axis 2 and mirror
- Along Axis C 0.5 6.42 L=3.21+3.21=6.42m
1.00 5.61 - L=5.61m 2 1.60 h=1.60m
2 2.70 - h=3.10-0.40=2.70m 10.27 m2
30.29 m2 Along Axis B and mirror
- Along Axis D 0.5 12.22 L=12.22m
1.00 8.51 - L=8.51m 2 1.60 h=1.60m
2 2.70 - h=3.10-0.40=2.70m 19.55 m2
45.95 m2 In the toilete area
- Along Axis E Along Axis 1 and mirror
1.00 11.22 - L=11.22m 2 9.23 L=4.62+4.61=9.23m
2 2.70 - h=3.10-0.40=2.70m 5 1.00 h=1.00m
60.59 m2 92.30 m2
- Along Axis F Deduction of D-6 Along Axis B
1.00 8.51 - L=8.51m -10 0.90 L=0.90m
2 2.70 - h=3.10-0.40=2.70m 5 1.00 h=1.00m
45.95 m2 (45.00) m2
- Around Urinals and foot wash walling
- Along Axis G 2 2.18 L=2.18m
1.00 7.23 - L=7.23m 5 1.00 h=1.00m
2 2.70 - h=3.10-0.40=2.70m 21.80 m2
m2 Deduction of D-6 Around Urinals and foot
39.04 wash walling
- Along Axis G' -2 0.90 L=0.90m
1.00 17.99 - L=17.99m 5 1.00 h=1.00m
2 2.70 - h=3.10-0.40=2.70m (9.00) m2
97.15 m2 Around Urinals and foot wash walling
- Deduction of D-5 Along Axis G' 2 2.80 L=2.80m
-3 0.80 - L=0.80m 5 1.00 h=1.00m
2 2.70 - w=2.70m 28.00 m2
(12.96) m2 Around Urinals and foot wash walling
- Along Axis H 2 0.89 L=0.89m
1.00 19.04 - L=19.04m 5 1.00 h=1.00m
2 2.70 - h=3.10-0.40=2.70m 8.90 m2
102.82 m2 Around Urinals and foot wash walling
- Deduction of D-5 Along Axis H 2 2.18 L=2.18m
-4 0.80 - L=0.80m 5 2.80 h=2.80m
2 2.70 - w=2.70m 61.04 m2
m2 Deduction of D-6 Around Urinals and foot
(17.28) wash walling
along axis 7 -2 0.90 L=0.90m
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
2.70 H=3.1-0.40=2.70M 5 2.80 h=2.80m
30.83 m2 (25.20) m2
Deduction of W1 along axis 7 Around Urinals and foot wash walling
-3 1.20 L=1.20m 2 2.80 L=2.80m
1.60 w=1.60m 5 2.80 h=2.80m
-5.76 m2
78.40 m2
Above top tie beam walling Around Urinals and foot wash walling
Along the colidor 2 0.89 L=0.89m
Along Axis 8' and mirror 5 2.80 h=2.80m
2 26.04 L=26.04m 24.92 m2
0.49 h=0.49m
25.52 m2
- Along Axis 8' and mirror
2 19.88 - L=19.88m
0.49 - h=0.49m
19.48 m2
2 11.89 -
2.80 -
66.59 m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

- in the toilete internal d) To exposed column and beams


24 0.80 - L=0.80m
0 1.20 - w=1.20m Exposed Column
- m2
C-1----64 pcs
8,491.48 m2 (item 6-6.01a) 68 1.00 (0.2+0.2+0.6)=1.00m
b) To external wall surface. 5 2.52 d=2.52m
0.00 m2 (item 6-6.01b) 856.80 m2
c) To RC concrete ceiling
Exposed beams
Axis b/n D-E and 5'-7 and mirror Typical floor beam
2 4.61 L=4.61m Along Axis 1' and mirror
4 8.22 w=8.22m 2 9.82 L=9.82m
303.15 m2 4 0.48 d=0.48m
- Axis b/n E-F and 5'-7 and mirror 37.71 m2
2 4.61 - L=4.61m - Along Axis 1' and mirror
4 8.22 - w=8.22m 2 8.92 - L=8.92m
303.15 m2 4 0.33 - d=0.33m
- Axis b/n F-G and 5'-7 and mirror 23.55 m2
2 4.56 - L=4.56m - Along Axis 1 and mirror
4 8.22 - w=8.22m 2 8.92 - L=9.82m
299.87 m2 4 0.18 - d=0.18m
- Axis b/n G-H and 6'-7 and mirror 12.84 m2
2 4.71 - L=4.71m - Along Axis 1 and mirror
4 5.31 - w=5.31m 2 19.24 - L=19.24m
200.08 m2 4 0.48 - d=0.48m
- Axis b/n G-I and 6-5 and mirror 73.88 m2
2 7.90 - L=7.90m - Along Axis 1 and mirror
4 4.56 - w=4.56m 2 26.96 - L=26.96m
288.19 m2 4 0.18 - d=0.18m
- Axis b/n G-I and 4-5 and mirror 38.82 m2
2 7.90 - L=7.90m - Along Axis 2 and mirror
4 4.61 - w=4.61m 2 26.96 - L=26.96m
291.35 m2 4 0.18 - d=0.18m
- Axis b/n A-B' and 4-5 and mirror 38.82 m2
2 4.91 - L=4.91m - Along Axis 2 and mirror
4 4.51 - w=4.51m 2 26.96 - L=26.96m
177.15 m2 4 0.18 - d=0.18m
- Axis b/n A-C and 4-5 and mirror 38.82 m2
2 8.22 - L=8.22m - Along Axis H and mirror
4 4.66 - w=4.66m 2 6.82 - L=6.82m
306.44 m2 4 0.48 - d=0.48m
- In 150mm thick Floor slab 26.19 m2
- Along axis b/n B-C and 6'-C and mirror - Along Axis H and mirror
2 4.61 - L=4.61m 2 6.76 - L=6.76m
4 6.02 - D=6.02m 4 0.18 - d=0.18m
222.02 m2 9.73 m2
- Along axis b/n C-D and 6'-C and mirror
2 4.61 - L=4.61m
4 6.02 - D=6.02m
222.02 m2

2,613.42 m2

2,613.42 m2 (item 6-6.01c)


Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis H and mirror Along Axis 5 and mirror


2 12.55 L=12.55m 2 4.81 L=4.81m
4 0.18 d=0.18m 4 0.18 d=0.18m
18.07 m2 6.93 m2
- Along Axis 3 and mirror - Along Axis B and mirror
2 13.33 - L=13.33m 2 5.81 - L=5.81m
4 0.00 - d=0.00m 4 0.18 - d=0.18m
- m2 8.37 m2
- Along Axis 3 and mirror - Along Axis B and mirror
2 14.13 - L=14.13m 2 4.91 - L=4.91m
4 0.18 - d=0.18m 4 0.48 - d=0.48m
20.35 m2 18.85 m2
- Along Axis I and mirror - Along Axis B and mirror
2 15.74 - L=15.74m 2 5.81 - L=5.81m
4 0.00 - d=0.00m 4 0.18 - d=0.18m
- m2 8.37 m2
- Along Axis I and mirror - Along Axis C and mirror
2 15.44 - L=15.44m 2 5.81 - L=5.81m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
22.23 m2 8.37 m2
- Along Axis J - Along Axis C and mirror
1 15.44 - L=15.44m 2 3.21 - L=3.21m
4 0.18 - d=0.18m 4 0.48 - d=0.48m
11.12 m2 12.33 m2
- Along Axis J - Along Axis C and mirror
1 15.44 - L=15.44m 2 1.00 - L=1.00m
4 0.18 - d=0.18m 4 0.48 - d=0.48m
11.12 m2 3.84 m2
- Along Axis 4 and mirror - Along Axis C and mirror
2 9.72 - L=9.72m 2 7.72 - L=7.72m
4 0.48 - d=0.48m 4 0.18 - d=0.18m
37.32 m2 11.12 m2
- Along Axis 4 and mirror - Along Axis D and E and mirror
2 8.97 - L=8.97m 4 7.72 - L=7.72m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
12.92 m2 22.23 m2
- Along Axis A and mirror - Along Axis D and E and mirror
2 6.81 - L=6.81m 4 7.72 - L=7.72m
4 0.48 - d=0.48m 4 0.18 - d=0.18m
26.15 m2 22.23 m2
- Along Axis A and mirror - Along Axis F and mirror
2 5.81 - L=5.81m 2 7.62 - L=7.62m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
8.37 m2 10.97 m2
- Along Axis 5 and mirror - Along Axis F and mirror
2 4.51 - L=4.51m 2 6.61 - L=6.61m
4 0.18 - d=0.18m 4 0.48 - d=0.48m
6.49 m2 25.38 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis F and mirror 2 9.87 RB5


2 13.83 L=13.83m 0.30
4 0.18 d=0.18m 5.92 m2
19.92 m2 2 9.52 -
- Along Axis 5 and mirror 0.30 -
2 8.97 - L=8.97m 5.71 m2
4 0.18 - d=0.18m 2 28.16 - RB6
12.92 m2 0.30 -
- Along Axis 5 and mirror 16.90 m2
2 8.97 - L=8.97m 2 27.76 -
4 0.18 - d=0.18m 0.30 -
12.92 m2 16.66 m2
- Along Axis G and mirror 2 19.29 - RB7
2 5.51 - L=5.51m 0.30 -
4 0.18 - d=0.18m 11.57 m2
7.93 m2 2 18.49 -
- Along Axis G and mirror 0.30 -
2 4.81 - L=4.81m 11.09 m2
4 0.18 - d=0.18m - RB8
6.93 m2 -
- Along Axis 4 and mirror 2 19.04 -
2 9.02 - L=9.02m 0.30 -
4 0.18 - d=0.18m 11.42 m2
12.99 m2 2 18.44 -
- Along Axis 4 and mirror 0.30 -
2 4.91 - L=4.91m 11.06 m2
4 0.48 - d=0.48m - RB9
18.85 m2 4 11.44 -
InTop tie beams 0.30 -
13.73 m2
3 6.71 RB1 2 19.44 - RB10
0.30 0.30 -
6.04 m2 11.66 m2
3 6.31 - 6 18.44 -
0.30 - 0.30 -
5.68 m2 33.19 m2
4 9.22 - RB2 2 9.80 - RB11
0.30 - 0.30 -
11.06 m2 5.88 m2
12 8.04 - RB3 2 9.22 -
0.30 - 0.30 -
28.94 m2 5.53 m2
2 5.41 - RB4 4 4.61 - RB12
0.30 - 0.30 -
3.25 m2 5.53 m2
2 5.01 - 12 8.22 - RB13
0.30 - 0.30 -
3.01 m2 29.59 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

RB14 e) To staircase
2 5.46
0.30 landing and mirror
3.28 m2 8 2.61 L=2.61m
2 4.86 - 1 3.02 w=3.02m
0.30 - 63.06 m2
2.92 m2 - Flight slab and mirror
2 9.97 - RB15 16 2.96 - L=2.96m
0.30 - 1 1.20 - w=2.76m
5.98 m2 56.83 m2
2 9.42 - - Staire beam and mirror
0.30 - 8 2.60 - L=2.81m
5.65 m2 1 0.72 - P=0.72m
14.98 m2
1854.00 m2 32 3.20 soffit side
0.18
1854.00 m2 total 18.43 m2
153.30 m2
927.00 m2 (item 6-6.01d) 160 0.50
0.14
0.28
3.14 m2
156.44 m2 (item 6-6.01d)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

6.02...Apply pointing to exposed part above


ground level stone masonry foundation wall
recessed joint in cement sand mortar mix (1:2).

Massonary for Ramp

1 9.50 L=1.90+5.00+2.60=9.50m

0.60 d=0.60m

5.70 m2 (item 6-6.02)

6.03...Apply two coats of plastering in cement


mortar (1.3)to receive ceramic wall tile.

Toilet room
10 23.25 L=23.25m
1.50 h=1.50m
348.75 M2
Toilet room
10 6.01 L=6.01m
1.50 h=1.50m
90.15 M2
Around Foot Wash
10 1.62 L=1.62m
1.20 h=1.20m
19.44 M2
Around Hand Wash
10 3.14 L=3.14m
0.60 h=0.60m
18.84 M2

477.18 m2 (item 6-6.03)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis I
6.04..Apply two coats of plastering in cement
mortar (1.3)to receive Quartiz paint. 4 4.61 L=4.61m
2.62 h=3.10-0.48=2.62m
a) To external wall surface. 48.31 m2
- Deduction of W-1 Along Axis I
Ground floor -4 1.20 - L=1.20m
External Waling 1.60 - w=1.60m
Along Axis 1 (7.68) m2
4 4.61 L=4.61m - Along Axis b/n 8' and 8
2.62 h=3.10-0.48=2.62m 1 6.32 - L=6.32m
48.31 m2 2.62 - h=3.10-0.48=2.62m
- Deduction of W-1 Along Axis 1 16.56 m2
-4 1.20 - L=1.20m - Along Axis 9
1.60 - w=1.60m 4 4.61 - L=4.61m
(7.68) m2 2.62 - h=3.10-0.48=2.62m
- Along Axis F 48.31 m2
1 1.21 - L=1.21m - Deduction of W-1 Along Axis 9
2.62 - h=3.10-0.48=2.62m -4 1.20 - L=1.20m
3.17 m2 1.60 - w=1.60m
- Along Axis 1 and cantiliver (7.68) m2
1 9.42 - L=9.42m - Along Axis D
2.62 - h=3.10-0.48=2.62m 1 1.21 - L=1.21m
24.68 m2 2.62 - h=3.10-0.48=2.62m
- De'n of TW1 Along Axis 1 and can'ver 3.17 m2
-3 0.60 - L=0.60m - Along Axis 9 and cantiliver
0.60 - w=0.60m 1 9.42 - L=9.42m
(1.08) m2 2.62 - h=3.10-0.48=2.62m
- D'on of TW3 Along Axis 1 and can'ver 24.68 m2
L=3.20m De'n of TW1 Along Axis 9 and cantiliver
-1 3.20 - -
0.60 - w=0.60m -3 0.60 - L=0.60m
(1.92) m2 0.60 - w=0.60m
- Along Axis H (1.08) m2
L=10.63m De'n of TW3 Along Axis 9 and cantiliver
1 10.63 - -
2.80 - h=3.10-0.30=2.80m -1 3.20 - L=3.20m
29.76 m2 0.60 - w=0.60m
- Deduction of D1 Along Axis H (1.92) m2
-1 1.60 - L=1.60m - Along Axis B
2.80 - h=3.10-0.30=2.80m 1 10.63 - L=10.63m
(4.48) m2 2.80 - h=3.10-0.30=2.80m
- Deduction of W-1 Along Axis H 29.76 m2
-1 1.20 - L=1.20m - Deduction of D1 Along Axis B
1.60 - w=1.60m -1 1.60 - L=1.60m
(1.92) m2 2.80 - h=3.10-0.30=2.80m
- Along Axis 2 (4.48) m2
1 3.16 - L=3.16m - Deduction of W-1 Along Axis B
2.62 - h=3.10-0.48=2.62m -1 1.20 - L=1.20m
8.28 m2 1.60 - w=1.60m
- Deduction of W-1 Along Axis 2 (1.92) m2
-1 1.20 - L=1.20m - Along Axis A
1.60 - w=1.60m 4 4.61 - L=4.61m
(1.92) m2 2.62 - h=3.10-0.48=2.62m
48.31 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Deduction of W-1 Along Axis A Along Axis F


