The document proposes the construction of a double-story building with 4 rooms (2+2) at a government high school. It includes tables showing calculations of the required steel reinforcement, including the weight and length of steel rods of different diameters needed for items like footings, columns, beams, slabs, and stairs. Over 14 tonnes of steel reinforcement ranging from 8mm to 25mm diameters will be required for the project.

Uploaded by

Ankit Suri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views16 pages

Rmsa School Steel

The document proposes the construction of a double-story building with 4 rooms (2+2) at a government high school. It includes tables showing calculations of the required steel reinforcement, including the weight and length of steel rods of different diameters needed for items like footings, columns, beams, slabs, and stairs. Over 14 tonnes of steel reinforcement ranging from 8mm to 25mm diameters will be required for the project.

Uploaded by

Ankit Suri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT.

HIGHER SECONDARY
SCHOOL BARWAL DISTRICT KATHUA.

Total Weight of
Weight of each diameter of Tor Steel (Tonne) Tor Steel in
S.No. Particulars of Items each Item
(Tonne)
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

1 Footings 0.00 0.00 1.17 0.00 0.00 0.00 1.17

2 Columns & Pedestals 1.45 0.00 0.33 1.57 0.60 0.00 3.95

3 Plinth Beams 0.38 0.00 0.00 0.76 0.34 0.00 1.48

4 Ground Floor Slab Level Beams 0.37 0.00 0.00 0.70 0.63 0.00 1.71

5 Ground Floor Slab 0.00 1.69 0.00 0.00 0.00 0.00 1.69

6 Roof Slab Level Beams 0.37 0.00 0.00 0.82 0.30 0.00 1.49

7 Roof Slab 0.00 1.69 0.00 0.00 0.00 0.00 1.69

8 Mumty beams 0.20 0.00 0.00 0.27 0.00 0.00 0.47

9 Mumty slab 0.00 0.17 0.00 0.00 0.00 0.00 0.17

10 Staircase 0.06 0.00 0.21 0.03 0.01 0.00 0.31

11 Lintel Beams & Chajjas (GF+FF) 0.10 0.02 0.00 0.00 0.00 0.00 0.12

Total Weight of each diameter of


2.94 3.58 1.70 4.15 1.89 0.00 14.26
Tor Steel (Tonne)

Page 1
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL
DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR FOOTINGS
Length of Tor Steel (metre)
Length of Total
Diameter of Nos of Nos of
S.No. Footing Notation each bar Length
Tor steel footings bars
(metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

1 F1 Main 12 mm 6.00 21.00 2.34 294.84 — — 294.84 — — —

Temp. 12 mm 6.00 21.00 2.34 294.84 — — 294.84 — — —

2 F2 Main 12 mm 5.00 22.00 2.49 273.90 — — 273.90 — — —

Temp. 12 mm 5.00 22.00 2.49 273.90 — — 273.90 — — —

3 F3 Main 12 mm 1.00 34.00 2.49 84.66 — — 84.66 — — —

Temp. 12 mm 1.00 27.00 3.25 87.83 — — 87.83 — — —

Total Length of each diameter of Tor Steel (metre) 0.00 0.00 1309.97 0.00 0.00 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 0.00 0.00 1165.87 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Quintal) 0.00 0.00 11.66 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Tonne) 0.00 0.00 1.17 0.00 0.00 0.00

Total Weight of all diameters of Tor Steel (Tonne) 1.17

Page 2
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR COLUMNS & PEDESTALS
S.No. Notation Length of Total Length of Tor Steel (metre)
Diameter of Nos of Nos of each bar Length
Size (mm x mm) (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
Tor steel columns bars

A Foundation to Ground Floor Slab

A.1 1'-4" X 1'-4" 4-16 Ø + 4-20 Ø


(9 Nos.)

\
Vertical 16 mm 9.00 4.00 5.99 215.80 —- —- —- 215.80 —- —-
Vertical 20 mm 9.00 4.00 5.99 215.80 —- —- —- 215.80 —- —-
Overlap 16 mm 9.00 4.00 1.00 36.00 —- —- —- 36.00 —- —-
Overlap 20 mm 9.00 4.00 1.20 43.20 —- —- —- —- 43.20 —-
Rings 8 mm 9.00 51.00 2.65 1216.35 1216.35 —- —- —- —- —-
Rings 8 mm 9.00 12.00 2.65 286.20 286.20 —- —- —- —- —-
A.2 1'-4" X 1'-4" 8-16 Ø
(1 Nos.)

