0% found this document useful (0 votes)
46 views40 pages

Hk232 - de Da Thiet Ke Me2011 - Me3139 (En)

The document describes a design project to design a transmission system for a chain conveyor. It provides operating conditions including tangential forces and velocities on the conveyor chain. It lists the system components as an electric motor, V-belt drive, dual-stage gear reducer, flexible shaft coupling, and chain conveyor. Tables provide data for 20 different conveyor systems including timing parameters. The requirements include a project report and assembly/part drawings. The report must select motor/gear ratios, and design uncovered/covered drives, shafts, bearings, housing and other parts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views40 pages

Hk232 - de Da Thiet Ke Me2011 - Me3139 (En)

The document describes a design project to design a transmission system for a chain conveyor. It provides operating conditions including tangential forces and velocities on the conveyor chain. It lists the system components as an electric motor, V-belt drive, dual-stage gear reducer, flexible shaft coupling, and chain conveyor. Tables provide data for 20 different conveyor systems including timing parameters. The requirements include a project report and assembly/part drawings. The report must select motor/gear ratios, and design uncovered/covered drives, shafts, bearings, housing and other parts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM

FACULTY OF MECHANICAL ENGINEERING


DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #1
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 4400 6300 4200 5400 2600 2400 3200 5700 6400 5500
Tangential velocity on conveyor chain: v (m/s) 2.55 2.26 3.36 2.32 2.99 3.02 3.19 3.03 3.88 2.96
Number of teeth of the drive conveyor sprocket: Z 9 11 9 9 9 11 11 9 11 9
Pitch of conveyor chain: p (mm) 110 125 125 125 125 110 110 125 110 125
Service life: L (years) 6 3 4 6 6 3 6 3 6 3
Number of working days per year 176 216 249 236 316 266 279 326 159 273
Number of shifts per working day 3 2 2 2 1 2 1 1 2 3
t1 (seconds) 47 24 56 38 12 20 44 30 57 16
t2 (seconds) 14 43 57 23 31 14 29 24 41 14
t3 (seconds) 21 47 20 56 24 28 14 57 38 25
T1 T T T T T T T T T T
T2 0.3T 0.5T 0.4T 0.6T 0.5T 0.6T 0.7T 0.6T 0.7T 0.8T
T3 0.4T 0.5T 0.8T 0.8T 0.7T 0.9T 0.2T 0.3T 0.5T 0.3T

Project #1 1/40
Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 4500 2900 5100 2300 5000 2400 4300 5600 6800 3300
Tangential velocity on conveyor chain: v (m/s) 2.11 2.14 2.1 2.41 3.32 3.46 2.58 2.1 2.9 2.79
Number of teeth of the drive conveyor sprocket: Z 11 11 9 11 9 11 9 9 9 9
Pitch of conveyor chain: p (mm) 110 110 125 110 125 110 110 125 110 110
Service life: L (years) 5 6 4 4 3 5 6 5 4 5
Number of working days per year 251 218 152 252 162 254 174 193 344 338
Number of shifts per working day 1 3 3 1 3 2 2 2 3 1
t1 (seconds) 44 10 41 18 31 50 48 18 34 60
t2 (seconds) 14 42 43 32 35 56 35 17 22 13
t3 (seconds) 24 52 33 30 13 46 27 36 50 42
T1 T T T T T T T T T T
T2 0.7T 0.5T 0.7T 0.4T 0.4T 0.6T 0.6T 0.9T 0.4T 0.2T
T3 0.4T 0.7T 0.8T 0.8T 0.4T 0.6T 0.8T 0.7T 0.1T 0.7T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #1 2/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #2
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 5600 3600 4200 3900 3900 4200 4100 4300 2400 3400
Tangential velocity on conveyor chain: v (m/s) 2.75 2.65 3.06 2.57 3.67 2.49 2.98 2.41 2.81 3.21
Number of teeth of the drive conveyor sprocket: Z 9 9 9 11 9 11 9 9 9 11
Pitch of conveyor chain: p (mm) 110 110 125 125 125 110 125 125 125 125
Service life: L (years) 6 6 3 3 4 6 3 6 6 4
Number of working days per year 299 212 250 333 332 326 224 240 305 328
Number of shifts per working day 1 2 3 3 2 2 1 2 3 1
t1 (seconds) 18 15 31 50 13 56 52 16 18 49
t2 (seconds) 49 43 60 54 14 57 48 42 35 37
t3 (seconds) 23 41 54 22 23 42 60 12 45 43
T1 T T T T T T T T T T
T2 0.1T 0.3T 0.2T 0.9T 0.5T 0.2T 0.9T 0.5T 0.2T 0.8T
T3 0.2T 0.4T 0.2T 0.3T 0.5T 0.4T 0.8T 0.9T 0.6T 0.1T

