Offshore Engineering Tender Summary
Offshore Engineering Tender Summary
LIMITED
TENDER RESUME
ENO-2330
STRICTLY CONFIDENTIAL
INTERNAL DOCUMENT
4iJagolu II giDIJI
saudi aramco
SAUDI ARAMCO
Contract No.: BI-12-23000
TENDER
TO
r,a"—
Ae Agr
Larnprell
INDEX
2.1 Overheads
2.2 Estimation Consideration
2.3 Contingency
2.4 Engineering Basic Man-hour Rate
2.5 Additional Assets
2.6 Professional Indemnity Insurance
2.7 Taxes
2.8 Risk & Profit
2.9 Performance Bank Guarantee Charges
2.10 Areas of Concern
SECTION 4 : ANNEXURES
1 INTRODUCTION
NEL scope of work includes carrying out Detailed Engineering, Procurement Engineering & Preparation
of As-Builts for the scope as per the following DOR.
CRPO-125
Sr. No Platform Name
1 ABSF-310/319, 509
2 ABSF-330/339, 510
CRPO-126
1. Lamprell shared tender documents Tender No. BI-12-23000 dated 14th June 2023.
2. Division of Responsibility (DOR) to NEL —14th June 2023.
1.3 Engineering Schedule
Award Dates
a) LOA to successful EPC : July 2023
b) Award to NEL : August/ September 2023
c) Completion of Engineering : May/ June 2024
Not Applicable
Not Applicable
90 days from bid submission date award of work to NEL whichever is earlier.
1.5.7 Currency
Preparation of as-built
90% payable progressively against submission of as-built
2 ESTIMATION PHILOSOPHY
2.1 Overheads
To recover the Overhead, the following Factors are applied on the Basic costs:
a) Basic Engineering Manpower Cost 60%
Lamprell has raised a Technical Query to the Company regarding 3D modelling software to be
used in CRPO 125 & 126, clarification is awaited. NEL shall provide different lumpsum price
considering E3D & SP3D. For E3D software cost is considered as on 2 licenses since NEL can
fetch E3D licenses from NPCC at no extra cost.
2.3 Contingency
5% Contingency is allowed in the estimates on the man-hours.
2.7 Taxes
No GST shall be charged extra on invoices raised as this is export services for which, presently
GST is not applicable.
Not Applicable
Nil
Firm Scope
Auto Cad, CEASAR II, MicroStation, E3D/SP3D, SPPID, Aspen Hysys, Navis Work Manage, SPEL,
MATH CAD, SACS PSI, SACS Offshore Structure Ultimate, SACS Offshore Structure, SPI, Spool Gen,
Tekla (20.1)
NEL has estimated 56 trips for 14 Engineers to Abu-Dhabi for Model review and other activities for
this project.
4 ANNEXURES
4.1 CRPO 125 & 126 - Man-hours — Annexure A
4.2 Tender Estimate with E3D Software —Annexure B
4.3 Tender Estimate with SP3D Software — Annexure C
Other Costs
- Cost of Trips NEL Personnel to Site for Model Reviews
8 4,200,000
- Hotel Stay & Daily Allowance of NEL Personnel for trip to Site
for Model Reviews
C. CONSTRUCTION-ENGINEERING - ENGINEERS
1 Shop ISOs & Support Drawings 1.225.00 1.000 0 0 0 0 0 0 0 0 0
2
3
4
5
6
TOTAL (C) 0 0 0 0 0 0 0 0 0 0 0 0
D. CONSTRUCTION-ENGINEERING - DRAFTSMEN
1 Shop ISOs & Support Drawings 850.00 1.000 0 0 0 0 0 0 0 0 0
2
3
4
5
6
TOTAL (D) 0 0 0 0 0 0 0 0 0 0 0 0
E. AS-BUILTS
1 ENGINEERS 1,826 1,225.00 1.100 2,460,535 1,476,321 3,936.856 0 459,300 0 0 196.843 4,592.999
2 DRAFTSMEN 3.028 850.00 1.100 2,831,180 1.698,708 4,529,888 0 528,487 0 0 226,494 5,284,869
3 1.000 0 0 0 0 0 0 0 0 0
4
5
6
7
TOTAL (E) 4,854 5,291,715 0 0 3,175,029 8,466,744 0 987,787 0 0 423,337 9,877,868
F. Digital Twin
1 Engineers 930 1,225.00 1.000 1,139 250 0 0 683550 1822,800 0 212,660 0 0 91,140 2.126 600
2 Designers 600 850.00 1.000 510.000 0 0 306,000 816,000 0 95,200 0 0 40,800 952.000
Total (F) 1,530 1,649,250 0 0 989,550 2,638,800 0 307,860 0 0 131,940 3,078,600
Sub-Total (A - F ) 110,899 117,252,340 0 0 70,351,404 187,603,744 0 21,887,103 0 0 9,380,187 218,871,035
SECTION 4.2 - DETAILED COST ESTIMATES (ALL IN Rs.)
