Cost Estimate Misku Bridge 150 Nov2019
Cost Estimate Misku Bridge 150 Nov2019
ETHIOPIA
Report on
                                       of
                               MISKU SUSPENDED BRIDGE
over
Tsetseka
Submitted by
Mode of Execution
Cost Estimate                                                                                            1
Pedestrain Trail Bridge                                                                                             Burundi
                                 TTRAIL BRIDGE IN ETHIOPIA
                                                     ETHIOPIA
                                     SPECIAL TRAIL BRIDGE PROJECT
Cost Estimate                                                                                                             2
Pedestrain Trail Bridge                              Burundi
                          TOTAL 400 TRANSPORTATION     308,121.78
Cost Estimate                                             3
Pedestrain Trail Bridge                                                                                    Burundi
Cost Estimate                                                                                                     4
Pedestrain Trail Bridge                                                                                  Burundi
363 INSURANCE
   1    Labours (20 persons)                       person          20.0                                                 0.00
Cost Estimate                                                                                                      6
Pedestrain Trail Bridge                                                                               Burundi
                                                                            Requirement of
                                             Require-             Sand                       Rubble/
            Item              Unit Quantity nment per Cement                                               Block
                                                                                 Gravel     Bldr
                                               Unit                                                     Stone
                                                       (bags)                        ( m3 )        ( m3
                                                                                                            ( m3 )
                                                                   ( m3 )                        )
                                                 4.40      0.00
551 Plain Mass Concrete
                              m3       0.00      0.47                     0.00
1:3:6
                                                 0.89                                  0.00
                                                 6.40    155.14
552 Reinforced Cement
                              m3      24.24      0.45                    10.79
Concrete 1:2:4
                                                 0.85                                 20.60
2.64 364.32
                                                 0.28                    38.64
553 Plum Concrete 40%         m3     138.00
                                                 0.54                                 74.52
0.50 69.00
2.28 46.79
1.10 22.57
1.50 61.56
1.10 45.14
                                                 9.12     18.42
564 Cement Plaster (1:4)      m3       2.02
                                                 1.31                     2.65
Cost Estimate                                                                                                7
   Pedestrain Trail Bridge                                                                                          Burundi
   Cost Estimate                                                                                                          8
Pedestrain Trail Bridge                                              Burundi
                                                Unit
                          Description   Unit                 Rate        Unit Cost
                                               Quantity
                                                      Total Cost (1+2)         19.31
                                                              Vat 13%           2.51
                                                     Total cost per kg         21.82
Cost Estimate                                                              9
   Pedestrain Trail Bridge                                                                                   Burundi
                                                                                      Unit
                             Description                                   Unit                      Rate        Unit Cost
                                                                                     Quantity
400 TRANSPORTATION
420 Transportation by Truck (Steel Parts, Cables, Cement, Tools & Other Materials) per ton
                                           Metalled Road                  720.00         1.00           5.000        3600.00
Sekota To (Ziquala) Road head
                                           Non-Metalled Road                58.00        1.00          10.000         580.00
                                                                                                 Total Per ton       4180.00
                                                                                                 Total per kg           4.18
430 Portering Road head to Site per 1000kg
     441 Materials except Cables & Cement (Rate=Daily Wage/40)                0.15       1000         250.00          937.50
                                                                                       Sub-total per 1000 kg          937.50
                                                 Total cost per kg transportation of materials except cables            0.94
     442 Cables, Bulldog Grips & Tools     (Rate=Daily Wage/22)               0.15       1000         250.00         1704.55
                                                                                       Sub-total per 1000 kg         1704.55
                                                              Total cost per kg transportation of wire ropes            1.70
     443 Cement                            (Rate=Daily Wage/40)               0.15       1000         250.00          937.50
                                                                                       Sub-total per 1000 kg          937.50
                                                              Total cost per kg transportation of wire ropes            0.94
500 CONSTRUCTION WORKS
510 Site Clearance per m2
         Labour                            unskilled                        md            0.06         250.00           15.00
                                                                                                 Cost per m2            15.00
520 All Excavation
    521 Soil
         Labour                            unskilled                        md            0.80         250.00          200.00
                                                                                                 Cost per m3           200.00
     522 Soft Rock
         Labour                            unskilled                        md            1.40         250.00          350.00
                                                                                                 Cost per m3           350.00
     523 Hard Rock (Quarrying)
         Material                          Fuel                             ltr           2.20          31.22           68.68
         Labour                            unskilled                        md            1.65         250.00          412.50
                                                                                                 Cost per m3           481.18
     524 Hard Rock by Blasting
         Material                          Fuel                             ltr           2.20          31.22           68.68
         Labour                            skilled                          md            0.04         550.00           22.00
                                           unskilled                        md            1.65         250.00          412.50
                                                                                                 Cost per m3           503.18
