0% found this document useful (0 votes)
142 views15 pages

BoQ Structure Architectur & MEP Villa Dream Sunrise

This document is a bill of quantities for the Dream Sunrise project located in Nusa Dua, Badung, Bali. It includes line items for operational management, resources, safety, and structure, architecture, and MEP works. The structure works section includes preliminary works, soil works, foundation works and details of materials needed for the foundation plates. The document provides a detailed breakdown of costs for the construction project.

Uploaded by

GitaSaputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views15 pages

BoQ Structure Architectur & MEP Villa Dream Sunrise

This document is a bill of quantities for the Dream Sunrise project located in Nusa Dua, Badung, Bali. It includes line items for operational management, resources, safety, and structure, architecture, and MEP works. The structure works section includes preliminary works, soil works, foundation works and details of materials needed for the foundation plates. The document provides a detailed breakdown of costs for the construction project.

Uploaded by

GitaSaputra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Bill Of Quantity

STRUCTURE - ARCHITECTURE & MEP

PROJECT
DREAM SUNRISE

OWNER
DEVELOPMENT GROUP  ANDIMAX

LOCATION
Nusa Dua, Badung - B A L I

DECEMBER 2023


 
 
RECAPITULATION
PROJECT : D R E A M S U N R I S E
LOCATION : Nusa Dua, Badung - B A L I

NO. DESCRIPTION SUB TOTAL

OPERATIONAL Rp -
I MANAGEMENT Rp -
II RESOURCE Rp -
III SAFETY & ENVIRONMENT Rp -
STRUCTURE WORK Rp -
I PRELIMINARY Rp -
II SOIL WORK Rp -
III FOUNDATION WORK Rp -
IV STRUCTURE PORTAL GROUND FLOOR SL. -0,050 Rp -
V STRUCTURE PORTAL UPPER FLOOR SL. +3,250 Rp -
VI STRUCTURE PORTAL ROOF FLOOR SL. +6,550 Rp -
VII STRUCTURE ROOF TOP SL. +9,550 Rp -
VIII STAIR STRUCTURE Rp -
IX STRUCTURE POOL DECK SL -0,200 Rp -
X STRUCTURE POOL SL -1,700 Rp -
XI STRUCTURE PUMP HOUSE & BALANCING TANK Rp -
XII BIO SEPTIC & INFILTRATION PIT Rp -
ARCHITECTURE WORK Rp -
I ARCHITECTURE GROUND FLOOR FFL 0,000 Rp -
II ARCHITECTURE UPPER FLOOR FFL +3,300 Rp -
III ARCHITECTURE ROOF FLOOR FFL +6,600 Rp -
IV STAIR FINISHING Rp -
V POOL - BALANCING TANK Rp -
VI LANDSCAPE Rp -
ME & P WORK Rp -
I ELECTRICAL supply & install - test & commissioning Rp -
II PLUMBING supply & install - test & commissioning Rp -