\
Vertical 16 mm 1.00 8.00 5.99 47.96 —- —- —- 47.96 —- —-
Overlap 16 mm 1.00 8.00 1.00 8.00 —- —- —- 8.00 —- —-
Rings 8 mm 1.00 51.00 2.65 135.15 135.15 —- —- —- —- —-
Rings 8 mm 1.00 12.00 2.65 31.80 31.80 —- —- —- —- —-
A.3 1'-4" X 1'-4" 8-20 Ø
(2 Nos.)
Vertical 20 mm 2.00 8.00 5.99 95.91 —- —- —- —- 95.91 —-
Overlap 20 mm 2.00 8.00 1.20 19.20 —- —- —- —- 19.20 —-
Rings 8 mm 2.00 51.00 2.65 270.30 270.30 —- —- —- —- —-
Rings 8 mm 2.00 12.00 2.65 63.60 63.60 —- —- —- —- —-
B Ground Floor Slab to Roof

B.1 1'-4" X 1'-4" 4-16 Ø + 4-20 Ø


(10 Nos.)
Vertical 16 mm 10.00 4.00 3.48 139.19 —- —- —- 139.19 —- —-
Vertical 20 mm 10.00 4.00 3.48 139.19 —- —- —- 139.19 —- —-
Overlap 16 mm 10.00 4.00 1.00 40.00 —- —- —- 40.00 —- —-
Overlap 20 mm 10.00 4.00 1.20 48.00 —- —- —- —- 48.00 —-
Rings 8 mm 10.00 23.00 2.65 609.50 609.50 —- —- —- —- —-
Rings 8 mm 10.00 12.00 2.65 318.00 318.00 —- —- —- —- —-

B.2 1'-4" X 1'-4" 8-16 Ø


(1 Nos.)

Page 3
Vertical 16 mm 1.00 8.00 3.48 27.84 —- —- —- 27.84 —- —-
Overlap 16 mm 1.00 8.00 1.00 8.00 —- —- —- 8.00 —- —-
Rings 8 mm 1.00 23.00 2.65 60.95 60.95 —- —- —- —- —-
Rings 8 mm 1.00 12.00 2.65 31.80 31.80 —- —- —- —- —-
B.3 1'-4" X 1'-4" 8-20 Ø
(1 Nos.)
Vertical 20 mm 1.00 8.00 3.48 27.84 —- —- —- —- 27.84 —-
Overlap 20 mm 1.00 8.00 1.20 9.60 —- —- —- —- 9.60 —-
Rings 8 mm 1.00 23.00 2.65 60.95 60.95 —- —- —- —- —-
Rings 8 mm 1.00 12.00 2.65 31.80 31.80 —- —- —- —- —-
C Roof slab to Mumty

C.1 1'-4" X 1'-4" 8-16 Ø


(4 Nos.)
Vertical 16 mm 4.00 8.00 2.57 82.09 —- —- —- 82.09 —- —-
Overlap 16 mm 4.00 8.00 1.00 32.00 —- —- —- 32.00 —- —-
Rings 8 mm 4.00 23.00 2.65 243.80 243.80 —- —- —- —- —-
Rings 8 mm 4.00 12.00 2.65 127.20 127.20 —- —- —- —- —-
D Pedestal
D.1 1'-10" X 1'-10" Around all columns (12 nos)
Vertical 12 mm 12.00 16.00 1.91 365.76 —- —- 365.76 —- —- —-
Rings 8 mm 12.00 11.00 1.83 241.56 241.56 —- —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 3728.96 0.00 365.76 991.87 243.75 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 1454.29 0.00 325.53 1567.15 599.62 0.00

Weight of each diameter of Tor Steel (Quintal) 14.54 0.00 3.26 15.67 6.00 0.00

Weight of each diameter of Tor Steel (Tonne) 1.45 0.00 0.33 1.57 0.60 0.00

Total Weight of all diameters of Tor Steel (Tonne) 3.95

Page 4
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT KATHUA.

