HARDO! UNNAO ROAD PRIVATE LIMITED
Ret: HURPL/LECPL-JV-BCLLC/2085 Date: 31% January 2024
Te.
Authorized Signatory
Lion Engineering Consultants Pvt. Ltd.
JV with Bloom Companies LLC.
Ganga Expressway Project
C/O Mr, Ravishankar Mishra,
1* Floor, Block A-B, Sector-D
Ne&r Shri Hans Satsang Ashram
P.O. Nagar, Unnao (U.P) - 209801
Project: Development of “Access Controlled Six Lane (Expandable to Eight Lane) Greenfield
“Ganga Expressway’ [Group-lll, from Km, 2894300 (Village: Ubariya Khurd, Distt:
Herdoi) to Km, 4454000, (Village: Sarso, Distt: Unnac), Design length=155.700 Km] In
the State of Uttar Pradesh on OBFOT (Toll) basis under PPP.
Subject: ‘Submission of cost estimates for Construction of
‘new additional SVUP - 3 nos. (Unique Ids 30401, 30404, 2 30408),
PUP (upgraded from BC to PUP) ~ 2 nos (Unique ID- 30402 & 30411)
New additional PUP - 6 nos. (Unique ids 30403, 30406, 30407, 30409, 30410 and
30412)
‘SVUP (upgraded from BC to SVUP) - 1 nos, (unique id 30405)
under COS as per Cl.16.2.2 of Concession Agreement & SOP for Cost estimation
finalized by Authority - Reg.
Ref. 1. Concession Agreement (CA) dated 06.01.2022.
2. UPEIDA letter no. 690/UPEIDA/2593-III/Tech, dated 02.05.2023 (COS Notice-04)
3. UPEIDA COS SOP ref. no. 5058/UPEIDA/1587/Tech. dated 16.11.2023,
4, Authority's letter no, 5121/UPEIDA/1696-II/Tech, dated 20.11.2023.
5. Our Letter no, HURPL/UPEIDA/LION-JV-8CLLC/2018, Dated 19.01.2024,
6. UPEIDA Letter No. 6655/UPEIDA/2437/Tech,, Dated 30.01.2024
Dear si
1. Reference is drawn to the Authority's letter at Ref. 06 vide which the Authority directed to
submit the cost estimate of change of scope notice no, 04 (Unique ID- 30401 to 30412) to
the Independent Engineer for further review.
2. In this connection, pursuant to Cl.16.2.2 of CA, we are submitting herewith a detailed cost
estimate for the works as mentioned in the preceding para, for your scrutiny. The abstract of
the cost estimate is tabulated hereunder for your ready reference and a detailed cost estimate
is enclosed herewith,
a
Hardoi Unneo Road Private Limited Tel +91 79 2656 7555
9 Fioor, Shalimar Iridium, Fax #91 7925557177
vibhuti Khand, Gamti Nagar
[email protected]
‘Lucknow, Uttar Pradesh - 226010 wu agani.cam
CIN: Uas202Gs2021PTC128309
Corporate ofice: Commerce House ~ 6, At 80 fe Corporate Road, OF SG Highway, Next to SNP Giobal House, Praniag Nagar, Ahmedabad 580 051
Registered Office: Adani Corporate Hause, Shantigram, Near Vaishe Devi Cicte. 5, 6, Highway Khodiyar, Anmegabad - 362421Ref HURPL/LION-JV-BCLLC/2085. Date: 31* Jan 2024
Reduction | Cost oF 7
Of cost of | additional
original | works
As per
Unique scope of | underCoS Net Estimated
ie Description cain eer Cae Oe | Remarks
1 2 3 5 625.4 7
Bes
SVUP (1X7X3) at Ch. |
30401 | 5064855 i
| Structure Work _ | . d 2.96 2.96
Lighting Work . 0.10 0.10
| Highway Work an | one 5.16 298
PUP (ix7x3) at Ch
| 30402 | 5074600 |
Structure Work ose | o70 332 2.62
Lighting Work . on0 0.10
Highway Work 2as | 197 487 290
PUP (ix7xiy at Ch.
30403 | 3504450
t
Structure Work . . 3,49 3.49
| Uphting Work |. | a0 | 0.0
_ Highway Work mes | 1418 w798 | 3.83 |
SVUP (ix7x4,05) at Ch.
30404 | 5404300
| Structure work |. | 2.93 2.93
Lighting Work . 0.10 0.10
i: Highway Work 179 | 62s 13.85 7.62
SVUP (ix7x3) at Ch.
30405 | 5554735
Structure Work ov | cee 3.02 2.40
Lighting Work . 0.10 0.10
Highway Work eon | ae 20.19 9.07
30406 | PUP (1x7x3) at Ch. 3734100
Structure Work . 2.66 2.66Ref: HURPLILION-JV-8CLLC/2085 Date: 31% Jan 2024
Reduction | Cost of a
of cost of | additional
original works
Unique ‘Ene! | scope of under GoS | Net Estimated
10.n0, cesceleeled) Cain | works @ | incr. Cost cr, | Remarks
Y | B0% as
1 2 3 5 6=5-4 7
Lighting Work . o.10 0.10
} |
Highway Work 612 | 490 nse 7.09
PUP (1X7X3) at Ch.
