Preventive maintenance Schedule for electric motor
Daily / Weekly PM
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
• Electrical Measurement recording (or use recording measurement device)
Recommended
I 1 I 2 I 3 Unbalance ratio Comment
value
10 %
Recommended
V 1 V 2 V 3 Unbalance ratio Comment
value
2%
Power factor Frequency Power Comment
• Temperature measurement recording (or use recording measurement device)
Drive end bearing Non-Drive end Motor frame Ambient
Comment
temperature bearing temperature temperature temperature
First Phase Second Phase Third Phase
Insulation class Comment
Wdg Temp. Wdg Temp. Wdg Temp.
• Vibration measurement recording (or use recording measurement device)
Motor overall Recommended Bearing drive end Bearing non drive Recommende
Comment
vibration value vibration end vibration d value
4.45 mm/sec 4 gE
• Visual Inspection
Points to inspect Checked (√) Comment
Rust / corrosion parts
Missing bolts
Earthing cable connection
ventilation fan
Abnormal sound
Preventive maintenance Schedule for electric motor
Monthly PM
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
Points to inspect Checked (√) Comment
Cleaning motor enclosure
Thermal image recording
Online Partial discharge test
Preventive maintenance Schedule for electric motor
Three Monthly PM
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
Points to inspect Checked (√) Comment
Greasing motor bearing
Motor Alignment check
Coupling connection
Check on Earthing cable
connection tighten and
greasing
Preventive maintenance Schedule for electric motor
Six Monthly PM
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
Points to inspect Checked (√) Comment
Bearing vibration testing
Preventive maintenance Schedule for electric motor
Annual PM
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
• Insulation evaluation testing
DAR Test Recommendation value Comment
Greater than 1.4
PI Test Recommendation value Comment
Greater than 4
DD Test Recommendation value Comment
Smaller than 2
Tan δ test Recommendation value Comment
0 to 0.005
HI-POT Test Recommendation value Comment
MΩ or GΩ
(100 mA Max.)
Surge Test Recommendation value Comment
LL EAR <10%
PP EAR <5%
Inductance test Recommendation value Comment
Trend values over time
Cu winding test Recommendation value Comment
Unbalance Smaller
than 3%
Capacitance test Recommendation value Comment
Trend values over time
• Tasks Inside switchgear and motor Junction box
Points to inspect Checked (√) Comment
Cleaning the MCC
Check on circuit breaker, fuses,
contactor mechanism and coil,
overload
Don’t use WD40 for electrical
contact Only mechanism
lubrication)
Earthing connection inside
switchgear
Revise protection setting
Tighten all control and power wiring
Make function check
Check on Junction box sealing
(gasket) and gland connection,
Earthing point
Check on any auxiliary circuit for
motor as RTD for bearing or
winding temperature, Vibration
sensor , space heater , internal
thermistor
Tighten power cable to motor
terminals
Check on sealing between Junction
box Terminals and motor enclosure
(Opening for wiring through)
Check on fan connection tighten and
fan blades for any damage or loose
Tighten motor mounting base , and
also check for coupling tighten , also
IP seal for motor shaft
• Insulation resistance test IR for Cable and motor from switchgear side
IR test Recommendation value Comment
MΩ or GΩ
Preventive maintenance Schedule for electric motor
Five years Overhaul
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
Points to inspect Checked (√) Comment
Replace the shaft bearing
Replace Bearing inner and
outer seal
Replace Front and End shield
sealing
Replace Junction box sealing
Replace inner sealing between
junction and motor body
(internal Wiring opening)
Check on uniformity for Stator
core slots and lamination, and
perform Lamination core test
Check on rotor balancing
Check for aluminum bar
continuity
Check for any deformation for
bearing housing
Replace Ventilation fan and it
is sealing
Preventive maintenance Schedule for electric motor
15 years Overhaul
DATE / / 2021 Motor Tag: PM-7001A Location: UNITY FPF
Points to inspect Checked (√) Comment
Sandblasting process
painting for motor frame
Cleaning and washing stator
winding using pressure steam
or electrical solvent to remove
any contamination or dirties
Dryness stator winding using
hot furnace
Increase Insulation of stator
winding
Replace all connection bolts