Project #2 3/40
Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 4800 2900 2600 4600 3600 2500 4700 2400 3400 4900
Tangential velocity on conveyor chain: v (m/s) 2.8 2.45 2.99 2.63 3.51 2.55 2.35 3.04 2.08 3.82
Number of teeth of the drive conveyor sprocket: Z 9 11 11 9 11 11 11 9 9 9
Pitch of conveyor chain: p (mm) 125 110 110 125 110 110 110 110 125 110
Service life: L (years) 6 4 4 6 6 4 5 5 5 4
Number of working days per year 240 167 337 322 303 227 226 182 323 357
Number of shifts per working day 2 3 1 1 2 2 3 3 2 2
t1 (seconds) 44 24 56 42 40 50 26 45 25 22
t2 (seconds) 45 34 46 11 36 38 33 45 33 23
t3 (seconds) 48 18 11 43 55 53 15 34 58 16
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.6T 0.7T 0.9T 0.5T 0.4T 0.6T 0.6T 0.5T
T3 0.5T 0.3T 0.4T 0.4T 0.2T 0.3T 0.7T 0.5T 0.3T 0.7T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #2 4/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #3
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 5700 4900 4500 5200 6500 4200 4700 5000 5400 6300
Tangential velocity on conveyor belt: v (m/s) 1.84 1.71 1.66 1.21 1.04 1.23 1.54 1.27 1.09 1.19
Diameter of drive conveyor pulley: D (mm) 360 560 390 380 260 560 550 460 270 480
Service life: L (years) 4 4 7 4 5 4 3 7 5 4
Number of working days per year 307 354 181 151 162 259 278 263 314 225
Number of shifts per working day 2 3 2 2 1 1 3 3 2 3
t1 (seconds) 38 38 33 26 15 43 22 18 26 35
t2 (seconds) 12 23 51 33 18 49 57 21 46 27
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.7T 0.6T 0.3T 0.7T 0.7T 0.9T 0.2T 0.3T

Project #3 5/40
Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 4400 6300 5900 6300 4700 4500 6500 4900 5100 6200
Tangential velocity on conveyor belt: v (m/s) 1.47 1.52 1.46 1.5 0.93 1.19 1.05 1.7 1.15 0.99
Diameter of drive conveyor pulley: D (mm) 320 280 320 570 320 360 490 370 230 320
Service life: L (years) 6 6 5 3 5 5 4 5 6 3
Number of working days per year 226 164 168 181 151 218 349 298 290 237
Number of shifts per working day 2 3 3 1 3 1 3 3 1 1
t1 (seconds) 59 45 34 57 21 32 21 10 42 21
t2 (seconds) 59 11 15 26 35 10 22 39 42 10
T1 T T T T T T T T T T
T2 0.6T 0.3T 0.8T 0.6T 0.5T 0.9T 0.9T 0.7T 0.3T 0.7T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #3 6/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #4
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 7.2 6.4 5.3 7.2 5.3 4.1 6.1 6.9 7.8 7.6
Rotation speed of blender shaft: n (rpm) 35 37 50 37 36 24 24 36 37 33
Service life: L (years) 7 6 3 6 4 5 3 7 7 3
Number of working days per year 347 222 240 315 181 308 341 173 260 336
Number of shifts per working day 2 1 3 3 3 1 2 3 3 2
t1 (seconds) 52 14 18 32 50 54 50 27 13 21
t2 (seconds) 49 42 17 53 20 30 22 28 22 20
T1 T T T T T T T T T T
T2 0.2T 0.8T 0.8T 0.5T 0.8T 0.7T 0.6T 0.7T 0.8T 0.5T

Project #4 7/40
Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 4.9 7.9 7.4 7.3 5.6 6.3 4.4 5 7.1 4.4
Rotation speed of blender shaft: n (rpm) 21 43 49 48 18 25 44 16 27 50
Service life: L (years) 4 3 3 5 5 5 4 5 4 4
Number of working days per year 163 167 214 347 219 341 308 247 234 306
Number of shifts per working day 2 2 2 3 2 1 2 1 3 2
t1 (seconds) 25 56 26 35 55 57 17 46 34 57
t2 (seconds) 20 32 13 48 47 25 32 50 56 26
T1 T T T T T T T T T T
T2 0.7T 0.4T 0.3T 0.7T 0.4T 0.3T 0.8T 0.6T 0.3T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #4 8/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #5
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on shaft of conveyor chain: P (kW) 7 8 8 8 6 7 5 7 5 6
Rotation speed of shaft of conveyor chain: n (rpm) 54 59 79 32 32 53 73 72 45 74
Service life: L (years) 4 7 5 3 7 5 3 7 3 7
Number of working days per year 222 279 187 240 231 318 255 267 326 291
Number of shifts per working day 3 2 1 1 3 1 3 2 3 2
t1 (seconds) 54 47 11 22 58 54 53 24 59 52
t2 (seconds) 19 25 41 16 56 60 17 10 52 12
t3 (seconds) 39 42 29 30 39 59 11 33 34 44
T1 T T T T T T T T T T
T2 0.2T 0.6T 0.7T 0.2T 0.9T 0.8T 0.6T 0.8T 0.2T 0.6T
T3 0.3T 0.5T 0.7T 0.3T 0.2T 0.6T 0.4T 0.4T 0.6T 0.8T

