0% found this document useful (0 votes)
182 views7 pages

IE3722 - ADANI - 2085 - Submission of Cost Estimates For Construction of Change of Scope No. 04.

letters

Uploaded by

Ganga KG3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
182 views7 pages

IE3722 - ADANI - 2085 - Submission of Cost Estimates For Construction of Change of Scope No. 04.

letters

Uploaded by

Ganga KG3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 7
HARDO! UNNAO ROAD PRIVATE LIMITED Ret: HURPL/LECPL-JV-BCLLC/2085 Date: 31% January 2024 Te. Authorized Signatory Lion Engineering Consultants Pvt. Ltd. JV with Bloom Companies LLC. Ganga Expressway Project C/O Mr, Ravishankar Mishra, 1* Floor, Block A-B, Sector-D Ne&r Shri Hans Satsang Ashram P.O. Nagar, Unnao (U.P) - 209801 Project: Development of “Access Controlled Six Lane (Expandable to Eight Lane) Greenfield “Ganga Expressway’ [Group-lll, from Km, 2894300 (Village: Ubariya Khurd, Distt: Herdoi) to Km, 4454000, (Village: Sarso, Distt: Unnac), Design length=155.700 Km] In the State of Uttar Pradesh on OBFOT (Toll) basis under PPP. Subject: ‘Submission of cost estimates for Construction of ‘new additional SVUP - 3 nos. (Unique Ids 30401, 30404, 2 30408), PUP (upgraded from BC to PUP) ~ 2 nos (Unique ID- 30402 & 30411) New additional PUP - 6 nos. (Unique ids 30403, 30406, 30407, 30409, 30410 and 30412) ‘SVUP (upgraded from BC to SVUP) - 1 nos, (unique id 30405) under COS as per Cl.16.2.2 of Concession Agreement & SOP for Cost estimation finalized by Authority - Reg. Ref. 1. Concession Agreement (CA) dated 06.01.2022. 2. UPEIDA letter no. 690/UPEIDA/2593-III/Tech, dated 02.05.2023 (COS Notice-04) 3. UPEIDA COS SOP ref. no. 5058/UPEIDA/1587/Tech. dated 16.11.2023, 4, Authority's letter no, 5121/UPEIDA/1696-II/Tech, dated 20.11.2023. 5. Our Letter no, HURPL/UPEIDA/LION-JV-8CLLC/2018, Dated 19.01.2024, 6. UPEIDA Letter No. 6655/UPEIDA/2437/Tech,, Dated 30.01.2024 Dear si 1. Reference is drawn to the Authority's letter at Ref. 06 vide which the Authority directed to submit the cost estimate of change of scope notice no, 04 (Unique ID- 30401 to 30412) to the Independent Engineer for further review. 2. In this connection, pursuant to Cl.16.2.2 of CA, we are submitting herewith a detailed cost estimate for the works as mentioned in the preceding para, for your scrutiny. The abstract of the cost estimate is tabulated hereunder for your ready reference and a detailed cost estimate is enclosed herewith, a Hardoi Unneo Road Private Limited Tel +91 79 2656 7555 9 Fioor, Shalimar Iridium, Fax #91 7925557177 vibhuti Khand, Gamti Nagar [email protected] ‘Lucknow, Uttar Pradesh - 226010 wu agani.cam CIN: Uas202Gs2021PTC128309 Corporate ofice: Commerce House ~ 6, At 80 fe Corporate Road, OF SG Highway, Next to SNP Giobal House, Praniag Nagar, Ahmedabad 580 051 Registered Office: Adani Corporate Hause, Shantigram, Near Vaishe Devi Cicte. 5, 6, Highway Khodiyar, Anmegabad - 362421 Ref HURPL/LION-JV-BCLLC/2085. Date: 31* Jan 2024 Reduction | Cost oF 7 Of cost of | additional original | works As per Unique scope of | underCoS Net Estimated ie Description cain eer Cae Oe | Remarks 1 2 3 5 625.4 7 Bes SVUP (1X7X3) at Ch. | 30401 | 5064855 i | Structure Work _ | . d 2.96 2.96 Lighting Work . 0.10 0.10 | Highway Work an | one 5.16 298 PUP (ix7x3) at Ch | 30402 | 5074600 | Structure Work ose | o70 332 2.62 Lighting Work . on0 0.10 Highway Work 2as | 197 487 290 PUP (ix7xiy at Ch. 30403 | 3504450 t Structure Work . . 3,49 3.49 | Uphting Work |. | a0 | 0.0 _ Highway Work mes | 1418 w798 | 3.83 | SVUP (ix7x4,05) at Ch. 30404 | 5404300 | Structure work |. | 2.93 2.93 Lighting Work . 0.10 0.10 i: Highway Work 179 | 62s 13.85 7.62 SVUP (ix7x3) at Ch. 30405 | 5554735 Structure Work ov | cee 3.02 2.40 Lighting Work . 0.10 0.10 Highway Work eon | ae 20.19 9.07 30406 | PUP (1x7x3) at Ch. 3734100 Structure Work . 2.66 2.66 Ref: HURPLILION-JV-8CLLC/2085 Date: 31% Jan 2024 Reduction | Cost of a of cost of | additional original works Unique ‘Ene! | scope of under GoS | Net Estimated 10.n0, cesceleeled) Cain | works @ | incr. Cost cr, | Remarks Y | B0% as 1 2 3 5 6=5-4 7 Lighting Work . o.10 0.10 } | Highway Work 612 | 490 nse 7.09 PUP (1X7X3) at Ch. 30407 | 5814030 | | | Structure Werk . 