-4 1.20 L=1.20m 2 1.21 L=1.21m
1.60 w=1.60m 3 2.62 h=3.10-0.48=2.62m
(7.68) m2 19.02 m2
- External cortyard walling Along Axis 1 and cantiliver
- 1 9.42 L=9.42m
- Along Axis C 3 2.62 h=3.10-0.48=2.62m
2 10.94 - L=10.94m 74.04 m2
h=3.10-0.48=2.62m Deduction of TW1 Along Axis 1 and
2.62 - cantiliver
57.33 m2 -3 0.60 L=0.60m
- Deduction of W-1 Along Axis C 3 0.60 w=0.60m
-3 1.20 - L=1.20m (3.24) m2
w=1.60m Deduction of TW3 Along Axis 1 and
1.60 - cantiliver
(5.76) m2 -1 3.20 L=3.20m
- Along Axis D 3 0.60 w=0.60m
1 2.71 - L=2.71m (5.76) m2
2.62 - h=3.10-0.48=2.62m Along Axis H
7.10 m2 1 10.63 L=10.63m
- Along Axis G 3 2.80 h=3.10-0.30=2.80m
1 10.94 - L=10.94m 89.29 m2
2.62 - h=3.10-0.48=2.62m Deduction of D1 Along Axis H
28.66 m2 -1 1.60 L=1.60m
- Deduction of W-1 Along Axis G 3 2.80 h=3.10-0.30=2.80m
-3 1.20 - L=1.20m (13.44) m2
1.60 - w=1.60m Deduction of W-1 Along Axis H
(5.76) m2 -1 1.20 L=1.20m
- Along Axis F 3 1.60 w=1.60m
1 2.71 - L=2.71m (5.76) m2
2.62 - h=3.10-0.48=2.62m - Along Axis 2
7.10 m2 2 3.16 - L=3.16m
- Along Axis 6 3 2.62 - h=3.10-0.48=2.62m
1.00 2.71 - L=2.71m 49.68 m2
2.62 - h=3.10-0.30=2.62m Deduction of W-1 Along Axis 2
7.10 m2 -1 1.20 L=1.20m
- Along Axis 4 3 1.60 w=1.60m
1.00 2.71 - L=2.71m (5.76) m2
2.62 - h=3.10-0.30=2.62m Along Axis I
7.10 m2 4 4.61 L=4.61m
- Aong axis 7 3 2.62 h=3.10-0.48=2.62m
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M 144.94 m2
2.62 H=3.1-0.48=2.62M Deduction of W-1 Along Axis I
29.92 m2 -4 1.20 L=1.20m
Deduction of W1 along axis 7 3 1.60 w=1.60m
-3 1.20 L=1.20m (23.04) m2
1.60 w=1.60m Along Axis b/n 8' and 8
-5.76 m2 1 6.32 L=6.32m
- 1st,2nd,3rd floor Walling 3 2.62 h=3.10-0.48=2.62m
- External Waling 49.68 m2
- Along Axis 1
4 4.61 - L=4.61m
3 2.62 - h=3.10-0.48=2.62m
144.94 m2
- Deduction of W-1 Along Axis 1
-4 1.20 - L=1.20m
3 1.60 - w=1.60m
(23.04) m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
Deduction of W-1 Along Axis C
Along Axis 9 -3 1.20 L=1.20m
6 4.61 L=4.61m 3 1.60 w=1.60m
3 2.62 h=3.10-0.48=2.62m (17.28) m2
217.41 m2 - Along Axis D
- Deduction of W-1 Along Axis 9 2 2.71 - L=2.71m
-4 1.20 - L=1.20m 3 2.62 - h=3.10-0.48=2.62m
3 1.60 - w=1.60m 42.60 m2
(23.04) m2 - Along Axis G
- Along Axis D 2 10.94 - L=10.94m
1 1.21 - L=1.21m 3 2.62 - h=3.10-0.48=2.62m
3 2.62 - h=3.10-0.48=2.62m 171.98 m2
9.51 m2 - Deduction of W-1 Along Axis G
- Along Axis 9 and cantiliver -3 1.20 - L=1.20m
1 9.42 - L=9.42m 3 1.60 - w=1.60m
3 2.62 - h=3.10-0.48=2.62m (17.28) m2
74.04 m2 - Along Axis F
- Deduction of TW1 Along Axis 9 and cantiliver 1 2.71 - L=2.71m
-3 0.60 - L=0.60m 3 2.62 - h=3.10-0.48=2.62m
3 0.60 - w=0.60m 21.30 m2
(3.24) m2 - Along Axis 6
- Deduction of TW3 Along Axis 9 and cantiliver 1.00 2.71 - L=2.71m
-1 3.20 - L=3.20m 3 2.62 - h=3.10-0.30=2.62m
3 0.60 - w=0.60m 21.30 m2
(5.76) m2 - Along Axis 4
- Along Axis B 1.00 2.71 - L=2.71m
1 11.63 - L=11.63m 3 2.62 - h=3.10-0.30=2.62m
3 2.80 - h=3.10-0.30=2.80m 21.30 m2
97.69 m2 Along axis 7
3 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
- Deduction of D1 Along Axis B 2.62 H=3.1-0.48=2.62M
-1 1.60 - L=1.60m 89.76 m2
3 2.80 - h=3.10-0.30=2.80m Deduction of W1 along axis 7
(13.44) m2 -3 1.20 L=1.20m
- Deduction of W-1 Along Axis B 1.60 w=1.60m
-1 1.20 - L=1.20m -5.76 m2
3 1.60 - w=1.60m 4th floor waling
(5.76) m2 External cortyard walling
- Along Axis A Along Axis C
4 4.61 - L=4.61m 1 10.94 L=10.94m
3 2.62 - h=3.10-0.48=2.62m 2.70 h=3.10-0.40=2.70m
144.94 m2 29.54 m2
- Deduction of W-1 Along Axis A - Deduction of W-1 Along Axis C
-4 1.20 - L=1.20m -3 1.20 - L=1.20m
3 1.60 - w=1.60m 1.60 - w=1.60m
(23.04) m2 (5.76) m2
- External cortyard walling - Along Axis D
- 1 2.71 - L=2.71m
- Along Axis C 2.70 - h=3.10-0.40=2.70m
1 10.94 - L=10.94m 7.32 m2
h=3.10-0.48=2.62m Deduction of TW3 Along Axis 1 and
3 2.62 - - cantiliver
85.99 m2 -1 3.20 - L=3.20m
0.60 - w=0.60m
(1.92) m2
- Along Axis H
1 10.63 - L=10.63m
2.70 - h=3.10-0.40=2.70m
28.70 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Deduction of D1 Along Axis H Deduction of TW3 Along Axis 9 and


cantiliver
-1 1.60 L=1.60m -1 3.20 L=3.20m
2.80 h=3.10-0.30=2.80m 0.60 w=0.60m
(4.48) m2 (1.92) m2
- Deduction of W-1 Along Axis H - Along Axis B
-1 1.20 - L=1.20m 2 10.63 - L=10.63m
1.60 - w=1.60m 2.70 - h=3.10-0.40=2.70m
(1.92) m2 57.40 m2
- Along Axis 2 - Deduction of D1 Along Axis B
1 3.16 - L=3.16m -1 1.60 - L=1.60m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
8.53 m2 (4.32) m2
- Deduction of W-1 Along Axis 2 - Deduction of W-1 Along Axis B
-1 1.20 - L=1.20m -1 1.20 - L=1.20m
1.60 - w=1.60m 1.60 - w=1.60m
(1.92) m2 (1.92) m2
- Along Axis I - Along Axis A
4 4.61 - L=4.61m 4 4.61 - L=4.61m
2.70 - h=3.10-0.40=2.70m 2.70 - h=3.10-0.40=2.70m
49.79 m2 49.79 m2
- Deduction of W-1 Along Axis I - Deduction of W-1 Along Axis A
-4 1.20 - L=1.20m -4 1.20 - L=1.20m
1.60 - w=1.60m 1.60 - w=1.60m
(7.68) m2 (7.68) m2
- Along Axis b/n 8' and 8 - External cortyard walling
1 6.32 - L=6.32m -
2.70 - h=3.10-0.40=2.70m - Along Axis C
17.06 m2 1 10.94 - L=10.94m
- Along Axis 9 2.70 - h=3.10-0.40=2.70m
4 4.61 - L=4.61m 29.54 m2
2.70 - h=3.10-0.40=2.70m - Deduction of W-1 Along Axis C
49.79 m2 -3 1.20 - L=1.20m
- Deduction of W-1 Along Axis 9 1.60 - w=1.60m
-4 1.20 - L=1.20m (5.76) m2
1.60 - w=1.60m - Along Axis D
(7.68) m2 1 2.71 - L=2.71m
- Along Axis D 2.70 - h=3.10-0.40=2.70m
1 1.21 - L=1.21m 7.32 m2
2.70 - h=3.10-0.40=2.70m - Along Axis G
3.27 m2 2 10.94 - L=10.94m
- Along Axis 9 and cantiliver 2.70 - h=3.10-0.40=2.70m
2 9.42 - L=9.42m 59.08 m2
2.70 - h=3.10-0.40=2.70m - Deduction of W-1 Along Axis G
50.87 m2 -3 1.20 - L=1.20m
- D'on of TW1 Along Axis 9 and can'ver 1.60 - w=1.60m
-3 0.60 - L=0.60m (5.76) m2
0.60 - w=0.60m
(1.08) m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis F
1 2.71 L=2.71m
2.70 h=3.10-0.40=2.70m
7.32 m2
- Along Axis 6
1.00 2.71 - L=2.71m
2.70 - h=3.10-0.40=2.70m
7.32 m2
- Along Axis 4
1.00 2.71 - L=2.71m
2.70 - h=3.10-0.40=2.70m
7.32 m2
Along axis 7
1 11.42 L=2.2*3+1.2*2+1.21*2=11.42M
2.62 H=3.1-0.48=2.62M
29.92 m2
Deduction of W1 along axis 7
-3 1.20 L=1.20m
1.60 w=1.60m
-5.76 m2
2,217.98 m2

2,217.98 m2 (item 6-6.01b)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

b) To exposed column and beams Along Axis 3 and mirror


2 14.13 L=14.13m
Exposed Column 4 0.18 d=0.18m
20.35 m2
C-1----64 pcs - Along Axis I and mirror
68 1.00 (0.2+0.2+0.6)=1.00m 2 15.74 - L=15.74m
5 2.59 d=2.59m 4 0.00 - d=0.00m
880.60 m2 - m2
- Along Axis I and mirror
Exposed beams 2 15.44 - L=15.44m
Typical floor beam 4 0.18 - d=0.18m
Along Axis 1' and mirror 22.23 m2
2 9.82 L=9.82m - Along Axis J
4 0.48 d=0.48m 1 15.44 - L=15.44m
37.71 m2 4 0.18 - d=0.18m
- Along Axis 1' and mirror 11.12 m2
2 8.92 - L=8.92m - Along Axis J
4 0.33 - d=0.33m 1 15.44 - L=15.44m
23.55 m2 4 0.18 - d=0.18m
- Along Axis 1 and mirror 11.12 m2
2 8.92 - L=9.82m - Along Axis 4 and mirror
4 0.18 - d=0.18m 2 9.72 - L=9.72m
12.84 m2 4 0.48 - d=0.48m
- Along Axis 1 and mirror 37.32 m2
2 19.24 - L=19.24m - Along Axis 4 and mirror
4 0.48 - d=0.48m 2 8.97 - L=8.97m
73.88 m2 4 0.18 - d=0.18m
- Along Axis 1 and mirror 12.92 m2
2 26.96 - L=26.96m - Along Axis A and mirror
4 0.18 - d=0.18m 2 6.81 - L=6.81m
38.82 m2 4 0.48 - d=0.48m
- Along Axis 2 and mirror 26.15 m2
2 26.96 - L=26.96m - Along Axis A and mirror
4 0.18 - d=0.18m 2 5.81 - L=5.81m
38.82 m2 4 0.18 - d=0.18m
- Along Axis 2 and mirror 8.37 m2
2 26.96 - L=26.96m - Along Axis 5 and mirror
4 0.18 - d=0.18m 2 4.51 - L=4.51m
38.82 m2 4 0.18 - d=0.18m
- Along Axis H and mirror 6.49 m2
2 6.82 - L=6.82m - Along Axis 5 and mirror
4 0.48 - d=0.48m 2 4.81 - L=4.81m
26.19 m2 4 0.18 - d=0.18m
- Along Axis H and mirror 6.93 m2
2 6.76 - L=6.76m - Along Axis B and mirror
4 0.18 - d=0.18m 2 5.81 - L=5.81m
9.73 m2 4 0.18 - d=0.18m
- Along Axis H and mirror 8.37 m2
2 12.55 - L=12.55m - Along Axis B and mirror
4 0.18 - d=0.18m 2 4.91 - L=4.91m
18.07 m2 4 0.48 - d=0.48m
- Along Axis 3 and mirror 18.85 m2
2 13.33 - L=13.33m
4 0.00 - d=0.00m
- m2
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

Along Axis B and mirror Along Axis G and mirror


2 5.81 L=5.81m 2 5.51 L=5.51m
4 0.18 d=0.18m 4 0.18 d=0.18m
8.37 m2 7.93 m2
- Along Axis C and mirror - Along Axis G and mirror
2 5.81 - L=5.81m 2 4.81 - L=4.81m
4 0.18 - d=0.18m 4 0.18 - d=0.18m
8.37 m2 6.93 m2
- Along Axis C and mirror - Along Axis 4 and mirror
2 3.21 - L=3.21m 2 9.02 - L=9.02m
4 0.48 - d=0.48m 4 0.18 - d=0.18m
12.33 m2 12.99 m2
- Along Axis C and mirror - Along Axis 4 and mirror
2 1.00 - L=1.00m 2 4.91 - L=4.91m
4 0.48 - d=0.48m 4 0.48 - d=0.48m
3.84 m2 18.85 m2
- Along Axis C and mirror InTop tie beams
2 7.72 - L=7.72m
4 0.18 - d=0.18m 3 6.71 RB1
11.12 m2 0.30
- Along Axis D and E and mirror 6.04 m2
4 7.72 - L=7.72m 3 6.31 -
4 0.18 - d=0.18m 0.30 -
22.23 m2 5.68 m2
- Along Axis D and E and mirror 4 9.22 - RB2
4 7.72 - L=7.72m 0.30 -
4 0.18 - d=0.18m 11.06 m2
22.23 m2 12 8.04 - RB3
- Along Axis F and mirror 0.30 -
2 7.62 - L=7.62m 28.94 m2
4 0.18 - d=0.18m 2 5.41 - RB4
10.97 m2 0.30 -
- Along Axis F and mirror 3.25 m2
2 6.61 - L=6.61m 2 5.01 -
4 0.48 - d=0.48m 0.30 -
25.38 m2 3.01 m2
- Along Axis F and mirror 2 9.87 - RB5
2 13.83 - L=13.83m 0.30 -
4 0.18 - d=0.18m 5.92 m2
19.92 m2 2 9.52 -
- Along Axis 5 and mirror 0.30 -
2 8.97 - L=8.97m 5.71 m2
4 0.18 - d=0.18m 2 28.16 - RB6
12.92 m2 0.30 -
- Along Axis 5 and mirror 16.90 m2
2 8.97 - L=8.97m 2 27.76 -
4 0.18 - d=0.18m 0.30 -
12.92 m2 16.66 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

2 19.29 RB7 2 9.42


0.3 0.30 -0.01
11.57 m2 5.65 m2
2 18.49 -
0.3 - 1877.80 m2 Total area
11.09 m2
- RB8 938.90 m2 ( item 6-6.04b)
-
2 19.04 -
0.3 -
11.42 m2
2 18.44 -
0.3 -
11.06 m2
- RB9
4 11.4 -
0.30 -
13.73 m2
2 19.44 - RB10
0.30 -
11.66 m2
6 18.44 -
0.30 -
33.19 m2
2 9.80 - RB11
0.30 -
5.88 m2
2 9.22 -
0.30 -
5.53 m2
4 4.61 - RB12
0.30 -
5.53 m2
12 8.22 - RB13
0.30 -
29.59 m2
- RB14
2 5.46 -
0.30 -
3.28 m2
2 4.86 -
0.30 -
2.92 m2
-
2 9.97 - RB15
0.30 -
5.98 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

7.0 FINISHING 60 1.40 Tilet and shower room


0.80
7.01….. 48mm thick cement sand screed 67.20 M2
smoothly finished flooring in mortar mix (1:3). 8 9.42
2.82
212.52 M2
a) To receive plastic floor tile. 0 4.61 Proctor room
3.10
Dormitary 0.00 M2
28 4.61 L=4.61m 1 9.42 TV Room
4 3.11 w=3.11m 8.22
1,605.76 m2 77.43 M2
- Dormitary 156 0.80 Under doors as door sill
23 4.61 - L=4.61m 0.25
1 3.11 - w=3.11m 31.20 M2
329.75 m2 -60 0.33 Ddt for toilet WC and turkish
- Tv room -19.94
0 8.22 - L=8.22m
0 9.42 - w=9.42m 1273.54 m2 total (item 7-7.02)
- m2
- Prokter Room 7.03……. 300x300x2mm PVC thick
1 1 3.11 - L=3.11m imported type hard plastic tile flooring
1 4.61 - w=4.61m stuck down with approved type adhesive on
cement and sand screed floor finsh.
14.34 m2

1,949.85 m2 (item 7-7.01) 1,949.85 m2 total (item 7-7.03)

7.02….. Ditto as item No 8.01 but 40mm thick 7.04….. 100mm high PVC skirting stuck to
wall with approved type of adhesive.

a) To receive porcelain floor tile.


136 14.80
2012.80 ml (item 7-7.04)
Corridors first up to fourth floor
b/n 1' and 2,C and F and its mirror 7.05...... 10mm thick imported type
10 14.73 approved quality porcelain tile flooring
1.62 stuck down with approved type adhesive on
cement sand screed floor finish and joints
238.63 M2
grouted in approprate color setting coat
b/n 1' and 2', B and C and its mirror mortar. Color and pattern of tile shall be
10 4.51 approved by the Engineers.
2.03
91.55 M2
10 9.62 b/n 1, and 2', F and H and mirror 1273.54 m2 (item 7-7.05)
2.01
193.36 M2
1 3.31 b/n 2' and 3, F and G and mirror
4.66
15.42 M2
1 4.66 b/n 2' and 3, G and G' and mirror
3.21
14.96 M2
10 19.24 b/n B aand B', 2' and 8 and its mirror
1.62
311.69 M2
b/n axis 1 & 2', H & I and mirror
2.00 5.63 L=0.2+5.11+0.32=5.63m
3.5 w=3.51m
39.52

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

7.06….. 10x100mm high porcelain skirting 7.07…… Supply and fix 6 mm thick &
stuck to wall with approved type of adhesive. 150x150mm white glazed ceramic wall tiles
with cement mortar (1:2) backing with 5mm
joints to be grouted with white cement.
Ground floor
2 24.61 along axis 1' b/n B and H and mirror
49.22 Ml
4 2.02 - along axis B and H b/n 1' and 2 and mirror Toilet room
8.08 Ml 10 23.25 L=23.25m
2 14.66 - along 2' b/n B' and F and mirror 1.50 h=1.50m
29.32 Ml 348.75 M2
2 15.81 - along axis B & B' b/n 2' & 8' Toilet room
31.62 Ml 10 6.01 L=6.01m
2 9.22 - along axis G & H b/n 2' & 4, 6 & 8' 1.50 h=1.50m
18.44 Ml 90.15 M2
- Toilet and showernroom Around Foot Wash
0 1.50 - along partion wall 10 1.62 L=1.62m
- Ml 1.20 h=1.20m
32 0.20 - along axis 1 and mirror 19.44 M2
6.40 Ml Around Hand Wash
2 14.91 - along axis 1' b/n F and H and mirror 10 3.14 L=3.14m
29.82 Ml 0.60 h=0.60m
2 2.10 - alonf axis 1" and mirror 18.84 M2
4.20 Ml
2 9.12 - TV Room along axis G and I
18.24 Ml
1 14.82 - along axis 4 and 6 b/n G and I 477.18 M2 (item 7.07)
14.82 Ml
- First- fourth floor 7.08…… 260x30mm Terrazzo window sill
cut to appropriate size, weathered and
8 24.61 - along axis 1' b/n B and H and mirror
mounted on and including 30mm thick
196.88 Ml cement mortar (1:3) bedding. Price includes
16 2.02 - along axis B and H b/n 1' and 2 and mirror making water drip and edge chamfering as
32.32 Ml shown on the Architectural detail drawing.
8 14.66 - along 2' b/n B' and F and mirror
117.28 Ml
16 15.81 - along axis B & B' b/n 2' & 8' and mirror
252.96 Ml 159 1.25 1.25m long
- Toilet and showernroom 198.75 Ml
0 1.50 - along partion wall 10 3.25 - 3.25m long
- Ml 32.50 Ml
128 0.20 - along axis 1 and mirror 30 0.65 - 0.65m long
25.60 Ml 19.50 Ml
8 14.91 - along axis 1' b/n F and H and mirror
119.28 Ml 250.75 ml (item 7-7.08)
8 2.10 - alonf axis 1" and mirror
16.80 Ml
8 2.10 - alonf axis 1" and mirror
16.80 Ml

988.08 ml (item 7-7.06)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION
7.11….. 100mm thick precast concrete
pavement in concrete class C-15 around the
7.09….. Granite tile flooring to stair case building open jointed on and including
bedded on and including cement sand mortar 400mm selected material compacted fill and
mix 1:3 and joints grouted in appropriate color 100mm thick redash or equivalent bedding
filler setting coat mortar. Pattern and color of material.
8 2.81 30mm thick landing
1.20
26.98 M2 total
along axis A and mirror
Tread size 350x30 2 21.64
160 1.25 1.20
200.00 Ml TOTAL 51.94 m2
3 3.51 along axis 2 and the 2 mirrors
Riser size 120*20mm 1.20
160 1.25 12.64 m2
200.00 Ml Total 2 10.62 along axis B b/n 1 & 2, 8' & 9 and mirror
1.20
25.49 m2
20*100mm skirting 2 33.77 along axis 1 b/n B & I and mirror
16 0.80 arround columns 1.20
12.80 Ml 81.05 m2
2 16.77 along axis C and mirror
7.10... Supply and fix 30 x 30 x 3 mm angle iron 1.20
corner protection up to a height of 1500mm 40.25 m2
from floor finish level, flushed to walls. 2 16.84 along axis 3 and mirror
1.20
40.42 m2
2 3.11 along axis D b/n 8' and 7 and mirror
125 125.00 Pcs (item7.10) 1.20
7.46 m2

259.25 M2 (item 7.11)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

8. GLAZING 9.0 PAINTING


8.01….. 4mm thick clear glass glazed to 9.0..Apply three coats of approved quality
metal beads and approved quality putty. plastic paint.Price shall include pre-cleaning
and preparation of surfaces.
9.01….. To internal plastered wall surface.
159 1.60 W1
1.20 8,491.48 m2 (item 9.0-9.01)
305.28 m2 9.02….. To external plastered wall surface.