Project #5 9/40
Data No. 11 12 13 14 15 16 17 18 19 20
Power on shaft of conveyor chain: P (kW) 5 5 7 8 7 5 5 8 8 6
Rotation speed of shaft of conveyor chain: n (rpm) 30 40 43 67 39 57 47 59 55 39
Service life: L (years) 5 3 6 5 7 6 7 6 6 3
Number of working days per year 243 322 318 179 325 162 188 239 334 256
Number of shifts per working day 3 2 3 2 3 2 3 1 1 2
t1 (seconds) 21 19 52 59 27 50 54 58 23 52
t2 (seconds) 31 58 22 54 15 37 46 56 56 50
t3 (seconds) 55 31 27 19 32 17 47 19 59 56
T1 T T T T T T T T T T
T2 0.8T 0.3T 0.3T 0.5T 0.4T 0.7T 0.6T 0.8T 0.9T 0.8T
T3 0.9T 0.2T 0.8T 0.2T 0.5T 0.7T 0.3T 0.2T 0.7T 0.2T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #5 10/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #6
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 5000 4400 2700 3200 3100 2100 4600 3500 4000 3700
Tangential velocity on conveyor chain: v (m/s) 1.6 3.14 3.47 3.41 3.35 3.45 2.85 3.93 2.63 2.14
Diameter of drive conveyor pulley: D (mm) 290 380 200 370 360 420 350 230 510 370
Service life: L (years) 3 4 6 4 4 4 5 5 6 4
Number of working days per year 261 197 220 266 232 204 173 310 228 162
Number of shifts per working day 2 3 1 2 1 3 3 2 1 3
t1 (seconds) 57 45 36 58 28 28 46 28 20 22
t2 (seconds) 15 48 11 28 27 11 50 42 40 25
T1 T T T T T T T T T T
T2 0.8T 0.5T 0.5T 0.3T 0.7T 0.5T 0.6T 0.7T 0.7T 0.7T

Project #6 11/40
Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 4100 4000 3500 3100 3400 2100 3000 2200 2100 3900
Tangential velocity on conveyor chain: v (m/s) 1.82 2.69 3.66 3.61 3.12 3.4 3.42 3.99 2.88 3.46
Diameter of drive conveyor pulley: D (mm) 510 450 280 570 420 380 350 430 270 570
Service life: L (years) 5 6 5 3 3 3 6 4 6 3
Number of working days per year 303 246 227 360 200 178 299 259 157 278
Number of shifts per working day 2 1 3 3 2 1 1 1 3 2
t1 (seconds) 44 40 10 37 12 30 21 38 36 46
t2 (seconds) 51 22 46 12 19 60 42 41 13 15
T1 T T T T T T T T T T
T2 0.1T 0.8T 0.8T 0.6T 0.6T 0.3T 0.9T 0.3T 0.8T 0.3T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #6 12/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #7
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 4 4.9 7.6 4.4 3.5 7.4 7.6 4.1 3.6 6.9
Rotation speed of blender shaft: n (rpm) 51 60 42 34 41 41 11 29 14 32
Service life: L (years) 4 6 7 7 6 3 3 7 4 6
Number of working days per year 325 351 344 335 170 333 339 222 305 168
Number of shifts per working day 1 1 1 2 1 3 3 2 2 3
t1 (seconds) 31 25 35 24 17 57 37 23 51 52
t2 (seconds) 17 60 54 36 38 42 15 17 28 59
T1 T T T T T T T T T T
T2 0.7T 0.5T 0.8T 0.7T 0.4T 0.6T 0.4T 0.4T 0.8T 0.8T

Project #7 13/40
Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 3.1 4.8 6.2 4.5 5.1 6.5 3.7 3.8 4.6 5
Rotation speed of blender shaft: n (rpm) 50 43 31 31 17 35 27 55 52 17
Service life: L (years) 5 6 4 4 3 5 7 3 6 3
Number of working days per year 273 160 201 268 344 218 309 286 357 299
Number of shifts per working day 2 2 2 1 3 3 1 1 2 3
t1 (seconds) 30 38 51 38 55 50 18 25 49 58
t2 (seconds) 13 59 16 25 12 41 41 39 60 27
T1 T T T T T T T T T T
T2 0.3T 0.5T 0.4T 0.7T 0.6T 0.3T 0.7T 0.6T 0.8T 0.6T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #7 14/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #8
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 5.2 4.1 5.2 4.7 5 3.3 6.4 3.9 6.4 3.2
Rotation speed of blender shaft: n (rpm) 45 60 19 52 11 52 37 44 19 43
Service life: L (years) 4 3 5 7 5 3 6 4 4 3
Number of working days per year 223 234 355 330 357 219 243 300 345 264
Number of shifts per working day 2 3 2 1 3 2 2 3 3 3
t1 (seconds) 19 53 24 13 27 52 56 29 20 58
t2 (seconds) 24 53 52 11 35 33 26 35 21 39
T1 T T T T T T T T T T
T2 0.6T 0.7T 0.4T 0.5T 0.5T 0.5T 0.4T 0.3T 0.3T 0.5T