291 291 Lighting Work \ . o.0 0.10 Highway Work eas | era 12.48 5.74 | SVUP (ix7xa) at Ch. 1 30408 | s90+979 - Structure Work . . 3.41 3.41 Lighting Work . 0.10 0.10 Highway Work on | 248 248 1.03 PUP (iX7XS) at Gh. 30409 | 4164690 | | = Structure Work roy 254 | 254 | Lighting Work . 0.10 0.0 | Highway Work ose | 750 1278 5.28 30410 | PUP (1x7x3) at Ch, 427+050 Structure Work : ; 2.82 282 Lighting Work : 0.10 0.10 Highway Work ot | oo 3.99 199 30411 | PUP (1x7x3) at Ch, 4360336 Structure Work oss | ove 2.87 215 Lighting Work | 0.10 0.10 Highway Work soz | az a3 1.89 Ref: HURPL/LION-JV-BCLLC/2085 Date: 31% Jan 2024 ] ] Reduction | Cost of 7 of cost of | additional a fas per | 2tiginal | works nique scope of | under CoS | Net Estimated an, Description cal ier Cost Cr | Remarks 1 2 3 5 655-4 7 | PUP (1x7x3) at Ch. “| | 3082 | 4394700 scar we , laa] a0 Lighting Work 0.410 0.10 - | Highway Work 11.44 9.15 13.69 | 453 | | | A _ | Total Basic Cost 70232 | 81.86 170,32 6846 | | 5% Escalation (5% per | annum) considered for 25% | | works - as Basic cost (A) | |ealeulsted based on SOR | | 2022 which is effective from 19.07.2022 and hence we ) |have calculated Escalation ee 215 from Jul'23 to Jul'24 (1 Year) considering work commencement from ‘1st Feb-24 to 25% works | completion up to Jul'24 | 110% Escalation (5% per | | T |annum) considered for | | | I) | balance 50% works - ie. 8.52 8.52 completion of 75% works upto Jul'25, 12.5% Escalation (5% per | annum) considered for balance 25% works - i. " | completion of 100% works me a on Scheduled completion date (02nd Nov 2025) Total Cost including 6) (pesapeee 186.29 104.43 1.0% for Design & Engineering charges on (+) 1.70 1.70 COS Cost Total Cost including Design © |e Engineering charges posi ‘Maintenance Cost on COS Cost- (Calculation in 24.62 Annexure-Il) | Ref HURPLILION-JV-BCLLC/2085 Date: 31* Jan 2024 Reduction | Cost of of cost of | additional original | works As per a ins Description CM ae eee ate” | Remarks or | o%as 2 3 5 6=5-4 9 | Total Cost including Maintenance | TED Labour Ces @1 % 131 Add 18 % GST on (8) 23.54 Total Cost - | 155.59 Total Cost including F | Premium as per Cl. 16.2.2 (b) : 205.38 _(.e. 7669/5811 = 1,32) i } 1. The following have been considered/adopted/assumed/followed while working out the cost implication of the Instant COS propos! (The B0@ of the items of work to be carried out for the proposed COS is based on the detailed drawings/design submitted for the said structures, (1) Rate analysis is based on latest revision of Schedule of Rates, PWD, Unnao and Banda, MORTH Standard Data Book 2019 and DSR, (ii) Bitumen and Emulsion rate has been considered ex-IOCL Mathura refinery. (iv) Design charges considered @ 1% as per SOP (Ref.03). () QBN cost for PUPs/SVUPs and maintenance of the lighting arrangements for the Concession Period has been considered on NPV basis. (i) This COS Proposal is inclusive of premium as per CI.16.2.2 of the CA and is 32%. (vil) Escalation has been considered since the applicable SOR has not been revised for more than 12 months prior to COS Notice date. 2. In case, additional time is required to construct these additional works under Change of Scope, that will be analyzed from the date of issuance of COS Order by the Authority and accordingly the additional time requirement for COS works will be submitted after receipt of the COS Order, 7 R ef HURPLILION-JV-BCLLC/2085 Date: 31* Jan 2024 3. The total estimate for the instant COS work is for Rs. 205.38 Cr. We request the Independent Engineer to scrutinize the enclosed cost estimates and recommend to the Authority at the earliest to enable the Authority to issue the COS Order in accordance with Cl. 16.2.3 of the cA, 4. We look forward to your urgent action on the above so that these COS works can be taken up ‘along with the ongoing original scope of works. ‘Thanking and assuring you of our best services at all times, we remain, Yours faithfully, For Hardoi Unnao Road Private Limited, a Mahaveer S D Chief Project Manager Enel. 1. Annexure-1; Drawings / Design for the proposed COS work 2. Annexure-2: Detailed cost estimate with Lead Chart, Cartage Calculation ete, complete in MS- Excel Format. Copy to: - For information please. 1) The CEO / Sr. CGM/ Executive Engineer, Ganga Expressway, UPEIDA, 2) Head Office / COO Office, M/s ARTL, Anmedabad / Lucknow.