GRAND TOTAL Rp -
NO JOB DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

OPERATIONAL
I MANAGEMENT
1 Site management staff and establishment cost 1,000 ls Rp -
2 Administration and Documentation 12,000 month Rp -
3 Weekly Report to Project Management 12,000 month Rp -
4 Shop drawing 12,000 month Rp -
5 As build drawing 2,000 books Rp -
6 Workman Insurance 1,000 ls Rp -
7 Temporary building for worker (out site) 20,000 m2 Rp -
8 Toilet / MCK 2,000 unit Rp -
9 Retribution to local government "KIPEM" 12,000 month Rp -
10 Site Office & Storage 10,000 m2 Rp -
11 Contractor all risk (insurance) 12,000 month Rp -
Sub Total Rp -
II RESOURCE
1 Temporary PLN conection (5.500 VA) 1,000 ls Rp -
2 PLN consumption for work 12,000 month Rp -
3 Water consumption for work use deep well 12,000 month Rp -
Sub Total Rp -
III SAFETY & ENVIRONMENT
1 Healty for worker (P3K) 1,000 ls Rp -
2 Safe guarding the work 1,000 ls Rp -
3 Self Protection 1,000 ls Rp -
4 Safety net 1,000 ls Rp -
5 Project protection fence 1,000 ls Rp -
6 Banner safety first 1,000 ls Rp -
Sub Total Rp -
OPERATIONAL COST Rp -
STRUCTURE WORK
I PRELIMINARY
1 Initial site cleaning 265,271 m2 Rp -
2 Uitzet / Measuring 265,271 m2 Rp -
3 Bowplank 66,250 m1 Rp -
Sub Total Rp -
II SOIL WORK
1 Excavation work continous foundation -0,550 25,515 m3 Rp -
2 Excavation work continous foundation -0,450 4,579 m3 Rp -
3 Excavation work FP1 (1750x1750x700) 26,031 m3 Rp -
4 Excavation work FP2 (1250x1250x600) 13,281 m3 Rp -
5 Excavation work swimming pool area 31,552 m3 Rp -
6 Excavation work pool continous foundation 3,920 m3 Rp -
7 Filling the soil back to the continous foundation -0,550 6,345 m3 Rp -
8 Filling the soil back to the continous foundation -0,540 1,139 m3 Rp -
9 Filling the soil back to the foundation FP1 12,581 m3 Rp -
10 Filling the soil back to the foundation FP2 6,613 m2 Rp -
11 Soil filling for floor elevation 69,293 m3 Rp -
12 Soil fill compaction 125,988 m2 Rp -
13 Disposal of waste soil 8,907 m3 Rp -
Sub Total Rp -
III FOUNDATION WORK
1 Foundation foot plate FP1 (1750x1750x700)
Sand filling 50mm thk 0,766 m3 Rp -
Lean concrete K-175 50mm thk 0,766 m3 Rp -
Top rebar U42 D16-100mm 483,263 kg Rp -
Bot rebar U42 D19-100mm 1.227,08 kg Rp -
Footing Formwork from concrete brick 24,500 m2 Rp -
Footing Sitemix 25 MPa / K-300 10,719 m3 Rp -
2 Foundation foot plate FP2 (1250x1250x600)
Sand filling 50mm thk 0,391 m3 Rp -
Lean concrete K-175 50mm thk 0,391 m3 Rp -
Top rebar U42 D16-150mm 246,563 kg Rp -
Bot rebar U42 D19-150mm 681,71 kg Rp -
Footing Formwork from concrete brick 15,000 m2 Rp -
Footing Sitemix 25 MPa / K-300 4,688 m3 Rp -
3 Pedestal column K1 400x400
Rebar U42 16 D19 1.193,136 kg Rp -
Stirrup U28 4 D10-100 296,16 kg Rp -
Formwork used twice 24,000 m2 Rp -
Concrete Sitemix 25 MPa / K-300 2,400 m3 Rp -
4 Continous foundation river stone masonry -0,550
Sand filling 1,215 m3 Rp -
Anchor U28 D10-500 39,982 kg Rp -
River stone masonry 1pc : 4pp 17,955 m3 Rp -
5 Continous foundation river stone masonry -0,450
Sand filling 0,218 m3 Rp -
Anchor U28 D10-500 7,174 kg Rp -
River stone masonry 1pc : 4pp 3,222 m3 Rp -
Sub Total Rp -
IV STRUCTURE PORTAL GROUND FLOOR SL. -0,050
1 Column K1 400x400
Rebar U42 16 D19 1.175,328 kg Rp -
Stirrup U28 4 D10-100~150 521,242 kg Rp -
Formwork used twice 52,800 m2 Rp -
Concrete Sitemix 25 MPa / K-300 5,280 m3 Rp -
2 Column K3 200x200
Rebar U42 8 D16 41,659 kg Rp -
Stirrup U28 D10-100~150mm 19,547 kg Rp -
Formwork used twice 2,640 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,132 m3 Rp -
3 Tie beam TB1 350x550
Rebar U42 8 D16 965,736 kg Rp -
Torque U42 4 D16 482,868 kg Rp -
Stirrup U28 310-100~150mm 887,369 kg Rp -
Formwork used twice 84,150 m2 Rp -
Concrete Sitemix 25 MPa / K-300 14,726 m3 Rp -
4 Tie beam TB2 200x300
Rebar U42 8 D13 187,560 kg Rp -
Torque U42 3 D13 70,335 kg Rp -
Stirrup U28 8-100~150mm 144,378 kg Rp -
Formwork used twice 13,500 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,350 m3 Rp -
6 Pek. Floor slab S1 100mm thk
Sand filling 50mm thk 6,299 m3 Rp -
Lean concrete K-175 50mm thk 6,299 m3 Rp -
Plastic mmbrane/waterproofing 125,988 m2 Rp -
Reinforcing Wiremesh M8 1 layer 125,988 m2 Rp -
Concrete Sitemix 25 MPa / K-300 9,471 m3 Rp -
Sub Total Rp -
V STRUCTURE PORTAL UPPER FLOOR SL. +3,250
1 Column K1 400x400
Rebar U42 16 D19 940,262 kg Rp -
Stirrup U28 4 D10-100~150 416,993 kg Rp -
Formwork used twice 42,240 m2 Rp -