Project #8 15/40
Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 3.8 5.4 3.8 3 3.6 5.8 7 6.6 3.2 6
Rotation speed of blender shaft: n (rpm) 34 18 47 24 54 59 27 60 50 44
Service life: L (years) 4 5 5 3 4 6 5 3 6 5
Number of working days per year 302 212 171 277 342 327 287 296 245 330
Number of shifts per working day 3 3 2 2 2 2 2 1 3 1
t1 (seconds) 33 19 60 27 33 34 18 41 37 51
t2 (seconds) 14 53 17 32 27 44 25 50 39 26
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.6T 0.3T 0.6T 0.7T 0.3T 0.9T 0.8T 0.3T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #8 16/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #9
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 5800 5000 7700 4400 6600 6800 4700 4200 4100 6300
Tangential velocity on conveyor belt: v (m/s) 1.49 0.55 0.67 0.74 0.52 0.6 0.57 1.25 0.57 0.79
Diameter of drive conveyor pulley: D (mm) 540 420 260 460 480 400 460 360 260 230
Service life: L (years) 7 6 7 7 6 4 6 4 3 3
Number of working days per year 321 332 267 299 307 221 188 219 315 249
Number of shifts per working day 1 3 2 3 1 1 1 3 3 1
t1 (seconds) 38 16 49 36 47 49 32 25 38 26
t2 (seconds) 34 37 10 17 44 36 58 38 26 38
T1 T T T T T T T T T T
T2 0.6T 0.6T 0.6T 0.4T 0.9T 0.6T 0.3T 0.3T 0.5T 0.9T

Project #9 17/40
Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 7000 7900 6200 7700 5000 7500 7700 6500 7800 7600
Tangential velocity on conveyor belt: v (m/s) 1.29 0.52 0.59 0.92 0.81 0.57 0.96 0.91 1.31 0.85
Diameter of drive conveyor pulley: D (mm) 500 420 370 220 560 470 370 220 390 210
Service life: L (years) 3 3 6 5 4 6 3 4 6 6
Number of working days per year 263 360 355 161 178 246 316 197 226 293
Number of shifts per working day 1 1 2 1 2 2 3 3 1 3
t1 (seconds) 14 49 27 13 27 41 38 19 19 38
t2 (seconds) 28 40 21 17 24 56 10 19 34 34
T1 T T T T T T T T T T
T2 0.1T 0.6T 0.5T 0.9T 0.4T 0.9T 0.2T 0.2T 0.3T 0.6T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #9 18/40
HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #10
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 4700 7300 3000 3400 6500 6100 7800 3100 3300 6500
Tangential velocity on conveyor chain: v (m/s) 1.14 3.92 2.74 3.6 3.44 3.5 2.21 2.05 3.9 3.85
Number of teeth of the drive conveyor sprocket: Z 11 9 11 11 9 11 11 9 11 11
Pitch of conveyor chain: p (mm) 150 150 150 125 125 125 125 150 125 125
Service life: L (years) 3 5 7 5 3 4 5 3 5 3
Number of working days per year 177 210 338 314 286 260 351 270 204 284
Number of shifts per working day 3 1 2 2 3 3 2 2 2 2
t1 (seconds) 22 11 20 48 31 19 58 60 46 31
t2 (seconds) 35 21 56 15 58 26 30 14 30 34
t3 (seconds) 28 47 49 26 49 56 39 21 48 12
T1 T T T T T T T T T T
T2 0.7T 0.5T 0.7T 0.8T 0.3T 0.3T 0.5T 0.7T 0.8T 0.5T
T3 0.5T 0.6T 0.3T 0.5T 0.7T 0.3T 0.7T 0.3T 0.2T 0.7T

