Inspection for Handrail

Uploaded by

qc4.saadalkaabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
51 views16 pages

GCG RESPONSE-PKG02-AKSPSG-S600-WIR-AR-0056 Rev.01

Inspection for Handrail

Uploaded by

qc4.saadalkaabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 16
Work Inspection Request Construction of Fire Life Safety Modification Contract No: €2022/15 Works for Existing 54 Nos. Government Schools —— Project Name: Project No: BP 2021 C014 S : and_Kindergartens- Package Two (26) Nos... —— z = aera Inspection Request no, PKG®2-AKSPSG-5600-WIR-AR- cient Ashghal 0056 consultant Gulf Consulting Group Rev. No. 7 lcontractor Brickstone Trading and Contracting Date BFeb-24 Wi Architectural (J Civi Plumbing HVAC Electrical Inspection Typs —— “ aes Earthworks [-) Structural || Others rf [1 Landscape Inspection Level: Hola L] Witness Surveillance [inspection Pe | = lorawing Ref: PKGO2-AKSPSG-S600-SD-AR-0014 Location: _Al-khor Second Primary Schoo for Gils DESCRIPTION OF WORKS: Inspection request for completed installation of external stainless steel handrail at ground floor as per attached highlighted drawing.(Code B to Code A) Date of iscipline Engr: YFeb-24 Th rection: Pisciptine Ener: enge Fakery Inspect BA ime of Inspet we-contractor SAAD AL KAABI [Contractor-Proj. Manager | |contractor- QA/OC Engineer IName: Engr.Andlis Signature Name: Eng. Mohamed Ali JSUPERVISION CONSULTANT lReceIveD By: — [SUPERVISION CONSULTANT COMMENTS os ies Sa FESS Iie works are: [Y“A= Approved [7] B= Approvedas Noted | [] C= Revise & Resubmit | DD b= rejected [Ab stsvatinn = eh Jsca-site Engineer: ener. <] L YAS (signature: SS fees tniocsne, Fs Herb. seen SiN oe Joce-anacéngineer nee. Ris ack M signature: nudged Project Manager: IMAIN CONTRACTOR) RECEIVED BY: Doc. Ref. No. GCG-QA-F-095 Rev. 03 ve ceomecee adc isaeicrcenniotinmacinn ar Benoa soLaTUIND | aunannco 200 a SNivLs “sBuymesg pary6uu6iy : NOISIAZY LSV7 PeYdEHY 40d S& J00Y PuNods je [/esPUEY }oaIs }eUIEIXg Jo UONEI|E}SU! Pa}s{dWOD 40) Senboy UORDadsuj 7 LNaWNDOG} — cua stom att oocEx ZOO! sounacsve ‘STOOHOS ‘ON (82) om) 3OWVHOVd - SNILUVOUSOND LU LoveNod| put s00Ho8 iNaMan0O °n ¥ OMLSHS HOA OMNOESSLIRoN Llane aoe aSteL Na ey sre (suo) ~< a ae 133HS NOLLNTOS3Y LNSINWOO S= ma SS. SSS aI Ministry of Municipality Ayal 539 Al Khor Municipality shill, p98 daly tracts ae | oy at Balad ©/2023/0005464-F pV ln by 2023-12-25 YL 35181 sh pa alg sali ak Ga 83066 pied ei gigs eg 2022-08-17 cool ghay Il ape anne lf gait), ala] JAY! Aga 24 vad ya 5 AD f aall gle Tlas2itfet S| suadar unde 74s 2 oS) sald dD ee ae pa 1001 5 i 1k, 26125 <2 by ny «(12/4 12007) 5 Mea (1197) hy Rank Pe Rha LA al fy) Sad ce Aad ll ih Shas Adal md ‘Pats jy Gal N= A AD Aaah gad Mii glo gaat BSL gga ela Lal 5 JY! tel kn pane Grea gj 4 lo fl cig lan Fema gata Cy So ose dy 100380 2 Mba Dsl Ua = (AVE EET One: GSU GAVE) FETT O06; wwrw mime gov.aa (+974) 44265070 - P.O.Box: 60021 - Al-Khor - Qatar Email : [email protected] 1 wt tae afo sms Work Inspection Request (WIR) Construction of Fire Life Safety Modification Works for Existing 54 Nos. Government Schools Contract No: €2022/15 ect Nae: Projet No: BP 2021 C0145 ti and Kindergartens- Package Two (26) Nos. Schools Inspection Request No. aaa alll [Client Ashghal onsuitant Gulf Consulting Group Rev. No. ° Comactor _Brekstone Trading and Contracting Date 2eiwn28 |B Architectural Givit Plumbing HVAC Electrical Inspection ype 2 earthworks Structural others © landscape Inspection Le Ci Hota “1 Witness Surveillance Inspection Orawing Ref PRGOD-AKSPSG-SEO0-SO-AR-0014 Location: Khor Second Primary School for Gis Inspection request for completed installation of external stainless steel handrail at ground floor as per attached highlighted drawing [Discipline Engr: ect 26-tun-23 Time of Inspect! - ‘ Engr. Fakery Inspection: i Iua-contractor SAAD Ai KAAB! [contractor- Proj. Manager contractor= QA/C Engineer Name: Engr Andi A tug Name: Eng. Mohamed Ali SUPERVISION CONSULT neceiveosy: : “UPERVISION CONSULTANT COMMENTS — [The Works are: ["] A= Approved (1 conevise & Resubmit Mined cap op novel) subjed to GICOP ae. [costo engineer CNS, sonore: Sherer signature: Rey Project Manager SRT , lawn contractor |" see Nnrrnarcn | fj OS JUL 2023. 1CG “Sr. Engineer: Engr. |GCG-QAQc Engineer: Engr. Signature: [RECEIVED B Doe. Ref. No. GCG-QA-F-095 Rev. 03, =e ale. Material Inspection Res IR) n of Fire Life Safety Modification Works for [Existing 54 Nos. Government Schools and Kindergartens Poject ID: BP 2021 C 014, Package Two (26) Nos. Schools Z |Contractor MIR No. PKG02-GEN-MIR-AR-014 ON. Ref No: SAK/D23/00241 [Submission Date: 19-Apr-23 _ Inspection Date: 20-Apr-23 Time: 3:00 PM | [Detail Description of MIR Material inspection request for stainless steel handrail as per attached delivery note. ‘SENo. = ‘Description tem | Quantity 1 Stainless steel handrail LMS as per attached} [Attachment References: (BP2021CO14S-MS-AR-0020 [LOCATION canal nase 7 re ~ ena ies Temporary Work | Survey ___ Electrical Plumbing |, Mechanical = pki costae Frater Nain) T|=a Oma RIT [Subcontractor (WAny): SAAD ALKANE t fQN/QC Engineer ie Project Manaaer Name: Eng.Andiiiy [SUPERVISON CONSULT! Name: Eng. Mohamed Ali RECEIVED BY: Date: ‘SUPERVISION CONSULTANTCOMMENTS C2] C= Revise & Resubmit C] I= For information SCG Site Engineer: L - |SCG-Sr. Engineer: Suh Signature: ...,K. pate: 2.7-U 7-25) ISCC-.QAQCENgINGE: ric ANKarl Signature: Pre. Date: 2.9.0.3... aie Ins; ion Request (MIR) Project: Construction of Fire Life Safety Modification Works for Existing 54 Nos. Government Schools and Kindergartens- _Poject ID: BP 2021 C 014 Package Two (26) Nos. Schools Contractor MIR No. PKGO2-GEN-MIR-AR-0194 DN. Ref No: SAK/D23/00375 |Submission D: ___ 29-May-23 _ Inspection Dat 30-May-23 [Detail Description of MIR Material inspection request for stainless steel handrail as per attached delivery note. Description [tem] ess steel handral Las as per attachea| [Attachment References: 15P2021C014S-MS-AR-0020 Givi Electrical ___ Plumbing —_. District Gooting __ Pneumatic Waste Subcontractor (If Any): SAAD AL KAAS) |QA/QC Engineer 1A Name: Eng.Andlib for |SUPERVISON CONSULTANT # IRECEIVED By: Date: Project Manager Name: Eng. Mohamed Ali [606 -Site Engineer: |GCG-Sr. Engineer: IECG-. QAQC Engineer: [Project manager: MAIN CONTRACTOR |RECEIVED BY: ble ae Aubert SHOAL) [consultant i dng ran JCOWTRACTOR itn Td Sonasng [_ys-0l-8S cit fsa [rot he canst ol na rare th conker tei [exvecinestt a afsed note! se creat (oo, Rat No, GOG-AA.062 Raw 01 Work Inspection Request (WIR). T Construction of Fire Like Safety Modification + react Nama, Wet tng S4 Noe, Goverment Sk | —— | and ‘Kindenpartans- Package Tivo (26) Wor. — 4602 AMIPSG-5613- Nospection Request No. | | | ‘Arlnah Warnoud Aiea Pay a Schools for Sire Inaction request for mockup installation of oor mourted anes steel handral 8s por attached highghed drawing. Project Manager: Engr. Ibrahim shar 2s am |PROWECT lcuer CONSULTANT porn ye CONTRACTING cena | wx Mo om OC ee OF m O ee ee = sail METHOO STATEMENT FOR INSTALLATION OF STAINLESS ‘STEEL HANDRAIL a he o TEST PI Ute Satay Modiestion Works Schone and Jerre NO pKQuZgEN ITE L} Revises kesuamT Beret SS pictaacrins Work inspection Request (WIR) ‘Construction of Fire Life Safely Modification Works for Existing 54 Nos. Governmant Schaais = ~ 1k Name: and Kindergartens: Package Two (26) Nos. i” Sei mec tee! neo cece oe. - Ange! j ai wsttrs —Gulf consulting Group Reno ° ronrecio, —_arckstone Trading and Contacting xe Sagat Avessn Siegel 1a sy staness tetany anchocace 6 (S601) as per attached Nighligheed drawings Bae of Engr. Anite Inspectior CONTRACTOR S04 AL Krag Engr: yom obae, ow eltaeat pane elf Satori a m ayer pe er Sn a 7 Searanctoe Cs [pny Sinus. SE == encom. emt a0 a= | 3 aioe i ‘ ty (@BY ENLARGED PLAN VIEW @ pee lr | oo : 7 = i SECTION VIEW /emucrvormemoorery | | comerToNWarsrORENSTAGSONOS | Z ‘ovetaeSeno.«nocRoARTese PACKAGE 2 (26 NOS SCHOOL) \ ‘ r @ mreew ean vew ‘STAIR & RAMPS STANLESS STEEL MANORAL ENLARGED PLAN & SECTIONS @ Mpsocorun vew © wseweanvew aE |" CoustRUCTION OF FRE AND SAFETY [MODIFICATION WORK FOR ERIETNG SC NOS | (GOVERNMENT SCHOO. KMIOETOARTENS PACKAGE 298 NOS SCHOOL} PRS pie Cer [== _____ Stor orang eS cca ena ALIOOR SECOND PRIMARY SCHOOL FOR GS — Pawo. rasae1s ‘STARS 6 RAMPS STAINLESS STEEL HANDRAIL [en assed PLAN SECTIONS & ENLARGED DET SS