Strap Beams Sections
Strap Beams Sections
N
1200 1200 12Y25+12Y25(IN 2 LAYERS) 12Y25
(12-Y25+ 12Y20) 4-Y16 ( SKIN BAR) @TOP 4-Y16 ( SKIN BAR) @TOP
(IN 2 LAYERS)
(12-Y25
4-Y16 ( SKIN BAR) @ TOP 4-Y16 ( SKIN BAR)
1800
1800
1800
1800
Y12- 12LEGGED @200C/C Y12- 12LEGGED @200C/C Y12- 12LEGGED @200 Y12- 12LEGGED @200 Notes:
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C
1.All dimensions are in millimeters and levels
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C TOP OF RAFT +208.620
@ 200 C\C @ 200 C\C @ 200 C\C are in meters unless otherwise specified.
(12-Y25
2.Drawing shall not be scaled, only written
650
650
650
650
@ BOTTOM dimensions to be followed.
100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 3.Any Error or Discrepancies in the
100mm SAND FILLING 100mm SAND FILLING 100mm SAND FILLING 150mm SAND FILLING
Y16 @ 200 C/C Y16 @ 200 C/C (12-Y25@ BOTT.) Y16 @ 200 C/C (12-Y25+ 12Y25) Y16 @ 200 C/C (12-Y25+ 12Y25)
Drawings are to be brought to the notice.
(IN 2 LAYERS (IN 2 LAYERS
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C of the Architect/ Engineers.
4. This drawings shall not be used other than
BEAM B1 BEAM B2 BEAM B3 BEAM B4
( 1200x1800 ) ( 1200x1800 ) ( 1200x1800 ) ( 1200x1800 ) the purpose marked/issued specified.
5. The drawings to be read with conjuction
with structural drawings.
6. All the drawings prepared by Design
and structural consultants are as per
NBC norms and guidelines.
REMOVAL OF FORMWORK(SHUTTERING) :
Shuttering of any part of the structure shall not be
removed until the concrete attains 70% of the specified
3000 3000 strength of concrete however the following minimum
period (after final pour ) shall be allowed before
3000 3000 12Y25+12Y25(IN 2 LAYERS) 12Y25
(12-Y25+ 12Y20) 4-Y16 ( SKIN BAR) @TOP 4-Y16 ( SKIN BAR) @TOP
removal of shuttering as per clause 11.3.1, is 456:2000
(IN 2 LAYERS)
(12-Y25 A. Vertical side of shuttering of columns,walls & beams
4-Y16 ( SKIN BAR) @ TOP 4-Y16 ( SKIN BAR) - 24 hours
B. Bottom shuttering of slabs (keeping the props)
- 3 days
C. Bottom shuttering of beams (keeping the props)
- 7 day
1800
1800
D. Props to slabs :
1800
1800
Y12- 12LEGGED @200C/C Y12- 12LEGGED @200C/C Y12- 12LEGGED @200 Y12- 12LEGGED @200 i .spanning upto 4.5 m - 7 days
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C i i .spanning over 4.5 m - 14 days
E. Props to beams & arches :
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C TOP OF RAFT +208.620
@ 200 C\C @ 200 C\C @ 200 C\C i .spanning upto 6 m - 14 days
i i.spanning over 6 m - 21 days
(12-Y25
650
650
650
650
@ BOTTOM LAP JOINTS FOR REINFORCEMENT BARS :
100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 100mm THK., PCC 1:4:8 1. At any cross section of the member,not more than
100mm SAND FILLING 100mm SAND FILLING 100mm SAND FILLING 150mm SAND FILLING 50% of the bars shall be lapped.
Y16 @ 200 C/C Y16 @ 200 C/C (12-Y25@ BOTT.) Y16 @ 200 C/C (12-Y25+ 12Y25) Y16 @ 200 C/C (12-Y25+ 12Y25) 2. Laps shall be staggered with a minimum centre to
(IN 2 LAYERS (IN 2 LAYERS
Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C Y16 @ 200 C/C centre distance of 1.3 times lap length of the bar for
tension & compression members.