NEL SECTION 4.2, TENDER COST SUMMARY - CRPO 125 & 126 with SP3D Software
Three (3) PDM
Date 29.06.2023
Estimated Qty Basic Costs Total Risk
Corporate Total Selling
SL No. Cost Items Rate Job 8, Tax Agency Fee Contingency
Nos. Others NEL Material Other Overhead Overhead Cost
(INR) Cost Profit
Engineering 60.00 10.00 - 5.00
Material - -
DETAILED ENGINEERING Uplift Factor Other -
H. OTHER COSTS
1 Cost of Trips NEL Personnel to Site for Model Reviews 1 4200.000.00 1.00 0 0 4,200,000 0 4 200.000 0 0 0 0 210,000 4.410,000
2 Hotel Stay & Daily Allownace of NEL Personnel for trip tot 0 217,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
3 NPCC personnel manhours cost to NEL for Deputation 0 1.00 0 0 0 0 0 0 0 0 0 0 0
4 No. of days stay at Abu Dhabi DAYS 0 25,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
5 Hired One car plus Driver (MONTHS) 0 60,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
6 Transient Analysis (3rd Party@ 103.200 USD) (SUM) 0 7,224,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
7 Safety Gear (SET) 0 5,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
8 Leased Software MONTHS 0 300,000.00 1.18 0 0 0 0 0 0 0 0 0 0 0
9 Other Charges (SUM) 0 75.00 1.00 0 0 0 0 0 0 0 0 0 0 0
10 External Printing (SUM) 0 40.00 1.00 0 0 0 0 0 0 0 0 0 0 0
TOTAL (H) 0 0 4.200,000 0 4,200,000 0 0 0 0 210,000 4,410,000
Loading %
I. ADDITIONAL ASSETS
1 Software 1 47.766,790 100.00% 0 47.766 790 0 47,766.790 0 0 0 0 2.388,339 50,155,129
2 HUMS Workstations 0 120.000.00 100.00% 0 0 0 0 0 0 0 0 0 0
3 CAD Workstations 0 50,000.00 100.00% 0 0 0 0 0 0 0 0 0 0
4 UPS for PC's 0 2,500.00 33.33% 0 0 0 0 0 0 0 0 0 0
5 Microstation 0 350,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
6 PDS Software 0 2,000,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
7 AUTOCAD Software 0 100.000.00 33.33% 0 0 0 0 0 0 0 0 0 0
8 Softwares (Server Cats, Mcafee, MS Office) 0 1,000,000.00 100.00% 0 0 0 0 0 0 0 0 0 0
9 H.D. Photocopier 0 530.000.00 100.00% 0 0 0 0 0 0 0 0 0 0
10 Printer 0 95,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
11 Scanner 0 26,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
12 Telephones 0 2.300.00 20.00% 0 0 0 0 0 0 0 0 0 0
13 Swipe Machine 0 50,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
14 Partitioning & Maintenance 0 500.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
15 Communication Link 0 300.000_00 20.00% 0 0 0 0 0 0 0 0 0 0
16 Office Equipment (FRID./BOIL/MICR.M.DISPENS.) 0 30,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
TOTAL (I) 0 47,766,790 0 0 47,766,790 0 0 0 0 _, _2,388,339 50,155,1.29
SECTION 4.2 - DETAILED COST ESTIMATES (ALL IN Rs.)
