PKG-1 Width Calculation Sheet
PKG-1 Width Calculation Sheet
050) of NH-158 in the State of Rajasthan under Green National Highways Corridor Project (GNHCP) with the
loan assistance of World Bank on EPC Mode”.
TCS Schedule With Crust Details
Pavement Crust Pavement WIDTH Pavement WIDTH Calculation
Type Of Type Of
S.No PQC- DBM- WMM- DLC- GSB- EMB-
TCS Pavement PQC BC DBM WMM DLC GSB SG Median SHY MCW PS ES BC-TOP SG-TOP Remarks
TOP TOP TOP TOP TOP TOP
1 TCS-1 Rigid 250 0 0 0 150 150 500 1000 500 7000 1500 2000 9000 10500 12800 13100 14100
2 TCS-2 Rigid 250 0 0 0 150 150 500 1000 500 7000 2000 0 9500 10250 10500 10500 10500
3 TCS-3 Rigid 250 0 0 0 150 150 500 1000 500 7000 1500 2000 9000 10500 12800 13100 14100
4 TCS-4 Rigid 250 0 0 0 150 150 500 1000 500 7000 1500 0 9000 10165 10965 11265 12265
To be
calculated
as per
5 TCS-6 Flexible 0 50 90 250 0 200 500 1000 500 7000 2000 0 9500 9500 9720 10500 10500 10500 approved
Retaining
Wall
Drawing
6 7A Rigid 250 0 0 0 150 150 500 750 500 10500 0 3000 11000 12500 14750 14750 14750
7 7B (LHS) Rigid 250 0 0 0 150 150 500 750 500 10500 0 3000 11000 12500 14750 14750 14750
8 7B (RHS) Rigid 250 0 0 0 150 150 500 750 500 10500 1000 0 12000 13000 13150 13300 13800
9 7C Rigid 250 0 0 0 150 150 500 750 500 10500 1000 0 12000 13000 13150 13300 13800
To be
calculated
as per
10 Toll Plaza Rigid 250 0 0 0 150 150 500 1000 500 7000 1500 2000 9000 10500 12800 13100 14100
approved
Toll Plaza
Drawing