Document No.
: PWA-RPD-QM-FM-040
Non-Conformance Report Revision No. : 05
Issue Date : 21 Jan. 2019
SA048-D&B R and I and Security for Development of Contract No.: BP2020 C60 G
Contract Name: Government Building in South West of the Country
Contractor: Tadmur Contracting NCR No.: SA048-WSP-GEN-MTS-MNCR-3
Engineers
WSP Date Issued: 27 Oct.. 2021
Representative:
Work Area / Location: (Enter Details)
Truck parking Area: By witness testing of rock materials for SP. 10, 11 NCR RAISED BY:
CONTRACTOR / ENGINEERS REP*
and 12, Results found unsatisfactory(Failed). Contractor to take his Name : Salah Soltan
remedial action ASAP and provide his plan how to improve the stockpile
Position : Resident Engineer
material and what action for the spreaded material. Materials used in
backfilling is considered rejected. Contractor to develope better way of Date : 27 Oct. 2021
his supervision to assure the non occurrence of same in the future.
Signed :
CATEGORY:
Specification / Drawings / Process /
☐ Standards ☐ Details ☒ Procedure ☒ Material ☐ Plant / Equip ☒ Management
ISSUE:
Quality Skill /
☒ Control; ☐ Competence ☒ Supervision ☐ Planning ☐ Information ☒ Performance
IMPACT:
Not Meeting Poor Const Poor Defective Inadequate
☒ Requirements ☐ Practice ☐ Workmanship ☒ Material ☐ Records ☐ Other
START DATE FOR
PART B: PROPOSED REMEDIAL/ CORRECTIVE ACTION CORRECTIVE ACTION
Root Cause:
CONTRACTOR
Correction:
Action to prevent recurrence: TARGET DATE
TO CLOSE NCR
☐ Reject/Replace ☐ Re-work ☐ Repair ☐ Use As Is
Name & Signature Title: Date:
PART C: ENGINEERS ACCEPTANCE OF CONTRACTORS PROPOSALS IN PART B:
ENGINEER REP.
☐ Contractors proposals are acceptable and remedial work may proceed.
☐ Contractor’s proposals are unacceptable for the following reasons. (Contractor should revise & resubmit):
Name & Signature Title: Date:
PART D: CORRECTIVE ACTION PROPOSED IN PART B ARE COMPLETE & READY FOR INSPECTION ON :
CONTRACTOR
(SPECIFY DATE) & (SPECIFY TIME)
Name & Signature: Title: Date:
PART E: FOLLOW UP & CLOSE-OUT:
ENGINEER REP.
☐ Corrective Action have been undertaken and are acceptable. This NCR may be closed out.
☐ Corrective Action undertaken by the Contractor are not acceptable for the following reasons and this NCR may not
be closed out. (Contractor must address these issues):
Title: Date:
Name & Signature:
NOTES AND ATTACHMENTS (Photographs, Sketches etc.):
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 21/01/2019 11:44 Page 1 of 1