CALCULATION OF TOR STEEL FOR PLINTH BEAMS


S.No. Notation Length of Total Length of Tor Steel (metre)
Size (mm x Diameter of Nos of Nos of each bar Length
mm) Tor steel Beams bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A Along X direction

A.1 12" X 15" PB1+PB1(2 nos)

Bottom all through 16 mm 2.00 4.00 12.61 100.86 —- —- —- 100.86 —- —-


Top all through 20 mm 2.00 2.00 12.81 51.23 —- —- —- —- 51.23 —-
Top extra 20 mm 2.00 2.00 3.89 15.54 —- —- —- —- 15.54 —-
Top extra 20 mm 2.00 4.00 3.14 25.12 —- —- —- —- 25.12 —-
Overlap 16 mm 2.00 4.00 1.00 8.00 —- —- —- 8.00 —- —-
Overlap 20 mm 2.00 2.00 1.20 4.80 —- —- —- —- 4.80 —-
Rings 8 mm 2.00 105.00 1.17 245.70 245.70 —- —- —- —- —-

A.2 12" X 15" PB2+PB2(1 nos)

Bottom all through 16 mm 1.00 3.00 12.61 37.82 —- —- —- 37.82 —- —-


Top all through 16 mm 1.00 2.00 12.61 25.22 —- —- —- 25.22 —- —-
Top extra 16 mm 1.00 1.00 3.89 3.89 —- —- —- 3.89 —- —-
Top extra 16 mm 1.00 2.00 2.86 5.72 —- —- —- 5.72 —- —-
Overlap 16 mm 1.00 5.00 1.00 5.00 —- —- —- 5.00 —- —-
Rings 8 mm 1.00 105.00 1.17 122.85 122.85 —- —- —- —- —-

A.3 12" X 15" PB3+PB4(1 nos)

Bottom all through 16 mm 1.00 4.00 12.61 50.43 —- —- —- 50.43 —- —-


Top all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top extra 20 mm 1.00 2.00 3.89 7.77 —- —- —- —- 7.77 —-
Top extra 20 mm 1.00 2.00 3.14 6.28 —- —- —- —- 6.28 —-
Top extra 12 mm 1.00 1.00 2.58 2.58 —- —- 2.58 —- —- —-
Overlap 16 mm 1.00 4.00 1.00 4.00 —- —- —- 4.00 —- —-
Overlap 20 mm 1.00 2.00 1.20 2.40 —- —- —- —- 2.40 —-
Rings 8 mm 1.00 105.00 1.17 122.85 122.85 —- —- —- —- —-

B Along Y direction

Page 5
B.1 12" X 15" PB6+PB7+PB7(3 nos)

Bottom all through 16 mm 3.00 3.00 10.25 92.21 —- —- —- 92.21 —- —-


Top all through 16 mm 3.00 2.00 10.25 61.47 —- —- —- 61.47 —- —-
Top extra 16 mm 3.00 4.00 2.33 27.92 —- —- —- 27.92 —- —-
Top extra 16 mm 3.00 4.00 2.08 24.96 —- —- —- 24.96 —- —-
Overlap 16 mm 3.00 5.00 1.00 15.00 —- —- —- 15.00 —- —-
Rings 8 mm 3.00 90.00 1.17 315.90 448.02 —- —- —- —- —-
B.2 12" X 15" PB5 (1 nos)
Bottom all through 16 mm 1.00 4.00 3.00 12.00 —- —- —- 12.00 —- —-
Top all through 16 mm 1.00 2.00 3.00 6.00 —- —- —- 6.00 —- —-
Rings 8 mm 1.00 25.00 1.17 29.25 29.25 —- —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 968.67 0.00 2.58 480.50 138.76 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 377.78 0.00 2.30 759.19 341.36 0.00

Weight of each diameter of Tor Steel (Quintal) 3.78 0.00 0.02 7.59 3.41 0.00

Weight of each diameter of Tor Steel (Tonne) 0.38 0.00 0.00 0.76 0.34 0.00

Total Weight of all diameters of Tor Steel (Tonne) 1.48

Page 6
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR FIRST FLOOR (LEVEL-01) BEAMS
S.No. Notation Length of Total Length of Tor Steel (metre)
Size (mm x Diameter of Nos of Nos of each bar Length
mm) Tor steel Beams bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A Along X direction

A.1 12" X 18" FB1+FB1 (1 nos)