Concrete Sitemix 25 MPa / K-300 4,224 m3 Rp -
2 Column K3 200x200
Rebar U42 8 D16 124,978 kg Rp -
Stirrup U28 D10-100~150mm 58,640 kg Rp -
Formwork used twice 7,920 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,396 m3 Rp -
3 Beam B1 300x600
Rebar U42 12 D16 1.410,732 kg Rp -
Torque U42 4 D16 470,244 kg Rp -
Stirrup U28 410-100~150mm 1.103,196 kg Rp -
Formwork used twice 111,750 m2 Rp -
Concrete Readymix 25 MPa / K-300 13,410 m3 Rp -
4 Beam B2 250x250
Rebar U42 8 D13 395,960 kg Rp -
Torque U42 2 D13 98,990 kg Rp -
Stirrup U28 10-100~150mm 234,460 kg Rp -
Formwork used twice 35,625 m2 Rp -
Concrete Readymix 25 MPa / K-300 2,969 m3 Rp -
5 Beam B3 300x150
Rebar U42 9 D16 154,802 kg Rp -
Torque U42 4 D13 45,431 kg Rp -
Stirrup U28 8-100~150mm 48,422 kg Rp -
Formwork used twice 6,540 m2 Rp -
Concrete Readymix 25 MPa / K-300 0,491 m3 Rp -
6 Beam B4 150x600
Rebar U42 4 D13 99,414 kg Rp -
Torque U28 6 D10 21,882 kg Rp -
Stirrup U28 8-100~150mm 77,742 kg Rp -
Formwork used twice 14,175 m2 Rp -
Concrete Readymix 20,75 MPa / K-3250 0,473 m3 Rp -
7 Floor slab S2 250mm thk
Top layer U28 D13-100mm 2.690,861 kg Rp -
Bot layer U28 D13-100mm 2.809,264 kg Rp -
Formwork used twice 129,120 m2 Rp -
Concrete Readymix 25 MPa / K-300 22,446 m3 Rp -
8 Reinforcement concrete wall RCW2 100mm Thk
Vertical rebar U28 8-150mm 9,401 kg Rp -
Horizontal rebar U28 8-150mm 9,401 kg Rp -
Formwork used twice 14,280 m2 Rp -
Concrete Readymix 25 MPa / K-300 1,071 m3 Rp -
Sub Total Rp -
VI STRUCTURE PORTAL ROOF FLOOR SL. +6,550
1 Column K2 250x250
Rebar U42 12 D16 454,464 kg Rp -
Stirrup U28 10-100~150mm 118,464 kg Rp -
Formwork used twice 24,000 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,500 m3 Rp -
2 Ring Beam RB1 300x550
Rebar U42 11 D16 1.119,591 kg Rp -
Torque U42 2 D16 203,562 kg Rp -
Stirrup U28 410-100~150mm 891,442 kg Rp -
Formwork used twice 90,300 m2 Rp -
Concrete Readymix 25 MPa / K-300 10,643 m3 Rp -
3 Ring Beam RB2 250x250
Rebar U42 8 D13 450,144 kg Rp -
Torque U42 2 D13 112,536 kg Rp -
Stirrup U28 10-100~150mm 266,544 kg Rp -
Formwork used twice 40,500 m2 Rp -
Concrete Readymix 25 MPa / K-300 3,375 m3 Rp -
4 Ring Beam RB3 150x600
Rebar U42 4 D13 43,764 kg Rp -
Torque U28 6 D10 38,871 kg Rp -
Stirrup U28 8-100~150mm 49,770 kg Rp -
Formwork used twice 14,175 m2 Rp -
Concrete Readymix 25 MPa / K-300 0,945 m3 Rp -
5 Ring Hollow
Hollow 100,50,5 14,300 m1 Rp -
Welded 1,000 ls Rp -
6 Floor slab S2 250mm thk
Top layer U28 D13-100mm 1.589,397 kg Rp -
Bot layer U28 D13-100mm 534,498 kg Rp -
Formwork used twice 114,400 m2 Rp -
Concrete Readymix 25 MPa / K-300 22,424 m3 Rp -
Sub Total Rp -
VII STRUCTURE ROOF TOP SL. +9,550
1 Ring Beam RB4 200x300
Rebar U42 4 D13 123,581 kg Rp -
Torque U28 6 D10 109,764 kg Rp -
Stirrup U28 8-100~150mm 93,694 kg Rp -
Formwork used twice 23,720 m2 Rp -
Concrete Readymix 25 MPa / K-300 1,779 m3 Rp -
2 Ring Beam RB5 300x150
Rebar U42 6 D13 40,951 kg Rp -
Stirrup U28 8-100~150mm 18,628 kg Rp -
Formwork used twice 3,930 m2 Rp -
Concrete Readymix 25 MPa / K-300 0,295 m3 Rp -
3 Roof slab S3 150mm thk
Top layer U28 D10-100mm 356,379 kg Rp -
Bot layer U28 D10-100mm 376,274 kg Rp -
Formwork used twice 28,880 m2 Rp -
Concrete Readymix 25 MPa / K-300 3,148 m3 Rp -
Sub Total Rp -
VIII STAIR STRUCTURE
1 Stair structure Ground Floor to Upper Floor
Rebar slab stair U42 D13-150 65,411 kg Rp -
Stirrup slab stair U42 D13-150 65,411 kg Rp -
Rebar stepping U42 7 D10 99,337 kg Rp -
Stirrup stepping U28 10-150mm 43,992 kg Rp -
Rebar Beam stair U42 6 D13 28,759 kg Rp -
Torque Beam stair U42 4 D13 19,173 kg Rp -
Stirrup Beam stair U28 10-100~150mm 388,538 kg Rp -
Formwork used twice 9,416 m2 Rp -
Concrete Sitemix 25 MPa / K-300 18,975 m3 Rp -
2 Stair structure 2 Upper Floor to Roof Floor
Rebar slab stair U42 D13-150 69,949 kg Rp -
Stirrup slab stair U42 D13-150 69,949 kg Rp -
Rebar stepping U42 7 D10 99,337 kg Rp -
Stirrup stepping U28 D10-150 43,992 kg Rp -
Rebar Beam stair U42 6 D13 28,759 kg Rp -
Torque Beam stair U42 4 D13 19,173 kg Rp -
Stirrup Beam stair U28 10-100~150mm 388,538 kg Rp -
Formwork used twice 10,069 m2 Rp -
Concrete Sitemix 25 MPa / K-300 19,378 m3 Rp -
Sub Total Rp -
IX STRUCTURE POOL DECK SL -0,200
1 Tie beam TB3 200x300
Rebar U42 6 D13 161,739 kg Rp -
Stirrup U28 8-100~150mm 81,749 kg Rp -
Formwork used twice 15,522 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,552 m3 Rp -
2 Pool deck slab S1 100mm thk
Sand filling 50mm thk 1,739 m3 Rp -
