SGQ ATS en
SGQ ATS en
All rights reserved. No part of this publication may be reproduced in any material form (including
photocopying or storing in any medium by electronic means or other) without the written permission of
the copyright holder.
SmartGen reserves the right to change the contents of this document without prior notice.
1 SUMMARY ..................................................................................................................................................4
4 WORKING REQUIREMENTS.......................................................................................................................9
7 ORDER MODELS...................................................................................................................................... 11
SGQ Automatic Transfer Switch (ATS) is used under conditions of AC660V 50/60Hz or DC250V. It is
two-stage PC class type with electromagnetism drive structure, which can make fast load transfer
(transfer time ≤80ms) of two power circuits. It can be widely used for national one-class load, for
example: high buildings, post, telecommunications, coal mines, ships, industrial assembly lines, health
care, military facilities etc. The two power circuits can be grid, auto start genset, storage battery etc.
SGQ Automatic Transfer Switch (ATS) adopts electromagnetic coil drive, electrical and mechanical
interlocking structure, main loop structure of two static contacts and one dynamic contact. Dynamic
contact applies V type, which ensures two power circuits shall not be short circuit. N type and T type
apply double coils; M type applies single coil. Coils are only energized at the time of transfer and this
extends the usage life of switch to a great degree. Coil control power can be supplied by master/slave
AC or DC power and it is not needed to add another control power. Switch itself has mechanical or
electrical close indication, and at the same time it provides volts free auxiliary contact.
3.1 ILLUSTRATION
SGQ ATS can be classified into 3 types by appearance: N type, T type, M type. Each type has 3P
and 4P, and N type still has 2P.
The rated current series are: 63A, 125A, 160A, 200A, 250A, 400A, 630A, 800A, 1000A and 1250A.
Switch appearances are as below.
Type 2P 3P 4P
N
Type
63A, 125A
T
Nil
Type
M
Nil
Type
Installation size
Overall size(mm) Copper bar and location hole (mm)
(mm)
Model
A B
D C E M NM U NU T
3P 4P 3P 4P
SGQ160 326 375 292 146 307 356 200 9 9 20 20 49
SGQ200 326 375 292 146 307 356 200 9 9 20 20 49
SGQ250 326 375 292 146 307 356 200 9 9 20 20 49
SGQ400 356 405 292 146 337 386 200 11 9 30 20 59
SGQ630 368 427 310 146 349 408 200 14 14 40 30 63
Item Requirements
Working temperature (-40~+70)ºC
Working Humidity (20~90)%RH
Installation elevation ≤5000m
Pollution class III
Installation type Ⅳ
Fig. 5 M Type
1. Position control I 2. Position control II
3. Aux. contact of position I 4. Aux. contact of position II
SB1 is #1 power close button SB2 is #2 power close button
H1 is #1 close indication H2 is #2 close indication
All operations about ATS installation and debugging shall be conducted by professionals or persons
knowing the switch device and protection and precaution measures must be considered during the
operation. Wiring connection of main loop must make sure leading wire is not taking any pressure or
force. Before installation and debugging please check firstly whether switch is damaged or whether
there is harmful environment effect on it. At the same time please check whether there is loose wire
resulting from transportation; clear the smudge, especially the smudge on the surface of insulating
parts. The smudge probably is caused by the packing materials in the transportation process or in the
storage process. Please make sure the phase sequences are in accordance at connecting the first
circuit; please observe the wiring connection diagram of user manual strictly at connecting the second
circuit and pay attention to control power voltage class at the same time. Ground must be well
connected on switch installation. Considering personal safety and switch changeover rapidity,
debugging handle can only be used for debugging and users are prohibited to operate on-load with
debugging handle. First use the handle to operate switch, and if nothing unusual occurs, then operate
button manually. If nothing unusual happens, then normal running can start.
7 ORDER MODELS
____________________________________