Bottom all through 16 mm 1.00 4.00 12.61 50.43 —- —- —- 50.43 —- —-


Top all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top extra 20 mm 1.00 3.00 3.89 11.66 —- —- —- —- 11.66 —-
Top extra 20 mm 1.00 6.00 3.14 18.84 —- —- —- —- 18.84 —-
Overlap 16 mm 1.00 4.00 1.00 4.00 —- —- —- 4.00 —- —-
Overlap 20 mm 1.00 2.00 1.20 2.40 —- —- —- —- 2.40 —-
Rings 8 mm 1.00 105.00 1.33 139.65 139.65 —- —- —- —- —-

A.2 12" X 18" FB2+FB2 (2 nos)

Bottom all through 16 mm 2.00 4.00 12.61 100.86 —- —- —- 100.86 —- —-


Top all through 20 mm 2.00 2.00 12.81 51.23 —- —- —- —- 51.23 —-
Top extra 20 mm 2.00 2.00 3.89 15.54 —- —- —- —- 15.54 —-
Top extra 20 mm 2.00 4.00 3.14 25.12 —- —- —- —- 25.12 —-
Overlap 16 mm 2.00 4.00 1.00 8.00 —- —- —- 8.00 —- —-
Overlap 20 mm 2.00 2.00 1.20 4.80 —- —- —- —- 4.80 —-
Rings 8 mm 2.00 105.00 1.33 279.30 279.30 —- —- —- —- —-

A.3 12" X 18" FB3+FB4(1 nos)

Bottom all through 16 mm 1.00 2.00 12.61 25.22 —- —- —- 25.22 —- —-


Bottom all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top extra 20 mm 1.00 4.00 3.89 15.54 —- —- —- —- 15.54 —-
Top extra 20 mm 1.00 3.00 3.14 9.42 —- —- —- —- 9.42 —-
Overlap 16 mm 1.00 2.00 1.00 2.00 —- —- —- 2.00 —- —-
Overlap 20 mm 1.00 4.00 1.20 4.80 —- —- —- —- 4.80 —-
Rings 8 mm 1.00 105.00 1.33 139.65 139.65 —- —- —- —- —-

B Along Y direction

Page 7
FB5+FB6+FB6 (2
B.1 12" X 18"
nos)

Bottom all through 16 mm 2.00 4.00 10.25 81.96 —- —- —- 81.96 —- —-


Top all through 16 mm 2.00 2.00 10.25 40.98 —- —- —- 40.98 —- —-
Top extra 16 mm 2.00 4.00 2.33 18.61 —- —- —- 18.61 —- —-
Top extra 16 mm 2.00 4.00 2.08 16.64 —- —- —- 16.64 —- —-
Overlap 16 mm 2.00 6.00 1.00 12.00 —- —- —- 12.00 —- —-
Rings 8 mm 2.00 90.00 1.33 239.40 239.40 —- —- —- —- —-
B.2 12" X 18" FB7 (1 nos)
Bottom all through 16 mm 1.00 4.00 3.00 12.00 —- —- —- 12.00 —- —-
Top all through 16 mm 1.00 2.00 3.00 6.00 —- —- —- 6.00 —- —-
Rings 8 mm 1.00 27.00 1.33 35.91 35.91 —- —- —- —- —-

FB8+FB9+FB9 (1
B.3 12" X 18"
nos)

Bottom all through 16 mm 1.00 4.00 10.25 40.98 —- —- —- 40.98 —- —-


Top all through 16 mm 1.00 2.00 10.25 20.49 —- —- —- 20.49 —- —-
Top extra 20 mm 1.00 4.00 2.81 11.23 —- —- —- —- 11.23 —-
Top extra 20 mm 1.00 4.00 2.60 10.40 —- —- —- —- 10.40 —-
Overlap 16 mm 1.00 6.00 1.00 6.00 —- —- —- 6.00 —- —-
Rings 8 mm 1.00 90.00 1.33 119.70 119.70 —- —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 953.61 0.00 0.00 446.18 257.83 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 371.91 0.00 0.00 704.97 634.26 0.00

Weight of each diameter of Tor Steel (Quintal) 3.72 0.00 0.00 7.05 6.34 0.00

Weight of each diameter of Tor Steel (Tonne) 0.37 0.00 0.00 0.70 0.63 0.00

Total Weight of all diameters of Tor Steel (Tonne) 1.71

Page 8
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL
BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR GROUND FLOOR SLAB

S.No. Notation Length of Total Length of Tor Steel (metre)


