0% found this document useful (0 votes)
607 views1 page

Raft Slab Bottom Short Bars Details

This document provides dimensions for a building layout in millimeters. It includes dimensions for 16 points labeled A through P, as well as overall dimensions. Notes indicate that all dimensions are in millimeters unless otherwise specified, drawings are not to be scaled, and any errors should be reported to the architect.

Uploaded by

DINESH M.N
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
607 views1 page

Raft Slab Bottom Short Bars Details

This document provides dimensions for a building layout in millimeters. It includes dimensions for 16 points labeled A through P, as well as overall dimensions. Notes indicate that all dimensions are in millimeters unless otherwise specified, drawings are not to be scaled, and any errors should be reported to the architect.

Uploaded by

DINESH M.N
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N

J M
A B C D E F G H E L N P Q R S T U
1020 1200
9900 9900 3240 4000 2660 9900 9830 1850 4500 2420 2580 7250 6600 3450
86300 Notes:
1.All dimensions are in millimeters and levels
are in meters unless otherwise specified.
1150

2.Drawing shall not be scaled, only written


8 1050
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 dimensions to be followed.
P1 P1
3.Any Error or Discrepancies in the
P1 P1 P1 P1 P1 P1 P1 P1 P1
Drawings are to be brought to the notice.
9600
Y16 @200 IN `Y' DIR of the Architect/ Engineers.
6900

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
4. This drawings shall not be used other than
10325

B1
the purpose marked/issued specified.
5. The drawings to be read with conjuction
7 P4

B1
P1

B1 B1 B1 B1 B1 B1 B1
P1

B1
P1
B1
with structural drawings.

19450
P1 P2 P1 P1 P1 P1 P1
6. All the drawings prepared by Design
4250

12100
and structural consultants are as per
B4

Y25 @100-2 LAYERS IN `Y' DIR


9505 NBC norms and guidelines.
6 REMOVAL OF FORMWORK(SHUTTERING) :
B2

B2

B2

B2

B1

B1

B1

B1
27500

S.W2

8920
Shuttering of any part of the structure shall not be
2000

5 Y16 @200 IN `Y' DIR


removed until the concrete attains 70% of the specified
strength of concrete however the following minimum
13400 period (after final pour ) shall be allowed before
B4
3650

removal of shuttering as per clause 11.3.1, is 456:2000


P1
A. Vertical side of shuttering of columns,walls & beams
- 24 hours
4 B2 B2 B2 B2 B2 B3 B3 B3 B1
P1 B. Bottom shuttering of slabs (keeping the props)
P2 P2 P2 P2 P1 P1
- 3 days
C. Bottom shuttering of beams (keeping the props)
- 7 day
Y16 @200 IN `Y' DIR Y16 @200 IN `Y' DIR

B1

B1
D. Props to slabs :
B4
6900

B1

B1
B4

B4
B4

B4
B4

Y32 @100-2 LAYERS IN `Y' DIR Y32 @100-2 LAYERS IN `Y' DIR i .spanning upto 4.5 m - 7 days

8850
i i .spanning over 4.5 m - 14 days
P1 E. Props to beams & arches :
B1 B1 B4 B4 B1 i .spanning upto 6 m - 14 days
3 P2 B2
P4
B4 B4 B4
P1
i i.spanning over 6 m - 21 days
RAFT LINE LAP JOINTS FOR REINFORCEMENT BARS :
3290

1. At any cross section of the member,not more than


50% of the bars shall be lapped.
2 2. Laps shall be staggered with a minimum centre to
centre distance of 1.3 times lap length of the bar for
PCC LINE tension & compression members.
NF2 NF1 NF2 3. Development length (ld) shall be as per (sp:34-1999)
NF1 NF1 NF1 NF1 NF1 table below:
a) Development length for column bars - 40d
b) Development length for beam bars - 50d
4. Laps in columns shall be provided at mid height of
11105

floor and not at slab level .


5. Laps in beams and slabs shall be provided at the
point of contraflexure.
3000 6. Welding of bars shall be done as a stitch weld for 5
2700 times diameter of bar and a gap of 5 times higher
1500
1350 diameter bar and again welding for another 5 times
diameter of bar using arc welding and special
electrodes after obtaining prior written approval from
1350

1 the structural designer.

3000
2700

7. Detailing of rebars shall confirm to sp-34 & is 13920.


GENERAL NOTES:
NF2 NF1 NF1 NF1 NF1 NF1 NF2 M-35 GRADE CONCRETE 1. Concrete grade shall be M35(design mix) confirming to
is 456:2000
2. Minimum cement content = 380 kg/m3.
3. Min.grade of reinforcement marked thus (y) shall be Fe
550D confirming to IS 1786-1985
4. Clear cover for reinforcement
a) Column = 40mm d) Raft slab bottom = 75mm
b) R.C wall = 40mm e) Raft slab top = 50mm
BOTTOM - LONG BAR DIRECTION-REINFORCEMENT DETAILS
c) Shear wall = 40mm
FOOTING SCHEDULE :
This drg. read in conjection with arch.drgs.
FOOTING 5. Raft & Columns are designed for Ground + Mezzanine +
SI. FOOTING REINFORCEMENT NO OF Four floor loads only.
NO. NAME FOOTING SIZE X = LONGER DIRECTION FOOTING 6. SBC of the soil is taken as 320kN / sqm. @ 2.40m below
Y = SHORTER DIRECTION
from N.G.L. as per soil report.
Y20 @ 125 C/C
01 NF1 2000 x 2000 BOTTOM - 14 7. Spacer bar - 25mm dia to be provided in between two
BOTHWAYS
Y16 @ 150 C/C layer of reinforcement at every 750mm c/c
D = 750 TOP - BOTHWAYS 8. Structural engineer responsibility is limited to design &
issual of structural drawing only
9. Onus of construction lies with contractor/owner
10. For concreting water cement ratio should be (0.45) (for
1bag cement= max-25 lit of water only to be added.)
NOTES STRUCTURAL DESIGN QUALITY ASSURANCE
REVISIONS
Notice of no objection from Southern Railways Katpadi is being accorded for design principles based on the The drawing has been prepared based on actual site survey and other terms and conditions of the EPC Agreement. Responsibility of accuracy, correctness , This drawing including its design and detailing has been checked in accordance with the requirements of EPC Agreement and found
recommendations of the Architect/Lead Designer and proposal by the Contractor. However, the completeness, integrity and full compliance with byelaws, standards, statutory, regulations of relevant Codes & Manuals/ Rules and as per EPC Agreement suitable for the execution purpose. The overall responsibility of correctness of design,detailing and compliance with EPC agreement R.NO DATE DESCRIPTION
overall responsibility and design accuracy lies with the contractor (Engineering Projects (india) Pvt Ltd) provisions, rests with the Design Consultants and the Contractor without any financial implications. rests with the Structural Design Consultant and Contractor.
CLIENT: PROJECT: EPC Contractor: DESIGN CONSULTANT Authority Engineer (PMS) AXEN CN/MAS DY. CE CN/MAS CE CN/MAS
Drawing Title :
SOUTHERN RAILWAYS, REDEVELOPMENT OF ENGINEERING PROJECTS M/S VOYANTS SOLUTIONS PVT. LTD.
KATPADI. KATPADI JUNCTION (INDIA) LTD-CHENNAI Drawing Type :
Drawing No.: Scale: 1:100 Date: 12.12.23
Drawing Purpose: Sheet Size: A2 Rev. No: R0
AGM DESIGN DIRECTOR TEAM LEADER LEAD DESIGNER

You might also like