Lean concrete K-175 50mm thk 1,739 m3 Rp -
Reinforcing Wiremesh M8 1 layer 34,780 m2 Rp -
Concrete Sitemix 25 MPa / K-300 2,961 m3 Rp -
Sub Total Rp -
X STRUCTURE POOL SL -1,700
1 Column KP 150x150
Rebar U42 4 D13 28,342 kg Rp -
Stirrup U28 8-100mm 16,116 kg Rp -
Formwork used twice 4,080 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,153 m3 Rp -
2 Tie beam TBP1 250x450
Rebar U42 8 D16 247,430 kg Rp -
Torque U42 2 D16 61,858 kg Rp -
Stirrup U28 10-100~150mm 135,444 kg Rp -
Formwork used twice 17,640 m2 Rp -
Concrete Sitemix 25 MPa / K-300 2,205 m3 Rp -
3 Tie beam TBP2 200x350
Rebar U42 6 D13 65,646 kg Rp -
Torque U42 2 D13 21,882 kg Rp -
Stirrup U28 8-100~150mm 57,011 kg Rp -
Formwork used twice 7,350 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,735 m3 Rp -
4 Tie beam TB3 150x250
Rebar U42 4 D13 81,693 kg Rp -
Torque U42 2 D13 40,846 kg Rp -
Stirrup U28 8-100~150mm 49,549 kg Rp -
Formwork used twice 9,800 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,735 m3 Rp -
5 Pool slab S4 200mm thk
Sand filling 50mm thk 1,088 m3 Rp -
Lean concrete K-175 50mm thk 1,088 m3 Rp -
Plastic mmbrane/waterproofing 21,760 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,088 m3 Rp -
Top layer U28 D13-150mm 302,319 kg Rp -
Bot layer U28 D13-150mm 329,550 kg Rp -
Concrete Sitemix 25 MPa / K-300 4,352 m3 Rp -
6 RCWP1 wall pool 150mm Thk
Formwork masonry concrete brick 33,320 m2 Rp -
Plastic mmbrane/waterproofing 33,320 m2 Rp -
Vertical rebar U28 D13-150mm 462,926 kg Rp -
Horizontal rebar U28 D10-150mm 274,113 kg Rp -
Formwork used twice 33,320 m2 Rp -
Concrete Sitemix 25 MPa / K-300 4,998 m3 Rp -
7 River stone foundation
Sand filling 0,490 m3 Rp -
River stone masonry 1pc : 4pp 4,900 m3 Rp -
Anchor U28 2 D13-500 10,212 kg Rp -
Sub Total Rp -
XI STRUCTURE PUMP HOUSE & BALANCING TANK
1 Column KP 150x150
Rebar U42 4 D13 14,171 kg Rp -
Stirrup U28 8-100mm 8,058 kg Rp -
Formwork used twice 2,040 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,077 m3 Rp -
2 Tie beam TBP1 250x450
Rebar U42 8 D16 136,339 kg Rp -
Torque U42 2 D16 34,085 kg Rp -
Stirrup U28 10-100~150mm 74,632 kg Rp -
Formwork used twice 9,720 m2 Rp -
Concrete Sitemix 25 MPa / K-300 1,215 m3 Rp -
3 Tie beam TBP2 200x350
Rebar U42 6 D13 14,380 kg Rp -
Torque U42 2 D13 4,793 kg Rp -
Stirrup U28 8-100~150mm 7,995 kg Rp -
Formwork used twice 1,610 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,161 m3 Rp -
4 Tie beam TB3 150x250
Rebar U42 4 D13 57,102 kg Rp -
Torque U42 2 D13 28,551 kg Rp -
Stirrup U28 8-100~150mm 34,634 kg Rp -
Formwork used twice 6,850 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,514 m3 Rp -
5 Pool slab S4 200mm thk
Sand filling 50mm thk 0,391 m3 Rp -
Lean concrete K-175 50mm thk 0,391 m3 Rp -
Plastic mmbrane/waterproofing 7,820 m2 Rp -
Concrete Sitemix 25 MPa / K-300 0,391 m3 Rp -
Top layer U28 D13-150mm 108,646 kg Rp -
Bot layer U28 D13-150mm 124,484 kg Rp -
Concrete Sitemix 25 MPa / K-300 1,564 m3 Rp -
6 RCWP1 wall pool 150mm Thk
Formwork masonry concrete brick 23,290 m2 Rp -
Plastic mmbrane/waterproofing 23,290 m2 Rp -
Vertical rebar U28 D13-150mm 323,576 kg Rp -
Horizontal rebar U28 D10-150mm 191,599 kg Rp -
Formwork used twice 23,290 m2 Rp -
Concrete Sitemix 25 MPa / K-300 3,494 m3 Rp -
7 River stone foundation
Sand filling 0,343 m3 Rp -
River stone masonry 1pc : 4pp 3,425 m3 Rp -
Anchor U28 2 D13-500 7,138 kg Rp -
Sub Total Rp -
XII BIO SEPTIC & INFILTRATION PIT
1 Bioseptictank Pit
Concrete brick 300x100x150mm with specy 1pc : 3pp 8,000 m2 Rp -
Wall plastering with portland cement 1pc : 2pc 16,000 m2 Rp -
Topping flat concrete K-250, 100mm thk wiremesh M6 2,560 m2
2 Infiltration Pit
Precast circullar concrete Bus 1000x500x80mm 8,000 pcs
Topping flat concrete K-250, 100mm thk wiremesh M6 2,000 m2
Sand fill 0,471 m3
Palm fiber 0,943 m3
Coral split 0,471 m3
Coral stone 0,471 m3
Sub Total Rp -
STRUCTURE COST Rp -
ARCHITECTURE WORK
I ARCHITECTURE GROUND FLOOR FFL 0,000
1 Wall Masonry
Hebel 60x20x20cm with Mortar MU380 87,780 m2 Rp -
Hebel 60x20x15cm with Mortar MU380 27,803 m2 Rp -
Hebel 60x20x7,5cm with Mortar MU380 20,438 m2 Rp -
2 Wall Finishing
Wall plastering with MU301 15mm thk 272,040 m2 Rp -
Skim wall with MU200 138,240 m2 Rp -
Interior wall painting ex Dulux Easy Clean (cornise, primary
138,240
& final)
m2 Rp -
Exterior wall painting ex Dulux Weather Shield (primary &87,780
final) m2 Rp -
Waterproofing ex sika top seal 107 22,680 m2 Rp -