Diameter of Nos of Nos of each bar Length
Tor steel Slabs bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

1 S1 (5 nos)
Bottom Main 10 mm 5.00 36.00 4.37 786.60 —- 786.60 —- —- —- —-
Bottom Temp 10 mm 5.00 17.00 7.78 661.30 —- 661.30 —- —- —- —-
Top Main 10 mm 5.00 72.00 1.95 702.00 —- 702.00 —- —- —- —-
Top Main 10 mm 5.00 17.00 3.44 292.40 —- 292.40 —- —- —- —-
Top Main 10 mm 5.00 17.00 2.52 214.20 —- 214.20 —- —- —- —-
2 S2 (1 nos)
Bottom Main 10 mm 1.00 15.00 1.22 18.30 —- 18.30 —- —- —- —-
Bottom Temp 10 mm 1.00 8.00 2.44 19.52 —- 19.52 —- —- —- —-
Top Main 10 mm 1.00 15.00 1.22 18.30 —- 18.30 —- —- —- —-
Top Temp 10 mm 1.00 8.00 2.44 19.52 —- 19.52 —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 0.00 2732.14 0.00 0.00 0.00 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 0.00 1693.93 0.00 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Quintal) 0.00 16.94 0.00 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Tonne) 0.00 1.69 0.00 0.00 0.00 0.00

Total Weight of all diameters of Tor Steel (Tonne) 1.69

Page 9
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR ROOF SLAB LEVEL (LEVEL-02) BEAMS
S.No. Notation Length of Total Length of Tor Steel (metre)
Size (mm x Diameter of Nos of Nos of each bar Length
mm) Tor steel Beams bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A Along X direction

A.1 12" X 18" RB1+RB1 (2 nos)

Bottom all through 16 mm 2.00 4.00 12.61 100.86 —- —- —- 100.86 —- —-


Top all through 16 mm 2.00 2.00 12.81 51.23 —- —- —- 51.23 —- —-
Top extra 20 mm 2.00 2.00 3.89 15.54 —- —- —- —- 15.54 —-
Top extra 20 mm 2.00 4.00 3.14 25.12 —- —- —- —- 25.12 —-
Overlap 16 mm 2.00 6.00 1.00 12.00 —- —- —- 12.00 —- —-
Rings 8 mm 2.00 105.00 1.33 279.30 279.30 —- —- —- —- —-

A.2 12" X 18" RB2+RB3 (1 nos)

Bottom all through 16 mm 1.00 4.00 12.61 50.43 —- —- —- 50.43 —- —-


Top all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top extra 20 mm 1.00 3.00 3.89 11.66 —- —- —- —- 11.66 —-
Top extra 20 mm 1.00 2.00 3.14 6.28 —- —- —- —- 6.28 —-
Top extra 16 mm 1.00 2.00 2.86 5.72 —- —- —- 5.72 —- —-
Overlap 16 mm 1.00 4.00 1.00 4.00 —- —- —- 4.00 —- —-
Overlap 20 mm 1.00 2.00 1.20 2.40 —- —- —- —- 2.40 —-
Rings 8 mm 1.00 105.00 1.33 139.65 139.65 —- —- —- —- —-

A.3 12" X 18" RB4+RB5 (1 nos)

Bottom all through 16 mm 1.00 4.00 12.61 50.43 —- —- —- 50.43 —- —-


Top all through 20 mm 1.00 2.00 12.81 25.62 —- —- —- —- 25.62 —-
Top extra 20 mm 1.00 2.00 3.89 7.77 —- —- —- —- 7.77 —-
Top extra 16 mm 1.00 4.00 2.86 11.44 —- —- —- 11.44 —- —-
Overlap 16 mm 1.00 4.00 1.00 4.00 —- —- —- 4.00 —- —-
Overlap 20 mm 1.00 2.00 1.20 2.40 —- —- —- —- 2.40 —-
Rings 8 mm 1.00 105.00 1.33 139.65 139.65 —- —- —- —- —-

B Along Y direction

Page 10
B.1 12" X 18" RB6+RB6 (1nos)

