Wadi Ad Dawasir Solar Meeting 0208

This document lists the attendees of a weekly meeting held on February 8, 2024 between representatives of TotalEnergies, Toyota Tsusho Corporation, Altaaqa Renewables, Nooralwadi, and SEPCO. It records that a safety moment was provided on incomplete fencing, lifting operations, and working in sandstorms, with the next safety moment to be given by the construction manager. An update was provided on HSE documentation and readiness, including an inspection of the camp by the owner and SEPCO's commitment to submit a report.

Uploaded by

Shams Tabrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
222 views1 page

Wadi Ad Dawasir Solar Meeting 0208

This document lists the attendees of a weekly meeting held on February 8, 2024 between representatives of TotalEnergies, Toyota Tsusho Corporation, Altaaqa Renewables, Nooralwadi, and SEPCO. It records that a safety moment was provided on incomplete fencing, lifting operations, and working in sandstorms, with the next safety moment to be given by the construction manager. An update was provided on HSE documentation and readiness, including an inspection of the camp by the owner and SEPCO's commitment to submit a report.

Uploaded by

Shams Tabrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ATTENDEES

Organization Name Email Adress (mandatory)


Tomohiro Iwakami (TTC) [email protected]
Oka Keisuke (TTC) [email protected]
Daisuke Yoshida (TTC) Wadi Ad Dawasir Solar PV Project
[email protected]
Shohei Hisamura (TTC) [email protected]
Rahul Verma (ARE) [email protected]
Shadhaf ALDUWAIS [email protected]
MEETING TITLE: Weekly
Emmanuel Meeting 02082024
Gayan [email protected]
Owner Alexei Kozlinskikh (HSE Regional Manager) [email protected]
MOM REFERENCE NO.: 40
Ahmad Khater (Quality Manager)
MEETING LOCATION: [email protected]
Anna Davydenko (Project Control Manager) SEP-WAD-PM-MOM-0040
[email protected]
Remote Meeting via MS Teams (Online)
Saad ALDawsari [email protected]
Weekly Meeting 02082024
Ahmad Alsuwi (Site Manager) [email protected]
MEETING DATE: 8th Sairafi
Ahmad February 2024 Manager)
(Technical [email protected]
th
REPORT DATE: 13 February 2024
Jithin9:30~11:30
MEETING TIME: Jose (project(UAE
HSE Time)
Manager) [email protected]
David de Lara (Project Director) [email protected]
REPORTED BY: David
Wang de Lara
Hongshi CONFIDENTIAL: No
[email protected]
Xu Xiaonan [email protected]
Li Benjiang THE PARTIES ACKNOWLEDGE THIS [email protected]
AN ACCURATE REPORT OF THIS MEETING
Wang Jinguang wang.jg<[email protected]>
Owner’s Meeting
FouadFocal Point
Maksoud CONTRACTOR Meeting Focal Point
f.maksoud<[email protected]>
Zhou Jiawei [email protected]
He Changlin [email protected]
Name: Mr. David De Lara Name: Mr. Wang Honshi
Title: ProjectLiu
SEPCO
Delong
Director [email protected]
Title: Project Manager
Zhang Xiao [email protected]
(electronic initial)
Yang Bin (electronic initial)
[email protected]
Mazhar Bilal [email protected]
TURKI DOSSARY [email protected]
Accepted on behalf of Owner Accepted on behalf of CONTRACTOR (SEPCO)
Zhuang Wen [email protected]
Wang Guodong [email protected]
NAME: Tu Shong NAME: Wang Hongshi
[email protected]
SHAMS TABREZ [email protected]

TITLE: OwnerNarayanan Pratheesh


Representative [email protected]
TITLE: Contractor Representative
No. Contents By Due
Safety Moment
1 SIGNATURE SIGNATURE & Date:
& Date:
a. Topic: Incomplete fence. Lifting operations. Working in
(electronic signature) (electronic signature)
the sandstorm.
b. Next Safety moment will be provided by Mr. Salman
Construction Manager.
2 HSE readiness.
a. HSE documentation status
08/02/2024: Updated table:

b. Camp:
Weekly08/02/2024: SEPCO should
Meeting 02082024 submit
Page PAGEthe1 of report for EPC6
NUMPAGES
Camp during today.
01/02/2024: Owner did an inspection and SEPCO will
submit the report after evaluation of the last inspection.