Granite tiles 60x120mm with tile grout ex am (W-01) 55,260 m2 Rp -
Granite tiles 60x120mm with tile grout ex am (W-02) 78,540 m2 Rp -
Wall shadowline
3 Door & Window
a. DW 1
Alumunium jamb 50x100x5mm 23,100 m1 Rp -
Alumunium frame 30x50x3mm 12,400 m1 Rp -
Alumunium jamb finish black paint 6,930 m2 Rp -
Alumunium frame finish black paint 8,680 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 2 set 2,000 pcs Rp -
Hinge ex deckson 2 set 2,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
b. D1
Wood jamb 50x100mm 7,800 m1 Rp -
Wood frame 30x50mm 12,600 m1 Rp -
Wood jamb finishing natural paint 2,340 m2 Rp -
Wood frame finishing natural paint 2,016 m2 Rp -
Leaf doors clear glass 8mm thk 3,600 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Hinge ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
c. D2
Wood jamb 50x100mm 5,600 m1 Rp -
Wood frame 30x50mm 6,400 m1 Rp -
Wooden leaf door 1,920 m2 Rp -
Wood jamb finishing natural paint 1,680 m2 Rp -
Wood frame finishing natural paint 1,024 m2 Rp -
wooden leaf door finshing natural 1,920 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Hinge ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
d. D3
Alumunium jamb 50x100x5mm 5,000 m1 Rp -
Alumunium frame 30x50x3mm 6,000 m1 Rp -
Leaf doors alumunium plate 1mm 2,000 m2 Rp -
Alumunium jamb finish black paint 1,500 m2 Rp -
Alumunium frame finish black paint 0,960 m2 Rp -
Leaf doors finish black paint 2,000 m2 Rp -
Handle ex deckson 2 set 1,000 pcs Rp -
Hinge ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
e. D4
Alumunium jamb 50x100x5mm 4,000 m1 Rp -
Alumunium frame 30x50x3mm 22,600 m1 Rp -
Leaf doors alumunium plate 1mm 10,600 m2 Rp -
Alumunium jamb finish black paint 1,200 m2 Rp -
Alumunium frame finish black paint 3,616 m2 Rp -
Leaf doors finish black paint 10,600 m2 Rp -
Handle ex deckson 2 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
f. W1
Alumunium jamb 50x100x1,5mm 8,300 m1 Rp -
Alumunium frame 30x50x1mm 8,300 m1 Rp -
Alumunium jamb finish black paint 2,490 m2 Rp -
Alumunium frame finish black paint 1,328 m2 Rp -
Leaf doors clear glass 8mm thk 4,200 m2 Rp -
Hinge 1 set 1,000 pcs Rp -
4 Ceiling Finishing
Ceiling holow frame 20x40x0,3mm 63,000 m2 Rp -
Gypsum board 9mm thk 63,000 m2 Rp -
Gypsum board 9mm thk (Water Resist) 2,375 m2 Rp -
Ceiling paint ex Dulux Pentalite 63,000 m2 Rp -
Shadowline alumunium profile U 48,200 m1 Rp -
5 Floor Finishing
Granite tiles 60x120mm with tile grout ex am 103,238 m2 Rp -
Wooden board 22,750 m2 Rp -
Sub Total Rp -
II ARCHITECTURE UPPER FLOOR FFL +3,300
1 Wall Masonry
Hebel 60x20x20cm with Mortar MU380 126,955 m2 Rp -
Hebel 60x20x15 with Mortar MU380 33,000 m2 Rp -
Hebel 60x20x7,5 with Mortar MU380 93,345 m2 Rp -
2 Wall Finishing
Wall plastering with MU301 15mm thk 506,600 m2 Rp -
Skim wall with MU200 292,550 m2 Rp -
Interior wall painting ex Dulux Easy Clean (cornise, primary
292,550
& final)
m2 Rp -
Exterior wall painting ex Dulux Weather Shield (primary 126,955
& final) m2 Rp -
Waterproofing ex sika top seal 107 116,460 m2 Rp -
Granite tiles 60x120mm with tile grout ex am (W-01) 119,340 m2 Rp -
Granite tiles 60x120mm with tile grout ex am 9W-02) 94,710 m2 Rp -
Wall shadowline
3 Door & Window
a. DW 2
Alumunium jamb 50x100x1,5mm 24,100 m1 Rp -
Alumunium frame 30x50x1mm 6,600 m1 Rp -
Alumunium jamb finish black paint 7,230 m2 Rp -
Alumunium frame finish black paint 4,620 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Hinge ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
b. DW 3
Alumunium jamb 50x100x1,5mm 18,500 m1 Rp -
Alumunium frame 30x50x1mm 6,600 m1 Rp -
Alumunium jamb finish black paint 5,550 m2 Rp -
Alumunium frame finish black paint 4,620 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 2 set 2,000 pcs Rp -
Hinge ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
c. DW 4
Alumunium jamb 50x100x1,5mm 39,200 m1 Rp -
Alumunium frame 30x50x1mm 60,000 m1 Rp -
Alumunium jamb finish black paint 11,760 m2 Rp -
Alumunium frame finish black paint 9,600 m2 Rp -
Clear glass 8mm thk 11,960 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Hinge ex deckson 1 set 2,000 pcs Rp -
Lockset ex deckson 1 set 2,000 pcs Rp -
d. D2
Wood jamb 50x100mm 11,200 m1 Rp -
Wood frame 30x50mm 12,800 m1 Rp -
Wooden leaf door 1,920 m2 Rp -
Wood jamb finishing natural paint 3,360 m2 Rp -
Wood frame finishing natural paint 2,048 m2 Rp -
wooden leaf door finshing natural 1,920 m2 Rp -