30407 | 5814030 | | |
Structure Werk . 291 291
Lighting Work \ . o.0 0.10
Highway Work eas | era 12.48 5.74
| SVUP (ix7xa) at Ch. 1
30408 | s90+979 -
Structure Work . . 3.41 3.41
Lighting Work . 0.10 0.10
Highway Work on | 248 248 1.03
PUP (iX7XS) at Gh.
30409 | 4164690 | | =
Structure Work roy 254 | 254 |
Lighting Work . 0.10 0.0 |
Highway Work ose | 750 1278 5.28
30410 | PUP (1x7x3) at Ch, 427+050
Structure Work : ; 2.82 282
Lighting Work : 0.10 0.10
Highway Work ot | oo 3.99 199
30411 | PUP (1x7x3) at Ch, 4360336
Structure Work oss | ove 2.87 215
Lighting Work | 0.10 0.10
Highway Work soz | az a3 1.89Ref: HURPL/LION-JV-BCLLC/2085 Date: 31% Jan 2024
] ] Reduction | Cost of 7
of cost of | additional
a fas per | 2tiginal | works
nique scope of | under CoS | Net Estimated
an, Description cal ier Cost Cr | Remarks
1 2 3 5 655-4 7
| PUP (1x7x3) at Ch. “|
| 3082 | 4394700
scar we , laa] a0
Lighting Work 0.410 0.10
- |
Highway Work 11.44 9.15 13.69 | 453 |
|
| A _ | Total Basic Cost 70232 | 81.86 170,32 6846 | |
5% Escalation (5% per |
annum) considered for 25% |
| works - as Basic cost (A) |
|ealeulsted based on SOR | |
2022 which is effective from
19.07.2022 and hence we
) |have calculated Escalation ee 215
from Jul'23 to Jul'24 (1 Year)
considering work
commencement from ‘1st
Feb-24 to 25% works
| completion up to Jul'24 |
110% Escalation (5% per | | T
|annum) considered for | | |
I) | balance 50% works - ie. 8.52 8.52
completion of 75% works
upto Jul'25,
12.5% Escalation (5% per |
annum) considered for
balance 25% works - i.
" | completion of 100% works me a
on Scheduled completion
date (02nd Nov 2025)
Total Cost including
6) (pesapeee 186.29 104.43
1.0% for Design &
Engineering charges on (+) 1.70 1.70
COS Cost
Total Cost including Design
© |e Engineering charges posi
‘Maintenance Cost on COS
Cost- (Calculation in 24.62
Annexure-Il) |Ref HURPLILION-JV-BCLLC/2085 Date: 31* Jan 2024
Reduction | Cost of
of cost of | additional
original | works
As per
a
ins Description CM ae eee ate” | Remarks
or | o%as
2 3 5 6=5-4
9 | Total Cost including
Maintenance | TED
Labour Ces @1 % 131
Add 18 % GST on (8) 23.54
Total Cost - | 155.59
Total Cost including
F | Premium as per Cl. 16.2.2 (b) : 205.38
_(.e. 7669/5811 = 1,32) i }
1. The following have been considered/adopted/assumed/followed while working out the cost
implication of the Instant COS propos!
(The B0@ of the items of work to be carried out for the proposed COS is based on the
detailed drawings/design submitted for the said structures,
(1) Rate analysis is based on latest revision of Schedule of Rates, PWD, Unnao and Banda,
MORTH Standard Data Book 2019 and DSR,
(ii) Bitumen and Emulsion rate has been considered ex-IOCL Mathura refinery.
(iv) Design charges considered @ 1% as per SOP (Ref.03).
() QBN cost for PUPs/SVUPs and maintenance of the lighting arrangements for the
Concession Period has been considered on NPV basis.
(i) This COS Proposal is inclusive of premium as per CI.16.2.2 of the CA and is 32%.
(vil) Escalation has been considered since the applicable SOR has not been revised for
more than 12 months prior to COS Notice date.
2. In case, additional time is required to construct these additional works under Change of
Scope, that will be analyzed from the date of issuance of COS Order by the Authority and
accordingly the additional time requirement for COS works will be submitted after receipt of
the COS Order,
7R ef HURPLILION-JV-BCLLC/2085 Date: 31* Jan 2024
3. The total estimate for the instant COS work is for Rs. 205.38 Cr. We request the Independent
Engineer to scrutinize the enclosed cost estimates and recommend to the Authority at the
earliest to enable the Authority to issue the COS Order in accordance with Cl. 16.2.3 of the
cA,
4. We look forward to your urgent action on the above so that these COS works can be taken up
‘along with the ongoing original scope of works.
‘Thanking and assuring you of our best services at all times, we remain,
Yours faithfully,
For Hardoi Unnao Road Private Limited,
a
Mahaveer S D
Chief Project Manager
Enel.
1. Annexure-1; Drawings / Design for the proposed COS work
2. Annexure-2: Detailed cost estimate with Lead Chart, Cartage Calculation ete, complete in MS-
Excel Format.
Copy to: - For information please.
1) The CEO / Sr. CGM/ Executive Engineer, Ganga Expressway, UPEIDA,
2) Head Office / COO Office, M/s ARTL, Anmedabad / Lucknow.