Testing & Commissioning Checklist Fire Hydrant

The document provides a checklist for testing and commissioning an external fire hydrant with 7 items. The checklist ensures that the hydrant is accessible, fitted with tags, has signage, alarm and monitoring systems work correctly, and delivers the required water pressure and reach during a test. Safety precautions must be followed before and after commissioning.

Uploaded by

Amie GTuned
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Testing & Commissioning Checklist Fire Hydrant

The document provides a checklist for testing and commissioning an external fire hydrant with 7 items. The checklist ensures that the hydrant is accessible, fitted with tags, has signage, alarm and monitoring systems work correctly, and delivers the required water pressure and reach during a test. Safety precautions must be followed before and after commissioning.

Uploaded by

Amie GTuned
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

VANTAG

E KUL14

CHECK LIST FOR:


TESTING & COMMISSIONING OF EXTERNAL FIRE HYDRANT Ref. No:
SUBCONTRACTOR X CONTRACTOR Rev. No: 00
Page : 1 of 1
SECTION OF WORK: FIRE FIGHTING SYSTEM LOCATION:
LEVEL: WIR No.:
ITEM Checked by Checked Date
by
STAGE
S/C CONT CONS.

1. Ensure all shop drawings has been approved by the cons..


SETTING OUT

2. Check Levels, elevations, distances & supports & equipment are as per
approved shop drawings & material approvals.
3. Ensure all material approvals & material verification records have been
approved by the cons..
4. Only trained & experienced personnel shall perform the work.
5. Ensure civil clearance has been issued prior to start of any Testing &
CIVIL
commissioning.

1. Verify that the hydrant can be easily accessible.

2. Verify that the hydrant has been fitted with maintenance record tag.
Testing & Commissioning

3. Verify that signage has been provided that clearly indicates the location of
the fire hydrant.

4. Verify that all water flow alarm & valve monitoring system switches operate
correctly.

5. Verify water pressure & flow rate at the fire Hydrant.

6. Connect fire hose to the fire hydrant. Open the fire hydrant & ensure that the
water should at least 20 meters.

7. Ensure all safety precautions have been complied before & after
Safety
commissioning.

For S/C Date: FOR CONTRACTOR Date: For CONS. Date:


QA/QC: QA/QC: Rep.:

Name: Sign: Name: Sign: Name: Sign:

Page 1 of 1