0.00 m2 (item 9.0-9.02)


9.03…. To exposed beam and column
30 0.60 - TW1
0.60 -
10.80 m2 927.00 m2 (item 9.0-9.03)
20 3.20 - TW3 9.04….. To RC ceiling and stair case
0.60 - 2613.42 m2 (item 9.0-9.04)
38.40 m2
156 0.76 - D5 9.05….. To chip wood ceiling.
0.56 - 638.22 m2 (item 9.0-9.05)
66.39 m2
D1 9.06…… Apply three coats of approved
13 1.60 quality oil paint above ceramic wall.Price
2.80 shall include pre-cleaning and preparation of
58.24 m2 surfaces.
In the toilete area
Along Axis 1 and mirror
479.11 M2 (item 8.01) 2 9.23 L=4.62+4.61=9.23m
5 0.80 h=2.80m-2m =0.8 m
73.84 m2
- Internal partition and mirror
16 1.41 - L=1.41m
5 0.80 - h=1.80m
90.24 m2
- Around Urinals and foot wash walling
2 1.78 - L=2.18m
5 0.80 - w=2.80m
14.24 m2
- Around Urinals and foot wash walling
2 1.78 - L=2.18m
5 0.80 - w=2.80m
14.24 m2
- Around Urinals and foot wash walling
2 0.89 - L=0.89m
5 0.80 - w=2.80m
7.12 m2

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

10.0 SANITARY INSTALLATION


Around Urinals and foot wash walling
2 2.80 L=2.80m
5 2.00 w=2.80m 10.1 SANITARY EQUIPMENT (FIXTURES)
56.00 m2
Around Urinals and foot wash walling a) All fixtures specified below are subject to the
2 0.89 L=0.89m owner's or consultants approval based on
w=2.80m samples,catalogues and brochures presented by
5 2.80 the contractor.
24.92 m2

280.60 m2 (item 9-9.06) b) Method of installation shall follow the


recommendations of EBCS-9

9.07...Apply approved quality of quartiz paint c) All fixtures must bear at least CE or equivalent
to external surface .price shall include pre- material quality ceritification.
cleaning and preparation of the surfaces with
praimary coat.
11.11..... Supply and fix Turkish type water
closets made of white vitreous china ceramics
a) To external wall complete with SS-304 stainless steel cistern (9-
12 liters capacity), heavey duty float valve
conection, diameter 110mm P- smell trap,
2217.98 m2 factory made steel down pipe & heavey duty
flexible pipe connction. Price shall include all the
b) To exposed beam and column necessary accessories and shall full fill the
requirments given on EBCS-9.
927.00 m2

60.00 pcs

11.1.2….. Supply and fix toilet paper holder


made of white vitreous china ceramics complete
with all the necessary fixing accessories.

60.00 pcs

11.1.3….. Supply and fix mirrors made from


stainless steel flat plates including chrome
plated brass mirror clips with chrome plated
screws etc. Price shall also include all the
necessary fixing accessories and assistance civil
works

Size: 1000x500mm
20.00 pcs

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

11.1.4……...Supply and fix floor drains made of 11.1.7.......... Construct and install Hand
stainless steel of approved quality, complete with Washing Trough made of reinforced concrete
separate P-smell trap connected to the floor drain with water saving self closing brass pillar tap (8-
and all the necessary fittings and accessories. 10 seconds opening time), P-smell bottle traps,
klinker tile cover suitable for wet floor & wall on
all internal & external surfaces of the trough.
Price shall include all the necessary acceseries &
Size:- Dia. 110 mm all required civil construction of concrete works
as shown on the detail drawing. The
40.00 pcs manufacturer / supplier of the tap shall ensure a
minimum of 5 years guarantee for the taps to
the client.
11.1.5........ Supply and fix recessed wall mounted
fire hose with cabinet complete with dia.40mm and
36 meters long canvas hose, three way (spray, jet &
nozzle), angle valve with built in pressure reducer
and with all other other necessary accessories.
Cabinet shall be factory made 1.2mm thick steel Size : 1760x620 mm
sheet, painted with electrostatic powder coating 0.00 pcs
and easily openable wired glass door with cabinet Size : 2720x620 mm
size 900 x 600x170mm. Price shall include 6kg ABC 10.00 pcs
dry powder fire extinguisher inside the cabinet.
11.1.4........ Supply and fix wall mount Urinals
made of white vitreous china complete with
heavy duty flushing valve, P-smell trap, flexible
hose, strainer, supporting elements & all other
necessary accessories which complete the set.

10.00 pcs 20.00 pcs

11.1.6.......... Construct and install Foot Washing 11.1.9..Construction wet shower unit made of
Trough made of reinforced concrete with water non-slippery approved quality pool type Klinker
saving self closing brass pillar tap (8-10 seconds tile suitable for wet floor with 4% slope towards
opening time), P-smell bottle traps, klinker tile shower floor drain and consisting of:-
cover suitable for wet floor & wall on all internal &
external surfaces of the trough. Price shall include
all the necessary acceseries & all required civil
construction of concrete works as shown on the 60.00 pcs

Internal size: 1400 x 450 mm

10.00 pcs

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

11.2 WATER SUPPLY PIPES, VALVES AND 11.2.4….. Supply, fix, and approved quality
ACCESSARIES bronze gate valves at internal branch water
pipes and pipe inlet to building.

Water supply pipes shall be PPR pipes and be


fixed to walls, beams, etc.Unit price shall
include all assistance civil works and necessary Dia .25 mm
fittings such as T, bends, Y, reducers. All the
10.00 pcs
necessary valves shall be fixed properly as per
the manufacturer's instruction. Dia .32 mm
10.00 pcs
Dia .40 mm
12.00 pcs
11.2.1….. Supply and install PPR pipe (PN20) Dia .50 mm
to internal water distribution system as shown 2.00 pcs
on the drawing, complete with the necessary Dia .65 mm
accessaries.
2.00 pcs

Dia. 20 mm
11.3 WASTE, VENT AND STORM WATER
85.00 ml PIPES AND ACCESSORIES
Dia. 25 mm All domestic waste, vent and storm water
pipe lines shall be uPVC pipes (PN6) and
75.00 ml
shall be provided with a minimum slope of
Dia. 32 mm 2% towards the outlet. All uPVC pipes and
40.00 ml necessary fittings shall be standard quality
Dia. 40 mm as specified in the technical specification and
30.00 ml be free from damage during storage,
Dia. 50 mm constraction and etc. Unit price shall include
all the necessary assistance civil works, such
40.00 ml
as chiseling, fixing or hanging to walls,
beams or slabs etc..neccessary fittings such
11.2.2….. Ditto item no. 2.1 above, but as bends, Y, T, etc. Storm water uPVC pipes
galvanized steel pipes for fire water supply shall resist the external temprature and the
system. quality shall meet the purpose.
Dia. 40mm
12.00 ml
Dia. 50mm
20.00 ml 11.3.1….. Supply and lay internal uPVC
( PN6) waste and vent pipes according to
Dia. 65mm
where shown on the drawings. Complete
20.00 ml with all the necessary fittings.

11.2.3….. Supply and fix chrome service valves


of approved standard before hand wash basins, Dia. 50 mm
water closets and other fixtures. Complete 30.00 ml (item 11-11.3-11.3.1)
with unions, elastic water proofing, hand
Dia. 80 mm
wheels of normal quality and with all other
necessary accessories. 85.00 ml (item 11-11.3-11.3.1)
Dia. 110 mm
179.00 ml (item 11-11.3-11.3.1)
Dia. 150 mm
Dia. 20 mm 73.00 ml (item 11-11.3-11.3.1)
220.00 pcs

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

11.3.1Ditto as above but for storm water 11.4 Water proofing


drainage out of the court yard including sand
bedding & all required civil works. Apply crystaline or compatable similar water
proofing material for upper floor wet areas
Diameter 200mm (toilet rooms)to a height of 30cm on walls
and columns as per the manufacturer's
25 ml (item 11-11.3-11.3.1)
instruction .The cost shall include cleaning
of all dirts, trace of grease, oil and loose
11.3.2….. Supply and install vent caps made particles and sealing of pipe penetrations
of rigid uPVC to be connected to the roof with appropriate material as per the
terminal of vent pipe as shown on the riser manifucturer's instruction. The work shall be
diagram,complete with all the necessary done on subcontractual bases with the
sealing gaskets and accessories. Dia. 110 supplier of the material which will give
mm material & construction gurantee to the
350.00 m2 (item 11-11.4)

8.00 pcs (item 11-11.3.2) 11.5 Storm Water Drainage

11.3.3…… Supply and fix approved quality 11.5.1…… Construct pre cast concrete
clean outs as where shown on the drawing. storm water drainage ditch as shown on the
Price shall include all the necessary connecting drawing. Price shall also include excavtion,
pieces. cart away, sand bedding and all assistsnce
civil works as per the drawing. Size = 1/2
400mm
Dia. 80 mm
20 pcs (item 11-11.3.3)
Dia. 110 mm 2 21.64 along axis A and mirror
10 pcs (item 11-11.3.3) 43.28 ml
Dia. 150 mm
10 pcs (item 11-11.3.3) 3 3.51 along axis 2 and the 3 mirrors
10.53 ml
11.3.4....... Supply and fix uPVC Downpipes
with mass concrete support at ground level and 1 13.02 along axis B b/n 1 & 2, 8' & 9 and mirror
complete with strainer at inlet, galvanized clips 13.02 ml
at every elbows,joints and at every 1m interval
& all the necessary accessories.Unit price shall
include all the necessary assistances to the 2 30.46 along axis 1 b/n B & H and mirror
installation works. 60.92 ml

2 16.77 along axis C and mirror


Dia. 80mm 33.54 ml
115.00 ml (item 11-11.3-11.3.4) 2 16.84 along axis 3 and mirror
33.68 ml
Dia. 110mm
2 3.11 along axis D b/n 8' and 7 and mirror
230.00 ml (item 11-11.3-11.3.4) 6.22 ml

201.19 ml (item 11-11.5-11.5.1)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

11.5.2…… Ditto as above but with metal grill 3….Feeder Cables


cover as per the drawing. PVC sheathed PVC insulated cable
NYY0.6/1KV and of:-

2 6.83 along axis A b/n 8 and 9' and mirror 3.1…..5x6mm² from MDB-D upto SDB-
13.66 Ml DTL(first floor)
2 4 along axis 9' b/n A and B and mirror 5m
7.62 3.2…..5x6mm² from MDB-D upto SDB-
21.28 Ml (item 11-11.5-11.5.2) DTL(second floor)
8m
11.5.3……. Construct catch pit with sand trap 3.3…..5x6mm² from MDB-D upto SDB-DTL(third
on storm drainage ditch made from reinforced floor)
concrete as shown on the drawing. Price shall
include excavtion, backfill, cart away and all 11 m
assistsnce civil works Diameter 600mm, Total 3.4…...5x6mm² from MDB-D upto SDB-
depth including trap 1000mm DTL(fourth floor)
14 m
3.5…..5x6mm² from SMDB-D upto SDB-DTR(first
floor)

5m
1.00 pcs (item 11-11.5-11.5.3) 3.6…..5x6mm² from SMDB-D upto SDB-
DTR(second floor)
11. ELECTRICAL INSTALLATION 8m
3.7…..5x6mm² from SMDB-D upto SDB-
Supply and Install ; DTR(third floor)

1....Low voltage system earthing 11 m


1.1….Low voltage system earthing consisting of 3.8…...5x6mm² from SMDB-D upto SDB-
1x35mm² bare copper conductor inside rigid DTR(fourth floor)
PVC conduit of 36mm diameter and bonded to 14 m
lightning earth termination ring including all
3.9…….3X35/16+1X16mm² from MDB-D upto
connecting accessories.
SMDB-D
55 m

8m (item 11-11.1-11.1.1)

1.2….Earthing rod of 16x1500mm inside


manhole of 600x600x700mm (measured
elsewhere)

1 pcs (item 11-11.1-11.1.2)

2….MANHOLE
2.1…..Manhole in brick or masonry, internally
of 600x600x700mm including reinforced
concrete cover with lifting lug.

4 pcs (item 11-11.2-11.2.1)

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

4…...Conduits and Pipes 6…...Light Points


4.1…..PVC pipe of 32mm diameter
6.1...Flush mounted light points fed through
PVC insulated conductors of 3x2.5 mm²
inside PVC conduits of 16 mm diameter,
70 m including junction boxes with covers
insulating screw cap connectors.
4.2…….PVC pipe of 110mm diameter 430 pcs
50 m

5…..Distribution Boards 7….Extra Over Light Points For : -


5.1…….Floor standing distribution board MDB- (Type Legrand Suno or Equivalent)
D, in sheet steel enclosure with lockable door 7.1..Flush mounting single switch, 7740 01 +
and with phase, neutral, and earth bus-bars of 7740 41
200A rating and consisting of:-
3 pcs
7.2..Flush mounting two gang single switch,
7740 05 + 7740 41

157 pcs
1 pc main MCCB of 160A/3P,25kA 7.3...Flush mounting two-way switch, 7740
06 + 7740 41

1 pc MCCB of 100A/3P,16kA 27 pcs


4 pcs MCB of 25A/3P,10kA 7.4...Flush mounting intermediate switch,
7740 07 + 7740 41
8 pcs MCB of 16A/1P,6kA 25 pcs
5 pcs MCB of 10A/1P,3kA
25% reserve pitches 8…..Socket Outlet Points
8.1..10-16A/1P socket outlet points fed
1 pcs through PVC insulated conductors of
3x2.5mm² inside PVC conduits of 16mm
5.2…...Surface mounting distribution board diameter including junction boxes with
SMDB-D, in sheet steel enclosure with lockable covers, and insulating screw cap connectors
door and with phase, neutral, and earth bus- all for flush mounting.
276 pcs
bars of 125A rating and consisting of:-
9…… Socket Outlets
(Type Legrand Suno or Equivalent)
9.1….. Flush mounting socket outlet of 10-
1 pc main MCCB of 100A/3P,16kA 16A/1P, 7740 20 + 77 40 41.
4 pcs MCB of 25A/3P,10kA 139 pcs (item 11-9-9.1)
6 pcs MCB of 16A/1P,6kA
5 pcs MCB of 10A/1P,3kA 9.2….. Flush mounting socket outlet of 10-
25% reserve pitches 16A/1P twin, 7740 25+ 77 40 42.
1 pcs 137 pcs (item 11-9-9.2)
5.3…..Flush mounting distribution board SDB-
DTL & DTR in sheet steel enclosure with 10….. Light Fittings and Lamps
lockable door and with phase, neutral, and (Specified Type or Equivalent)
earth bus-bars of 63A rating and consisting of:-
10.1…….. Fluorescent fitting type MODUS
TU 136K + 1XT8 36W/840 lamp.
430.00 pcs (item 11-10)
1 pc mainMCB of 25A/3P
8 pcs MCB of 16A/1P
4 pcs MCB of 10A/1P
25% reserve pitches

8 pcs
Submitted by Contractor: Checked by: Approved by:
Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
Project: - Mekdela Amba (Mekene Selam) Universty MISGANAW ALEM engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: -
Consultant: - MISGANAW ALEM engineering
Type of work: - DORMITORY COURTYARD TYPE 1(DO-CYT-T1-072) Title :Take off sheet
DESCRIPTION DESCRIPTION

11….. Lightning Arrester System

11.1…… Air termination circular Galvanized


steel rod of 16mm diametr and up to 1.0m
length mounted on the air termination
network.

4 pcs

11.2…… 1x50mm sq. circular bare galvanized


steel wire for roof conductor which is
mounted on the roof in the form of a mesh.

250 m

10.3…… 1x50mm sq. circular bare galvanized


steel wire down conductor from roof bond to
test junction box.

80 m

10.4….. Testing junction boxes at 1.5m above


ground level made of galvanized steel.

8 pcs

10.5…… Circular bare galvanized steel


conductor of 10mm diameter from testing
junction box to earth rod.

30 m

10.6…… 1500mm long and 100x50x3mm X-


head galvanized steel earth rod including all
connecting accessories.

4 pcs

10.7…… Bonding materials for down


conductor with galvanized steel air termination
netwok.

1 pcs

10.8…… 30x3.5mm galvanized steel ring


earth termination network 43micrometer zinc
coating around the building at least one meter
away from the wall of the building and 1.0m
150 m

Submitted by Contractor: Checked by: Approved by:


Proj/Site Engineer: ________ Assistant Resident Engineer:___________ Client Proj. Eng.:_________
Signature:_______________ Resident Engineer:____________ Signature:__________
Date : __________ Date : _______________ Date : _________
አሰሪ መ/ቤት :መቅደላ አምባ ዩኒቨርሲቲ
አማካሪ ድርጅት፡ መንገድና ህንጻ ዲዛይንና ግንባታ ቁጥጥር ስራዎች የተከፈለ መሀል ክፍያ ቁጥር 01ን አስመልክቶ የተዘጋጀ ሪፖርት
የግንባታ አይነት፡የተማሪዎች መኖሪያ ህንጻ እና የዉስጥ ቀለም እድሳት
ስራ ተቋራጭ፡ ካሳሁን ዘሪሁን ህ/ስ/ተቋራጭ

የመሀል ክፍያ ቁጥር 01ን አስመልክቶ በተደረገዉ ማጣራት መሰረት በተማሪዎች መኖሪያ ላይ የተገኘው ልዩነት እንደሚከተለዉ ይሆናል፡፡
ሀ) መግቢያ
በመሀል ክፍያ ላይ ያሉ ችግሮችን ለይቶ ማስተካከያ ለማድርግ ሳይት ላይ ያሉ የስራ ተቋራጭ ድርጅቱ ባለሙያዎች፣ የአማካሪ ድርጅት መሀንዲስ እንዲሁም ፕሮጀክት ጽ/ቤታችን በጋራ በመሆን፣
* የpit ቁፋሮ ዳታ እና የግንብ ስራ ለማረጋገጥ 3/ሶስት ቦታዎች ላይ ናሙና አስቆፍረናል፡፡
* አጠቃላይ በሚደረገዉ የቁፋሮ ናሙና አወሳሰድና አለካክ ሂደት ላይ ተግባብተን ልኬት ወስደናል፡፡ ለዚህም ቃለ ጉባኤ አድርገናል፡፡
* በተቆፈረው ናሙና ልኬት እና ባገኘነዉ መረጃ መሰረት የግንብ ስራ ቁፋሮ እንዲቀነስ ተደርጓል፡፡
* Takeoff ሲዘጋጅ የነበሩ ስህተቶችን ለማረምና ክፍያዉን ለማጥራት በጋራ በመናበብ ማስተካከያ ተደርጓል፡፡

ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. የተከፈለ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
A. SUBSTRUCTURE WORKS
1.0 EXCAVATION & EARTH WORK
1.01 Clear and remove top soil to an average M2 23.13
depth of 200mm. 1,328.37 30,719.17 1,328.37 30,719.17 - -
1.02 Bulk excavation in ordinary soil to M3 128.48
reduce level to depth not exceeding
1500mm .
542.63 69,714.43 542.63 69,714.43 - -
1.07 Ditto as item 1.02 but in Hard rock M3 1,367.89 456.28 624,142.17 456.28 624,142.17 - -
-
1.08 Pit excavation in ordinary soil to a M3
depth not exceeding 1500mm from 136.03
reduce ground level.
-
1.12 Ditto as item No 1.09 but in Hard rock M3
1,683.64 501.47
844,298.69 501.47 844,298.69 - -
1.13 Trench excavation in ordinary soil to a M3
depth of 1500mm from reduced ground 144.53 -12.03% በክፍያ ላይ ሳይካተት በመቅረቱ
level.
- 77.03 11,132.96 (77.03) (11,132.96)
1.14 Fill around foundation and building in M3
non expansive selected material from
quarry waste well rolled and Trench excavation ሲግባ
compacted in layers not exceeding 200 498.18 654.83 -86.48% የሚመጣ ልዩነት
mm thick.
326,223.52 815.47 406,250.26 (160.64) (80,026.74)
1.15 Fill around foundation and building in M3
non expansive selected material from
site well rolled and compacted in layers አርቲሜቲክ ስህተት (columns &
not exceeding 200 mm thick. 253.47 425.47 8.10% footing pads deduction ላይ)

107,845.06 395.89 100,345.81 29.59 7,499.25


1.16 Fill under hard core with imported M3
selected material from quarry waste GFS-Stair Size 4.46m x 3m x
well rolled and compacted in layers not 498.18 128.88 -2.75% 0.20m ያለተካተተ ስለነበርና እንዲካተት
exceeding 200 mm thick. በመደረጉ
64,204.58 133.98 66,746.41 (5.10) (2,541.83)
1.17 Load and cart away surplus excavated M3
material to an appropriate tip. ከተ.ቁ 1.13 አእስከ ተ.ቁ 1.16 ያሉ
144.54 1,802.26 -12.03% የስራ ክፍሎች ሲቀየሩ የሚመጣ ልዉጥ
260,498.64 1,879.28 271,631.39 (77.02) (11,132.75)
1.18 250mm thick basaltic stone hardcore M2 GFS-Stair Size 4.46m x 3m x
well rolled, consolidated and blinded 304.80 644.39 -9.18% 0.20m ያለተካተተ ስለነበርና እንዲካተት
with crushed stone . በመደረጉ
196,413.27 672.26 204,906.81 (27.87) (8,493.54)
ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. የተከፈለ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
TOTAL CARRIED TO
SUMMARY ....................................... 2,524,059.54 2,629,888.11 (105,828.57)
ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. የተከፈለ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ

ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. በፊት ለበጀት የተያዘ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
2.0 CONCRETE WORK - -
2.01 50 mm lean concrete quality C-5, with
minimum cement content of 150 kg
/m3, of concrete:
- -
a) Under Footings M2 224.65
-5.42% የሊን ኮንክሪት ስፋት ላይ 5ሳንቲ ሜትር ስፋት
180.96 40,652.11 203.30 45,670.73 (22.34) (5,018.62) በመካተቱ
b) Under Ground Slab and Grade Beam M2 224.65
-17.97% የሊን ኮንክሪት ስፋት ላይ በአንድ በኩል 5ሳንቲ
ሜትር ስፋት በመካተቱ(በሁለቱም ብኩል =10
774.98 174,097.52 849.02 190,729.40 (74.04) (16,631.88) ሳንቲ ሜትር)
c) Under Masonry Foundation Wall M 2
224.65
5.00% የሊን ኮንክሪት ስፋት ላይ በሁለቱም በኩል 5ሳንቲ
ሜትር ስፋት በመካተቱ እና የክፊሉ ግ ንብ ስፋት
121.44 27,281.13 100.84 22,652.50 20.60 4,628.63 1ሜትር ተድርጎ በመወሰዱ
2.02 Reinforced concrete quality C-25,360
kg of cement/m3 -
a) In Footings M3 8,090.24 90.79 734,529.44 90.79 734,529.44 0.00 0.00
- - - -
b) In Foundation Columns M3 8,090.24 14.79 119,679.72 14.79 119,679.72 - -
- - - -
c) In Grade Beams M3 8,090.24 GFS-Stair Size 4.46m x 3m x
-8.66% 0.20m ያልተካተተ ስለነበርና እንዲካተት
69.38 561,260.68 70.36 569,270.02 (0.99) (8,009.34) በመደረጉ
d) In 100 mm thick Ground Floor Slab M2 809.02
Under stair case ቀድሞ ያልተካተተ
-23.39% ስለነበርና እንዲካተት በመደረጉ
643.93 520,952.49 670.69 542,601.99 (26.76) (21,649.50)
2.03 Provide, cut and fix in position sawn
structural wood or steel formwork
which ever is appropriate.
-
a) To Footing M2 669.87 213.28 142,870.11 213.28 142,870.11 - -
b) To Foundation Column M2 669.87 172.59 115,610.42 172.59 115,610.42 - -
c) To Grade Beams M2 669.87
GFB Stair-500x300mm
L=3.30+1=4.30m ቀድሞ
-6.23% ያልተካተተ ስለነበርና እንዲካተት
በመደረጉ
427.94 286,667.32 436.54 292,428.21 (8.60) (5,760.89)
2.04 Mild steel reinforcement according to
structural drawings.
a) Dia. 8 mm deformed bar Kg 185.73 GFS-Stair Size 4.46m x 3m x
-25.00% 0.20m ያልተካተተ ስለነበርና እንዲካተት
3,864.91 717,837.97 3,989.46 740,972.18 (124.56) (23,134.21) በመደረጉ
c) Dia. 12mm deformed bar Kg 181.72 3,463.56 629,410.31 3,463.56 629,410.31 0.00 0.00
d) Dia. 14mm deformed bar Kg 181.72 GFS-Stair Size 4.46m x 3m x
-2.76% 0.20m ያልተካተተ ስለነበርና እንዲካተት
3,554.21 645,883.57 3,568.27 648,440.22 (14.07) (2,556.65) በመደረጉ
e]) Dia. 16mm deformed bar Kg 181.72 3,334.70 605,994.20 3,334.70 605,994.20 - -
2.05 10x100mm Styrofoam expansion joint
filler between ground beams and floor በExcel link ስህተት ክፍያ ላይ
Ml 73.09 -54.34% ሳይካተት በመቅረቱ
slab.
- 687.90 50,281.89 (687.90) (50,281.89)
ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. የተከፈለ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
TOTAL CARRIED TO
SUMMARY ....................................... 5,322,726.98 5,451,141.32 (128,414.34) 5,451,141.32
ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. የተከፈለ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
3.0 MASONRY WORK - -
3.01 400mm thick hard trachytic or
equivalent roughly dressed stone የግንብ ዳታ አወሳሰድ ችግር ማለትም በፊት ተይዞ
masonry foundation wall below ground የነበረዉ ጥልቅት ወይንም depth of
level bedded in cement mortar mix masonry በጋራ አስቆፍረን ከወሰድነዉ የሶስት
ratio (1:3). 236.64% ናሙና አማካይ እንዲሁም ከተገኘዉ መረጃ አንጻር
ክፍያ ላይ የገባዉ የ66.71ሜትር ኩብ ብልጫ
አሳይቷል፡፡ ምክን ያቱም የጥልቅት(depth)
ጭማሬ ነዉ፡፡
M3 3,282.58 131.59 431,970.84 64.88 212,983.45 66.71 218,987.39
3.02 Ditto but for exposed part above 3,437.93
natural ground level. የግንብ ዳታ አወሳሰድ ችግር ማለትም በፊት ተይዞ
የነበረዉ ጥልቅት ወይንም depth of
masonry በጋራ አስቆፍረን ከወሰድነዉ የሶስት
116.49% ናሙና አማካይ እንዲሁም ከተገኘዉ መረጃ አንጻር
ክፍያ ላይ የገባዉ የ31.35ሜትር ኩብ ብልጫ
አሳይቷል፡፡ ምክን ያቱም የጥልቅት(depth)
ጭማሬ ነዉ፡፡
M3 57.65 198,195.62 26.29 90,400.44 31.35 107,795.18
TOTAL CARRIED TO
SUMMARY ....................................... 630,166.46 303,383.90 326,782.56 303,383.90

TOTAL SUMMARY SUB STRUCTURE 8,476,952.98 8,384,413.32 92,539.66 5,754,525.22

ተ/ቁ ልዩነት የታየበት የስራ ክፍል ሀ. በፊት ለበጀት የተያዘ ለ.አሁን ማስተካከያ ከተደረገበት በኋላ ልዩነት (ሐ)=(ሀ)-(ለ)
የልዩነት መንስኤዉ በመቶኛ=ልዩነት መጠን
መለኪያ ነጠላ ዋጋ ብዛት መጠን በብር ብዛት መጠን በብር ብዛት መጠን በብር በብር/አጠቃላይ ልዩነት በብር የልዩንት ምክንያት/ማብራሪያ
B-SUPER STRUCTURE - -
1.0 CONCRETE WORK - -
1.01 Reinforced concrete quality C-25,360
kg of cement/m3 - -
a) In Elevation Column M3 8,591.75 21.30 182,983.76 21.30 182,983.76 - -
1.03 Provide, cut and fix in position sawn
structural wood or steel formwork
which ever is appropriate.

- - -
a) To Elevation Columns M2 697.65 248.47 173,346.60 248.47 173,346.60 - -
1.07 Mild steel reinforcement according to
structural drawings. - - - -
a) Dia. 6 mm plain bar Kg 185.73 - - - -
b) Dia. 8 mm deformed bar Kg 185.73 702.42 130,462.02 782.93 145,415.69 (80.51) (14,953.67)
f) Dia. 16mm deformed bar Kg 181.72 3,263.42 593,040.94 3,263.42 593,040.94 - -
TOTAL CARRIED TO
SUMMARY ....................................... 1,079,833.31 1,094,786.98 (14,953.67)

TOTAL SUMMARY SUB STRUCTURE 1,079,833.31 1,094,786.98 (14,953.67)

GRAND TOTAL 9,556,786.28 9,479,200.30 77,585.98

ሐ) ማጠቃለያ

ከላይ ለማሳየት እንደተሞከረው የአርቲሜቲክ ስህተት፣ክፍያ ላይ ቀደሞ ያልተካተቱ ስራዎች መኖራቸው፣ የExcel link ስህተት፣የግንብ ዳታ አወሳሰድ ችግር እና ሌሎችም ምክንያቶች ለተፈጠርዉ ልዩነት መንስኤዎች ቢሆኑም በተናጠል ስናየው ከፍተኛዉን ድርሻ የሚወስድዉ
የግንብ ዳታ አወሳሰድ ችግር እንደሆነ የመቶኛ ስሌቱ ያስረዳናል፡፡ አጠቃላይ Cummulative ድምር ልዩነቱ በSummary Sheet ላይ 92,539.66 ብር ነው፡፡
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.13.Trench excavation in ordinary soil


A-SUB STRUCTURE
1 1 175.06 L=175m W=1m
1. EXCAVATION & EARTH WORK 1.00 working space 0.25m both side
0.44
1.01, Clear & remove top soil to an 77.03 m2 total ( item 1 - 1.13 )
average depth of 200mm.
average depth of 200mm.
1 40.80 L=38.80m W=32.40m
34.40 working space 1m both side
1,403.5 ddt 1=2x3.26x5.68m
-75.2 ddt 2= 2x3.510x5.40m
1,328.37 m2 total ( item 1 - 1.01 )

1.02,Bulk excavation in ordinary soil


to depth of 1500mm from reduce level.
bulk area l=38,80, W=32.40m
1 39.30
32.9 working space 0.50m both side
0.420 542.6 average bulk depth=0.422

542.63 m3 total ( item 1 - 1.02 )

1.07. Ditto as item 1.02 but


in Hard rock
1 38.58 bulk area l=38.08+0.5=38.58,
17.85 W=17.35+0.5=17.85m
0.66
456.3 m3 total ( item 1 - 1.07 )
Pit excavation
1.12, Ditto of item No 1.09 but
in Hard rock.
1 4 2.50 F-1 SIZE= 2mx2mx0.60m
2.50 working space 0.25m both side
1.64 41.0 m3

1 28 2.30 F-2 size 1.80x1.80x0.55m


2.30 working space 0.25m both side
1.64 242.8 m3

1 24 1.90 F-3 Size 1.40x1.40x0.40m


1.90 working space 0.25m both side
1.64 142.1 m3

1 2 2.50 F-4 Size 2.0x2.0x0.60m


2.50 working space 0.25m both side
1.64 20.5 m3

1 8 2.1 F-6 Size 1.60x1.50x0.40m


2.0 working space 0.25m both side
1.64 55.1 m3
501.47 m3 total ( item 1 - 1.12 )

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.14, Fill around foundation & building

in quarry waste

1 1 39.30 PL to pit dipth=3.395-1.64-1.55=0.155


32.9 PL-FFL = (3233.202)-(3232.152) =1.05m
0.66 846.90 Avg. Clear Depth Of RGL=1.05m
-64.88 ddt masonary wall
-5.04 ddt masonary lean concrete

776.97 Net Fill Volume From Quarry Waste

Trench excavation fill


Length=175m
1 1 175.00 W=0.5m
0.5 average Trench depth=0.44m
0.440
38.5
815.47 m3 total filled Volume to the RGL

m3 (item 2- 2.01-a)

m3 (item 2- 2.02-a)

m3 (item 2- 2.02-b)

m3 (item 3- 3.01 and 3.02)

815.47 m3 (item 1- 1.14)


1.15, Fill around foundation & building in
non expensive selected material from site
well rolled & compact in layer not exceeding
200mm thick.
501.47 pit excavation fill
-105.6 ddt columns & footing pads

395.89 m3 total ( item 1 - 1.14 )


Net Fill Volume From On site Material

395.89 m3 (item 1- 1.15)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
1 2 4.46
2.86 GFS-12 Size 4.46m x 2.86m x 0.2m
1.16,Fill under hard core with imported 0.20
1 8 4.91 selected material from quarry waste 5.10 m3
4.51 GFS-1 Size 4.91m x 4.51m x 0.2m
0.20 1 2 4.46 GFS-Stair Size 4.46m x 3m x 0.20m
35.43 m3 2.86
1 2 4.91 0.20
4.46 GFS-2 Size 4.91m x 4.46m x 0.2m 5.10
0.20
8.76 m3
1 2 4.91
4.56 GFS-3 Size 4.91m x 4.56m x 0.2m 133.98 m3 (item 1- 1.16)
0.20
8.96 m3
1 4 4.51
2.81 GFS-4 Size 4.51m x 2.81m x 0.2m
0.20 1.17, Load and cart away surplus excavated
material to an appropriate tip.
10.14 m3
1 2 4.46
2.81 GFS-5 Size 4.46m x 2.81m x 0.2m 265.67 m3 (item 1- 1.01)
0.20
5.01 m3 654.83 m3 (item 1- 1.02)
1 4 4.51
0.90 GFS-6 Size 4.51m x 0.90m x 0.2m 456.28 m3 (item 1- 1.03)
0.20
3.25 m3 425.47 m3 (item 1- 1.12)
1 2 5.13
3.56 GFS-7 Size 5.13m x 3.56m x 0.2m 77.03 m3 (item 1- 1.13)
0.20 Net Load and Cart away Excavated Material
7.31 m3 Volume

1 2 4.71 1879.28 m3 (item 1- 1.17)


4.46 GFS-8 Size 4.71m x 4.46m x 0.2m
0.20
8.40 m3
1 4 4.86
4.51 GFS-9 Size 4.86m x 4.51m x 0.2m
0.20
17.53 m3
1 4 4.51
2.86 GFS-10 Size 4.51m x 2.86m x 0.2m
0.20
10.32 m3
1 2 4.86
4.46 GFS-11 Size 4.86m x 4.46m x 0.2m
0.20
8.67 m3

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.18, 250mm thick basaltic hardcore well


rolled,consolidated and blinded with crushed
1 8 4.91 stone.
4.51 GFS-1 Size 4.91m x 4.51m
177.15 m2
1 2 4.91
4.46 GFS-2 Size 4.91m x 4.46m
43.80 m2
1 2 4.91
4.56 GFS-3 Size 4.91m x 4.56m
44.78 m2
1 4 4.51
2.81 GFS-4 Size 4.51m x 2.81m
50.69 m2
1 2 4.46
2.81 GFS-5 Size 4.46m x 2.81m
25.07 m2
1 4 4.51
0.90 GFS-6 Size 4.51m x 0.90m
16.24 m2
1 2 5.13
3.56 GFS-7 Size 5.13m x 3.56m
36.53 m2
1 2 4.71
4.46 GFS-8 Size 4.71m x 4.46m
42.01 m2
1 4 4.86
4.51 GFS-9 Size 4.86m x 4.51m
87.67 m2
1 4 4.51
2.86 GFS-10 Size 4.51m x 2.86m
51.59 m2
1 2 4.86
4.46 GFS-11 Size 4.86m x 4.46m
43.35 m2
1 2 4.46
2.86 GFS-12 Size 4.46m x 2.86m
25.51 m2
1 2 4.48 GFS-Stair Size 4.46m x 3m
3.11
27.87 m2

