Concrete Checklist

This document is a concrete inspection checklist for an underground project. It has sections for checks before pouring concrete, during the pour, after destressing, stripping forms, and inspecting/stacking concrete members. It includes checks on reinforcement, formwork, embedded items, concrete properties and curing. The checklist is to ensure quality control of the concrete pour and casting.

Uploaded by

Kevin Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

Concrete Checklist

This document is a concrete inspection checklist for an underground project. It has sections for checks before pouring concrete, during the pour, after destressing, stripping forms, and inspecting/stacking concrete members. It includes checks on reinforcement, formwork, embedded items, concrete properties and curing. The checklist is to ensure quality control of the concrete pour and casting.

Uploaded by

Kevin Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

CONCRETE INSPECTION CHECKLIST Version 1.

Structural Member Mix Type

Pour Date Concrete Quantity

Pour Time Location

Checklist Completed by Page 1 of 2

PRE-POUR

REINFORCEMENT SETUP CHECKS


Reinforcement - Bar Sizes Correct Yes / No
Reinforcement - Spacing Correct Yes / No
Reinforcement - Lap Lengths Correct Yes / No
Reinforcement - 60mm Cover All Sides Yes / No
Reinforcement - Electrical Conductivity Yes / No
Reinforcement - Welding of Reinforcement to AS1554.3 (if applicable) Yes / No / NA
EPCM Supervisor Initial and Date

CASTING SETUP CHECKS


Formwork - Aligned and Straight (< 4mm or L/1000) Yes / No
Mould Oiled Yes / No
Void Former Installed - Location Correct and Secure Yes / No
Cast-in Ferrules / Bolts - Location Correct and Secure Yes / No
Cast-in Swift Lifts - Location Correct and Secure Yes / No
Other Embedded Items - PVC Pipes etc Location / Diameter Correct and Secure Yes / No
Physical Checks - Length, Width and Depth Dimensions Correct Yes / No
Fillets / Chamfers - Width of Bevel shall be 25mm Yes / No
EPCM Supervisor Initial and Date

STRESSING SETUP CHECKS


Prestressing Strands - Coil Identification Recorded Yes / No / NA
Prestressing Strands - Correct Number Yes / No / NA
Prestressing Strands - Correct Configuration Yes / No / NA
Prestressing Strands - Stressing Sequence Confirmed and Attached Yes / No / NA
Prestressing Strands - Stressing Loads Achieved. Documentation Attached Yes / No / NA
Debonding Tendons - Location Correct and Secure Yes / No / NA
Visual Check Carried Out - Location Correct and Secure Yes / No / NA
EPCM Supervisor Initial and Date

POUR
** For the initial pours, check the uniformity of batching tolerances shown in the delivery dockets compared with the approved mix design**
CONCRETE CHECKS
Weather conditions - Rain imminent Yes / No / NA
Ambient Temperature - if > 30 C then forms watered down; aliphatic alcohol applied
o
Yes / No / NA
Delivery Docket Numbers -
Concrete Additives - Silica Fume - Addition of Microsilica in Accordance with the Mix Design Yes / No
Concrete Additives - Superplasticer - Addition of Daracem in Accordance with the Mix Design Yes / No
Time of Placement - Has Not Exceeded 90min from Time of Batching Yes / No
Concrete Temperature - Less than or Equal to 30oC Yes / No
Concrete Testing to AS1379 - See cl 4.5.3.2 of SPEC-XXXXXXX Yes / No
Concrete Field Testing Worksheet No. -
Concrete Slump - Compliance with Proposed Design Slump of 150 +/- 30mm Yes / No

EPCM Supervisor Initial and Date


Agyle Diamond Mine
Underground Project CONCRETE INSPECTION CHECKLIST Version 1.0
Contract Number AN4Q

Structural Member

Destressing Date

Checklist Completed by Page 2 of 2

DE-STRESSING / STRIP / INSPECT AND STACK CHECKS

De-stressing Strength of Plank - Minimum 35 MPa Yes / No


Prestressing Strands - De-stressing Sequence Confirmed Yes / No
Prestressing Strands - Grouting Completed in Accordance with the Drawings Yes / No
Surface Finish - Plank Visually Conforming to Class 2 Finish (incl. Bottom Face) Yes / No
Scabbling of Top Face / Const. Joints - Laitence Removed / Scabbled to Expose Aggregate to a Depth of 6mm Yes / No / NA
Curing Commmencement Date -
Curing Completed Date -
Total Water Cured Days -
Stripping of Formwork - Stripping in Accordance with cl 8.7.1 of SPEC-XXXXXXXXX Yes / No
Physical Checks - Dimensional Checked Plank Yes / No
Stacking of Precast Units - Stacked on Timber Spacers/Gluts in Accordance with ITP Yes / No / NA
Plank Labelling - Plank Clearly Labelled Yes / No
EPCM Supervisor Initial and Date

COMPLIANCE
Any Non-Conformances Closed Out - Yes / No / NA
Non-Conformance Report No. (if applicable)

OTHER NOTES AND COMMENTS

WORK COMPLETE AND INSPECTIONS / CHECKS COMPLETE SIGNED

DATE