Handle ex deckson 1 set 2,000 pcs Rp -
Hinge ex deckson 1 set 2,000 pcs Rp -
Lockset ex deckson 1 set 2,000 pcs Rp -
e. D5
Wood jamb 50x100mm 11,000 m1 Rp -
Wood frame 30x50mm 12,800 m1 Rp -
Wood jamb finishing natural paint 3,300 m2 Rp -
Wood frame finishing natural paint 2,048 m2 Rp -
Leaf doors clear glass 8mm thk 2,070 m2 Rp -
Handle ex deckson 2 set 4,000 pcs Rp -
Lockset ex deckson 1 set 2,000 pcs Rp -
f. D6
Wood jamb 50x100mm 7,200 m1 Rp -
Wood frame 30x50mm 12,000 m1 Rp -
Wood jamb finishing natural paint 2,160 m2 Rp -
Wood frame finish natural paint 1,920 m2 Rp -
Leaf doors clear glass 8mm thk 2,880 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
e. D7
Leaf wood 20mm thk 2,880 m2 Rp -
Wood cover rail dor 0,120 m2 Rp -
Wooden leaf finishing natural paint 5,760 m2 Rp -
Wooden cover finishing natural paint 0,240 m2 Rp -
Double slideing door hanging rail 1,200 m1 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
f. D8
Tempred Glass 10mm 3,900 m2 Rp -
Handle stainless 2,000 pcs Rp -
Pivot ex deckson 1,000 pcs Rp -
g. W2
Alumunium jamb 50x100x1,5mm 8,200 m1 Rp -
Alumunium frame 30x50x1mm 8,200 m1 Rp -
Alumunium jamb finish black paint 2,460 m2 Rp -
Alumunium frame finish black paint 1,312 m2 Rp -
Leaf doors clear glass 8mm thk 4,080 m2 Rp -
Hinge ex deckson1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
h. W3
Alumunium jamb 50x100x1,5mm 19,800 m1 Rp -
Alumunium frame 30x50x1mm 19,800 m1 Rp -
Alumunium jamb finish black paint 5,940 m2 Rp -
Alumunium frame finish black paint 3,168 m2 Rp -
Leaf doors clear glass 8mm thk 1,820 m2 Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
4 Railing Balcony bedroom
Hollow 50x50x3mm 21,500 m1 Rp -
Finish black paint 4,300 m2 Rp -
Iron sling finish black paint 86,000 m1 Rp -
5 Pergola
Column hollow 100x100x5mm 6,000 m1 Rp -
Beam hollow 100x100x5mm 19,060 m1 Rp -
Base Plate 10mm 0,023 m2 Rp -
Anchor bolt D13 U42 8 D13 16,000 pcs Rp -
Welded 1,000 ls Rp -
Finish black paint 10,024 m2 Rp -
Tempred Glass 10mm 12,387 m2 Rp -
6 Railing pergola
Hollow 50x50x3mm 20,800 m1 Rp -
Finish black paint 4,160 m2 Rp -
Iron sling finish black paint 83,200 m1 Rp -
7 Ceiling Finishing
Ceiling holow frame 20x40x0,3mm 144,780 m2 Rp -
Gypsum board 9mm thk 127,880 m2 Rp -
Gypsum board 9mm thk (Water Resist) 16,900 m2 Rp -
Ceiling paint ex Dulux Pentalite 144,780 m2 Rp -
Shadowline alumunium profile U 95,000 m1 Rp -
8 Floor Finishing
Granite tiles 60x120mm with tile grout ex am 144,780 m2 Rp -
Sub Total Rp -
III ARCHITECTURE ROOF FLOOR FFL +6,600
1 Wall Masonry
Hebel 60x20x20cm with Mortar MU380 14,921 m2 Rp -
Wall plastering with MU301 15mm thk 29,842 m2 Rp -
Skim wall with MU200 29,842 m2 Rp -
Interior wall painting ex Dulux Easy Clean (cornise, primary
14,921
& final)
m2 Rp -
Exterior wall painting ex Dulux Weather Shield (primary &14,921
final) m2 Rp -
Waterproofing ex sika top seal 107 14,921 m2 Rp -
Wall shadowline
2 Door & Window
a. DW 5
Alumunium jamb 50x100x1,5mm 12,400 m1 Rp -
Alumunium frame 30x50x1mm 15,000 m1 Rp -
Alumunium jamb finish black paint 3,720 m2 Rp -
Alumunium frame finish black paint 10,500 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Handle ex deckson 1 set 1,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
b. DW 6
Alumunium jamb 50x100x1,5mm 15,300 m1 Rp -
Alumunium frame 30x50x1mm 17,900 m1 Rp -
Alumunium jamb finish black paint 4,590 m2 Rp -
Alumunium frame finish black paint 12,530 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 2 set 2,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
c. DW 7
Alumunium jamb 50x100x1,5mm 15,300 m1 Rp -
Alumunium frame 30x50x1mm 17,900 m1 Rp -
Alumunium jamb finish black paint 4,590 m2 Rp -
Alumunium frame finish black paint 12,530 m2 Rp -
Clear glass 8mm thk 12,210 m2 Rp -
Handle ex deckson 2 set 2,000 pcs Rp -
Lockset ex deckson 1 set 1,000 pcs Rp -
i. W4
Alumunium jamb 50x100x1,5mm 25,480 m1 Rp -
Alumunium frame 30x50x1mm 25,480 m1 Rp -
Alumunium jamb finish black paint 7,644 m2 Rp -
Alumunium frame finish black paint 4,077 m2 Rp -
Leaf doors clear glass 8mm thk 9,802 m2 Rp -
j. W5
Alumunium jamb 50x100x1,5mm 13,400 m1 Rp -
Alumunium frame 30x50x1mm 13,400 m1 Rp -
Alumunium jamb finish black paint 4,020 m2 Rp -
Alumunium frame finish black paint 2,144 m2 Rp -
Leaf doors clear glass 8mm thk 1,950 m2 Rp -
Hinge 1 set 2,000 pcs Rp -
Lockset ex deckson 1 set 2,000 pcs Rp -
k. W6
Alumunium jamb 50x100x1,5mm 9,800 m1 Rp -
Alumunium frame 30x50x1mm 9,800 m1 Rp -