672.26 m2 (item 1- 1.18)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
1 6 8.62 GFB 6-500x300mm L=8.62m
2. CONCRETE WORK
0.40
20.7 m2
2.01, 50mm lean concrete quality C-5, with 1 2 5.51 GFB 7-500x300mm L=5.51m
minimum cement content of 150kg/m3,of 0.40
concrete. 4.4 m2
1 2 4.71 GFB 8-500x300mm L=4.71m
a) Under Footing 0.40
1 4 2.10 F-1 SIZE= 2mx2mx0.60m 3.8 m2
2.10 1 6 8.32 GFB 9-500x300mm L=8.32m
17.64 m2 0.40
20.0 m2
1 28 1.90 F-2 size 1.80x1.80x0.55m 1 2 19.44 GFB 10-500x300mm L=19.44m
1.90 0.40
101.08 m2 15.6 m2
1 2 13.48 GFB 11-500x300mm L=13.48m
1 24 1.50 F-3 Size 1.40x1.40x0.40m 0.40
1.50 10.8 m2
54.00 m2 1 2 10.72 GFB 12-500x300mm L=10.72m
0.40
1 2 2.10 F-4 Size 2.0x2.0x0.60m 8.6 m2
2.10 1 2 4.46 GFB 13-500x300mm L=4.46m
8.82 m2 0.40
3.6 m2
1 8 1.70 F-6 Size 1.60x1.50x0.40m 1 2 8.12 GFB 14-500x300mm L=8.12m
1.60 0.40
21.76 m2 6.5 m2
1 2 3.01 GFB'-500x300mm L=3.01m
203.30 m2 (item 2- 2.01-a) 0.40
2.4 m2
b) Under Ground Slab & Grade Beam 1 2 4.78 GFB''-500x300mm L=4.78m
0.40
1 2 9.92 GFB 1-500x300mm L=9.92m 3.8 m2
0.40 1 -68 0.40 ddt 68x0.4x0.3m
7.9 m2 0.4
1 4 29.16 GFB 2-500x300mm L=29.26m -10.88 m2
0.40
46.7 m2 1 2 3.30 GFB Stair-500x300mm L=3.30m
1 2 14.68 GFB 3-500x300mm L=14.68m 0.40
0.40 2.64 m2
11.7 m2
4 6.73 GFB 4-500x300mm L=6.73m
0.40
10.8 m2 849.02 m2 (item 2- 2.01-b)
1 2 9.82 GFB 5-500x300mm L=9.82m
0.40
7.9 m2

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
c) Under Masonry Foundation Wall
thickness of masonary is 0.50m 4.51 1C-1D
4.51 7HG 4.51
4.51 4.51 1D-1E
4.51 7GF 4.51
4.51 4.51 1E-1F
4.51 7FE 4.51
4.51 11.30 Toilet Area(F1-H1)
4.51 7ED 11.30
4.51 105.04 ML
5.11 1H-2H
5.11 -35 0.12 -4.2 DDT
3.66 H2-I2' 100.84 m2 (item 2- 2.01-c)
3.66
4.51 I2'-I3
4.51
4.51 I3-I4
4.51
4.51 I4-I5
4.51
4.51 I5-I6
4.51
3.66 I6-H6'
3.66
5.11 H6'-H7
5.11 Courtyard(Axis G''-C/2''
45.22
45.22

thickness of masonary is 1.0m at the base


and avarge thickness of the wall is 0.75m
11.30 7DB
11.30
5.11 7B-6'
5.11
3.66 B6'-A6
3.66
4.51 A6-A5
4.51
4.51 A5-A4
4.51
4.51 A4-A3
4.51
4.51 A3-A2'
4.51
3.66 A2'-B2
3.66
5.11 B2-B1
5.11
4.51 1B-1C
4.51

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
4 6.73 GFB 4-500x300mm L=6.73m
2.02, Reinforced concrete quality C-25,360 0.30
kg of cement/m3 filled in to form work and 0.50 4.0 m3
vibrated around rod reinforcement 1 2 9.82 GFB 5-500x300mm L=9.82m
(Formwork and reinforcement measured 0.30
separately) . 0.50 2.9 m3
a) In Footing 1 6 8.62 GFB 6-500x300mm L=8.62m
0.30
1 4 2.00 F-1 SIZE= 2mx2mx0.60m 0.50 7.8 m3
2.00 1 2 5.51 GFB 7-500x300mm L=5.51m
0.60 0.30
9.60 m3 0.50 1.7 m3
1 28 1.80 F-2 size 1.80x1.80x0.55m 1 2 4.71 GFB 8-500x300mm L=4.71m
1.80 0.30
0.55 0.50 1.4 m3
49.90 m3 1 6 8.32 GFB 9-500x300mm L=8.32m
1 24 1.40 F-3 Size 1.40x1.40x0.40m 0.30
1.40 0.50 7.5 m3
0.40 1 2 19.44 GFB 10-500x300mm L=19.44m
18.82 m3 0.30
1 2 2.00 F-4 Size 2.0x2.0x0.60m 0.50 5.8 m3
2.00 1 2 13.48 GFB 11-500x300mm L=13.48m
0.60 0.30
4.80 m3 0.50 4.0 m3
1 8 1.60 F-6 Size 1.60x1.50x0.40m 1 2 10.72 GFB 12-500x300mm L=10.72m
1.50 0.30
0.40 0.50 3.2 m3
7.68 m3 1 2 4.46 GFB 13-500x300mm L=4.46m
0.30
90.79 m3 (item 2- 2.02-a) 0.50 1.3 m3
1 2 8.12 GFB 14-500x300mm L=8.12m
b) In Foundation Columns 0.30
0.50 2.4 m3
1 68 0.40 C-1 Size=0.4m x 0.3m x 1.62m 1 2 3.01 0.0 GFB'-500x300mm L=3.01m
0.30 0.30
1.81 0.50 0.9 m3
14.79 m3 (item 2- 2.02-b) 1 2 4.78 GFB''-500x300mm L=4.78m
0.30
0.50 1.4 m3
1 2 3.30 GFB Stair-500x300mm L=3.30m
c) In Grade Beams 0.30
1 2 9.92 GFB 1-500x300mm L=9.92m 0.50
0.30 1.0 GFB Stair-500x300mm L=3.30m
0.50 3.0 m3
1 4 29.16 GFB 2-500x300mm L=29.26m 70.36 m3
0.30
0.50 17.5 m3
1 2 14.68 GFB 3-500x300mm L=14.68m
0.30
0.50 4.4 m3

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
d) In 100mm thick Ground Floor Slab

1 8 4.51 GFSB-1 Size=4.51 x 4.86m


4.86
175.35 m2
1 2 4.46 GFSB-2 Size= 4.46 x 4.86m
4.86
43.35 m2
1 2 4.56 GFSB-3
4.86
44.32 m2
1 4 2.86 GFSB-4
4.51
51.59 m2
1 2 4.46 GFSB-5
2.86
25.51 m2
1 4 0.90 GFSB-6
4.51
16.24 m2
1 2 3.56 GFSB-7
5.13
36.53 m2

1 2 4.71 GFSB-8 Size= 4.71 x 4.46m


4.46
42.01 m2
1 4 4.86 GFSB-9 Size= 4.86 x 4.51m
4.51
87.67 m2
1 4 4.51 GFSB-10 Size = 4.51 x 2.86m
2.86
51.59 m2
1 2 4.86 GFSB-11 Size=4.86 x 4.46m
4.46
43.35 m2
1 2 2.96 GFSB-12 Size=2.96 x 4.46m
4.46
26.40 m2
Under stair case

1 2 4.46 GFS-Stair Size=4.46 x 3m


3.00
26.76 m2

670.69 m2 (item 2- 2.02-d)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1 2 13.48 GFB 3-500x300mm L=13.48m


1.00
2.03, Provide, cut and fix in position sawn 26.96 m2
structural wood or steel formwork which
ever is appropriate.
1 4 5.61 GFB 4-500x300mm L=5.61m
1.00
a) In Footing 22.44 m2

1 4 8.00 F-1 1 2 8.32 GFB 5-500x300mm L=8.32m


0.60 Perimeter=(2m+2m)*2=8m 1.00
19.20 m2 16.64 m2

1 28 7.20 F-2 1 6 7.42 GFB 6-500x300mm L=7.42m


0.55 Perimeter=(1.8m+1.8m)=2=7.2m 1.00
110.88 m2 44.52 m2

1 24 5.60 F-3 1 2 4.71 GFB 7-500x300mm L=4.71m


0.40 Perimeter=(1.4m+1.4m)=2=5.6m 1.00
53.76 m2 9.42 m2

1 2 8.00 F-4 1 2 4.61 GFB 8-500x300mm L=4.61m


0.60 Perimeter=(2m+2m)=2=8m 1.00
9.60 m2 9.22 m2

1 8 6.20 F-6 1 6 7.42 GFB 9-500x300mm L=7.42m


0.40 Perimeter=(1.6m+1.5m)=2=6.2m 1.00
19.84 m2 44.52 m2

1 2 17.94 GFB 10-500x300mm L=17.94m


213.28 m2 (item 2- 2.03-a) 1.00
35.88 m2

1 2 13.48 GFB 11-500x300mm L=13.48m


b) In Foundation Columns 1.00
26.96 m2
1 68 1.40 C-1, Perimeter=(0.4m+0.3m)*2=1.4m
1.81 1 2 10.67 GFB 12-500x300mm L=10.67m
172.59 m2 (item 2- 2.03-b) 1.00
21.34 m2
1 2 4.46 GFB 13-500x300mm L=4.46m
1.00
8.92 m2
c) In Grade Beams
1 2 7.17 GFB 14-500x300mm L=7.17m
1 2 9.92 GFB 1-500x300mm L=9.92m 1.00
1.00 Perimeter=0.5m+0.5m=1m 14.34 m2
19.84 m2 1 2 4.30 GFB Stair-500x300mm L=3.30+1=4.30m
1.00 L=1
1 4 27.06 GFB 2-500x300mm L=27.06m 8.60
1.00
108.24 m2

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
All Column to Beam connection GFSB-6
Perimeter=(4.51m+0.9m)*2=10.82m
1 1 37.40 All pence & exposed Column sides 1 4 10.82 43.28 ml
0.50
18.70 m2
436.54 m2 (item 2- 2.03-C) GFSB-7
2.04, Mild steel reinforcement according to Perimeter=(3.56m+5.13m)*2=17.38m
structural drawing. Price includes cutting, 1 2 17.38 34.76 ml
beanding,placing in
position,tying,wire,concrete spacers &
reinforcement bar charis. GFSB-8
a) Die 8 mm deformed bar Perimeter=(4.71m+4.46m)*2=18.34m
1 2 18.34 36.68 ml
3989.46 Kg Die=8mm
b) Die 12 mm deformed bar
GFSB-9
3463.56 Kg Die=12mm Perimeter=(4.51m+4.86m)*2=18.74m
c) Die 14 mm deformed bar 1 4 18.74 74.96 ml

3568.27 Kg Die=14mm
d) Die 16 mm deformed bar GFSB-10
Perimeter=(4.51m+2.86m)*2=18.74m
3334.70 Kg Die=16mm 1 4 18.74 74.96 ml

2.05, 10*100mm Styrofoam expansion joint


filler between ground beams & floor slab. GFSB-11
Perimeter=(4.46m+4.86m)*2=14.74m
1 2 14.74 29.48 ml
GFSB-1
Perimeter=(4.51m+4.86m)*2=18.74m
1 8 18.74 149.92 ml GFSB-12
Perimeter=(2.96m+4.46m)*2=14.84m
1 2 14.84 29.68 ml
GFSB-2 Under stair case
Perimeter=(4.46m+4.86m)*2=18.64m
1 2 18.64 37.28 ml Perimeter=(1.84m+3.02m)*2=9.72m
GFSB-3 1 2 9.72 19.44 ml
Perimeter=(4.56m+4.86m)*2=18.84m
1 2 18.84 37.68 ml Perimeter=(2.59m+1.84m)*2=8.86m
1 2 8.86 17.72 ml

GFSB-4 Expansion joints


Perimeter=(2.86m+4.51m)*2=14.74m
1 4 14.74 58.96 ml B/n GFB14 & GFB2
GFSB-5 1 2 5.16 10.32 ml
Perimeter=(4.46m+2.86m)*2=14.64m
1 2 14.64 29.28 ml B/n GFB8 & GFB2
1 2 1.75 3.50 ml

687.90 ml (item 2- 2.05)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
3. MASONRY WORK 4.51 1C-1D
0.85 3.83
3.01, 400mm thick hard trachytic roughly 4.51 1D-1E
dressed stone masonry foundation wall below
0.83 3.72
ground level bedded in cement mortar mix
ratio(1:3) 4.51 1E-1F
0.90 4.06
thickness of masonary is 0.50m 11.30 Toilet Area(F1-H1)
7HG
4.51 0.93 10.45
0.85 3.83 43.96 DDT
7GF
4.51 -35 0.12 -4.2 C-1 , L=0.4m , W=0.3m
0.75 3.38 91.18 TOTAL
7FE
4.51 64.88 ABOVE NGL=0.5m
0.83 3.76 64.88 m3 (item 3 - 3.01)
7ED
4.51 3.02, Ditto but for exposed part above natural
0.85 3.83 ground level.
1H-2H
5.11 26.29 m3 (item 3 - 3.01)
1.13 5.75
H2-I2'
3.66
1.25 4.58
I2'-I3
4.51
1.00 4.51
I3-I4
4.51
0.93 4.17
4.51 I4-I5
0.97 4.36
4.51 I5-I6
0.90 4.06
3.66 I6-H6'
1.25 4.58
5.11 H6'-H7
1.18 6.00 Courtyard(Axis G''-C/2''
45.22
1.11 50.02
51.42 m3
thickness of masonary is 1.0m at the base
and avarge thickness of the wall is 0.75m
11.30 7DB
1.00 11.30
5.11 7B-6'
1.33 6.77
3.66 B6'-A6
1.53 5.58
4.51 A6-A5
1.38 6.20
4.51 A5-A4
1.30 5.86
4.51 A4-A3
1.23 5.52
4.51 A3-A2'
1.33 5.98
3.66 A2'-B2
1.55 5.67
5.11 B2-B1
1.50 7.67
4.51 1B-1C
1.17 5.30

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

2.04, Mild steel reinforcement according to


structural drawing. Price includes cutting,
beanding,placing in
position,tying,wire,concrete spacers &
reinforcement bar charis.

b) Die 8 mm deformed bar

Kg Die=8mm
c) Die 10 mm deformed bar

Kg Die=10mm
d) Die 12 mm deformed bar

Kg Die=12mm
e) Die 14mm deformed bar

Kg Die=14mm
f) Die 16 mm deformed bar

Kg Die=16mm
g) Die 20 mm deformed bar

Kg Die=20mm

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
SUPER-STRUCTURE
1.0 CONCRETE WORK
1.01, Reinforced concrete quality C-25,360
kg of cement/m3 filled in to form work and
vibrated around rod reinforcement
(Formwork and reinforcement measured
separately) .
a) In Elevation Columns

1 68 0.40 C-1 Size=0.4m x 0.3m x 1.62m


0.30
2.61
21.30 m3 (item 1.01-a)
1.02, Provide, cut and fix in position sawn
structural wood or steel formwork which
ever is appropriate.

a) In elvation Columns

1 68 1.40 C-1, Perimeter=(0.4m+0.3m)*2=1.4m


2.61
248.47 m2 (item 1.02-a)
1.07, Mild steel reinforcement according to
structural drawing. Price includes cutting,
beanding,placing in
position,tying,wire,concrete spacers &
reinforcement bar charis.
a) Die 8 mm deformed bar

702.42 Kg Die=8mm
b) Die 12 mm deformed bar

0.00 Kg Die=12mm
c) Die 14 mm deformed bar

0.00 Kg Die=14mm
d) Die 16 mm deformed bar

3263.42 Kg Die=16mm

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION
SUPER-STRUCTURE
1.0 CONCRETE WORK
1.01, Reinforced concrete quality C-25,360
kg of cement/m3 filled in to form work and
vibrated around rod reinforcement
(Formwork and reinforcement measured
separately) .
a) In Elevation Column

First Floor
1 68 0.40 C-1 Size=0.4m x 0.3m x 2.61m 1 2 14.08 FB8 -480x200mm L=14.08m
0.30 0.48
2.61 0.20
21.30 m3 (item 1.01-a) 2.70 m3

1 2 4.76 FB9 -480x200mm L=4.76m


0.48
0.20
1 2 6.69 FB1 -480x200mm L=6.685m 0.91 m3
0.48
0.20 1 2 9.72 FB10 -480x200mm L=9.72m
1.28 m3 0.48
0.20
1 2 9.82 FB2 -480x200mm L=9.82m 1.87 m3
0.48
0.20 1 2 19.44 FB11 -480x200mm L=19.44m
1.89 m3 0.48
0.20
1 6 8.62 FB3 -480x200mm L=8.62m 3.73 m3
0.48
0.20 1 2 9.98 FB12 -480x200mm L=9.982m
4.97 m3 0.48
0.20
1 6 6.71 FB4 -480x200mm L=6.71m 1.92 m3
0.48
0.20 1 2 5.42 FB13 -480x200mm L=5.422m
3.86 m3 0.48
0.20
1 2 5.31 FB5 -480x200mm L=5.31m 1.04 m3
0.48
0.20 1 2 8.22 FB14 -480x200mm L=8.22m
1.02 m3 0.48
0.20
1 2 9.52 FB6 -480x200mm L=9.52m 1.58 m3
0.48
0.20
1.83 m3

1 2 18.72 FB7 -480x200mm L=18.72m


0.48
0.20
3.59 m3

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.02.Ribbed slab for suspended floor slab made of


60 mm thick concrete slab in C-25,60x120 mm
one way concrete girder
1 4 8.22 FB15 -480x200mm L=8.22m 1 6 4.61 B/n 5'7-(DE,EF,FG)
0.48 8.22
0.20
3.16 m3 227.37 m2