NEL SECTION 4.2: TENDER COST SUMMARY - CRPO 125 & 126 with SP3D Software
Three (3) PDM
Date 29.06.2023
Estimated Qty Basic Costs Total Risk
SI. No. Cost Items Rate Corporate Total Selling
Nos. Others NEL Job & Tax Agency Fee Contingency
(INR) Material Other Overhead Overhead Cost
Cost Profit
Engineering 60.00 10.00 5.00
Material
DETAILED ENGINEERING Uplift Factor Other -
J. ADDITIONAL FACILITIES
1 Hired Offices 0 387,500.00 1.00 0 0 0 0 0 0 0 0 0
2 Parking Space 0 15.000.00 1.00 0 0 0 0 0 0 0 0 0
3 Electricity 0 45,000.00 1.00 0 0 0 0 0 0 0 0 0
4 Communication (Video -r- Landline) 0 25.000.00 1.00 0 0 0 0 0 0 0 0 0
5 H.D. Copier AMC 0 7.000.00 1.00 0 0 0 0 0 0 0 0 0
6 NC AMC 0 3,000.00 1.00 0 0 0 0 0 0 0 0 0
7 Staff Welfare 0 500.00 1.00 0 0 0 0 0 0 0 0 0
8 Stationary & Copying 0 100,000.00 1.00 0 0 0 0 0 0 0 0 0
9 Office Boys 0 6,000.00 1.00 0 0 0 0 0 0 0 0 0
TOTAL (J) 0 0 0 0 0 0 0 0 0 0 0
Loading %
K. FURNITURE & FIXTURES
1 Engineering Staff 0 15.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
2 Conference Room 0 8,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
3 Visitor Room 0 8,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
4 Reception 0 40,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
TOTAL (K) 0 0 0 0 0 0 0 0
0 0 0
L. OTHER PERSONNEL
1 Receptionist - (Additional) 0 12.000.00 1.00 0 0 0 0 0 0 0 0 0
2 Secretary / Typist - (Additional) 0 12,000.00 1.00 0 0 0 0 0 0 0 0 0
3 Office Boy - (Additional) 0 6.000.00 1.00 0 0 0 0 0 0 0 0 0
4 NPCC Manhours Cost for carrying out Safety Reviews 0 1.00 0 0 0 0 0 0 0 0 0
5 NPCC Visit cost for carrying out Safely reviews & meeting. 0 1 00 0 0 0 0 0 0 0 0 0
TOTAL (L) 0 0 0 0 0 0 0 0 0 0 0
M FACILITIES TO CLIENT
1 Engg. @ R&0.5 lakh/cabin/month for NPCC for 2 months 0 50.000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
2 Additional Office Facility PMT 0 300,000.00 1.05 0 0 0 0 0 0 0 0 0 0 0
3 Secretary / Typist - (Part Time @ 50 HR. / Month) 0 200.00 1.00 0 0 0 0 0 0 0 0 0 0 0
4 Parking Space - (1 No. @ Rs. 8000 / Month) 0 8.000.00 1.05 0 0 0 0 0 0 0 0
TOTAL (M) 0 0 0 0 0 0 0 0 0 0 0
TOTAL (H - M ) 0 47,766,790 4,200.000 0 51,966,790 0 0 0 0 2,598,339 54,565,129
GRAND TOTAL (A - N) 132,867,795 47,766,790 4,200,000 79.720,677 264,555.262 0 24,801,988 0 0 13,227,763 302,585.013
(ON SALE)
(ON SALE)
(ON SALE)
(ON SALE)
(ON SALE)
SECTION 4.2: TENDER COST SUMMARY - CRPO 125 & 126 with E3D Software
Other Costs
- Cost of Trips NEL Personnel to Site for Model Reviews 4,200.000
8
- Hotel Stay & Daily Allowance of NEL Personnel for trip to Site
for Model Reviews
C. CONSTRUCTION-ENGINEERING - ENGINEERS
1 Shop ISOs & Support Drawings 1 225.00 1.000 0 0 0 0 0 0 0 0 0
2
3
4
5
6
TOTAL (C) 0 0 0 0 0 0 0 0 0 C 0 0
D. CONSTRUCTION-ENGINEERING - DRAFTSMEN
1 Shop ISOs & Support Drawings 850.00 1 .000 0 0 0 0 0 0 0 0 0
2
3
4
5
6
TOTAL (D) 0 0 0 0 0 0 0 0 0 0 0 0
E. AS-BUILTS
1 ENGINEERS 1,826 1.225.00 1.100 2.460,535 1,476.321 3,936,856 0 459,300 0 0 196.843 4,592,999
2 DRAFTSMEN 3,028 850.00 1.100 2.831,180 1,698.708 4,529,888 0 528,487 0 0 226.494 5,284,869
3 1.000 0 0 0 0 0 0 0 0 0
4
5
6
7
TOTAL (E) 4,854 5,291,715 0 0 3,175,029 8,466,744 0 987,787 0 0 423,337 9,877,868