Project #10 19/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 2900 4600 5500 6900 5000 4300 3700 7200 5800 2200
Tangential velocity on conveyor chain: v (m/s) 1.58 2.09 3.27 3.42 2.78 3.12 2.13 3.25 2.29 3.51
Number of teeth of the drive conveyor sprocket: Z 9 11 11 9 9 11 9 11 11 9
Pitch of conveyor chain: p (mm) 125 150 150 150 125 125 125 125 150 125
Service life: L (years) 4 5 5 5 6 3 6 4 6 4
Number of working days per year 247 155 150 159 173 162 328 158 280 266
Number of shifts per working day 1 1 2 1 1 3 2 3 3 1
t1 (seconds) 51 25 24 56 47 38 52 22 19 48
t2 (seconds) 57 43 60 31 56 20 30 54 26 49
t3 (seconds) 45 28 47 33 13 10 36 26 50 28
T1 T T T T T T T T T T
T2 0.6T 0.5T 0.7T 0.9T 0.8T 0.6T 0.5T 0.4T 0.6T 0.9T
T3 0.4T 0.2T 0.6T 0.3T 0.8T 0.7T 0.8T 0.4T 0.2T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #10 20/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #11
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 5.3 7.5 6.4 7.9 7.7 4.7 5.4 3.2 3.7 5.5
Rotation speed of blender shaft: n (rpm) 54 16 19 47 12 63 94 18 34 57
Service life: L (years) 7 3 7 7 6 7 5 4 6 4
Number of working days per year 302 345 157 252 317 348 231 349 228 266
Number of shifts per working day 2 2 1 2 3 2 2 3 3 3
t1 (seconds) 13 47 52 26 16 35 27 31 50 20
t2 (seconds) 40 28 26 25 33 51 51 27 14 43
t3 (seconds) 20 50 52 17 19 29 28 34 26 26
T1 T T T T T T T T T T
T2 0.6T 0.8T 0.5T 0.2T 0.4T 0.3T 0.4T 0.8T 0.3T 0.5T
T3 0.5T 0.8T 0.7T 0.5T 0.3T 0.5T 0.3T 0.9T 0.8T 0.6T
Project #11 21/40
Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 4.8 6.1 6.4 5.4 7.1 6.7 5.3 6.7 7.4 6.6
Rotation speed of blender shaft: n (rpm) 91 68 14 24 31 12 57 22 82 70
Service life: L (years) 5 6 7 4 5 5 5 4 4 7
Number of working days per year 261 355 155 312 324 188 299 277 263 306
Number of shifts per working day 1 2 3 2 1 3 2 1 1 3
t1 (seconds) 59 40 29 39 12 11 38 47 30 17
t2 (seconds) 40 24 38 46 54 55 56 14 50 17
t3 (seconds) 12 31 24 14 28 57 44 24 46 14
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.6T 0.2T 0.3T 0.7T 0.3T 0.6T 0.2T 0.4T
T3 0.4T 0.8T 0.9T 0.5T 0.9T 0.6T 0.3T 0.8T 0.9T 0.3T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #11 22/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #12
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 4200 6700 6900 5100 5200 4100 6000 4200 4700 5000
Tangential velocity on conveyor belt: v (m/s) 0.87 1.91 1.45 1.25 1.45 0.83 2.11 0.85 1.71 0.87
Diameter of drive conveyor pulley: D (mm) 420 290 390 300 320 460 470 550 340 480
Service life: L (years) 3 5 6 4 3 5 7 7 5 5
Number of working days per year 279 316 223 174 165 268 175 277 301 343
Number of shifts per working day 1 1 3 3 3 3 2 1 3 2
t1 (seconds) 41 44 17 21 42 17 48 49 42 23
t2 (seconds) 41 10 28 18 26 60 33 46 35 59
T1 T T T T T T T T T T
T2 0.8T 0.6T 0.7T 0.8T 0.7T 0.6T 0.7T 0.3T 0.5T 0.4T

Project #12 23/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 4400 4300 5600 5200 6400 6900 4500 4300 4700 5000
Tangential velocity on conveyor belt: v (m/s) 0.91 1.89 1.71 1.97 1.7 1.15 1.74 1.65 0.94 0.83
Diameter of drive conveyor pulley: D (mm) 540 410 290 380 360 250 260 210 370 220
Service life: L (years) 7 8 6 7 6 3 5 7 3 8
Number of working days per year 206 249 307 333 168 297 270 167 188 277
Number of shifts per working day 2 1 1 3 1 2 1 1 2 1
t1 (seconds) 56 23 57 50 26 29 41 33 34 30
t2 (seconds) 25 19 13 45 17 48 44 26 22 19
T1 T T T T T T T T T T
T2 0.7T 0.4T 0.3T 0.9T 0.5T 0.8T 0.7T 0.3T 0.5T 0.5T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #12 24/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #13
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage gear reducer
4. Roller chain drive 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 3.8 7.9 7.9 5.2 3.3 6 5.5 3.5 4.4 3
Rotation speed of blender shaft: n (rpm) 22 12 21 40 30 13 24 70 20 66
Service life: L (years) 3 6 7 7 3 5 3 3 6 6
Number of working days per year 349 240 323 185 164 230 295 337 184 270
Number of shifts per working day 2 2 1 1 2 3 1 3 1 3
t1 (seconds) 49 41 35 39 58 48 11 11 56 28
t2 (seconds) 31 55 24 34 16 43 55 13 41 41
T1 T T T T T T T T T T
T2 0.1T 0.3T 0.4T 0.8T 0.6T 0.2T 0.6T 0.4T 0.9T 0.3T

Project #13 25/40


Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 4.9 8 4.2 6.9 6.1 3.1 6.8 5.9 3.2 3.8
Rotation speed of blender shaft: n (rpm) 58 31 40 61 41 35 20 48 17 52
Service life: L (years) 8 3 4 8 7 8 8 6 5 8
Number of working days per year 209 167 328 279 269 322 222 162 331 289
Number of shifts per working day 2 2 1 1 1 1 2 1 3 1
t1 (seconds) 22 12 25 39 28 40 24 15 19 17
t2 (seconds) 16 52 43 17 48 32 41 24 50 19
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.4T 0.7T 0.2T 0.6T 0.4T 0.7T 0.8T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #13 26/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #14
DESIGN OF A TRANSMISSION SYSTEM FOR INDUSTRIAL BLENDER
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Blender