PEDESTAL P1 PEDESTAL P2 PEDESTAL P3 PEDESTAL P4 3. Development length (ld) shall be as per (sp:34-1999)
( 3000x1800 ) ( 3000x1800 ) ( 3000x1800 ) ( 3000x1800 ) table below:
a) Development length for column bars - 40d
b) Development length for beam bars - 50d
4. Laps in columns shall be provided at mid height of
floor and not at slab level .
5. Laps in beams and slabs shall be provided at the
point of contraflexure.
6. Welding of bars shall be done as a stitch weld for 5
COLUMN times diameter of bar and a gap of 5 times higher
diameter bar and again welding for another 5 times
diameter of bar using arc welding and special
600
TOP OF FFL +211.097 electrodes after obtaining prior written approval from
the structural designer.
200
200
100
100
GRADE SLAB
PLINTH PCC 7. Detailing of rebars shall confirm to sp-34 & is 13920.
900 BEAM
GENERAL NOTES:
PLINTH BOTTOM +210.197
1. Concrete grade shall be M35(design mix) confirming to
977
977
EARTH FIILLING EARTH FIILLING
is 456:2000
2. Minimum cement content = 380 kg/m3.
3000 3. Min.grade of reinforcement marked thus (y) shall be Fe
PEDESTAL BEAM 3000X1200
550D confirming to IS 1786-1985
1200
1200
4. Clear cover for reinforcement
a) Column = 40mm d) Raft slab bottom = 75mm
b) R.C wall = 40mm e) Raft slab top = 50mm
c) Shear wall = 40mm
1150 BEAM 1200X1200 This drg. read in conjection with arch.drgs.
1150
BEAM 1200X1200
5. Raft & Columns are designed for Ground + Mezzanine +
TOP OF RAFT +208.620 Four floor loads only.
6. SBC of the soil is taken as 320kN / sqm. @ 2.40m below
RAFT BEAM 650 mm DEEP from N.G.L. as per soil report.
650
650
TOP OF PCC +207.90
7. Spacer bar - 25mm dia to be provided in between two
layer of reinforcement at every 750mm c/c
250
100PCC+150 SAND
8. Structural engineer responsibility is limited to design &
issual of structural drawing only
TYPPICAL CROSS SECTION AT COLUMN LOCATIONS 9. Onus of construction lies with contractor/owner
10. For concreting water cement ratio should be (0.45) (for
1bag cement= max-25 lit of water only to be added.)
NOTES STRUCTURAL DESIGN QUALITY ASSURANCE
REVISIONS
Notice of no objection from Southern Railways Katpadi is being accorded for design principles based on the The drawing has been prepared based on actual site survey and other terms and conditions of the EPC Agreement. Responsibility of accuracy, correctness , This drawing including its design and detailing has been checked in accordance with the requirements of EPC Agreement and found
recommendations of the Architect/Lead Designer and proposal by the Contractor. However, the completeness, integrity and full compliance with byelaws, standards, statutory, regulations of relevant Codes & Manuals/ Rules and as per EPC Agreement suitable for the execution purpose. The overall responsibility of correctness of design,detailing and compliance with EPC agreement R.NO DATE DESCRIPTION
overall responsibility and design accuracy lies with the contractor (Engineering Projects (india) Pvt Ltd) provisions, rests with the Design Consultants and the Contractor without any financial implications. rests with the Structural Design Consultant and Contractor.
CLIENT: PROJECT: EPC Contractor: DESIGN CONSULTANT Authority Engineer (PMS) AXEN CN/MAS DY. CE CN/MAS CE CN/MAS
Drawing Title :
SOUTHERN RAILWAYS, REDEVELOPMENT OF ENGINEERING PROJECTS M/S VOYANTS SOLUTIONS PVT. LTD.
KATPADI. KATPADI JUNCTION (INDIA) LTD-CHENNAI Drawing Type :
Drawing No.: Scale: 1:100 Date: 12.12.23
Drawing Purpose: Sheet Size: A2 Rev. No: R0
AGM DESIGN DIRECTOR TEAM LEADER LEAD DESIGNER