F. Digital Twin
1 Engineers 930 1,225.00 1.000 1,139,250 0 0 683,550 1,822,800 0 212,660 0 0 91.140 2 126 600
2 Designers 600 850.00 1.000 510,000 0 0 306,000 816.000 0 95.200 0 0 40. 800 952 000
Total (F) 1,530 1,649,250 0 0 989,550 2,638.800 0 307,860 0 0 131,940 3,078,600
Sub-Total (A - F ) 110,899 117,252,340 0 0 70,351,404 187,603,744 0 21,887.103 0 0 9,380,187 218,871,035
SECTION 4.2 - DETAILED COST ESTIMATES (ALL IN Rs.)
NEL SECTION 4.2: TENDER COST SUMMARY - CRPO 125 & 126 with E3D Software
Three (3) PDMS
I 29_06._
__._ _ 2023
Estimated Qty Basic Costs Total Risk
SI. No. Cost Items Rate Job Corporate Total Selling
(INR) Others NEL Material Other Overhead 8. Tax Agency Fee Contingency
Nos. Cost Overhead Profit Cost
Engineering 60.00 10.00 5.00
Material - -
DETAILED ENGINEERING Uplift Factor Other -
H. OTHER COSTS
1 Cost of Tops NEL Personnel to Site for Model Reviews 1 4,200,000.00 1.00 0 0 4,200,000 0 4.200,000 0 0 0 0 210,000 4.410.000
2 Hotel Stay & Daily Allownace of NEI. Personnel for trip to) 0 217.000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
3 NPCC personnel manhours cost to NEL for Deputation 0 1.00 0 0 0 0 0 0 0 0 0 0 0
4 No. of days stay at Abu Dhabi DAYS 0 25,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
5 Hired One car plus Driver (MONTHS) 0 60,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
6 Transient Analysis (3rd Partyi 103,200 USD) (SUM) 0 7,224,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
7 Safety Gear (SET) 0 5,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
8 Leased Software MONTHS 0 300,000.00 1.18 0 0 0 0 0 0 0 0 0 0 0
9 Other Charges (SUM) 0 75.00 1.00 0 0 0 0 0 0 0 0 0 0 0
'0 External Printing (SUM) 0 40.00 1.00 0 0 0 0 0 0 0 0 0 0 0
TOTAL (H) 0 0 4,200,000 0 4,200,000 0 0 0 0 210,000 4,410,000
Loading %
I. ADDITIONAL ASSETS
1 Software 1 23,742,790 100.00% 0 23.742,790 0 23,742,790 0 0 0 0 1,187.139 24.929,929
2 PDMS Workstations 0 120.000.00 100.00% 0 0 0 0 0 0 0 0 0 0
3 CAD Workstations 0 50,000.00 100.00% 0 0 0 0 0 0 0 0 0 0
4 UPS for PC's 0 2,500.00 33.33% 0 0 0 0 0 0 0 0 0 0
5 Microstation 0 350,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
6 PDS Software 0 2,000,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
7 AUTOCAD Software 0 100,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
8 Softwares (Server Cals. Mcafee, MS Office) 0 1,000,000.00 100.00% 0 0 0 0 0 0 0 0 0 0
9 H.D. Photocopier 0 530,000.00 100.00% 0 0 0 0 0 0 0 0 0 0
10 Printer 0 95,000.00 33.33% 0 0 0 0 0 0 0 0 0 0
11 Scanner 0 26.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
12 Telephones 0 2,300.00 20.00% 0 0 0 0 0 0 0 0 0 0
13 Swipe Machine 0 50,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
14 Partitioning & Maintenance 0 500,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
15 Communication Link 0 300,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
16 Office Equipment (FRID./B011....(MICR.J"W.DISPENS.) 0 30,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
TOTAL (I) 0 23,742,790 0 0 23,742,790 0 0 0 0 1,187,139 24,929,929
SECTION 4.2 - DETAILED COST ESTIMATES (ALL IN Rs.)