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Power on blender shaft: P (kW) 7.3 5.3 4 5.8 3.4 7.5 4.7 5.3 6.1 6.5
Rotation speed of blender shaft: n (rpm) 53 47 14 28 65 11 24 21 47 47
Service life: L (years) 7 6 5 5 6 6 6 6 6 3
Number of working days per year 196 337 336 343 181 297 260 273 187 315
Number of shifts per working day 1 2 1 2 3 1 1 3 2 3
t1 (seconds) 18 30 33 27 46 41 25 28 19 32
t2 (seconds) 52 44 28 43 49 17 54 19 14 31
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.9T 0.5T 0.3T 0.3T 0.5T 0.9T 0.6T 0.7T

Project #14 27/40


Data No. 11 12 13 14 15 16 17 18 19 20
Power on blender shaft: P (kW) 3.5 3.5 6.5 6.6 4.1 6.8 4.6 3.1 7.2 4.3
Rotation speed of blender shaft: n (rpm) 44 61 38 55 70 14 18 55 26 65
Service life: L (years) 4 6 4 5 7 4 4 3 4 5
Number of working days per year 347 158 236 216 207 360 208 343 235 198
Number of shifts per working day 3 1 3 2 3 1 1 3 1 1
t1 (seconds) 11 46 13 58 59 54 51 27 25 45
t2 (seconds) 19 36 22 16 46 38 24 51 47 12
T1 T T T T T T T T T T
T2 0.4T 0.7T 0.3T 0.4T 0.6T 0.4T 0.4T 0.3T 0.6T 0.3T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #14 28/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #15
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 5900 4800 6200 5300 5800 6900 6100 4300 4900 4900
Tangential velocity on conveyor belt: v (m/s) 1.94 1.15 1.49 1.25 0.94 1.03 1.91 2.37 1.33 2.07
Diameter of drive conveyor pulley: D (mm) 370 450 600 410 400 550 300 440 310 520
Service life: L (years) 8 6 6 4 5 5 7 8 7 5
Number of working days per year 315 318 219 280 352 223 321 229 193 186
Number of shifts per working day 1 1 2 2 2 3 3 3 2 3
t1 (seconds) 16 11 39 22 12 48 11 48 44 34
t2 (seconds) 56 24 14 14 20 54 20 15 44 46
T1 T T T T T T T T T T
T2 0.3T 0.7T 0.4T 0.5T 0.4T 0.6T 0.8T 0.3T 0.7T 0.7T

Project #15 29/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 5700 5800 4300 4300 4800 5500 4300 6100 6600 6300
Tangential velocity on conveyor belt: v (m/s) 1.5 2.04 1.27 1.11 1.19 1.06 1.92 0.94 1.24 1.03
Diameter of drive conveyor pulley: D (mm) 440 250 360 510 350 200 360 570 530 320
Service life: L (years) 8 3 5 6 6 5 3 5 5 4
Number of working days per year 321 294 217 292 342 259 184 187 188 346
Number of shifts per working day 1 2 3 2 2 2 2 1 2 2
t1 (seconds) 58 22 34 57 33 25 14 36 57 28
t2 (seconds) 10 42 12 18 23 37 42 34 55 30
T1 T T T T T T T T T T
T2 0.8T 0.5T 0.7T 0.8T 0.7T 0.8T 0.3T 0.6T 0.5T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #15 30/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #16
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage gear reducer
4. Flexible shaft coupling 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 2300 3200 2900 6800 5900 2200 6700 4500 4000 2900
Tangential velocity on conveyor chain: v (m/s) 1.29 1.15 1.77 1.89 1.05 1.74 1.26 1.54 1.67 1.27
Number of teeth of the drive conveyor sprocket: Z 9 9 11 9 9 9 11 9 9 9
Pitch of conveyor chain: p (mm) 125 125 150 150 125 125 125 125 150 150
Service life: L (years) 4 6 7 4 6 7 7 5 6 4
Number of working days per year 235 254 246 357 354 356 332 355 351 247
Number of shifts per working day 2 3 1 1 3 2 3 3 1 3
t1 (seconds) 52 35 38 20 22 37 46 55 46 29
t2 (seconds) 60 22 60 45 24 41 27 24 27 16
T1 T T T T T T T T T T
T2 0.8T 0.8T 0.5T 0.3T 0.8T 0.5T 0.9T 0.4T 0.6T 0.8T

Project #16 31/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 5100 3200 7200 4800 5000 4700 5300 5700 3000 5700
Tangential velocity on conveyor chain: v (m/s) 1.97 1.39 1.08 1.21 1.95 1.21 1.89 1.99 1.98 1.01
Number of teeth of the drive conveyor sprocket: Z 9 11 11 11 11 9 11 11 11 9
Pitch of conveyor chain: p (mm) 150 150 150 125 125 150 125 125 150 150
Service life: L (years) 6 4 4 7 5 5 4 4 5 3
Number of working days per year 160 271 195 195 270 278 280 184 156 230
Number of shifts per working day 2 1 1 1 1 3 3 1 3 1
t1 (seconds) 35 10 18 60 53 45 38 18 27 44
t2 (seconds) 14 15 38 30 53 58 50 41 60 47
T1 T T T T T T T T T T
T2 0.3T 0.2T 0.9T 0.4T 0.2T 0.7T 0.7T 0.8T 0.5T 0.2T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #16 32/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #17
DESIGN OF A TRANSMISSION SYSTEM FOR CHAIN CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage worm & gear reducer
4. Flexible shaft coupling 5. Chain conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor chain: F (N) 22200 31300 21100 25900 38700 36600 33700 33200 24500 27800
Tangential velocity on conveyor chain: v (m/s) 0.56 0.46 0.52 0.23 0.47 0.51 0.23 0.31 0.45 0.38
Number of teeth of the drive conveyor sprocket: Z 11 11 11 11 9 11 11 11 11 9
Pitch of conveyor chain: p (mm) 125 150 150 125 125 125 150 150 125 125
Service life: L (years) 7 6 3 3 6 6 4 3 3 7
Number of working days per year 284 340 191 159 187 207 260 304 223 304
Number of shifts per working day 3 2 2 3 3 2 1 1 2 1
t1 (seconds) 13 10 59 53 51 48 25 56 28 50
t2 (seconds) 12 60 58 47 32 12 26 17 33 36
T1 T T T T T T T T T T
T2 0.5T 0.4T 0.4T 0.8T 0.5T 0.8T 0.8T 0.7T 0.7T 0.4T

Project #17 33/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor chain: F (N) 29300 39800 28300 35800 31600 33000 27800 27900 38500 34200
Tangential velocity on conveyor chain: v (m/s) 0.49 0.26 0.53 0.27 0.25 0.6 0.43 0.27 0.25 0.41
Number of teeth of the drive conveyor sprocket: Z 11 11 9 11 11 11 11 11 9 11
Pitch of conveyor chain: p (mm) 125 125 150 150 150 125 150 150 150 125
Service life: L (years) 4 4 7 3 7 4 5 3 3 3
Number of working days per year 175 209 161 216 193 156 308 315 233 351
Number of shifts per working day 2 1 3 1 1 3 1 1 3 3
t1 (seconds) 29 41 43 25 41 34 41 10 35 49
t2 (seconds) 18 60 37 28 27 21 26 50 33 29
T1 T T T T T T T T T T
T2 0.4T 0.7T 0.9T 0.8T 0.8T 0.3T 0.2T 0.4T 0.2T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #17 34/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #18
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. V-belt drive 3. Dual-stage worm & gear reducer
4. Flexible shaft coupling 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 26700 27200 22900 10100 20800 21000 14100 21900 28800 12400
Tangential velocity on conveyor belt: v (m/s) 0.47 0.23 0.46 0.35 0.22 0.3 0.28 0.41 0.3 0.27
Diameter of drive conveyor pulley: D (mm) 220 480 290 310 280 420 580 410 260 440
Service life: L (years) 4 4 5 8 6 8 7 7 4 3
Number of working days per year 282 274 236 353 170 191 315 241 301 309
Number of shifts per working day 3 3 2 2 2 1 3 3 3 1
t1 (seconds) 45 33 40 39 23 58 26 23 11 35
t2 (seconds) 11 13 52 54 37 34 60 42 55 55
T1 T T T T T T T T T T
T2 0.2T 0.2T 0.4T 0.5T 0.6T 0.7T 0.2T 0.7T 0.2T 0.4T

Project #18 35/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 29200 10400 29700 13700 23600 23600 25000 21200 16500 18200
Tangential velocity on conveyor belt: v (m/s) 0.44 0.45 0.43 0.36 0.3 0.33 0.23 0.26 0.41 0.47
Diameter of drive conveyor pulley: D (mm) 380 240 210 480 580 370 410 340 360 430
Service life: L (years) 8 4 6 3 4 4 4 4 3 3
Number of working days per year 314 228 176 250 189 304 195 356 153 180
Number of shifts per working day 1 1 3 1 1 1 2 3 1 2
t1 (seconds) 29 47 27 16 46 12 30 21 18 39
t2 (seconds) 25 19 23 60 13 38 39 49 24 24
T1 T T T T T T T T T T
T2 0.9T 0.6T 0.6T 0.6T 0.3T 0.5T 0.8T 0.9T 0.8T 0.9T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #18 36/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #19
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage worm & gear reducer
4. Roller chain drive 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 13700 18700 23900 20000 19800 24000 20400 14100 10400 10500
Tangential velocity on conveyor belt: v (m/s) 0.36 0.2 0.4 0.22 0.32 0.46 0.4 0.45 0.36 0.3
Diameter of drive conveyor pulley: D (mm) 390 380 560 430 510 380 500 300 530 450
Service life: L (years) 4 6 7 7 5 6 5 8 7 8
Number of working days per year 337 251 271 265 171 286 323 176 290 177
Number of shifts per working day 1 1 3 3 3 2 3 2 1 1
t1 (seconds) 37 22 40 22 25 47 30 24 38 12
t2 (seconds) 31 37 34 56 40 40 31 37 28 40
T1 T T T T T T T T T T
T2 0.1T 0.3T 0.3T 0.8T 0.8T 0.7T 0.3T 0.5T 0.3T 0.6T