Alumunium jamb finish black paint 2,940 m2 Rp -
Alumunium frame finish black paint 1,568 m2 Rp -
Leaf doors clear glass 8mm thk 5,980 m2 Rp -
3 Ceiling Finishing
Ceiling holow frame 20x40x0,3mm 32,000 m2 Rp -
Gypsum board 9mm thk 32,000 m2 Rp -
Ceiling paint ex Dulux Pentalite 32,000 m2 Rp -
Shadowline alumunium profile U 23,295 m1 Rp -
4 Railing rooftop
Hollow 50x50x3mm 93,100 m1 Rp -
Finish black paint 18,620 m2 Rp -
Iron sling finish black paint 372,400 m1 Rp -
5 Floor Finishing
Granite tiles 60x120mm with tile grout ex am 132,800 m2 Rp -
6 Flat Roof Finishing (Rooftop)
Membrane water proofing 32,000 m2 Rp -
Sub Total Rp -
IV STAIR FINISHING
1 Stair 1 Ground Floor to Upper Floor
Stepping cover with wooden board antrade 6,900 m2 Rp -
Stepping cover with wooden board optrade 3,795 m2 Rp -
Plastering with MU301 15mm thk 33,000 m2 Rp -
Skim with MU200 33,000 m2 Rp -
Painting ex Dulux Easy Clean (cornise, primary & final) 33,000 m2 Rp -
2 Stair 2 Upper Floor to Roof Floor
Stepping cover with wooden board antrade 6,900 m2 Rp -
Stepping cover with wooden board optrade 3,795 m2 Rp -
Plastering with MU301 15mm thk 33,700 m2 Rp -
Skim with MU200 33,700 m2 Rp -
Painting ex Dulux Easy Clean (cornise, primary & final) 33,700 m2 Rp -
Sub Total Rp -
V POOL - BALANCING TANK
1 Swimming Pool
Pool floor finishing white granite 600x1200mm 21,760 m2 Rp -
Wall Pool finishing white granite 600x1200mm 33,320 m2 Rp -
Topping pool finishing white stone 4,900 m2 Rp -
Filling pool water 36,992 m3 Rp -
Water treatment (vaccum & chemical) 1,000 ls Rp -
2 Balancing tank
Pool floor finishing white granite 600x1200mm 13,600 m2 Rp -
Wall Pool finishing white granite 600x1200mm 13,600 m2 Rp -
Sub Total Rp -
VI LANDSCAPE
1 Boundary Wall Structure
River stone masonry 1pc : 4pp 16,510 m3 Rp -
Anchor U28 8-1000 13,043 kg Rp -
Pracctical sloof 100x200mm 66,040 m1 Rp -
Lintel beam 100x200mm 66,040 m1 Rp -
Practical column 110x110mm 26,000 m1 Rp -
2 Boundary Wall
Concrete brick 300x100x150mm with specy 1pc : 3pp 106,880 m2 Rp -
Wall plastering with MU301 15mm thk 213,760 m2 Rp -
Skim wall with MU200 213,760 m2 Rp -
3 Garden
Humus soil filling 56,059 m2 Rp -
Grass 56,059 m2 Rp -
Sub Total Rp -
ARCHITECTURE COST Rp -
ME & P WORK
I ELECTRICAL supply & install - test & commissioning
1 PLN Connections, Electrical & Panel
PLN Power Connection administration cost for 16,500 VA 1 lot Rp -
LVMDP all accessories required as design drawings 1 pcs Rp -
MCB-3P 35A 1 pcs Rp -
MCB-3P 10A 1 pcs Rp -
ELCB-10mA 3P 16A 1 pcs Rp -
MCB-3P 25A 1 pcs Rp -
ELCB-10mA 3P 10A 1 pcs Rp -
MCB-1P 6A 9 pcs Rp -
MCB-1P 16A 2 pcs Rp -
MCB-1P 20A 1 pcs Rp -
Timer ex schneider 1 pcs Rp -
Feeder cable NYFGBY 4 x 10sqmm + BC 10sqmm PLN to4LVMDP m1 Rp -
SDP-01 and all accessories required as design drawings 1 pcs Rp -
MCB-3P 25A 1 pcs Rp -
MCB-3P 10A 1 pcs Rp -
ELCB-10mA 3P 16A 1 pcs Rp -
MCB-1P 6A 5 pcs Rp -
MCB-1P 10A 6 pcs Rp -
Feeder cable NYY 4 x 10sqmm + BC 10 sqmm LVMDP to SDP 4 m1 Rp -
SDP-02 and all accessories required as design drawings 1 pcs Rp -
ELCB-10mA 3P 10A 1 pcs Rp -
MCB-1P 6A 3 pcs Rp -
MCB-1P 10A 5 pcs Rp -
Timer ex schneider 2 pcs Rp -
Feeder cable NYY 4 x 6sqmm + BC 6 sqmm LVMDP to SDP 10 m1 Rp -
2 Cabling ex. supreme instalastion in HIC clipsal 20mm
Indoor lighting cable installation NYM 3x2,5 sqmm 253,925 m1 Rp -
Outdoor lighting cable instalattion NYY 3x2,5 sqmm 130,784 m1 Rp -
Power outlet cable installation NYM 3x4 sqmm 20,000 m1 Rp -
Power outlet cable installation NYM 3x2,5 sqmm 288,000 m1 Rp -
Indoor AC 2PK cable installation NYM 3x4 sqmm 13,000 m1 Rp -
Indoor AC 1PK cable installation NYM 3x2,5 sqmm 33,500 m1 Rp -
Pump cable instalation NYY 3x2.5 sqmm 71,400 m1 Rp -
Waterproof lamp transformer NYHY 2x2,5 sqmm 29,470 m1 Rp -
Exhaust fan instalation cable 3x2,5 sqmm 33,600 m1 Rp -
3 Switch and Power Outlet ex. Schneider
Cross way one gang switch (hotel engkel) 1 pcs Rp -
Two way two gang switch (hotel engkel) 2 pcs Rp -
Two way one gang switch (hotel engkel) 12 pcs Rp -
One way two gang / double switch (seri) 8 pcs Rp -
One way one gang / single switch (engkel) 15 pcs Rp -
Waterproof lamp/transformer DC12V-60W 1 pcs Rp -
Waterproof general power outlet 3 pcs Rp -
General Power Outlet, Wall type 26 pcs Rp -
Universal / Internasional power outlet 19 pcs Rp -
TV outlet 3 pcs Rp -
4 Lighting Fixtures
LED Inbow ceiling downlight 3" 3W/5W 40 pcs Rp -
LED outbow ceiling downlight 4" 5W 22 pcs Rp -