NEL SECTION 4.2, TENDER COST SUMMARY CRPO 125 & 126 with E3D Software
Three (3) PDMS
Date 29.06.2023
Estimated Qty Basic Costs Total Risk
Corporate Total Selling
SI. No. Cost Items Rate Job & Tax Agency Fee Contingency
Nos. Others NEL Material Other Overhead Overhead Cost
(1NR) Cost Profit
Engineering 60.00 10.00 5,00
Material - -
DETAILED ENGINEERING Uplift Factor Other -
J. ADDITIONAL FACILITIES
1 Hired Offices 0 387 500.00 1.00 0 0 0 0 0 0 0 0 0
2 Parking Space 0 15 000.00 1.00 0 0 0 0 0 0 0 0 0
3 Electricity 0 45,000.00 1.00 0 0 0 0 0 0 0 0 0
4 Communication (Video + Landline) 0 25,000.00 1.00 0 0 0 0 0 0 0 0 0
5 H.D. Copier AMC 0 7,000.00 1.00 0 0 0 0 0 0 0 0 0
6 A/C AMC 0 3,000.00 1.00 0 0 0 0 0 0 0 0 0
7 Staff Welfare 0 500.00 1.00 0 0 0 0 0 0 0 0 0
8 Stationary & Copying 0 100,000.00 1.00 0 0 0 0 0 0 0 0 0
9 Office Boys 0 6.000.00 1.00 0 0 0 0 0 0 0 0 0
TOTAL (J) 0 0 0 0 0 0 0 0 0 0 0
Loading
K. FURNITURE & FIXTURES
1 Engineering Staff 0 15.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
2 Conference Room 0 8.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
3 Visitor Room 0 8.000.00 20.00% 0 0 0 0 0 0 0 0 0 0
4 Reception 0 40,000.00 20.00% 0 0 0 0 0 0 0 0 0 0
TOTAL (K) 0 0 0 0 0 0 0 0 0 0 0
L. OTHER PERSONNEL
1 Receptionist - (Additional) 0 12,000.00 1.00 0 0 0 0 0 0 0 0 0
2 Secretary / Typist - (Additional) 0 12,000.00 1.00 0 0 0 0 0 0 0 0 0
3 Office Boy - (Additional) 0 6,000.00 1.00 0 0 0 0 0 0 0 0 0
4 NPCC Manhours Cost for carrying out Safety Reviews 0 1.00 0 0 0 0 0 0 0 0 0
5 NPCC Visit cost for carrying out Safety reviews & meetings 0 - 1.00 0 0 0 0 0 0 0 0 0
TOTAL (L) 0 0 0 0 0 0 0 0 0 0 0
M FACILITIES TO CLIENT
1 Engg. @ Rs.0.5 lakh/cabirVmonth for NPCC for 2 months 0 50,000.00 1.00 0 0 0 0 0 0 0 0 0 0 0
2 Additional Office Facility PMT 0 300.000.00 1.05 0 0 0 0 0 0 0 0 0 0 0
3 Secretary / Typist - (Part Time @ 50 HR. i Month) 0 200.00 1.00 0 0 0 0 0 0 0 0 0 0 0
4 Parking Space - (1 No. @ Rs. 8000 ,' Month) 0 8,000.00 1.05 0 0 0 0 0 0 0 0
TOTAL (M) 0 0 0 0 0 0 0 0 0 0 0
TOTAL (A - M ) 132,867,795 23,742,790 4,200,000 79,720,677 240,53 262 0 24,801.988 0 0 12,026,563 277,359,813
N Additional Overhead Recovery 0.0 8,500.000 1,00 0 0 0 0 0
GRAND TOTAL (A - N) 132,867,795 23,742,790 4,200,000 79,720,677 240,531,262 0 24,801,988 0 C 12,026,563 277.359,813