0% found this document useful (0 votes)
35 views1 page

LOA Jabalpur Nagpur

Uploaded by

nhai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

LOA Jabalpur Nagpur

Uploaded by

nhai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
a cardia ureter zrsrart urfracor rT Phen 1-14. 250rev0art9or200 As a6, 4et-v0, greet, vd Reel nowrs NHAI/MH/RO NGP/FC/2018/109 14% March, 2019 To, ‘Mis Indraprastha Corridor Advisory Services (P) Ltd, 93, Qutab View Apartment, Qutab Institutional Area, SUS Marg, Oppt. Qutab Hotel, New Delhi - 110016 Tel. no.: 011-26512200/25082200 Email: [email protected] Sub: Construction of Pedestrian underpass at km 685.820 including service road in forest section under safety requirement of Jabalpur-Nagpur section of NH-44 in the State of ‘Maharashtra on EPC Mode - Letter of Award (LOA) - Reg.: Sir, With the approval of Competent Authority, your firm has been selected for engagement as Financial Consultant for the above mentioned work to the availability of key personnel. 2, The scope of service and other terms and condition shall be as per Policy Circular No. 11014/11/2016-HR-| dated 27.12.2016. The total fee payable shall be Rs. 6,00,000/- (Rupees ‘Six Lakhs Only) plus service tax on reimbursement basis as per schedule given below: Particulars of work to be done by Financial Consultant Percentage of payable | Preparation/ Evaluation of Bidding Documents i.e. RFQLRFP | 20% | Z__| Preparation of EPC Documents 70% 3 | Evaluation of RFP Sasa 1 30% qT | Preparation o of Agreements [308] 3. The work is to be carried out: at Regional Office - Nagpur and accordingly, you are requested to provide services to the Regional Office - Nagpur. 4. You are requested to confirm your acceptance and kindly acknowledge the same. 5. You are also required to execute the contract agreement for the aforesaid Consultancy assignment. (Ashish Asati) General Manager (Tech) ‘Maharashtra Division

You might also like