Bottom all through 16 mm 1.00 3.00 7.65 22.96 —- —- —- 22.96 —- —-


Top all through 16 mm 1.00 2.00 7.65 15.31 —- —- —- 15.31 —- —-
Top extra 16 mm 1.00 2.00 2.33 4.65 —- —- —- 4.65 —- —-
Top extra 16 mm 1.00 4.00 2.08 8.32 —- —- —- 8.32 —- —-
Overlap 16 mm 1.00 5.00 1.00 5.00 —- —- —- 5.00 —- —-
Rings 8 mm 1.00 90.00 1.33 119.70 119.70 —- —- —- —- —-
B.2 12" X 18" RB7 (1 nos)
Bottom all through 16 mm 1.00 3.00 3.00 9.00 —- —- —- 9.00 —- —-
Top all through 16 mm 1.00 2.00 3.00 6.00 —- —- —- 6.00 —- —-
Rings 8 mm 1.00 27.00 1.33 35.91 35.91 —- —- —- —- —-

RB6+RB6+RB8
B.3 12" X 18"
(2nos)

Bottom all through 16 mm 2.00 3.00 10.25 61.47 —- —- —- 61.47 —- —-


Top all through 16 mm 2.00 2.00 10.25 40.98 —- —- —- 40.98 —- —-
Top extra 16 mm 2.00 4.00 2.81 22.45 —- —- —- 22.45 —- —-
Top extra 16 mm 2.00 4.00 2.60 20.80 —- —- —- 20.80 —- —-
Overlap 16 mm 2.00 5.00 1.00 10.00 —- —- —- 10.00 —- —-
Rings 8 mm 2.00 90.00 1.33 239.40 239.40 —- —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 953.61 0.00 0.00 517.07 122.41 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 371.91 0.00 0.00 816.97 301.12 0.00

Weight of each diameter of Tor Steel (Quintal) 3.72 0.00 0.00 8.17 3.01 0.00

Weight of each diameter of Tor Steel (Tonne) 0.37 0.00 0.00 0.82 0.30 0.00
Total Weight of all diameters of Tor Steel (Tonne) 1.49

Page 11
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR MUMTY (LEVEL-03) BEAMS
S.No. Notation Length of Total Length of Tor Steel (metre)
Size (mm x Diameter of Nos of Nos of each bar Length
mm) Tor steel Beams bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A Along X direction

A.1 12" X 18" MB1 (2 nos)

Bottom all through 16 mm 2.00 3.00 7.10 42.61 —- —- —- 42.61 —- —-


Top all through 16 mm 2.00 2.00 7.10 28.41 —- —- —- 28.41 —- —-
Top extra 16 mm 2.00 4.00 2.86 22.88 —- —- —- 22.88 —- —-
Overlap 16 mm 2.00 5.00 1.00 10.00 —- —- —- 10.00 —- —-
Rings 8 mm 2.00 105.00 1.33 279.30 279.30 —- —- —- —- —-
B Along Y direction

B.1 12" X 18" MB2 (2 nos)

Bottom all through 16 mm 2.00 3.00 5.69 34.15 —- —- —- 34.15 —- —-


Top all through 16 mm 2.00 3.00 5.69 34.15 —- —- —- 34.15 —- —-
Rings 8 mm 2.00 90.00 1.33 239.40 239.40 —- —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 518.70 0.00 0.00 172.20 0.00 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 202.29 0.00 0.00 272.08 0.00 0.00

Weight of each diameter of Tor Steel (Quintal) 2.02 0.00 0.00 2.72 0.00 0.00

Weight of each diameter of Tor Steel (Tonne) 0.20 0.00 0.00 0.27 0.00 0.00

Total Weight of all diameters of Tor Steel (Tonne) 0.47

Page 12
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL
BARWAL DISTRICT KATHUA.
CALCULATION OF TOR STEEL FOR MUMTY SLAB

S.No. Notation Length of Total Length of Tor Steel (metre)


Diameter of Nos of Nos of each bar Length
Tor steel Slabs bars (metre) (metre) 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

1 S1 (1 nos)
Bottom Main 10 mm 1.00 36.00 3.13 112.50 —- 112.50 —- —- —- —-
Bottom Temp 10 mm 1.00 16.00 5.98 95.68 —- 95.68 —- —- —- —-
Binder 10 mm 1.00 6.00 5.98 35.88 —- 35.88 —- —- —- —-
Binder 10 mm 1.00 10.00 3.13 31.25 —- 31.25 —- —- —- —-

Total Length of each diameter of Tor Steel (metre) 0.00 275.31 0.00 0.00 0.00 0.00

