Saudi Aramco Submittal Transmittal Form

This document is a submittal transmittal form from a contractor to Saudi Aramco for review of a heat stress management plan. It includes information such as the contract and building identification numbers, submittal number, date, description of the attached document, and signatures for approval.

Uploaded by

01095902062ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
211 views1 page

Saudi Aramco Submittal Transmittal Form

This document is a submittal transmittal form from a contractor to Saudi Aramco for review of a heat stress management plan. It includes information such as the contract and building identification numbers, submittal number, date, description of the attached document, and signatures for approval.

Uploaded by

01095902062ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

KING SALMAN ENERGY PARK (SPARK) INFRASTRUCTURE & MAINTENANCE BUILDING

Contract # 6600050462 B.I # 25-00040 Job Order No. 0020

SUBMITTAL TRANSMITTAL FORM


INFRASTRUCTURE & MAINTENANCE
Submittal No. Project
BUILDING
Contractor: BRANCH OF SINOHYDRO CORP. LTD.
DOC-IMB-SH-HSE-0007-02 Date: 30 Mar 2023
Transmission of Documents Delivery Submitted For Code
__ Courier APPROVAL 1
To: SAUDI ARAMCO
__ Recipient Manager Other INFORMATION 2
For Contractor COORDINATION 3
FOR CM USE ONLY: Action Code
Arch. Str. Cvl. Elec. Mech. Gen. CV Com. Letter Other APPROVED A

APPROVED AS NOTED B
QA/QC PROC MAT HSE DWG MS TQ ITP DOC TECH CORRECT & RESUBMIT C
✘ ✘
FOR INFORMATION D
Rec'd 00/00/000 Out To: 00/00/000 REJECTED E
In From 00/00/000 To Contractor: 00/00/000 COORDINATION F
Code
Old. Ref. # Rev. Dwg. / Spec. Ref. Rev. Description Type
Submittal Action

DOC-IMB-SH-HSE-0007 02 Heat Stress Management Plan DOC

Distribution:

Contractor Representative Signature : Li Rongping

**Type: SD - Shop Drawings CT - Certificates


SM - Sample GT - Guarantees

MD - Manufacturer's Data OT - Others
Remarks

Saudi Aramco Representative


Date:

Approval correction or comments made relative to submittals during this review do not relieve the Contractor for compliance with the requirements of the drawings or
specification. This check is only for review of general performance with the design concept of the project and general compliance with the information given in the correct
documents. The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
coordination his work with that of other trades, and performing his work in a safe, timely, and satisfactory manner.

For Saudi Aramco Use Only


Contractor's Signature:
Received For:
Received:
Date: Date: