Work Inspection Request
Construction of Fire Life Safety Modification Contract No: €2022/15
Works for Existing 54 Nos. Government Schools ——
Project Name: Project No: BP 2021 C014 S
: and_Kindergartens- Package Two (26) Nos... —— z =
aera Inspection Request no, PKG®2-AKSPSG-5600-WIR-AR-
cient Ashghal 0056
consultant Gulf Consulting Group Rev. No. 7
lcontractor Brickstone Trading and Contracting Date BFeb-24
Wi Architectural (J Civi Plumbing HVAC Electrical
Inspection Typs —— “ aes
Earthworks [-) Structural || Others rf [1 Landscape
Inspection Level: Hola L] Witness Surveillance [inspection
Pe | =
lorawing Ref: PKGO2-AKSPSG-S600-SD-AR-0014 Location: _Al-khor Second Primary Schoo for Gils
DESCRIPTION OF WORKS:
Inspection request for completed installation of external stainless steel handrail at ground floor as per attached highlighted
drawing.(Code B to Code A)
Date of
iscipline Engr: YFeb-24 Th rection:
Pisciptine Ener: enge Fakery Inspect BA ime of Inspet
we-contractor SAAD AL KAABI [Contractor-Proj. Manager |
|contractor- QA/OC Engineer
IName: Engr.Andlis Signature Name: Eng. Mohamed Ali
JSUPERVISION CONSULTANT
lReceIveD By: —
[SUPERVISION CONSULTANT COMMENTS os ies Sa FESS
Iie works are: [Y“A= Approved [7] B= Approvedas Noted | [] C= Revise & Resubmit | DD b= rejected
[Ab stsvatinn
= eh
Jsca-site Engineer: ener. <] L YAS (signature: SS
fees tniocsne, Fs Herb. seen SiN oe
Joce-anacéngineer nee. Ris ack M signature: nudged
Project Manager:
IMAIN CONTRACTOR)
RECEIVED BY:
Doc. Ref. No. GCG-QA-F-095 Rev. 03ve ceomecee
adc isaeicrcenniotinmacinn
ar Benoa soLaTUIND | aunannco 200 a
SNivLs “sBuymesg pary6uu6iy
: NOISIAZY LSV7 PeYdEHY 40d S& J00Y PuNods je [/esPUEY }oaIs }eUIEIXg Jo UONEI|E}SU! Pa}s{dWOD 40) Senboy UORDadsuj 7 LNaWNDOG}
— cua stom att oocEx ZOO! sounacsve
‘STOOHOS ‘ON (82) om) 3OWVHOVd - SNILUVOUSOND LU LoveNod|
put s00Ho8 iNaMan0O °n ¥ OMLSHS HOA OMNOESSLIRoN Llane aoe aSteL Na
ey sre
(suo) ~< a
ae 133HS NOLLNTOS3Y LNSINWOO S= ma SS.
SSS aIMinistry of Municipality Ayal 539
Al Khor Municipality shill, p98 daly
tracts
ae | oy at Balad
©/2023/0005464-F pV ln by 2023-12-25 YL 35181 sh pa alg
sali ak Ga 83066 pied ei gigs eg
2022-08-17
cool ghay Il ape anne lf gait), ala] JAY! Aga 24 vad ya
5 AD f aall gle
Tlas2itfet S| suadar unde 74s 2 oS) sald dD
ee
ae pa 1001 5
i 1k, 26125
<2 by ny «(12/4 12007) 5 Mea (1197) hy Rank Pe Rha LA al fy) Sad ce Aad ll ih
Shas Adal md
‘Pats jy Gal N= A
AD Aaah gad Mii glo gaat
BSL gga ela Lal 5 JY!
tel kn pane Grea gj 4 lo fl cig lan Fema gata
Cy So ose dy 100380 2 Mba Dsl
Ua = (AVE EET One: GSU GAVE) FETT O06;
wwrw mime gov.aa
(+974) 44265070 - P.O.Box: 60021 - Al-Khor - Qatar
Email :
[email protected]
1 wt taeafo
sms
Work Inspection Request (WIR)
Construction of Fire Life Safety Modification
Works for Existing 54 Nos. Government Schools
Contract No: €2022/15
ect Nae: Projet No: BP 2021 C0145
ti and Kindergartens- Package Two (26) Nos.