530 Foundation Excavation
    531 Soil
        Labour                             unskilled                        md            1.69         250.00          422.50
                                                                                                 Cost per m3           422.50
     532 Soft Rock
         Labour                            unskilled                        md            2.50         250.00          625.00
                                                                                                 Cost per m3           625.00
     533 Hard Rock by Quarrying
         Material                          Fuel                             ltr           4.00          31.22         124.87
         Labour                            unskilled                        md            5.50         250.00        1375.00
                                                                                                 Cost per m3         1499.87
     534 Hard Rock by Blasting
         Material                          Fuel                             ltr           2.20          31.22          68.68
         Labour                            skilled                          md            0.04         550.00          22.00
                                           unskilled                        md            4.40         250.00        1100.00
                                                                                                 Cost per m3         1190.68
     535 Hard Rock by Chiselling
         Labour                            unskilled                        md          25.20          250.00        6300.00
                                                                                                 Cost per m3         6300.00
     536 Backfilling
   Cost Estimate                                                                                                  10
Pedestrain Trail Bridge                                                          Burundi
                                                            Unit
                          Description               Unit                 Rate        Unit Cost
                                                           Quantity
      Labour                            unskilled   md         0.85         250.00         212.50
                                                                      Cost per m3          212.50
Cost Estimate                                                                         11
   Pedestrain Trail Bridge                                                                      Burundi
                                                                           Unit
                               Description                         Unit                 Rate        Unit Cost
                                                                          Quantity
540 Gabions Works
    541 Box Size 2.0 x 1.0 x 1.0
        Material                             Mesh Wire 10 SWG      kg        12.08          45.19        545.89
                                             Selvage Wire 7 SWG    kg         1.58          45.19         71.40
                                             Binding Wire 12 SWG   kg         0.48          45.19         21.69
                                             Rubble                m3         1.10        1192.50       1311.75
          Labour       Fabrication of Gabion skilled               md         0.23         550.00        126.50
                                             unskilled             md         0.10         250.00         25.00
                    Construction of Gabions unskilled              md         0.20         250.00         50.00
                                                                                     Cost per m3        2152.23
     542 Box Size 3.0 x 1.0 x 1.0
         Material                            Mesh Wire 10 SWG      kg        11.70          45.19        528.72
                                             Selvage Wire 7 SWG    kg         1.37          45.19         61.91
                                             Binding Wire 12 SWG   kg         0.43          45.19         19.43
                                             Rubble                m3         1.10        1192.50       1311.75
          Labour       Fabrication of Gabion skilled               md         0.21         550.00        115.50
                                             unskilled             md         0.10         250.00         25.00
                    Construction of Gabions unskilled              md         0.20         250.00         50.00
                                                                                     Cost per m3        2112.31
     543 Box Size 2.0 x 1.0 x 0.3
         Material                            Mesh Wire 10 SWG      kg        22.33          45.19       1009.08
                                             Selvage Wire 7 SWG    kg         3.75          45.19        169.46
                                             Binding Wire 12 SWG   kg         1.08          45.19         48.80
                                             Rubble                m3         1.10        1192.50       1311.75
          Labour       Fabrication of Gabion skilled               md         0.44         550.00        242.00
                                             unskilled             md         0.20         250.00         50.00
                    Construction of Gabions unskilled              md         0.20         250.00         50.00
                                                                                     Cost per m3        2881.10
     544 Box Size 3.0 x 1.0 x 0.3
         Material                            Mesh Wire 10 SWG      kg        21.94          45.19        991.46
                                             Selvage Wire 7 SWG    kg         3.33          45.19        150.48
                                             Binding Wire 12 SWG   kg         1.00          45.19         45.19
                                             Rubble                m3         1.10        1192.50       1311.75
          Labour       Fabrication of Gabion skilled               md         0.41         550.00        225.50
                                             unskilled             md         0.19         250.00         47.50
                    Construction of Gabions unskilled              md         0.20         250.00         50.00
                                                                                     Cost per m3        2821.88
550 Concrete Works
     551 Plain Mass Concrete 1:3:6
         Material                            Cement                bag        4.40         500.00       2200.00
                                             Gravel (5-40 mm)      m3         0.89        1542.50       1372.83
                                             Sand                  m3         0.47        1497.50        703.82
          Labour                             skilled               md         1.00         550.00        550.00
                                             unskilled             md         4.00         250.00       1000.00
                                                                                     Cost per m3        5826.65
     552 Reinforcement Cement Concrete 1:2:4
         Material                         Cement                   bag        6.40         500.00       3200.00
                                          Gravel (5-40 mm)         m3         0.85        1542.50       1311.13
                                          Sand                     m3         0.45        1497.50        673.88
         Labour                           skilled                  md         1.00         550.00        550.00
                                          unskilled                md         4.00         250.00       1000.00
                                                                                     Cost per m3        6735.00
     553 Plum Concrete (1:3:6)+40% Boulder
         Material                        Cement                    bag        2.64         500.00       1320.00
                                         Gravel (5-40 mm)          m3         0.54        1542.50        832.95
                                         Sand                      m3         0.28        1497.50        419.30
