PROJECT MANFO EV CHARGING HUB _BANGALORE
SUBJECT BILL OF QUANTITIES
Item No Description
Civil Work For Cable trenches - Charging Station
Scope includes Earth Excavation , Hume Pipe Laying , PCC Bed Consturcution at relevent
1 Places ,Coupling of Pipes , Compaction , Soil re- Filling , PCC Bed Construction , Finishing
etc complete as per the drawing provided Instruction Given by Engineer Incharge
DRG no:
RCC Cable Trench Work - Charging Bay
Supply and Providing RCC cable trench.The cable trench shall be filled with river sand
2 after laying of cable and Paver Block of relevent Grades shall be placed in position with
and properly finished as per instruction of site engineer or as per the drawing provided
by Engineer
Drg No:
MANHOLE For Cable Chember
Supply and Providing Man Hole construction including ,Excavation , RCC Raft , Brickwork ,
Plastering along With RCC cover of respective size the manhole shall be constructed in
conjustion with provided drawing and guidance of engineer incharge
3 Drg No:
HDPE PIPE Laying
Providing and laying in standard lengths(6 metre) High Density Polyethylene (H.D.P.E)
Pipes confirming to IS 4984:1995 and IS 7328:1992(amended up to date), including all
local & central taxes, transportation and freight charges inspection charges, loading /
unloading charges, conveyance tothe site of work & stacking the same in closed shade
duly protecting from sunrays, rain & theft or
physical damage, etc. complete. relevent nominal outer diameter (OD) HDPE pipe of
4 material grade PN 8 , jointing HDPE pipe in proper position by
coupler sockets /butt fusion jointing procedure including manual testing as per relevant
IS Code complete with all materials for jointing procedures
like butt fusion welding machine with hydraulic jack, top loading clamp etc
Drg No:
LOCATION BANGALORE
BOQ NO BSCPL/BOQ/MANFO/23-24
Sub - Description Measurement Measurement Qty Unit
Cable Trench for Charging Station
Total Qty For Cable Trench =
RCC Cable Trench for Charging Shed
Total Qty of RCC Trench =
Manhole For Cable Chamber
Total Qty for Manhole =
HDPE utilise for Lighting Cables
DATE 14.02.2023
REVISON R00
Unit Rate Sub total ₹ 779,950
₹ 413,050
₹ 191,900
₹ 175,000
₹0
No of Horizontal Rods In Mesh = Width /C to C distance
No of Vertical Rods in Mesh = Length/ C to C distance
Total Rods = No of Rods in Width X No of Rods in Length
Volume of one rod = PI / (ROD DIA)^2 X Total No of Rods
Volume of Mesh = Volume of One Rod X Total Rods
Total Volume in Meter Volume of Mesh /10000
Weight Density of Steel = 7900 kG/ M3
Steel Weight = Volume of Mesh X Weight Density of Steel
Bill Of Quantities - Civil Charging Hub Man
S. No. Description of items Unit Quantity Supply Rate
Blu Smart Scope of Work
The scope of work involves the excavation of earth
using machines and manual labor for Hume pipe laying.
The excavation will be 1000mm wide and 600/300mm
1 deep respectively. Meters 557
Additionally, the work includes backfilling of trenches
after the pipes have been laid
Supply and laying of 300mm Hume pipes in the
excavated trenches after placing a PCC (Plain Cement
Concrete) bed of 75/100mm at the bottom for the
2 Hume pipes. It is essential that the Hume pipes are Meters
properly concealed with rubber seals
233
Supply and laying of 150mm Hume pipes in the
excavated trenches after placing a PCC (Plain Cement
Concrete) bed of 75/100mm at the bottom for the
3 Hume pipes. It is essential that the Hume pipes are Meters 304
properly concealed with rubber seals
Supply and laying of 75mm HDPE pipes in the
excavated trenches after placing a PCC (Plain Cement
Concrete) bed of 75/100mm at the bottom for the
4 Hume pipes. It is essential that the HDPE pipes are Meters 20
properly concealed with rubber seals
Providing and Making of Trenches below Car Parking
Sheds of size 1500 mm Wide and 150mm deep below
ground level (300mm deep below ground level at fast
charger points) and 300mm above ground level (Refer
drawing for detail). The trench should be made with
228mm thick brick wall all around having plaster of
5 12.7mm thickness. There should be a 64mm layer of Meters 311
bricks at the bottom of trench with RCC bed over it
(Refer to the drawing for details)
The scope of work includes providing and constructing
a manhole for Hume pipes measuring 5500x1500mm,
along with an RCC cover of 150mm thickness. The
construction will involve the use of M8/10 TMT bars for
reinforcement, in accordance with the depth of the
6 Hume pipe. The manhole will be designed for the No. 1
purpose of putting and pulling electrical cables, with a
suitable cover as per the provided drawing
The scope of work includes providing and constructing
a manhole for Hume pipes measuring 1000x1000mm,
along with an RCC cover of 150mm thickness. The
construction will involve the use of M8/10 TMT bars for
reinforcement, in accordance with the depth of the
Hume pipe. The manhole will be designed for the
7 purpose of putting and pulling electrical cables, with a No. 9
suitable cover as per the provided drawing
The scope of work includes providing and constructing
a manhole for Hume pipes measuring 500x500mm,
along with an RCC cover of 150mm thickness. The
construction will involve the use of M8/10 TMT bars for
reinforcement, in accordance with the depth of the
8 Hume pipe. The manhole will be designed for the No. 30
purpose of putting and pulling electrical cables, with a
suitable cover as per the provided drawing
Supply Total
Inst. Total
Grand Total
arging Hub Manpho Bangalore
Supply Amount Inst. Rate Inst. Amount Remarks
#NAME?
#NAME?
#NAME?