Schools Inspection Request No. aaa alll
[Client Ashghal
onsuitant Gulf Consulting Group Rev. No. °
Comactor _Brekstone Trading and Contracting Date 2eiwn28
|B Architectural Givit Plumbing HVAC Electrical
Inspection ype
2 earthworks Structural others © landscape
Inspection Le Ci Hota “1 Witness Surveillance Inspection
Orawing Ref PRGOD-AKSPSG-SEO0-SO-AR-0014 Location: Khor Second Primary School for Gis
Inspection request for completed installation of external stainless steel handrail at ground floor as per attached highlighted
drawing
[Discipline Engr: ect 26-tun-23 Time of Inspect!
- ‘ Engr. Fakery Inspection: i
Iua-contractor SAAD Ai KAAB! [contractor- Proj. Manager
contractor= QA/C Engineer
Name: Engr Andi A tug Name: Eng. Mohamed Ali
SUPERVISION CONSULT
neceiveosy: :
“UPERVISION CONSULTANT COMMENTS —
[The Works are: ["] A= Approved (1 conevise & Resubmit
Mined cap op novel) subjed to GICOP ae.
[costo engineer CNS, sonore:
Sherer signature:
Rey
Project Manager SRT ,
lawn contractor |" see Nnrrnarcn |
fj OS JUL 2023.
1CG “Sr. Engineer: Engr.
|GCG-QAQc Engineer: Engr. Signature:
[RECEIVED B
Doe. Ref. No. GCG-QA-F-095 Rev. 03,=e ale.
Material Inspection Res IR)
n of Fire Life Safety Modification Works for
[Existing 54 Nos. Government Schools and Kindergartens Poject ID: BP 2021 C 014,
Package Two (26) Nos. Schools Z
|Contractor MIR No. PKG02-GEN-MIR-AR-014 ON. Ref No: SAK/D23/00241
[Submission Date: 19-Apr-23 _ Inspection Date: 20-Apr-23 Time: 3:00 PM |
[Detail Description of MIR
Material inspection request for stainless steel handrail as per attached delivery note.
‘SENo. = ‘Description tem | Quantity
1 Stainless steel handrail LMS as per attached}
[Attachment References: (BP2021CO14S-MS-AR-0020
[LOCATION
canal nase 7 re
~ ena ies Temporary Work | Survey
___ Electrical Plumbing |, Mechanical
= pki costae Frater Nain) T|=a Oma RIT
[Subcontractor (WAny): SAAD ALKANE t
fQN/QC Engineer ie Project Manaaer
Name: Eng.Andiiiy
[SUPERVISON CONSULT!
Name: Eng. Mohamed Ali
RECEIVED BY: Date:
‘SUPERVISION CONSULTANTCOMMENTS
C2] C= Revise & Resubmit C] I= For information
SCG Site Engineer:
L -
|SCG-Sr. Engineer: Suh Signature: ...,K. pate: 2.7-U 7-25)
ISCC-.QAQCENgINGE: ric ANKarl Signature: Pre. Date: 2.9.0.3...aie
Ins; ion Request (MIR)
Project: Construction of Fire Life Safety Modification Works for
Existing 54 Nos. Government Schools and Kindergartens- _Poject ID: BP 2021 C 014
Package Two (26) Nos. Schools
Contractor MIR No. PKGO2-GEN-MIR-AR-0194 DN. Ref No: SAK/D23/00375
|Submission D: ___ 29-May-23 _ Inspection Dat 30-May-23
[Detail Description of MIR
Material inspection request for stainless steel handrail as per attached delivery note.
Description [tem]
ess steel handral Las as per attachea|
[Attachment References: 15P2021C014S-MS-AR-0020
Givi
Electrical ___ Plumbing
—_. District Gooting __ Pneumatic Waste
Subcontractor (If Any): SAAD AL KAAS)
|QA/QC Engineer 1A
Name: Eng.Andlib for
|SUPERVISON CONSULTANT
#
IRECEIVED By: Date:
Project Manager
Name: Eng. Mohamed Ali
[606 -Site Engineer:
|GCG-Sr. Engineer:
IECG-. QAQC Engineer:
[Project manager:
MAIN CONTRACTOR
|RECEIVED BY:ble ae Aubert SHOAL)
[consultant i dng ran
JCOWTRACTOR itn Td Sonasng
[_ys-0l-8S cit fsa
[rot he canst ol na rare th conker tei
[exvecinestt a afsed note! se creat
(oo, Rat No, GOG-AA.062 Raw 01Work Inspection Request (WIR).
T Construction of Fire Like Safety Modification +
react Nama, Wet tng S4 Noe, Goverment Sk | ——
| and ‘Kindenpartans- Package Tivo (26) Wor. —
4602 AMIPSG-5613-
Nospection Request No. |
|
|
‘Arlnah Warnoud Aiea Pay
a Schools for Sire
Inaction request for mockup installation of oor mourted anes steel handral 8s por attached highghed drawing.
Project Manager: Engr. Ibrahim shar
2s am|PROWECT
lcuer
CONSULTANT
porn ye CONTRACTING cena
| wx Mo om OC ee OF m O
ee ee = sail
METHOO STATEMENT FOR INSTALLATION OF STAINLESS
‘STEEL HANDRAIL
a
he oTEST PI
Ute Satay Modiestion Works
Schone and Jerre NO pKQuZgEN ITE
L} Revises kesuamT
Beret
SS pictaacrinsWork inspection Request (WIR)
‘Construction of Fire Life Safely Modification
Works for Existing 54 Nos. Governmant Schaais = ~
1k Name:
and Kindergartens: Package Two (26) Nos.
i” Sei mec tee! neo cece oe.
- Ange! j ai
wsttrs —Gulf consulting Group Reno °
ronrecio, —_arckstone Trading and Contacting xe Sagat
Avessn Siegel 1a sy staness tetany anchocace 6
(S601) as per attached Nighligheed drawings
Bae of
Engr. Anite Inspectior
CONTRACTOR S04 AL Krag
Engr:
yom obae, ow eltaeat pane elf Satori
a m
ayer pe er Sn a 7
Searanctoe Cs [pny Sinus. SE==
encom.
emt a0
a=| 3
aioe i ‘ ty
(@BY ENLARGED PLAN VIEW
@ pee
lr
| oo : 7 =
i
SECTION VIEW
/emucrvormemoorery |
| comerToNWarsrORENSTAGSONOS |
Z ‘ovetaeSeno.«nocRoARTese
PACKAGE 2 (26 NOS SCHOOL) \
‘ r@ mreew ean vew
‘STAIR & RAMPS STANLESS STEEL MANORAL
ENLARGED PLAN & SECTIONS@ Mpsocorun vew © wseweanvew
aE
|" CoustRUCTION OF FRE AND SAFETY
[MODIFICATION WORK FOR ERIETNG SC NOS |
(GOVERNMENT SCHOO. KMIOETOARTENS
PACKAGE 298 NOS SCHOOL}
PRS pie
Cer
[== _____ Stor orang
eS cca ena
ALIOOR SECOND PRIMARY SCHOOL FOR GS —
Pawo. rasae1s
‘STARS 6 RAMPS STAINLESS STEEL HANDRAIL
[en assed PLAN SECTIONS & ENLARGED DET SS