Decorative ceiling 15W 1 pcs Rp -
LED pendant light side wall 3W 4 pcs Rp -
LED stripe 6W light 4 pcs Rp -
Decorative hanging lamp 5W 1 pcs Rp -
LED pendant light 25W 1 pcs Rp -
LED pendant light kitchen 7W 3 pcs Rp -
LED pendant light dinning 3W 38 pcs Rp -
LED pendant light living 25W 1 pcs Rp -
Track light living 5W 22 pcs Rp -
Pendant light dinning 15W 1 pcs Rp -
LED outdoor wall lamp 7W 13 pcs Rp -
LED flood light outdoor 10W 10 pcs Rp -
LED pool lamp 12W 8 pcs Rp -
5 Air Conditioning Fixtures
AC wall mounted 2PK ex. Daikin 2 unit Rp -
Drain pipe PVC AW Class 3"/4 insulation 10,310 m1 Rp -
Refrigerant insulation with armaflex/superlon 8,370 m1 Rp -
AC wall mounted 1PK ex. Daikin 2 unit Rp -
Drain pipe PVC AW Class 3"/4 insulation 11,000 m1 Rp -
Refrigerant insulation with armaflex/superlon 18,300 m1 Rp -
Ceiling Fan 220V-75W 3 unit Rp -
Exhaust fan ceiling 35W 5 unit Rp -
5 Lightning Protection
Grounding cable NYY 70 sqmm in HIC clipsal 14,150 m1 Rp -
Grounding system R maks 2 Ohm 3 unit Rp -
Base plate with stifener 10mm & 4x anchore 12mm 1 ls Rp -
Galvanish steel 2" 1,500 m1 Rp -
Head protector R60m 1 unit Rp -
Control box with CU terminal junction 1 unit Rp -
6 Water Pump & Water heater Fixtures
Deep well pump 0,75KW-220V ex. Grundfos 1 unit Rp -
Booster pump 0,75KW-220V ex. Grundfos 1 unit Rp -
Pool pump 0,75PK-220V ex. Grundfos 1 unit Rp -
Sumpit pump 0,5PK-370W ex. Grundfos 1 unit Rp -
Electric water heater 100ltr / 1,5KW ex. ariston 1 unit Rp -
Electric water heater 30ltr / 0,8KW ex. ariston 2 unit Rp -
Sub Total Rp -
II PLUMBING supply & install - test & commissioning
1 Clean water supply
PDAM connection include water meter 1 unit Rp -
Deep well 60m (depend on water quality) c/w cassing pipe
60,000
4" m1 Rp -
1,5" PVC pipe AW class 10 ex rucika 60,000 m1 Rp -
Multimedia filter 1 unit Rp -
Softner filter 1 unit Rp -
2 Clean water
PPR PN-10 1" ex. rucika 53,700 m1 Rp -
PPR PN-10 3"/4 ex. rucika 25,700 m1 Rp -
Gate valve PPR 1" 1,000 pcs Rp -
Check valve / union PPR 4,000 pcs Rp -
Reducer PPR 1" - 3"/4 5,000 pcs Rp -
Tee PPR 1" 25,000 pcs Rp -
Tee PPR 3"/4 50,000 pcs Rp -
90 elbow PPR 1" 25,000 pcs Rp -
90 elbow PPR 3"/4 50,000 pcs Rp -
3 Pool water circulation
High rate sand filter ex. Grundfos 1,000 unit Rp -
2" PVC pipe JIS class 26,860 m1 Rp -
1" PVC pipe JIS class 4,000 m1 Rp -
Wall inlet 3,000 pcs Rp -
Skimmer 1,000 pcs Rp -
Maindrain 1,000 pcs Rp -
Balvalve 2" PVC 5,000 pcs Rp -
Balvalve 1" PVC 1,000 pcs Rp -
Watermur PVC 2" 4,000 pcs Rp -
Watermur PVC 1" 1,000 pcs Rp -
4 Hot water
PPR PN-20 1" ex. Rucika 14,900 m1 Rp -
female thread elbow with double nepel 6,000 pcs Rp -
Tee PPR 1" 6,000 pcs Rp -
90 elbow PPR 1" 14,000 pcs Rp -
5 Sewage & Waste Water
4" PVC pipe AW class ex rucika 111,700 m1 Rp -
3" PVC pipe AW class ex rucika 42,800 m1 Rp -
2" PVC pipe AW class ex rucika 6,830 m1 Rp -
1" PVC pipe AW class ex rucika 4,000 m1 Rp -
1" PVC pipe D class ex rucika for venting 26,400 m1 Rp -
Check valve PVC 4" 2 pcs Rp -
Check valve PVC 3" 2 pcs Rp -
Check valve PVC 2" 2 pcs Rp -
Large radius tee PVC 4" 8 pcs Rp -
Large radius tee PVC 3" 5 pcs Rp -
Large radius tee PVC 2" 5 pcs Rp -
90° elbow PVC 4" 11 pcs Rp -
90° elbow PVC 3" 20 pcs Rp -
90° elbow PVC 2" 10 pcs Rp -
45° elbow PVC 4" 6 pcs Rp -
45° elbow PVC 3" 4 pcs Rp -
Reducer PVC 4"-3" 3 pcs Rp -
Reducer PVC 3"-2" 3 pcs Rp -
Reducer PVC 2"-1" 5 pcs Rp -
Dop PVC 2" 2 pcs Rp -
P-trap PVC 4" 4 pcs Rp -
P-trap PVC 3" 4 pcs Rp -
Control box 50x50x50 100mm thk 2 unit Rp -
Biotank cap 1,5m3/day 1 unit Rp -
6 Sanitary
Hand shower TOTO TX426MMA 3 unit Rp -
Fixed shower wall type TOTO TX488SY#MB black series 3 unit Rp -
Shower mixer TOTO TX451SY#MB black series 3 unit Rp -
Bathtub TOTO PJY1814PWE 1 unit Rp -
Bathub faucet TOTO TX116LRSN black series 1 unit Rp -
Closed TOTO wall hung CW620NJ/TV150NRNV3 4 unit Rp -
Shower spray TOTO TX403MMDV2#MB black series 4 unit Rp -
Accessories stop valve with flexible house TOTO TX277SV3 4 unit Rp -
Suplementary parts TOTO 1 ls Rp -
Paper holder TOTO TX703AQ 4 unit Rp -
Towel holder TX4W 4 unit Rp -
Lavatory TOTO LW896J 5 unit Rp -
Lavatory faucet TOTO TX115MMA black series 5 unit Rp -
Smart floor dran TOTO TX1DBV1 5 unit Rp -
Sink double bowl ex. Modena 1 unit Rp -
Sink tap palom FCP 9262 black series 1 unit Rp -
Garden tap ex. paloma 2 unit Rp -
Roof drain 3 unit Rp -
Sub Total Rp -
ME & P COST Rp -
GRAND TOTAL : Rp - BE CALCULATED