                                         Boulders (225 mm)         m3         0.50        1192.50        596.25
         Labour                          skilled                   md         0.50         550.00        275.00
                                         unskilled                 md         4.00         250.00       1000.00
                                                                                     Cost per m3        4443.50
     554 Form Work
         Material                            Wood                  m3         0.01          0.00            0.00
                                             Nails                 kg         0.03         44.60            1.34
          Labour                             skilled               md         0.78        550.00          429.00
   Cost Estimate                                                                                     12
Pedestrain Trail Bridge                                                         Burundi
                                                            Unit
                          Description               Unit                 Rate       Unit Cost
                                                           Quantity
                                        unskilled   md         0.62        250.00         155.00
                                                                      Cost per m2         585.34
Cost Estimate                                                                        13
   Pedestrain Trail Bridge                                                                                   Burundi
                                                                                      Unit
                               Description                                  Unit                     Rate        Unit Cost
                                                                                     Quantity
560 Masonry Mortar Works
     561 Dry Stone Masonry or Pitching
         Material                            Rubble                          m3            1.10        1192.50       1311.75
         Labour                              skilled                         md            1.00         550.00        550.00
                                             unskilled                       md            2.00         250.00        500.00
                                                                                                  Cost per m3        2361.75
     562 Rubble Masonry 1:4
         Material                            Cement                          bag           2.28         500.00       1140.00
                                             Sand                            m3            0.45        1497.50        673.88
                                             Stone                           m3            1.10        1192.50       1311.75
          Labour                             skilled                         md            1.50         550.00        825.00
                                             unskilled                       md            5.00         250.00       1250.00
                                                                                                  Cost per m3        5200.63
     563 Rubble Masonry 1:6
         Material                            Cement                          bag           1.50         500.00        750.00
                                             Sand                            m3            0.47        1497.50        703.82
                                             Stone                           m3            1.10        1192.50       1311.75
          Labour                             skilled                         md            1.50         550.00        825.00
                                             unskilled                       md            5.00         250.00       1250.00
                                                                                                  Cost per m3        4840.58
     564 Cement Plaster 1:4, 20 mm thick
         Material                            Cement                          bag           0.16        500.00           80.00
                                             Sand                            m3            0.02       1497.50           29.95
          Labour                             skilled                         md            0.22        550.00          121.00
                                             unskilled                       md            0.22        250.00           55.00
                                                                                                  Cost per m2          285.95
570 Erection and Finishing Works
    571 Hoisting of Cables per m (Incl un/coiling)
         Cable Ø 13 mm
         Labour                              skilled                         md            0.01         550.00           5.50
                                             unskilled                       md            0.08         250.00          20.00
                                                                                                      Subtotal          25.50
          Cable Ø 26 mm
          Labour                             skilled                         md            0.04         550.00          22.00
                                             unskilled                       md            0.32         250.00          80.00
                                                                                                      Subtotal         102.00
          Cable Ø 32 mm
          Labour                             skilled                         md            0.06         550.00          33.00
                                             unskilled                       md            0.48         250.00         120.00
                                                                                                      Subtotal         153.00
          Cable Ø 36 mm
          Labour                             skilled                         md            0.08        550.00           44.00
                                             unskilled                       md            0.61        250.00          152.50
                                                                                                      Subtotal         196.50
          Cable Ø 40 mm
          Labour                             skilled                         md            0.10        550.00           55.00
                                             unskilled                       md            0.75        250.00          187.50
                                                                                                     Subtotal          242.50
                                         Total (refer to the corresponding number and diameter of wire ropes)          719.50
                                                                                                 Cost per m            719.50
      572 Hoisting of Windties and Stabilizing Cables
          Labour                              skilled                         md          0.27         550.00          148.50
                                              unskilled                       md          0.67         250.00          167.50
                                                                                                  Cost per pc          316.00
     573 Erection of the Walkway
          For Suspended Bridge
          Labour                              skilled                         md          1.53         550.00         841.50
                                              unskilled                       md          3.22         250.00         806.25
                                                                                                  Cost per m         1647.75
     574 Coaltar Application
          For Suspended Bridge
          Material                            Coaltar                         ltr         0.56           2.00            1.12
                                              Kerosene                        ltr         0.19           1.00            0.19
          Labour                              skilled                         md          0.03         550.00           16.50
                                              unskilled                       md          0.06         250.00           15.00
