0% found this document useful (0 votes)
74 views3 pages

CWC Salient Features

1. The Upper Kundlika Medium Project is located in Sonna Khotta village, Wadwani Taluka of Beed district in Maharashtra. 2. The project involves constructing an earthen dam 24.28 meters high across the Kundlika river, a tributary of the Sindphina river, to store 18.77 Mm3 of water for irrigation, domestic supply, and to offset evaporation losses. 3. The project is estimated to cost Rs. 31899.719 lakh and will irrigate 3738 hectares of land with a 74.91% irrigation intensity, benefiting 1200 people through domestic water supply and irrigation.

Uploaded by

pravin munde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views3 pages

CWC Salient Features

1. The Upper Kundlika Medium Project is located in Sonna Khotta village, Wadwani Taluka of Beed district in Maharashtra. 2. The project involves constructing an earthen dam 24.28 meters high across the Kundlika river, a tributary of the Sindphina river, to store 18.77 Mm3 of water for irrigation, domestic supply, and to offset evaporation losses. 3. The project is estimated to cost Rs. 31899.719 lakh and will irrigate 3738 hectares of land with a 74.91% irrigation intensity, benefiting 1200 people through domestic water supply and irrigation.

Uploaded by

pravin munde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

UPPER KUNDLIKA MEDIUM PROJECT

TQ : WADWANI DISTRICT : BEED


(MAHARASHTRA)

SALIENT FEATURES

1. NAME OF PROJECT : UPPER KUNDLIKA Medium


Project.

2. LOCATION :

a) Nalla / River : Kundlika / Tributary of


Sindphina

b) Village & Taluka : Sonna Khotta village


Taluka: Wadwani

c) District : Beed (Maharashtra)

d) Co-ordinates :
(a) Latitude : 180 –56’-00 N
(b) Longitude : 760 –01’ 00 E

3. HYDROLOGY :

a) Total catchment area up 273.68 sq


to dam site km

b) Maximum annual rainfall : 1287.10 mm

c) Minimum annual rainfall : 318.00 mm

d) Average annual rainfall : 698.80 mm

e) 75% dependable monsoon : 473.44 mm


rainfall.

f) 75% dependable monsoon : 26.59 Mm3


runoff.

f) 75% dependable annual : 27.92 Mm3


runoff

g) 75% dependable net : 25.061 Mm3


annual runoff

4. UTILISATION

a) Total Utilisation : 17.797 Mm3

- Irrigation : 12.551Mm3

- Domestic water supply : 1.778 Mm3

- Evaporation losses : 3.468 Mm3


5. RESERVOIR

a) Top of dam : 541.30 m

b) Maximum water level : 538.80 m

c) Full reservoir level : 537.00 m

d) MDDL : 528.30 m

e) River bed level : 516.00 m

f) Gross storage : 18.77 Mm3

g) Live Storage : 15.57 Mm3

h) Dead storage : 3.19 Mm3

6. DAM

a) Type : Earthen dam

b) Length of Dam(Excluding : 967 m


O.F and N.O.F. length)
c) Maximum height of Dam. : 24.28 m

d) Free board over FRL : 4.30 m

e) Free board over MWL : 2.50 m

7. SPILLWAY
a) Type : Ogee shaped gated concrete.

b) Location : Central (RD 890 m to 963 m)

c) Length of Spillway : 73 m

d) No. and size of gates : 5 No. each of size 12 m x6.5 m

e) Crest Level : 530.50 m

f) Flood lift (Over FRL) : 1.80m

g) Design Flood : 3353.52 cumec

h) Design discharge of : 3068.07 cumec


spillway

8. HEAD REGULATOR
a) i) Number : Two
ii) Size 1.2 m X 1.2 m

b) Location : R.D. 510 m Left flank

c) Sill level : 526.70 m

d) Capacity of head : 3.26 Cumec


regulator.
9. CANAL SYSTEM : Canal distribution system (LBC)
Length 15 km
Capacity 3.26 cumec
10 SUBMERGENCE

a) Area under submergence : 304.00 ha

b) Total population fully : 1200


affected

c) No. of villages affected : Fully affected one village Rui


and partially affected three
Sonna Khotta, Pimpaltakka,
Pimpala

11 IRRIGATION

a) Gross command area : 4232 ha

b) Culturable Command area : 3738 ha

c) Annual Irrigation : 2800 ha

d) Intensity of Irrigation : 74.91 %


(w.r.t. CCA)

12 FINANCIAL ASPECTS

a) Estimated Cost. : Rs.31899.719 lakh (2008-


09,2009-10, 2011-12,2012-
13,2013-14 & 2014-15
SOR,Tender Rates,)

b) Benefit Cost Ratio at 10% : 1.04


rate of interest.

c) Internal Rate of Return. : 10.53 %

13 UNIT COST

a) Cost per Mm3 of gross : Rs.1699.50 lakh


storage.

b) Cost per Mm3 of live : Rs.2048.79 lakh


storage.

c) Cost per ha of Annual : Rs. 1139275


Irrigation.

Sub Divisional Officer Executive Engineer


Kundlika Canal Sub Division Beed Irrigation Division
Beed Beed

Superintending Engineer
Beed Irrigation Project Circle Parli ( V)

You might also like