Weight per metre length of Tor Steel (Kg/metre) 0.39 0.62 0.89 1.58 2.46 3.85

Weight of each diameter of Tor Steel (Kg) 0.00 170.69 0.00 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Quintal) 0.00 1.71 0.00 0.00 0.00 0.00

Weight of each diameter of Tor Steel (Tonne) 0.00 0.17 0.00 0.00 0.00 0.00

Total Weight of all diameters of Tor Steel (Tonne) 0.17

Page 13
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT
KATHUA.
CALCULATION OF TOR STEEL FOR STAIRCASE

Diameter of Nos of Nos of Nos of Length of Total Length of Tor Steel (metre)
Tor steel floors flight/ bars each bar Length
steps/ (metre) (metre)
S.No. Notation landing/
beam 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A Staircase
Ground Floor to 2nd Floor
1 Flight including landing

Bottom Main 12 mm 2.00 1.00 13.00 4.47 116.30 —- —- 116.30 —- —- —-


Top Main 12 mm 2.00 1.00 13.00 4.47 116.30 —- —- 116.30 —- —- —-
Binders Bottom 8 mm 2.00 1.00 24.00 1.14 54.72 54.72 —- —- —- —- —-
Binders Top 8 mm 2.00 1.00 24.00 1.14 54.72 54.72 —- —- —- —- —-
2 Landing Beam (12" x
18")
Bottom all through 16 mm 1.00 1.00 4.00 3.05 12.19 —- —- —- 12.19 —- —-
Top all through 16 mm 1.00 1.00 2.00 3.05 6.10 —- —- —- 6.10 —- —-
Top extra 20 mm 1.00 1.00 4.00 1.02 4.06 —- —- —- —- 4.06 —-
Rings 8 mm 1.00 1.00 34.00 1.33 45.22 45.22 —- —- —- —- —-
Total Length of each diameter of Tor Steel (metre)
154.66 0.00 232.60 18.29 4.06 0.00
Weight per metre length of Tor Steel (Kg/metre)
0.39 0.62 0.89 1.58 2.46 3.85
Weight of each diameter of Tor Steel (Kg)
60.32 0.00 207.01 28.90 10.00 0.00
Weight of each diameter of Tor Steel (Quintal)
0.60 0.00 2.07 0.29 0.10 0.00
Weight of each diameter of Tor Steel (Tonne)
0.06 0.00 0.21 0.03 0.01 0.00
Total Weight of all diameters of Tor Steel (Tonne)
0.31

Page 14
PROPOSED CONSTRUCTION OF 4 ROOMS (2 + 2) DOUBLE STOREY BUILDING AT GOVT. HIGHER SECONDARY SCHOOL BARWAL DISTRICT
KATHUA.
CALCULATION OF TOR STEEL FOR RCC LINTEL BEAMS & CHAJJAS

Diameter of Nos of Nos of Nos of Length of Total Length of Tor Steel (metre)
Tor steel floors flight/ bars each bar Length
steps/ (metre) (metre)
S.No. Notation landing/
beam 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

A RCC Lintel Beams


(230x230)
Bottom all through 10 mm 1.00 5.00 2.00 1.68 16.76 —- 16.76 —- —- —- —-
Top all through 10 mm 1.00 5.00 2.00 1.68 16.76 —- 16.76 —- —- —- —-
Rings 8 mm 1.00 5.00 12.00 0.71 42.72 42.72 —- —- —- —- —-
B RCC Chajjas
Main U-bar 8 mm 1.00 1.00 116.00 1.52 176.32 176.32 —- —- —- —- —-
Temp. 8 mm 1.00 1.00 4.00 11.66 46.64 46.64 —- —- —- —- —-
Total Length of each diameter of Tor Steel (metre)
265.68 33.53 0.00 0.00 0.00 0.00
Weight per metre length of Tor Steel (Kg/metre)
0.39 0.62 0.89 1.58 2.46 3.85
Weight of each diameter of Tor Steel (Kg)
103.62 20.79 0.00 0.00 0.00 0.00
Weight of each diameter of Tor Steel (Quintal)
1.04 0.21 0.00 0.00 0.00 0.00
Weight of each diameter of Tor Steel (Tonne)
0.10 0.02 0.00 0.00 0.00 0.00
Total Weight of all diameters of Tor Steel (Tonne)
0.12