Project #19 37/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 26900 11200 25000 12700 24200 21000 13900 29800 17100 26100
Tangential velocity on conveyor belt: v (m/s) 0.27 0.28 0.39 0.22 0.31 0.45 0.26 0.35 0.26 0.45
Diameter of drive conveyor pulley: D (mm) 270 300 470 570 590 400 370 330 230 520
Service life: L (years) 4 7 4 6 8 3 3 8 7 8
Number of working days per year 227 242 150 246 275 181 175 348 327 232
Number of shifts per working day 2 3 1 1 2 1 3 2 2 1
t1 (seconds) 17 57 27 49 49 51 43 43 35 37
t2 (seconds) 11 13 36 22 42 44 22 60 60 40
T1 T T T T T T T T T T
T2 0.7T 0.7T 0.4T 0.9T 0.2T 0.3T 0.4T 0.3T 0.8T 0.5T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #19 38/40


HCMC UNIVERSITY OF TECHNOLOGY - VNU HCM
FACULTY OF MECHANICAL ENGINEERING
DEVISION OF MACHINE DESIGN

DESIGN PROJECT
(ME2011 / ME3139)
Semester 2/Academic year 2023-2024

Student: ……………………………. Student ID: …………………………….


Advisor: ……………………………. Signature: …………………………….
Completion day: ……………………………. Defense day: …………………………….

PROJECT #20
DESIGN OF A TRANSMISSION SYSTEM FOR BELT CONVEYOR
Data No.: ……….

System components:
1. Electric motor 2. Flexible shaft coupling 3. Dual-stage worm & gear reducer
4. Roller chain drive 5. Belt conveyor

Operating conditions: one-direction working, light-impact loading, 8-hour shift

Data No. 1 2 3 4 5 6 7 8 9 10
Tangential force on conveyor belt: F (N) 17500 24700 22700 11200 27900 10700 16800 18800 19900 14400
Tangential velocity on conveyor belt: v (m/s) 0.23 0.27 0.46 0.22 0.3 0.28 0.32 0.31 0.45 0.43
Diameter of drive conveyor pulley: D (mm) 440 260 430 400 520 230 310 580 280 270
Service life: L (years) 8 8 6 4 7 8 6 4 8 5
Number of working days per year 282 248 279 246 224 264 231 177 183 270
Number of shifts per working day 3 2 2 1 2 3 2 3 2 2
t1 (seconds) 28 22 40 45 11 42 16 14 23 36
t2 (seconds) 36 46 44 24 14 28 31 13 53 39
T1 T T T T T T T T T T
T2 0.2T 0.3T 0.5T 0.4T 0.3T 0.8T 0.9T 0.5T 0.5T 0.5T

Project #20 39/40


Data No. 11 12 13 14 15 16 17 18 19 20
Tangential force on conveyor belt: F (N) 11800 21800 10300 19700 24200 18300 17000 18000 27000 19600
Tangential velocity on conveyor belt: v (m/s) 0.31 0.42 0.45 0.49 0.24 0.26 0.21 0.47 0.22 0.43
Diameter of drive conveyor pulley: D (mm) 550 250 580 420 340 400 340 440 240 530
Service life: L (years) 8 6 6 7 3 4 4 7 6 7
Number of working days per year 241 315 287 230 349 351 234 221 216 271
Number of shifts per working day 1 1 3 1 1 3 1 3 1 2
t1 (seconds) 14 18 48 54 22 20 45 58 48 37
t2 (seconds) 49 27 22 36 42 14 14 33 51 32
T1 T T T T T T T T T T
T2 0.2T 0.4T 0.6T 0.3T 0.5T 0.8T 0.3T 0.2T 0.3T 0.4T

Requirements:
- 01 project report
- 01 A0 assembly drawing and 01 part drawing following TCVN.

Contents of the project report:


1. Select proper electric motor and distribute velocity ratio for the transmission system.
2. Design machine elements:
a. Design uncovered drives (belt, chain or gear).
b. Design covered drives (gears, worm, worm wheel).
c. Draw diagram of forces applied on drives and calculate the values of forces.
d. Design shafts and keys.
e. Select bearings and shaft coupling.
f. Select housing of the speed reducer, bolts/screws and other parts.
3. Select assembly fits and tolerances.
4. References.

Project #20 40/40