1 2 8.00 FB16 -480x200mm L=8m 1 2 4.61 B/n 76'-GH


0.48 4.91
0.20
1.54 m3 45.27 m2

1 2 5.06 FB17 -480x200mm L=8m 1 6 8.22 B/n 54-AC


0.48 4.61
0.20
0.97 m3 227.37 m2

1 2 4.92 B/n AB'-56


37.86 m3 (item 1.01 -b) 4.61

d)To 150mm thick floor slab 45.36 m2

B/n axis (B-D & 6'-7') and (F-H & 1'-2) 545.4 m2 (item 1.02)
1 2 9.22
6.11

112.61 m2 (item 1.01 -d)

e)To Staircase

2 2 3.25 Flight
1.24
0.18
2.91 m3

2 1 2.44 Landing
3.02
0.18
2.65 m3

1 18 1.24 Riser and thread


0.28
0.16
1.00 m3

6.56 m3 (item 1.01 -e)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.03.Provide, cut and fix in position sawn


structural wood or steel formwork
a)To elevation column 1 2 5.91 FB4 -perimeter=(0.2+0.33+0.33=0.86)
1 68 1.40 C-1, Perimeter=(0.4m+0.3m)*2=1.4m 0.86 internal and soffit
2.61
248.47 m2 (item 1.03-a) 10.16 m2

b)To Floor beam 1 2 5.51 FB5 -perimeter=0.48


0.48 External
1 2 6.69 FB1 -perimeter= 0.48 ,L=6.685m
0.48 External 5.29 m2

6.42 m2 1 2 5.31 FB5 -perimeter=0.2+0.2=0.4


0.40 inter and soffit
1 2 6.29 FB1 -perimeter= (0.33+0.2=0.55)
0.53 internal and soffit 4.25 m2

6.66 m2 1 2 9.87 FB6 -perimeter=0.48


FB2 - 0.48 External
1 2 4.91 perimeter=(0.33+0.2+0.2=0.73) ,L=6.685m
0.73 internal and soffit 9.48 m2

7.17 m2 1 2 9.22 FB6 -perimeter=0.2+0.33=0.53


0.53 inter and soffit
1 2 5.08 FB2 -perimeter=0.48 ,
0.48 External 9.77 m2

4.88 m2 1 2 19.24 FB7 -perimeter=0.48


0.48 External
1 2 4.98 FB2 -perimeter=0.2+0.2=0.4
0.40 internal and soffit 18.47 m2

3.98 m2 1 2 18.44 FB 7-perimeter=0.2+0.2=0.4


0.40 inter and soffit
1 4 8.02 FB3 -perimeter=(0.2+0.2+0.2=0.6)
0.60 internal and soffit 14.75 m2

19.25 m2 1 2 14.70 FB8 -perimeter=0.48


0.48 External
1 2 4.91 FB3 -perimeter=(0.2+0.2+0.2=0.6)
0.60 internal and soffit 14.11 m2

5.89 m2 1 2 14.10 FB 8-perimeter=0.2+0.2=0.4


0.40 inter and soffit
1 2 2.91 FB3 -perimeter=0.48
0.48 External 11.28 m2

2.79 m2 1 2 4.61 FB 9-perimeter=0.2+0.2+0.2=0.6


0.40 inter and soffit
1 2 2.91 FB3 -perimeter=0.2+0.2=0.4
0.40 Internal and external 3.69 m2

2.33 m2

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1 2 9.38 FB10 -perimeter=0.48 1 2 3.31 FB 14-perimeter=0.2+0.2=0.4


0.48 External 0.40 inter and soffit

9.00 m2 2.65 m2

1 2 8.98 FB 10-perimeter=0.2+0.33=0.53 1 4 8.22 FB 15-perimeter=0.2+0.2+0.2=0.6


0.53 inter and soffit 0.60 inter and soffit

9.52 m2 19.73 m2

1 2 19.39 FB11 -perimeter=0.48 1 2 8.49 FB16-perimeter=0.2+0.2+0.2=0.6


0.48 External 0.60 inter and soffit

18.61 m2 10.19 m2

1 2 18.59 FB 11-perimeter=0.2+0.2=0.4 1 2 3.51 FB 16-perimeter=0.48


0.40 inter and soffit 0.48 External

14.87 m2 3.37 m2
1 2 3.41 FB 16-perimeter=0.2+0.2=0.4
1 2 11.57 FB12 -perimeter=0.48 0.40 inter and soffit
0.48 External
2.73 m2
11.11 m2
1 2 4.86 FB 17-perimeter=0.2+0.2=0.4
1 2 11.07 FB 12-perimeter=0.2+0.2=0.4 0.40 inter and soffit
0.40 inter and soffit
3.89 m2
8.86 m2
1 2 5.06 FB12 -perimeter=0.48
1 2 5.06 FB13 -perimeter=0.48 0.48 External
0.48 External
4.86 m2
4.86 m2

1 2 4.86 FB 13-perimeter=0.2+0.2=0.4 297.8 m2 (item 1.03-b)


0.40 inter and soffit

3.89 m2

1 2 4.91 FB14-perimeter=0.2+0.2+0.2=0.6
0.60 inter and soffit

5.89 m2

1 2 3.31 FB 14-perimeter=0.48
0.48 inter and soffit

3.18 m2

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.04.Pre-cast elements (PB1) to the size of


d)To 150mm thick floor slab 4770x120x80
B/n axis (B-D & 6'-7') and (F-H & 1'-2) 1 1 120.00
1 2 9.22
6.11
120.00 Pcs (item 1.04)
112.61 m2 (item 1.02 -d)
1.05.Pre-cast elements (PB2) to the size of
4820x120x80mm

e)To staircase 1 1 78.00

2 2 3.25 Flight
1.24 78.00 Pcs (item 1.05)

1.06.Pre-cast elements (PB3) to the size of


16.14 m2 4720x120x80mm

2 4 3.25 flight 1 1 18.00


0.30

7.80 m2 18.00 Pcs (item 1.06)

2 1 2.44 Landing
3.02

14.74 m2

2 18 1.24 Thread
0.16

6.92 m2

45.60 m2 (item 1.02 -e)

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-Kassahun Zeriun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title=Takeoff Sheet
N SIZE PRODUCT DESCRIPTION N SIZE PRODUCT DESCRIPTION

1.07, Mild steel reinforcement according to


structural drawing. Price includes cutting,
beanding,placing in
position,tying,wire,concrete spacers &
reinforcement bar charis.
a) Die 6 mm deformed bar

1007.74 Kg Die=6mm
b) Die 8 mm deformed bar

1373.38 Kg Die=8mm
c) Die 10 mm deformed bar

2472.67 Kg Die=10mm
d) Die 12 mm deformed bar

2881.03 Kg Die=12mm
e) Die 14mm deformed bar

1823.64 Kg Die=14mm
f) Die 16 mm deformed bar

4331.86 Kg Die=16mm
g) Die 20 mm deformed bar

1625.53 Kg Die=20mm

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________ Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________ Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure
1- Footing
F-1
Primary bar 12 2.90 18 4 208.80
Secondary bar 12 2.90 18 4 208.80
F-2
Primary bar 12 2.60 14 28 1,019.20
Secondary bar 12 2.60 14 28 1,019.20
F-3
Primary bar 12 1.90 10 24 456.00
Secondary bar 12 1.90 10 24 456.00
F-4
Primary bar 12 2.90 19 2 110.20
Secondary bar 12 2.90 19 2 110.20
F-6
Primary bar 12 2.00 9 8 144.00
Secondary bar 12 2.10 10 8 168.00

Total Length - - - 3,900.40 - - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - - - 3,463.56 - - - -
Total weight(Kg) prev.page - - - - - - - -
TOTAL WEIGHT(KG) - - - 3,463.56 - - - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure

2- Foundation Column
C-1 16 3.88 8 68 2,112.35
Stirup 8 1.40 16 68 1,523.20

3- Grade Beam
GFB-1
Top bar 14 10.60 3 2 63.60
Bottom bar 14 10.60 3 2 63.60
Stirup 8 1.40 48 2 134.40
GFB-2
Top bar 14 12.00 3 4 144.00
Top bar 14 12.00 3 4 144.00
Top bar 14 7.40 3 4 88.80
Bottom bar 14 10.30 3 4 123.60
Bottom bar 14 10.18 3 4 122.16
Bottom bar 14 10.40 3 4 124.80
Stirup 8 1.40 145 4 812.00
GFB-3
Top bar 14 12.00 3 2 72.00
Top bar 14 4.20 3 2 25.20
Bottom bar 14 10.40 3 2 62.40
Bottom bar 14 5.60 3 2 33.60
Stirup 8 1.40 73 2 204.40

Total Length - 2,674.00 - - 1,067.76 2,112.35 - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 1,055.34 - - 1,290.57 3,334.70 - -
Total weight(Kg) prev.page - - - 3,463.56 - - - -
TOTAL WEIGHT(KG) - 1,055.34 - 3,463.56 1,290.57 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure

GFB-4
Top bar 14 7.40 3 4 88.80
Bottom bar 14 7.40 3 4 88.80
Stirup 8 1.40 31 4 173.60
GFB-5
Top bar 14 10.57 3 2 63.42
Bottom bar 14 10.50 3 2 63.00
Stirup 8 1.40 46 2 128.80
GFB-6
Top bar 14 9.40 3 6 169.20
Bottom bar 14 9.40 3 6 169.20
Stirup 8 1.40 40 6 336.00
GFB-7
Top bar 14 6.20 3 2 37.20
Bottom bar 14 6.20 3 2 37.20
Stirup 8 1.40 25 2 70.00
GFB-8
Top bar 14 6.00 3 2 36.00
Bottom bar 14 6.00 3 2 36.00
Stirup 8 1.40 25 2 70.00

Total Length - 778.40 - - 788.82 - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 307.21 - - 953.42 - - -
Total weight(Kg) prev.page - 1,055.34 - 3,463.56 1,290.57 3,334.70 - -
TOTAL WEIGHT(KG) - 1,362.55 - 3,463.56 2,243.99 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure

GFB-9
Top bar 14 9.20 3 6 165.60
Bottom bar 14 9.20 3 6 165.60
Stirup 8 1.40 40 6 336.00
GFB-10
Top bar 14 12.00 3 2 72.00
Top bar 14 8.90 3 2 53.40
Bottom bar 14 10.35 3 2 62.10
Bottom bar 14 10.30 3 2 61.80
Stirup 8 1.40 96 2 268.80
GFB-11
Top bar 14 12.00 3 2 72.00
Top bar 14 4.00 3 2 24.00
Bottom bar 14 10.35 3 2 62.10
Bottom bar 14 5.59 3 2 33.54
Stirup 8 1.40 72 2 201.60
GFB-12
Top bar 14 12.00 3 2 72.00
Bottom bar 14 12.00 3 2 72.00
Stirup 8 1.40 58 2 162.40

Total Length - 968.80 - - 916.14 - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 382.35 - - 1,107.31 - - -
Total weight(Kg) prev.page - 1,362.55 - 3,463.56 2,243.99 3,334.70 - -
TOTAL WEIGHT(KG) - 1,744.90 - 3,463.56 3,351.29 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure

GFB-13
Top bar 14 5.70 3 2 34.20
Bottom bar 14 5.70 3 2 34.20
Stirup 8 1.40 24 2 67.20
GFB-14
Top bar 14 9.42 3 2 56.52
Bottom bar 14 9.10 3 2 54.60
Stirup 8 1.40 41 2 114.80

Total Length - 182.00 - - 179.52 - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 71.83 - - 216.98 - - -
Total weight(Kg) prev.page - 1,744.90 - 3,463.56 3,351.29 3,334.70 - -
TOTAL WEIGHT(KG) - 1,816.73 - 3,463.56 3,568.27 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure
4- Ground Floor Slab

GFS-1 8 4.86 20 8 777.60


8 4.46 21 8 749.28
GFS-2 8 4.82 20 2 192.80
8 4.46 21 2 187.32
GFS-3 8 4.82 20 2 192.80
8 4.52 21 2 189.84
GFS-4 8 4.46 12 4 214.08
8 2.77 19 4 210.52
GFS-5 8 4.47 13 2 116.22
8 2.77 19 2 105.26
GFS-6 8 4.47 5 4 89.40
8 0.85 19 4 64.60
GFS-7 8 5.09 16 2 162.88
8 3.51 22 2 154.44
GFS-8 8 4.41 20 2 176.40
8 4.67 19 2 177.46
GFS-9 8 4.82 19 4 366.32
8 4.47 21 4 375.48
GFS-10 8 4.47 13 4 232.44
8 2.82 19 4 214.32

Total Length - 4,949.46 - - - - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 1,953.39 - - - - - -
Total weight(Kg) prev.page - 1,816.73 - 3,463.56 3,568.27 3,334.70 - -
TOTAL WEIGHT(KG) - 3,770.12 - 3,463.56 3,568.27 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
A- Sub Structure

GFS-11 8 4.81 19 2 182.78


8 4.47 21 2 187.74
GFS-12 8 2.82 8 2 45.12
8 2.92 13 2 75.92
8 2.47 13 2 64.22

Total Length - 555.78 - - - - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 219.35 - - - - - -
Total weight(Kg) prev.page - 3,770.12 - 3,463.56 3,568.27 3,334.70 - -
TOTAL WEIGHT(KG) - 3,989.46 - 3,463.56 3,568.27 3,334.70 - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
B- Super-structure
1- Elevation Column
C-1 16 3.80 8 68 2,067.20
Stirup 8 1.20 15 68 1,224.00

Total Length - 1,224.00 - - - 2,067.20 - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 483.07 - - - 3,263.42 - -
Total weight(Kg) prev.page 219.35
TOTAL WEIGHT(KG) 702.42 3,263.42

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

B- Sub structure
Grade Beam(stair)
GFB-stair case
Top bar 14 4.05 3 2 24.30
Bottom bar 14 4.05 3 2 24.30
Stirup 8 1.40 15 2 42.00
Ground Floor Slab

GFS-Stair 8 4.46 13 2 115.96


8 3.00 19 2 114.00

Total Length - 271.96 - - 48.60 - - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 107.33 - - 58.74 - - -
Total weight(Kg) prev.page - - - - - - -

Submitted by:Proj/Site Eng:__________Signature:_________Date:___________


Checked by:Ass.Resident Eng:__________Resident Eng:______Date:________
Approved by:Client Proj Eng:__________Signature:__________Date:__________
በአብክመ የመንገድና ህንጻ ዲዛይንና ግንባታ ቁጥጥር ሥራዎች ድርጅት ANRS Road Building Design and Construction Supervision Works Enterprise EARTH WORK DATA MEASUREMENT TAKING FORMAT

Project:-MEKDELA AMBA UNIVERSITY


Employer:- MEKDELA AMBA UNIVERSITY
Consultant:- RBDCSWE
Contractor :-KASSAHUNZERIHUN BC.
Location:- TULU AWLIYA Earthwork Data
Block:-Dormitory(DO-CYT-T1-16) Note:- PL-FFL = (3233.202)-(3232.652) =0.55m
Bulk Excavation Pit Excavation Foundation Column
Depth
from
Clear Depth of Bulk
Profile Depth of Bulk Excavation From Depth of Pit Excavation From Clear depth of Pit Excavation Foundation Thicken Column
Depth =(PL to Bulk)-(PL to Length Width Length Width Height
Level to Profile Level Profile Level =(PL to Pit)-(PL to Bulk) Type ess Type
Ite from RGL)
RGL(after
m Axis Profile
Site
No Level to
Clearing)
NGL In In In In In In In
In Hard In Hard In Hard In Ordinary In Hard
Ordinary Weathered Ordinary Weathered Ordinary Weathere Weathered
=(PL to Rock Rock Rock Soil Rock
Soil Rock Soil Rock Soil d Rock Rock
NGL)+0.20

1 I2' 1.15 1.35 1.90 0.55 3.15 1.25 F3 1.40 1.40 0.40C1 0.40 0.30 1.65
2 I3 1.05 1.25 1.90 0.65 2.95 1.05 F2 1.80 1.80 0.55C1 0.40 0.30 1.30
3 I4 0.82 1.02 1.83 0.81 3.25 1.42 F2 1.80 1.80 0.55C1 0.40 0.30 1.60
4 I5 0.65 0.85 1.83 0.98 3.05 1.22 F2 1.80 1.80 0.55C1 0.40 0.30 1.40
5 I6 0.75 0.95 1.75 0.80 3.23 1.48 F3 1.40 1.40 0.40C1 0.40 0.30 1.73
6 H7 0.70 0.90 1.75 0.85 3.10 1.35 F3 1.40 1.40 0.40C1 0.40 0.30 1.60
7 H6' 0.72 0.92 1.70 0.78 3.40 1.70 F6 1.60 1.50 0.40C1 0.40 0.30 1.90
8 H2 1.10 1.30 1.90 0.60 3.30 1.40 F6 1.60 1.50 0.40C1 0.40 0.30 1.80
9 H1 1.25 1.45 2.03 0.58 3.25 1.22 F2 1.80 1.80 0.55C1 0.40 0.30 1.60
10 G'2' 1.10 1.30 1.82 0.52 3.30 1.48 F6 1.60 1.50 0.40C1 0.40 0.30 1.80
11 G'2'' 1.00 1.20 1.80 0.60 3.25 1.45 F3 1.40 1.40 0.40C1 0.40 0.30 1.75
12 G'3 1.00 1.20 1.75 0.55 3.25 1.50 F2 1.80 1.80 0.55C1 0.40 0.30 1.60
13 G'4 0.85 1.05 1.75 0.70 2.95 1.20 F2 1.80 1.80 0.55C1 0.40 0.30 1.30
14 G'5 0.75 0.95 1.70 0.75 3.30 1.60 F2 1.80 1.80 0.55C1 0.40 0.30 1.65
15 G'6 0.72 0.92 1.65 0.73 3.40 1.75 F6 1.60 1.50 0.40C1 0.40 0.30 1.90
16 G7 0.65 0.85 1.56 0.71 3.05 1.49 F2 1.80 1.80 0.55C1 0.40 0.30 1.40
17 G6' /G"6 0.70 0.90 1.60 0.70 3.25 1.65 F4 2.00 2.00 0.60C1 0.40 0.30 1.55
18 G5' 0.75 0.95 1.63 0.68 3.30 1.67 F3 1.40 1.40 0.40C1 0.40 0.30 1.80
19 G5 0.75 0.95 1.68 0.73 3.05 1.37 F3 1.40 1.40 0.40C1 0.40 0.30 1.55
20 G4 0.95 1.15 1.75 0.60 3.00 1.25 F3 1.40 1.40 0.40C1 0.40 0.30 1.50
21 G3 0.95 1.15 1.77 0.62 3.25 1.48 F3 1.40 1.40 0.40C1 0.40 0.30 1.75
22 G2'' 1.00 1.20 1.72 0.52 3.25 1.53 F3 1.40 1.40 0.40C1 0.40 0.30 1.75
23 G2 1.10 1.30 1.91 0.61 3.30 1.39 F2 1.80 1.80 0.55C1 0.40 0.30 1.65
24 G1 1.15 1.35 2.02 0.67 3.05 1.03 F1 2.00 2.00 0.60C1 0.40 0.30 1.35
25 F1 1.32 1.52 1.96 0.44 3.10 1.14 F1 2.00 2.00 0.60C1 0.40 0.30 1.40
26 F2 1.10 1.30 1.75 0.45 3.50 1.75 F2 1.80 1.80 0.55C1 0.40 0.30 1.85
27 F2'' 1.05 1.25 1.70 0.45 3.50 1.80 F3 1.40 1.40 0.40C1 0.40 0.30 2.00
28 F5' 0.62 0.82 1.62 0.80 3.55 1.93 F3 1.40 1.40 0.40C1 0.40 0.30 2.05
29 F6' 0.80 1.00 1.60 0.60 3.45 1.85 F2 1.80 1.80 0.55C1 0.40 0.30 1.80
30 F7 0.65 0.85 1.58 0.73 3.05 1.47 F2 1.80 1.80 0.55C1 0.40 0.30 1.40
For Contractor For Consultant Project Coordinator For Client
Name__________________________________ Name__________________________________ Name__________________________________ Name__________________________________
Sign_________________ Sign_________________ Sign_________________ Sign_________________
Date_______________ Date__________________ Date__________________ Date__________________
በአብክመ የመንገድና ህንጻ ዲዛይንና ግንባታ ቁጥጥር ሥራዎች ድርጅት ANRS Road Building Design and Construction Supervision Works Enterprise EARTH WORK DATA MEASUREMENT TAKING FORMAT