   Cost Estimate                                                                                                  14
Pedestrain Trail Bridge                                            Burundi
                                                Unit
                          Description   Unit                Rate       Unit Cost
                                               Quantity
                                                          Cost per m         32.81
Cost Estimate                                                           15
                                    TTRAIL BRIDGE IN ETHIOPIA
                                                 ETHIOPIA
                              SPECIAL TRAIL BRIDGE PROJECT
4. Transportation
Description                                              Unit Quantity         Rate     Cost
Addis Ababa to       Wire Ropes, Bulldog Grips, Steel
                                                         kg        59330.94
  Road Head          Parts, Cement & Other Materials
                                                               Total Transportation
                            LIST OF DESIGN & DRAWING
A. List Of Deque Design
S. No.                          Description                                           Qty        Remarks
   1     Main & Handrail Cable Structures for Suspended Bridge                         1
   2                                                                                   1    Left Bank on Rock
         Drum Type Main Anchorage Foundation
   3                                                                                   1    Right Bank on Rock
   4                                                                                   1    Up Stream
         Design of Windguy Cable Structure
   5                                                                                   1    Down Stream
   6                                                                                   1    Up Stream
                                                                   Left Bank
   7     Windguy Anchorage Foundation                                                  1    Down Stream
   8         (Extended Anchorage)                                                      1    Up Stream
                                                                   Right Bank
   9                                                                                   1    Down Stream
  10                                                                                   1    Up Stream
         Design of Windguy Cable Structure (Windties Details)
  11                                                                                   1    Down Stream
                                                                       Total Sheet    11
B. List Of Drawing
                                                                    Sheet      Page
S. No. Drawing No                       Description                                   Qty        Remarks
                                                                     No.       No.
  1          1GA       GA                                             1-1              1
  2                                                                   1-2     1        1
              02       Walk Way
  3                                                                   2-2     2        1
  4                                                                   1-2     11       1
              06       Steel Deck
  5                                                                   2-2     12       1
                                                                                            Common
  6                                                                   1-2     18       1
              11       Windtie
  7                                                                   2-2     19       1
  8                                                                   1-3     63       1
  9           42       Windgay Cable Anchorage Extended length        2-3     64       1
  10                                                                  3-3     65       1
  11                                                                  1-4     96       1
  12                                                                  2-4     97       1
              61       Main Cable Anchorage                                                 Left Bank
  13                                                                  3-4     98       1
  14                                                                  4-4     99       1
  15                                                                  1-4     96       1
  16                                                                  2-4     97       1
              61       Main Cable Anchorage                                                 Right Bank
  17                                                                  3-4     98       1
  18                                                                  4-4     99       1
  19                                                                  1-2    107       1
            63(32)     Handrail Cable & Fixation Cable Anchorage
  20                                                                  2-2    108       1
  21                                                                  2-2    291       1    L/B DS
  22                                                                  2-2    291       1    L/B US
             42/1      Windguy Cable Foundation
  23                                                                  2-2    291       1    R/B DS
  24                                                                  2-2    291       1    R/B US
  25                                                                  1-3    327       1
  26       61/1(32)    Main Foundation                                2-3    328       1    Left Bank
  27                                                                  3-3    329       1
  28                                                                  1-3    327       1
  29       61/1(32)    Main Foundation                                2-3    328       1    Right Bank
  30                                                                  3-3    329       1
                                                               Total Drawing Sheet    30
                                            TTRAIL BRIDGE IN ETHIOPIA
                                                               ETHIOPIA
                                       SPECIAL TRAIL BRIDGE PROJECT
                     COST ESTIMATE : INFORMATION, DATA & QUANTITY INPUT SHEET
Bridge Information Sheet
                                  m   3
                                             m   3
                                                        m   3
                                                                      m   2
                                                                                    m   3
                                                                                                m3            m3          m3         m3
Main Block Foundation                                                                                                                           PC 1:
   Left Bank                                  12.12      62.16            8.87                                 20.52        0.81     95.62
   Right Bank                                 12.12      62.16            8.87                                 20.52        0.81     95.62
Windguy Cable Anchorage                                                                                                                         TV
   US - Left Bank                                           3.42          0.00                    5.13                     0.100         8.64
                                                                                                                                              D
   US - Right Bank                                          3.42          0.00                    5.13                     0.100         8.64 W
                                                                                                                                              o
   DS - Left Bank                                           3.42          0.00                    5.13                     0.100         8.64 iw
