0% found this document useful (0 votes)
49 views1 page

Tulip-Epcc-Exe-Axn-Saro-Pro-Pfd-001 - 0 Process Flow Diagram

This document provides a diagram of the piping and instrumentation diagram (P&ID) for sector 2 of the process gas unit (PGU) II loop 2. The diagram shows the vent lines from various equipment like the SL-270 separator, SR-273 scrubber, S-211/221 surge drums and FE-311/321/331 fired heaters routing to designated safe areas. It also shows the bypass provisions for control valves FCV-411/421/431 and PCV-411/421/431.

Uploaded by

jialiangthegamma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views1 page

Tulip-Epcc-Exe-Axn-Saro-Pro-Pfd-001 - 0 Process Flow Diagram

This document provides a diagram of the piping and instrumentation diagram (P&ID) for sector 2 of the process gas unit (PGU) II loop 2. The diagram shows the vent lines from various equipment like the SL-270 separator, SR-273 scrubber, S-211/221 surge drums and FE-311/321/331 fired heaters routing to designated safe areas. It also shows the bypass provisions for control valves FCV-411/421/431 and PCV-411/421/431.

Uploaded by

jialiangthegamma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SL-270 SR-273 S-211 / 221 FE-311 / 321 / 331 FCV-411 / 421 / 431 PCV-411 / 421 / 431

VENT TO SAFE AREA


VENT TO SAFE AREA VENT TO SAFE AREA
VENT TO SAFE AREA

TOV
STATION

SL-270 1 2 SR-273
AG
UG

BV-271 BV-272
STATION STATION

TP
02

BY PASS
PROVISION

TP
01 5C 6C 7A 8A 9A
FCV-411 PCV-411
USM
FE-311 (NOTE 5, 6)
3A (NOTE 3, 4)

S-211 4A
(NOTE 2)

GC
NPS 36 PGU II-SECTOR 2

NPS 36 PGU II LOOP 2

BY PGB BY OTHER
5A 6A 7B 8B 9B
FCV-421 PCV-421
USM
FE-321 (NOTE 5, 6)
3B 10
(NOTE 3)
TP
S-221 4B 03 REVISION CONTRACTOR OWNER
(NOTE 2)

BY PASS
PROVISION

5B 6B 7C 8C 9C
USM FCV-431 PCV-431
FE-331 (NOTE 5, 6)
(NOTE 3)
0 22/07/21 APPROVED FOR CONSTRUCTION IJS NZJ MAA MSMS AFAM JJS

DRF EM PM DE EM PM
REV. DATE DESCRIPTIONS
DRAWN CHK'D APP'D REV'D ENDORS'D APP'D

OWNER
PETRONAS GAS BERHAD (101671-H)
SEGAMAT OPERATION CENTRE
GAS TRANSMISSION & REGASIFICATION
KM 10, LEBUHRAYA SEGAMAT - KUANTAN
85000 SEGAMAT
JOHOR DARUL TAKZIM
MALAYSIA

CONTRACTOR
AXIANERGY (M) SDN. BHD.
NO.18 & 18-1, PERSIARAN METRO SENDAYAN 1,
SENDAYAN METRO PARK,
71950 BANDAR SERI SENDAYAN SEREMBAN,
NEGERI SEMBILAN
TEL : 06-792-2154 FAX : 06-792-2451

SUB CONTRACTOR

PROJECT
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING
(EPCC) OF NPS 36 PULAU INDAH LATERAL PIPELINE PROJECT (TULIP)

CONTRACT NO JOB NO

RFP-000000000263/1004 -

DRAWING TITLE
PROCESS FLOW DIAGRAM

DRAWING NO. SHEET SCALE REV.

TULIP-EPCC-EXE-AXN-SARO-PRO-PFD-001 1 OF 1 N.T.S 0

You might also like