Project:-MEKDELA AMBA UNIVERSITY


Employer:- MEKDELA AMBA UNIVERSITY
Consultant:- RBDCSWE
Contractor :-KASSAHUNZERIHUN BC.
Location:- TULU AWLIYA Earthwork Data
Block:-Dormitory(DO-CYT-T1-16) Note:- PL-FFL = (3233.202)-(3232.652) =0.55m
Depth
from Bulk Excavation Pit Excavation Foundation Column
Depth Profile Clear Depth of Bulk
Level to Depth of Bulk Excavation From Depth of Pit Excavation From Clear depth of Pit Excavation Foundation Thicken Column
Ite from =(PL to Bulk)-(PL to Length Wedth Length Width Height
RGL(after Profile Level Profile Level =(PL to Pit)-(PL to Bulk) Type ess Type
m Axis Profile RGL)
Site
No Level to Clearing) In In In In
NGL In Ordinary In Hard In Weathered In Hard In Ordinary In Hard In Ordinary In Hard
Weathered Ordinary Weathere Weathered
Soil Rock Rock Rock Soil Rock Soil Rock
=(PL to Rock Soil d Rock Rock
NGL)+0.20
31 E7 0.50 0.70 1.72 1.02 3.20 1.48 F2 1.80 1.80 0.55C1 0.40 0.30 1.55
32 E6' 0.75 0.95 1.66 0.71 3.45 1.79 F2 1.80 1.80 0.55C1 0.40 0.30 1.80
33 E5' 0.82 1.02 1.65 0.63 3.50 1.85 F3 1.40 1.40 0.40C1 0.40 0.30 2.00
34 E2'' 1.05 1.25 1.70 0.45 3.10 1.40 F3 1.40 1.40 0.40C1 0.40 0.30 1.60
35 E2 1.20 1.40 1.70 0.30 3.35 1.65 F2 1.80 1.80 0.55C1 0.40 0.30 1.70
36 E1 1.40 1.60 1.90 0.30 3.05 1.15 F2 1.80 1.80 0.55C1 0.40 0.30 1.40
37 D1 1.45 1.65 1.75 0.10 3.00 1.25 F2 1.80 1.80 0.55C1 0.40 0.30 1.35
38 D2 1.10 1.30 1.68 0.38 3.18 1.50 F2 1.80 1.80 0.55C1 0.40 0.30 1.53
39 D2'' 1.05 1.25 1.58 0.33 3.35 1.77 F3 1.40 1.40 0.40C1 0.40 0.30 1.85
40 D5' 0.95 1.15 1.62 0.47 3.90 2.28 F3 1.40 1.40 0.40C1 0.40 0.30 2.40
41 D6' 0.80 1.00 1.70 0.70 3.75 2.05 F2 1.80 1.80 0.55C1 0.40 0.30 2.10
42 D7 0.55 0.75 1.73 0.98 3.40 1.67 F1 2.00 2.00 0.60C1 0.40 0.30 1.70
43 C7 0.76 0.96 1.85 0.89 3.45 1.60 F1 2.00 2.00 0.60C1 0.40 0.30 1.75
44 C6' 0.86 1.06 1.86 0.80 3.90 2.04 F2 1.80 1.80 0.55C1 0.40 0.30 2.25
45 C5' 0.95 1.15 1.72 0.57 3.85 2.13 F3 1.40 1.40 0.40C1 0.40 0.30 2.35
46 C5 1.02 1.22 1.68 0.46 3.95 2.27 F3 1.40 1.40 0.40C1 0.40 0.30 2.45
47 C4 1.10 1.30 1.58 0.28 3.70 2.12 F3 1.40 1.40 0.40C1 0.40 0.30 2.20
48 C3 1.15 1.35 1.58 0.23 3.60 2.02 F3 1.40 1.40 0.40C1 0.40 0.30 2.10
49 C2'' 1.20 1.40 1.70 0.30 3.60 1.90 F3 1.40 1.40 0.40C1 0.40 0.30 2.10
50 C2/B"2' 1.30 1.50 1.82 0.32 3.25 1.43 F4 2.00 2.00 0.60C1 0.40 0.30 1.55
51 C1 1.55 1.75 1.88 0.13 3.10 1.22 F2 1.80 1.80 0.55C1 0.40 0.30 1.45
52 B'2' 1.30 1.50 1.87 0.37 3.57 1.70 F6 1.60 1.50 0.40C1 0.40 0.30 2.07
53 B'3 1.32 1.52 1.72 0.20 3.60 1.88 F2 1.80 1.80 0.55C1 0.40 0.30 1.95
54 B'4 1.10 1.30 1.65 0.35 3.90 2.25 F2 1.80 1.80 0.55C1 0.40 0.30 2.25
55 B'5 1.10 1.30 1.68 0.38 3.90 2.22 F2 1.80 1.80 0.55C1 0.40 0.30 2.25
56 B'5' 1.07 1.27 1.68 0.41 3.85 2.17 F3 1.40 1.40 0.40C1 0.40 0.30 2.35
57 B'6 0.87 1.07 1.78 0.71 3.85 2.07 F6 1.60 1.50 0.40C1 0.40 0.30 2.35
58 B7 0.80 1.00 1.92 0.92 3.45 1.53 F2 1.80 1.80 0.55C1 0.40 0.30 1.80
59 B6' 0.87 1.07 1.72 0.65 3.85 2.13 F6 1.60 1.50 0.40C1 0.40 0.30 2.35
60 B2 1.35 1.55 1.96 0.41 3.57 1.61 F6 1.60 1.50 0.40C1 0.40 0.30 2.07
61 B1 1.60 1.80 2.08 0.28 3.40 1.32 F3 1.40 1.40 0.40C1 0.40 0.30 1.90
62 A2' 1.53 1.73 1.96 0.23 3.60 1.64 F3 1.40 1.40 0.40C1 0.40 0.30 2.10
63 A3 1.43 1.63 1.80 0.17 3.50 1.70 F2 1.80 1.80 0.55C1 0.40 0.30 1.85
64 A4 1.28 1.48 1.64 0.16 3.50 1.86 F2 1.80 1.80 0.55C1 0.40 0.30 1.85
65 A5 1.16 1.36 1.66 0.30 3.60 1.94 F2 1.80 1.80 0.55C1 0.40 0.30 1.95
66 A6 1.00 1.20 1.75 0.55 3.50 1.75 F3 1.40 1.40 0.40C1 0.40 0.30 2.00
Average Depth 1.007 1.207 1.818 1.699 0.420 0.663 3.395 1.640 1.648 1.636 0.482 0.400 0.300 1.813

For Contractor For Consultant Project Coordinator For Client


Name__________________________________ Name__________________________________ Name__________________________________ Name__________________________________
Sign_________________ Sign_________________ Sign_________________ Sign_________________
Date_______________ Date__________________ Date__________________ Date__________________
Project:-MEKDELA AMBA UNIVERSITY
Employer:- MEKDELA AMBA UNIVERSITY
Consultant:- R&BD&CSWE
Contractor :-Kassahun Zerihun BC.
Location:- TULU AWLIYA
Block:-Students' Dormitory(DO-CYT-T1-16)
DORMITORY MASONRY DATA
Masonry Depth clear depth Average
Volume of
Span Length of trench Depth
h1 h2 h3 Masonry
excavation masnory
7HG 4.51 1.05 0.70 0.80 0.85 0.85 1.92
7GF 4.51 0.80 0.85 0.60 0.75 0.75 1.69
7FE 4.51 0.85 0.65 1.00 0.83 0.83 1.88
7ED 4.51 1.00 0.60 0.95 0.85 0.85 1.92
7DB 11.30 0.95 1.05 1.00 1.00 5.65
7B-6' 5.11 1.05 1.60 1.33 1.33 3.39
B6'-A6 3.66 1.60 1.45 1.53 1.53 2.79
A6-A5 4.51 1.45 1.30 1.38 1.38 3.10
A5-A4 4.51 1.30 1.30 1.30 1.30 2.93
A4-A3 4.51 1.30 1.15 1.23 1.23 2.76
A3-A2' 4.51 1.15 1.50 1.33 1.33 2.99
A2'-B2 3.66 1.50 1.60 1.55 1.55 2.84
B2-B1 5.11 1.60 1.40 1.50 1.50 3.83
1B-1C 4.51 1.40 0.95 1.17 1.17 2.65
1C-1D 4.51 0.95 0.75 0.85 0.85 1.92
1D-1E 4.51 0.75 0.90 0.83 0.83 1.86
1E-1F 4.51 0.90 0.90 0.90 0.90 2.03
Toilet Area(F1-H1) 11.30 0.90 0.95 0.93 0.93 5.23
1H-2H 5.11 0.95 1.30 1.13 1.13 2.87
H2-I2' 3.66 1.30 1.20 1.25 1.25 2.29
I2'-I3 4.51 0.80 1.20 1.00 1.00 2.26
I3-I4 4.51 0.80 1.05 0.93 0.93 2.09
I4-I5 4.51 1.05 0.80 1.05 0.97 0.97 2.18
I5-I6 4.51 1.20 1.05 0.75 1.00 0.90 2.26
I6-H6' 3.66 1.30 1.20 1.25 1.25 2.29
H6'-H7 5.11 1.30 1.05 1.18 1.18 3.00
1.20 1.20
1.45 1.45
0.90 0.90
Courtyard(Axis G''- 45.22 1.05 1.05 1.11 25.01
C/2'' 0.90 0.90
1.05 1.05
0.90 0.90
1.40 1.40
Total Volume of Masonry(m3)
Project:-MEKDELA AMBA UNIVERSITY
Employer:- MEKDELA AMBA UNIVERSITY
Consultant:- R&BD&CSWE
Contractor :-Kassahun Zerihun BC.
Location:- TULU AWLIYA
Block:-Students' Dormitory(DO-CYT-T1-16)
DORMITORY MASONRY DATA
Masonry Depth
Average Volume of
Span Length
h1 h2 h3 Depth Masonry

7HG 4.51 1.05 0.70 0.80 0.85 1.92


7GF 4.51 0.80 0.85 0.60 0.75 1.69
7FE 4.51 0.85 0.65 1.00 0.83 1.87
7ED 4.51 1.00 0.60 0.95 0.85 1.92
7DB 11.30 0.95 1.05 1.05 8.90
7B-6' 5.11 1.05 1.60 1.60 6.13
B6'-A6 3.66 1.60 1.45 1.45 3.98
A6-A5 4.51 1.45 1.30 1.30 4.40
A5-A4 4.51 1.30 1.30 1.30 4.40
A4-A3 4.51 1.30 1.15 1.15 3.89
A3-A2' 4.51 1.15 1.50 1.50 5.07
A2'-B2 3.66 #DIV/0! #DIV/0!
B2-B1 5.11 #DIV/0! #DIV/0!
1B-1C 4.51 #DIV/0! #DIV/0!
1C-1D 4.51 #DIV/0! #DIV/0!
1D-1E 4.51 #DIV/0! #DIV/0!
1E-1F 4.51 #DIV/0! #DIV/0!
Toilet Area(F1-H1) 11.30 #DIV/0! #DIV/0!
1H-2H 5.11 #DIV/0! #DIV/0!
H2-I2' 3.66 #DIV/0! #DIV/0!
I2'-I3 4.51 #DIV/0! #DIV/0!
I3-I4 4.51 #DIV/0! #DIV/0!
I4-I5 4.51 #DIV/0! #DIV/0!
I5-I6 4.51 #DIV/0! #DIV/0!
I6-H6' 3.66 #DIV/0! #DIV/0!
H6'-H7 5.11 #DIV/0! #DIV/0!

Courtyard(Axis G''- 45.22 #DIV/0! #DIV/0!


C/2''

Total Volume of Masonry(m3) #DIV/0!


Project: - M. A UNI(MEKANE SELAM CAMPAS) Misganaw Alem Engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: - DEBEBE KINFE B.C
Consultant: - Misganaw Alem Engineering
Type of work: - (DO-CYT-T1-072) Title :BULK DEPTH
Height from Depth of bulk excav.
Height from NET Depth of
Axis Length Width Profile to Above 1.5m- Above 3m-
Profile to RGL Bulk Upto 1.5m Above 1.5m
NGL 3m 4.5m
A2' - - 0.38 2.85 2.47 1.50 0.97 0.97 -
A3 - - 0.39 2.85 2.46 1.50 0.96 0.96 -
A4 - - 0.31 2.85 2.54 1.50 1.04 1.04 -
A5 - - 0.22 2.85 2.63 1.50 1.13 1.13 -
A6 - - 0.75 2.85 2.10 1.50 0.60 0.60 -
B1 - - 0.40 2.85 2.45 1.50 0.95 0.95 -
B2 - - 0.39 2.85 2.46 1.50 0.96 0.96 -
B'2' - - 0.40 2.85 2.45 1.50 0.95 0.95 -
B''2' - - 0.41 2.85 2.44 1.50 0.94 0.94 -
B'3 - - 0.37 2.85 2.48 1.50 0.98 0.98 -
B'4 - - 0.30 2.85 2.55 1.50 1.05 1.05 -
B'5 - - 0.23 2.85 2.62 1.50 1.12 1.12 -
B'5' - - 0.23 2.85 2.62 1.50 1.12 1.12 -
B6' - - 0.16 2.85 2.69 1.50 1.19 1.19 -
B'6 - - 0.16 2.85 2.69 1.50 1.19 1.19 -
B7 - - 0.13 2.85 2.72 1.50 1.22 1.22 -
C1 - - 0.75 2.85 2.10 1.50 0.60 0.60 -
C2 - - 0.43 2.85 2.42 1.50 0.92 0.92 -
C2'' - - 0.38 2.85 2.47 1.50 0.97 0.97 -
C3 - - 0.36 2.85 2.49 1.50 0.99 0.99 -
C4 - - 0.29 2.85 2.56 1.50 1.06 1.06 -
C5 - - 0.30 2.85 2.55 1.50 1.05 1.05 -
C5' - - 0.22 2.85 2.63 1.50 1.13 1.13 -
C6' - - 0.22 2.85 2.63 1.50 1.13 1.13 -
C7 - - 0.15 2.85 2.70 1.50 1.20 1.20 -
D1 - - 0.84 2.85 2.01 1.50 0.51 0.51 -
D2' - - 0.50 2.85 2.35 1.50 0.85 0.85 -
D2'' - - 0.34 2.85 2.51 1.50 1.01 1.01 -
D5' - - 0.47 2.85 2.38 1.50 0.88 0.88 -
D6' - - 0.32 2.85 2.53 1.50 1.03 1.03 -
D7 - - 0.37 2.85 2.48 1.50 0.98 0.98 -
E1 - - 1.09 2.85 1.76 1.50 0.26 0.26 -
E2 - - 0.72 2.85 2.13 1.50 0.63 0.63 -
E2'' - - 1.00 2.85 1.85 1.50 0.35 0.35 -
E5' - - 0.83 2.85 2.02 1.50 0.52 0.52 -
E6' 0.65 2.85 2.20 1.50 0.70 0.70 -
E7 0.47 2.85 2.38 1.50 0.88 0.88 -
F1 1.28 2.85 1.57 1.50 0.07 0.07 -
F2 1.03 2.85 1.82 1.50 0.32 0.32 -
F2'' 0.97 2.85 1.88 1.50 0.38 0.38 -
F5' 0.75 2.85 2.10 1.50 0.60 0.60 -
F6' 0.81 2.85 2.04 1.50 0.54 0.54 -
F7 0.57 2.85 2.28 1.50 0.78 0.78 -
G1 1.44 2.85 1.41 1.41 - - -
G2 1.16 2.85 1.69 1.50 0.19 0.19 -
G2'' 1.11 2.85 1.74 1.50 0.24 0.24 -
G3 1.41 2.85 1.44 1.44 - - -
G4 1.00 2.85 1.85 1.50 0.35 0.35 -
G2' 1.30 2.85 1.55 1.50 0.05 0.05 -
G'2'' 1.45 2.85 1.40 1.40 - - -
G'3 1.60 2.85 1.25 1.25 - - -
G'4 - - 0.58 2.85 2.27 1.50 0.77 0.77 -
G5 - - 0.89 2.85 1.96 1.50 0.46 0.46 -
G5' - - 0.85 2.85 2.00 1.50 0.50 0.50 -
G'5 - - 0.92 2.85 1.93 1.50 0.43 0.43 -
G6' - - 0.78 2.85 2.07 1.50 0.57 0.57 -
G'6 - - 0.79 2.85 2.06 1.50 0.56 0.56 -
G''6 - - 0.78 2.85 2.07 1.50 0.57 0.57 -
G7 - - 0.71 2.85 2.14 1.50 0.64 0.64 -
H1 - - 1.76 2.85 1.09 1.09 - - -
H2 - - 1.30 2.85 1.55 1.50 0.05 0.05 -
H6' - - 0.79 2.85 2.06 1.50 0.56 0.56 -
H7 - - 0.85 2.85 2.00 1.50 0.50 0.50 -
I2' - - 1.74 2.85 1.11 1.11 - - -
I3 - - 1.71 2.85 1.14 1.14 - - -
I4 - - 1.47 2.85 1.38 1.38 - - -
I5 - - 1.13 2.85 1.72 1.50 0.22 0.22 -
I6 - - 1.10 2.85 1.75 1.50 0.25 0.25 -
Total 0.73 2.85 2.12 1.28 0.64 0.64 -
Height from
Height from NET Depth of Depth of bulk excav.
Axis Length Width Profile to Above 1.5m- Above 3m-
Profile to RGL Bulk Upto 1.5m Above 1.5m
NGL 3m 4.5m
Submitted by Contractor: Checked by: Verified by:

Page 111 of 126


Proj/Site Engineer: ___________ Assistant Resident Engineer:____________ Client Proj. Eng.:______________
Signature:_______________ Resident Engineer:_______________ Signature:_______________
Date : _______________ Date : _______________ Date : ____________

Page 112 of 126


Project: - M. A UNI(MEKANE SELAM CAMPAS) Misganaw Alem Engineering
Location: - Mekene Selam
Employer: - Ministry of Education
Contractor: - DEBEBE KINFE B.C
Consultant: - Misganaw Alem Engineering
Type of work: - (DO-CYT-T1-072) Title :PIT DEPTH
Height from PIT depth Height b/n Height from AVARAGE Height of
PIT DEPTH Height from Fill under
Profile to from FFl(B) GB FFL and bttm profile bttm DEPTH OF Foundation
FROM PROFIL Profile to FFL FOOTING
NGL IN M of FOOTING of FOOTING FOOTING Column
0.38 3.00 4.53 0.50 (1.15) - 3.38 4.53 0.55 2.280
0.39 3.00 4.54 0.50 (1.15) - 3.39 4.54 0.55 2.340
0.31 3.00 4.46 0.50 (1.15) - 3.31 4.46 0.55 2.260
0.22 3.00 4.37 0.50 (1.15) - 3.22 4.37 0.55 2.170
0.75 3.00 4.90 0.50 (1.15) - 3.75 4.90 0.55 2.700
0.40 3.00 4.55 0.50 (1.15) - 3.40 4.55 0.55 2.350
0.39 3.00 4.54 0.50 (1.15) - 3.39 4.54 0.55 2.340
0.40 3.00 4.55 0.50 (1.15) - 3.40 4.55 0.55 2.350
0.41 3.00 4.56 0.50 (1.15) - 3.41 4.56 0.55 2.360
0.37 3.00 4.52 0.50 (1.15) - 3.37 4.52 0.55 2.320
0.30 3.00 4.45 0.50 (1.15) - 3.30 4.45 0.55 2.250
0.23 3.00 4.38 0.50 (1.15) - 3.23 4.38 0.55 2.180
0.23 3.00 4.38 0.50 (1.15) - 3.23 4.38 0.55 2.180
0.16 3.00 4.31 0.50 (1.15) - 3.16 4.31 0.55 2.110
0.16 3.00 4.31 0.50 (1.15) - 3.16 4.31 0.55 2.110
0.13 3.00 4.28 0.50 (1.15) - 3.13 4.28 0.55 2.080
0.75 3.00 4.90 0.50 (1.15) - 3.75 4.90 0.55 2.700
0.43 3.00 4.58 0.50 (1.15) - 3.43 4.58 0.55 2.380
0.38 3.00 4.53 0.50 (1.15) - 3.38 4.53 0.55 2.330
0.36 3.00 4.51 0.50 (1.15) - 3.36 4.51 0.55 2.310
0.29 3.00 4.44 0.50 (1.15) - 3.29 4.44 0.55 2.240
0.30 3.00 4.45 0.50 (1.15) - 3.30 4.45 0.55 2.250
0.22 3.00 4.37 0.50 (1.15) - 3.22 4.37 0.55 2.170
0.22 3.00 4.37 0.50 (1.15) - 3.22 4.37 0.55 2.170
0.15 3.00 4.30 0.50 (1.15) - 3.15 4.30 0.55 2.100
0.84 3.00 4.99 0.50 (1.15) - 3.84 4.99 0.55 2.790
0.50 3.00 4.65 0.50 (1.15) - 3.50 4.65 0.55 2.450
0.34 3.00 4.49 0.50 (1.15) - 3.34 4.49 0.55 2.290
0.47 3.00 4.62 0.50 (1.15) - 3.47 4.62 0.55 2.420
0.32 3.00 4.47 0.50 (1.15) - 3.32 4.47 0.55 2.270
0.37 3.00 4.52 0.50 (1.15) - 3.37 4.52 0.55 2.320
1.09 3.00 5.24 0.50 (1.15) - 4.09 5.24 0.55 3.040
0.72 3.00 4.87 0.50 (1.15) - 3.72 4.87 0.55 2.670
1.00 3.00 5.15 0.50 (1.15) - 4.00 5.15 0.55 2.950
0.83 3.00 4.98 0.50 (1.15) - 3.83 4.98 0.55 2.780
0.65 3.00 4.80 0.50 (1.15) - 3.65 4.80 0.55 2.600
0.47 3.00 4.62 0.50 (1.15) - 3.47 4.62 0.55 2.420
1.28 3.00 5.43 0.50 (1.15) - 4.28 5.43 0.55 3.230
1.03 3.00 5.18 0.50 (1.15) - 4.03 5.18 0.55 2.980
0.97 3.00 5.12 0.50 (1.15) - 3.97 5.12 0.55 2.920
0.75 3.00 4.90 0.50 (1.15) - 3.75 4.90 0.55 2.700
0.81 3.00 4.96 0.50 (1.15) - 3.81 4.96 0.55 2.760
0.57 3.00 4.72 0.50 (1.15) - 3.57 4.72 0.55 2.520
1.44 3.00 5.59 0.50 (1.15) - 4.44 5.59 0.55 3.390
1.16 3.00 5.31 0.50 (1.15) - 4.16 5.31 0.55 3.110
1.11 3.00 5.26 0.50 (1.15) - 4.11 5.26 0.55 3.060
1.41 3.00 5.56 0.50 (1.15) - 4.41 5.56 0.55 3.360
1.00 3.00 5.15 0.50 (1.15) - 4.00 5.15 0.55 2.950
1.30 3.00 5.45 0.50 (1.15) - 4.30 5.45 0.55 3.250
1.45 3.00 5.60 0.50 (1.15) - 4.45 5.60 0.55 3.400
1.60 3.00 5.75 0.50 (1.15) - 4.60 5.75 0.55 3.550
0.58 3.00 4.73 0.50 (1.15) - 3.58 4.73 0.55 2.530
0.89 3.00 5.04 0.50 (1.15) - 3.89 5.04 0.55 2.840
0.85 3.00 5.00 0.50 (1.15) - 3.85 5.00 0.55 2.800
0.92 3.00 5.07 0.50 (1.15) - 3.92 5.07 0.55 2.870
0.78 3.00 4.93 0.50 (1.15) - 3.78 4.93 0.55 2.730
0.79 3.00 4.94 0.50 (1.15) - 3.79 4.94 0.55 2.740
0.78 3.00 4.93 0.50 (1.15) - 3.78 4.93 0.55 2.730
0.71 3.00 4.86 0.50 (1.15) - 3.71 4.86 0.55 2.660
1.76 3.00 5.91 0.50 (1.15) - 4.76 5.91 0.55 3.710
1.30 3.00 5.45 0.50 (1.15) - 4.30 5.45 0.55 3.250
0.79 3.00 4.94 0.50 (1.15) - 3.79 4.94 0.55 2.740
0.85 3.00 5.00 0.50 (1.15) - 3.85 5.00 0.55 2.800
1.74 3.00 5.89 0.50 (1.15) - 4.74 5.89 0.55 3.690
1.71 3.00 5.86 0.50 (1.15) - 4.71 5.86 0.55 3.660
1.47 3.00 5.62 0.50 (1.15) - 4.47 5.62 0.55 3.420
1.13 3.00 5.28 0.50 (1.15) - 4.13 5.28 0.55 3.080
1.10 3.00 5.25 0.50 (1.15) - 4.10 5.25 0.55 3.050
0.73 3.00 4.88 0.50 (1.15) - 3.73 4.88 0.55 2.684
Height from PIT depth Height b/n Height from AVARAGE Height of
PIT DEPTH Height from Fill under
Profile to from FFl(B) GB FFL and bttm profile bttm DEPTH OF Foundation
FROM PROFIL Profile to FFL FOOTING
NGL IN M of FOOTING of FOOTING FOOTING Column
Submitted by Contractor: Checked by: Verified by:

Page 113 of 126


Proj/Site Engineer: ___________ Assistant Resident Engineer:____________ Client Proj. Eng.:______________
Signature:_______________ Resident Engineer:_______________ Signature:_______________
Date : _______________ Date : _______________ Date : ____________

Page 114 of 126


Client :Mekidela Amba University Payment No-2
Consultant:- Road & Building Design & Construction Supervision Works Enterprise
Contractor:-KassahunZerihun B.C.
Type Of Block:-Dormitory(D0-CYT-T1-16)
Location:- Tulu Awliya Title:Bar Schedule

Length No. of No.of Length in meter


No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24
B- Super-structure
1- Elevation Column

Ground floor

Stirup 8 0.20 15 68 204.00

First Floor
C-1 16 3.80 8 68 2,067.20
Stirup 8 1.40 15 68 1,428.00

FIRST FLOOR BEAM


FFB 1
Top bar 16 4 2 2 16.00
20 4.2 2 2 16.80
Negative bar 16 2.4 1 2 4.80
20 3.5 2 2 14.00
Bottom bar 16 7.4 3 2 44.40
Stirup 8 1.26 40 2 100.80

Total Length - 1,732.80 - - - 2,132.40 30.80 -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 683.88 - - - 3,366.35 75.97 -
Total weight(Kg) prev.page - 683.88 - - - 3,366.35 75.97 -
TOTAL WEIGHT(KG) - 683.88 - - - 3,366.35 75.97 -
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 2
Top bar 20 10.5 2 2 42.00
Negative bar 20 2.7 2 2 10.80
20 3.5 3 2 21.00
Bottom bar 14 4 2 2 16.00
20 7.1 3 2 42.60
Stirup 8 1.26 25 2 63.00
10 1.26 35 2 88.20
FFB 3
Top bar 20 9.30 2 6 111.60
Negative bar 16 2.7 2 6 32.40
16 2.2 2 6 26.40
Bottom bar 14 4 2 6 48.00
20 6 3 6 108.00
Stirup 10 1.26 65 6 491.40
FFB 4
Top bar 20 7.4 3 2 44.40
Negative bar 20 2.40 1 2 4.80
20 3.50 3 2 21.00
Bottom bar 20 7.40 3 2 44.40
Stirup 10 1.26 44 2 110.88

Total Length - 63.00 690.48 - 64.00 58.80 450.60 -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 24.86 425.80 - 77.35 92.83 1,111.48 -
Total weight(Kg) prev.page - 683.88 - - - 3,366.35 75.97 -
TOTAL WEIGHT(KG) - 708.74 425.80 - 77.35 3,459.17 1,187.45 -
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 5
Top bar 16 6.20 2 2 24.80
Negative bar 16 2.4 2 2 9.60
16 2.4 2 2 9.60
Bottom bar 16 6.2 2 2 24.80
Stirup 10 1.26 30 2 75.60
FFB 6
Top bar 14 10.6 3 2 63.60
Bottom bar 14 10.60 4 2 84.80
Stirup 8 1.26 48 2 120.96
FFB 7
Top bar 14 12.00 2 2 48.00
14 9.1 2 2 36.40
Bottom bar 14 10.3 2 2 41.20
14 10.4 2 2 41.60
Stirup 8 1.26 97 2 244.44
FFB 8
Top bar 14 12 2 2 48.00
14 4.20 2 2 16.80
Bottom bar 14 10.30 2 2 41.20
14 5.50 2 2 22.00
Stirup 8 1.26 73 2 183.96

Total Length - 549.36 75.60 - 443.60 68.80 - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 216.81 46.62 - 536.16 108.61 - -
Total weight(Kg) prev.page - 708.74 425.80 - 77.35 3,459.17 1,187.45 -
TOTAL WEIGHT(KG) - 925.56 472.42 - 613.52 3,567.79 1,187.45 -
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 9
Top bar 14 5.50 4 2 44.00
Bottom bar 14 5.50 4.00 2 44.00
Stirup 8 1.26 25.00 2 63.00
FFB 10
Top bar 16 10.60 4.00 2 84.80
Bottom bar 14 10.60 4.00 2 84.80
Stirup 8 1.26 49.00 2 123.48
FFB 11
Top bar 14 12.00 2 2 48.00
14 9.00 2 2 36.00
Bottom bar 14 10.30 2 2 41.20
14 10.30 2.00 2 41.20
Stirup 8 1.26 97.00 2 244.44
FFB 12
Top bar 14 12.00 2.00 2 48.00
Bottom bar 14 12.00 2.00 2 48.00
Stirup 8 1.26 49.00 2 123.48
FFB 13
Top bar 16 6.10 2 4 48.80
Negative bar 16 2.40 2 4 19.20
16 2.40 2 4 19.20
Bottom bar 16 6.10 2 4 48.80
Stirup 10 1.26 29 4 146.16
Total Length - 554.40 146.16 - 435.20 220.80 - -
Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 218.80 90.13 - 526.01 348.57 - -
Total weight(Kg) prev.page - 925.56 472.42 - 613.52 3,567.79 1,187.45 -
TOTAL WEIGHT(KG) - 1,144.36 562.55 - 1,139.53 3,916.36 1,187.45 -
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 14
Top bar 20 7.80 2 2 31.20
14 2.4 2 2 9.60
Negative bar 16 2.2 2 2 8.80
16 2.8 2 2 11.20
14 1.5 2 2 6.00
Bottom bar 20 6 3 2 36.00
14 4 2 2 16.00
Stirup 10 1.26 59 2 148.68
FFB 15
Top bar 20 7.80 2 4 62.40
14 2.40 2 4 19.20
Negative bar 16 2.20 2.00 4 17.60
16 2.80 2.00 4 22.40
14 1.50 2.00 4 12.00
Bottom bar 20 6.00 2.00 4 48.00
14 4.00 2.00 4 32.00
Stirup 10 1.26 65.00 4 327.60
FFB 16
Top bar 16 9.10 2 2 36.40
Negative bar 16 2.40 2 2 9.60
16 2.60 2 2 10.40
14 1.50 2 2 6.00
Bottom bar 16 9.10 2 2 36.40
Stirup 10 1.26 45 2 113.40
Total Length - - 589.68 - 100.80 152.80 177.60 -
Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - - 363.64 - 121.83 241.22 438.08 -
Total weight(Kg) prev.page - 1,144.36 562.55 - 1,139.53 3,916.36 1,187.45 -
TOTAL WEIGHT(KG) - 1,144.36 926.18 - 1,261.36 4,157.58 1,625.53 -
Length No. of No.of Length in meter
No. Description Dia. (m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 17
Top bar 16 5.80 2 2 23.20
Bottom bar 16 5.8 2 2 23.20
Stirup 8 1.26 25 2 63.00

150MM FLOOR SLAB


1 12 6.9 51 2 703.80
1 12 6.9 13 2 179.40
2 10 5.21 41 2 427.22
3 12 3.20 51 4 652.80
4 10 12.00 37 4 1,776.00
Distribution Bar 12 2.15 68 2 292.40
Kebelito 12 1.20 30 2 72.00
PRECAST CONNECTION
At every precast connection 12 3.20 2.00 156 998.40
At precast edge 14 2.00 1.00 112 224.00
B/n solid and precast 10 1.00 20.00 2 40.00
B/n solid and precast 8 0.60 20.00 2 24.00
SLAB MESH
6 5.01 17.00 12 1,022.04
6 8.32 28.00 12 2,795.52
6 5.01 18 4 360.72
6 5.31 17 4 361.08

Total Length 4,539.36 87.00 2,243.22 2,898.80 224.00 46.40 - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page 1,007.74 34.34 1,383.32 2,574.13 270.74 73.25 - -
Total weight(Kg) prev.page - 1,144.36 926.18 - 1,261.36 4,157.58 1,625.53 -
TOTAL WEIGHT(KG) 1,007.74 1,178.70 2,309.50 2,574.13 1,532.11 4,230.83 1,625.53 -
Length No. of No.of Length in meter
No. Description Dia. (m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

STAIRCASE
1 14 6.70 9 4 241.20
2 10 1.75 10 4 70.00
3 10 1.75 20 4 140.00
4 12 1 9 4 36.00
5 12 3.7 9 4 133.20
6 12 3.9 9 4 140.40
7 12 1 9 4 36.00
8 0.90 45 4 162.00
LANDING
8 3.18 13 4 165.36
8 2.44 17 4 165.92

Staircase beam 16 4.00 4.00 2 32.00


On axis 5' 16 4.00 4.00 2 32.00
10 1.30 21.00 2 54.60

Total Length - 493.28 264.60 345.60 241.20 64.00 - -


Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - 194.68 163.17 306.89 291.53 101.03 - -
Total weight(Kg) prev.page 1,007.74 1,178.70 2,309.50 2,574.13 1,532.11 4,230.83 1,625.53 -
TOTAL WEIGHT(KG) 1,007.74 1,373.38 2,472.67 2,881.03 1,823.64 4,331.86 1,625.53 -
Length No. of No.of Length in meter
No. Description Dia.
(m) bars members ø6 ø8 ø10 ø12 ø14 ø16 ø20 ø24

FFB 13

Total Length - - - - - - - -
Bar Weight(KG/m) 0.22 0.39 0.62 0.89 1.21 1.58 2.47 3.55
Total weight(Kg) this. Page - - - - - - - -
Total weight(Kg) prev.page 1,007.74 1,373.38 2,472.67 2,881.03 1,823.64 4,331.86 1,625.53 -
TOTAL WEIGHT(KG) 1,007.74 1,373.38 2,472.67 2,881.03 1,823.64 4,331.86 1,625.53 -
,
9.62
48.1

19.24
96.2
2.34
11.7
54.842555105713
15,515.85

18.45
16.9
6.5

2.34
11.7

7000
u