   DS - Right Bank                                          3.42          0.00                    5.13                     0.100         8.64  n
                                                                                                                                               d
   Ramp-LB                                                                                                                                     g
                                                                                                                                               S
   Ramp-RB                                                                                                                                     Right
                                                                                                                                               u
                                                                                                                                               t
   Others - LB                                                                                                                                 y
                                                                                                                                               r
   Others - RB                                                                                                                                 e
                                                                                                                                         PC 1:3:6
                   TOTAL            0.00      24.24     138.00         17.74         0.00        20.52        41.04        2.02                B
                                                                                                                                               a
                                                                                                                                           UPlm
                   POS CE         551        552        553           554          561          562          563         564                   Right
                                                                                                                                               o
                                                                                                                                               c
                                                                                                                                               k
Official Rates
                                                                                                  Rate
                                  Description                                             Unit                 Remarks
                                                                                                     BIRR
Wire Ropes                             Ø 13 mm                                              m          48.00
                                       Ø 26 mm                                              m           0.00
                                       Ø 32 mm                                              m        268.80
                                       Ø 36 mm                                              m           0.00
                                       Ø 40 mm                                              m           0.00
Bulldog Grips                          Ø 13 mm                                              pc         46.80
                                       Ø 26 mm                                              pc          0.00
                                       Ø 32 mm                                              pc       238.80
                                       Ø 36 mm                                              pc          0.00
                                       Ø 40 mm                                              pc          0.00
Blasting Materials                     Gelatine                                             kg
                                       Detonator                                            pc
                                       Fuse Wire                                            m
Supply of Steelparts                   Structural Steel                                     kg        80.00
                                       Reinforcement Steel                                  kg        54.00
Thimbles                               Ø 13 mm                                              pc        60.00
                                       Ø 26 mm                                              pc         0.00
                                       Ø 32 mm                                              pc       240.00
                                       Ø 36 mm                                              pc         0.00
                                       Ø 40 mm                                              pc         0.00
Miscellaneous Supply                   Gabion Wire 7,10,12 SWG                              kg        45.19
                                       Sign Board                                           pc         0.00
                                       Bolts, Nuts & Washers: Grade 4.6                     kg       250.00
Rust Prevention                        Zink                                                 kg       122.49
               Hot Dip Galvanization   Hydrochloric Acid                                    ltr       38.65
                                       Chemical for pre-fluxing                             kg         7.73
                                       Fuel                                                 ltr       31.22
Paint                                  Primer and finishing Enamel                         m2         63.00
Tools & Equipment                      Tools & Equipment                                   set     10000.00
Labour Rates    Workshop               Skilled                                             md        550.00
                  for Fabrication      Unskilled                                           md        250.00
                Site                   Skilled                                             md        550.00
                    for Construction   Unskilled                                           md        250.00
                                       Porter                                              md        250.00
Transportation                         Truck Metalled Road (….........to ….............   txkm         5.00
                                       Truck Non-Metalled Road (…........to..........     txkm        10.00
Construction                           Cement                                              bag       500.00
                                       Binding Wire                                         kg        44.60
                                       Nail for Site store & Form work                      kg        44.60
                                       Seiving wire mesh (1.5m) (3mm2)                      pc       300.00
                                       Project Information Hoarding Board                   pc
                                       Local Wood                                          m3
Site Management Local Human            Interpreter cum Social Mobilizer                   month
                Resource               Watch Person/Office Assisstant                     month
                Site Store &           Temporary Shed at Bridge Site                        no
                Vehicle/Fuel           Store Rent at Bridge Site                          month
                                       Vehicle Rent with Driver & Maintenance             month
                                       Fuel for Vehicle                                   month
Erection and Finishing Works           Coaltar                                              ltr        2.00
                                       Kerosene                                             ltr        1.00
Additional Haulage, m                  Sand                                                md          2.50
                                       Rubble                                              md          4.00