ATTENDEES
Organization      Name                                              Email Adress (mandatory)
                  Tomohiro Iwakami (TTC)                            
[email protected]                  Oka Keisuke (TTC)                                 
[email protected]                  Daisuke Yoshida (TTC)                      Wadi Ad Dawasir Solar PV Project                                                                   
[email protected]                  Shohei Hisamura (TTC)                             
[email protected]                  Rahul Verma (ARE)                                 
[email protected]                  Shadhaf ALDUWAIS                                  
[email protected]  MEETING TITLE: Weekly
             Emmanuel      Meeting 02082024
                         Gayan                                      
[email protected]Owner        Alexei Kozlinskikh (HSE Regional Manager)              
[email protected]                                                                       MOM REFERENCE NO.: 40
               Ahmad Khater (Quality Manager)
     MEETING LOCATION:                                              
[email protected]                  Anna Davydenko (Project Control Manager)             SEP-WAD-PM-MOM-0040                                                                    
[email protected]     Remote Meeting via MS Teams (Online)
                  Saad ALDawsari                                    
[email protected]                                                                        Weekly Meeting 02082024
                  Ahmad Alsuwi (Site Manager)                       
[email protected]     MEETING DATE: 8th Sairafi
               Ahmad   February    2024 Manager)
                               (Technical                           
[email protected]                                                                                           th
                                                                       REPORT DATE: 13 February 2024
               Jithin9:30~11:30
     MEETING TIME:    Jose (project(UAE
                                    HSE Time)
                                        Manager)                    
[email protected]                  David de Lara (Project Director)                  
[email protected]     REPORTED BY: David
               Wang     de Lara
                    Hongshi                                            CONFIDENTIAL: No                                                                    
[email protected]                  Xu Xiaonan                                        
[email protected]                  Li Benjiang      THE PARTIES ACKNOWLEDGE THIS 
[email protected]                                                                     AN ACCURATE REPORT OF THIS MEETING
                  Wang Jinguang                                     wang.jg<
[email protected]>
     Owner’s Meeting
               FouadFocal Point
                     Maksoud                                            CONTRACTOR Meeting Focal Point
                                                                    f.maksoud<
[email protected]>
                  Zhou Jiawei                                       
[email protected]                  He Changlin                                       
[email protected]   Name: Mr. David De Lara                                              Name: Mr. Wang Honshi
   Title: ProjectLiu
SEPCO
                     Delong
                  Director                                          
[email protected]                                                                         Title: Project Manager
                  Zhang Xiao                                        
[email protected]     (electronic initial)
                   Yang Bin                                             (electronic initial)                                                                    
[email protected]                  Mazhar Bilal                                      
[email protected]                  TURKI DOSSARY                                     
[email protected]     Accepted on behalf of Owner                                        Accepted on behalf of CONTRACTOR (SEPCO)
                  Zhuang Wen                                        
[email protected]                  Wang Guodong                                      
[email protected]     NAME:        Tu Shong                                              NAME: Wang Hongshi                                                                    
[email protected]                  SHAMS TABREZ                                      
[email protected]     TITLE: OwnerNarayanan Pratheesh
                  Representative                                    
[email protected]                                                                        TITLE: Contractor Representative
    No.     Contents                                                                           By           Due
         Safety Moment
1 SIGNATURE                                                    SIGNATURE & Date:
               & Date:
          a.      Topic: Incomplete fence. Lifting operations. Working in
  (electronic signature)                                       (electronic signature)
                  the sandstorm.
          b.      Next Safety moment will be provided by Mr. Salman
                  Construction Manager.
2           HSE readiness.
                a. HSE documentation status
                   08/02/2024: Updated table:
               b. Camp:
              Weekly08/02/2024:  SEPCO should
                     Meeting 02082024             submit
                                               Page PAGEthe1 of report for EPC6
                                                                 NUMPAGES
                    Camp during today.
                    01/02/2024: Owner did an inspection and SEPCO will
                    submit the report after evaluation of the last inspection.