KING SALMAN ENERGY PARK (SPARK) INFRASTRUCTURE & MAINTENANCE BUILDING
Contract # 6600050462 B.I # 25-00040 Job Order No. 0020
SUBMITTAL TRANSMITTAL FORM
INFRASTRUCTURE & MAINTENANCE
Submittal No. Project
BUILDING
Contractor: BRANCH OF SINOHYDRO CORP. LTD.
DOC-IMB-SH-HSE-0007-02 Date: 30 Mar 2023
Transmission of Documents Delivery Submitted For Code
__ Courier APPROVAL 1
To: SAUDI ARAMCO
__ Recipient Manager Other INFORMATION 2
For Contractor COORDINATION 3
FOR CM USE ONLY: Action Code
Arch. Str. Cvl. Elec. Mech. Gen. CV Com. Letter Other APPROVED A
✘
APPROVED AS NOTED B
QA/QC PROC MAT HSE DWG MS TQ ITP DOC TECH CORRECT & RESUBMIT C
✘ ✘
FOR INFORMATION D
Rec'd 00/00/000 Out To: 00/00/000 REJECTED E
In From 00/00/000 To Contractor: 00/00/000 COORDINATION F
Code
Old. Ref. # Rev. Dwg. / Spec. Ref. Rev. Description Type
Submittal Action
DOC-IMB-SH-HSE-0007 02 Heat Stress Management Plan DOC
Distribution:
Contractor Representative Signature : Li Rongping
**Type: SD - Shop Drawings CT - Certificates
SM - Sample GT - Guarantees
✘
MD - Manufacturer's Data OT - Others
Remarks
Saudi Aramco Representative
Date:
Approval correction or comments made relative to submittals during this review do not relieve the Contractor for compliance with the requirements of the drawings or
specification. This check is only for review of general performance with the design concept of the project and general compliance with the information given in the correct
documents. The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
coordination his work with that of other trades, and performing his work in a safe, timely, and satisfactory manner.
For Saudi Aramco Use Only
Contractor's Signature:
Received For:
Received:
Date: Date:
00000011:52:06# 00000Saudi Aramco: Company General Use
Non-Business Use
0