0% found this document useful (0 votes)
39 views5 pages

CV 1 PSV Laboratory

This document is a resume for Karim Ibrahim, an Egyptian mechanical engineer. It lists his objective of contributing effectively to an organization, his education including a 2014 bachelor's degree in mechatronics, and relevant internship experiences from 2010 to 2013. It also outlines his work experience including roles maintaining electrical systems for a real estate development from 2016 to 2017 and maintaining trains from 2017 to 2018. His current role involves maintaining valves at an oil refinery. The resume highlights his skills in languages, software, maintenance procedures, and safety standards.

Uploaded by

Ismaila Kone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views5 pages

CV 1 PSV Laboratory

This document is a resume for Karim Ibrahim, an Egyptian mechanical engineer. It lists his objective of contributing effectively to an organization, his education including a 2014 bachelor's degree in mechatronics, and relevant internship experiences from 2010 to 2013. It also outlines his work experience including roles maintaining electrical systems for a real estate development from 2016 to 2017 and maintaining trains from 2017 to 2018. His current role involves maintaining valves at an oil refinery. The resume highlights his skills in languages, software, maintenance procedures, and safety standards.

Uploaded by

Ismaila Kone
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

253 Building, Gardenia City,

Suez roud,1st settlement , Cairo,


Egypt
01018125644/01066662838
0227009607
[email protected]

KARIM IBRAHIM

OBJECTIVE Aspire to engage with an environment that provides me the opportunity to


effectively contribute to fulfill the goals of the organization and thereby
improve my skill.

EDUCATION  BACHELOR DEGREE, FACULTY OF ENGINEERING, MECHATRONICS


DEPARTMENT, ARAB ACADEMY FOR SCIENCE AND TECHNOLOGY AND
MARITIME TRANSPORT. GRADUATE 2014.
 THANAWYA AMMA, VICTORY COLLEGE SCHOOL, MAADI, CAIRO, EGYPT.
GRADUATE 2008

INTERNSHIPS MECHATRONICS ENGINEER FIELD TRAINEE, PETROBELL


COMPANY (PARTICIPATE IN RUNNING RESERVOIR SIMULATOR)
Summer 2013
MECHATRONICS ENGINEER FIELD TRAINEE, PETROBELL
COMPANY (PARTICIPATE IN RUNNING RESERVOIR SIMULATOR)
Summer 2012
MECHATRONICS ENGINEER OFFICE TRAINEE, NATIONAL PETROLIUM COMPANY
Summer 2012
MECHATRONICS ENGINEER FIELD TRAINEE, RASHID NATURAL GAS COMPANY
Summer 2010
MECHATRONICS ENGINEER FIELD TRAINEE, KAROUN PETROLIUM COMPANY
Summer 2009

WORK ELECTRICAL SITE ENGINEER, MANAZEL REAL ESTATE DEVELOPMENT


EXPERIENCE January2016 to July 2017

LAYAN Residence (hiip://layanresidences.com)

Project description:
A total value over One Billion and 300 million EGP total area one million m2 total units 1267unit
with different types

Commercial mall , Club house , Nursery and Gym


DUTIES:
 Execution of internal electricity for villas and distribution
 Execution of infra work (installing and testing) for the compound includes:
o Low voltage cables
o Medium voltage cables
o Transformers rooms
o Distributor room
o Pillars
o Junction boxes
o Lighting of streets
 Synchronizing works with other departments

ELECTRIC AND CONTROL MAINTENANCE ENGINEER, HYUNDAI ROTEM FOR


METRO
December 2017 to July 2018

Project description:
Hyundai Rotem is a Korean company for trains production and the project that I work in, is 20
trains from Hyundai Rotem in HELWAN EL MARG metro line with two years’ warranty and
eight years’ maintenance contract

DUTIES:
 I work in the corrective maintenance team
 Investigate and solve train control problems
 Investigate and solve train electrical problems
 Contact with suppliers for spare parts
 Contact with suppliers for solving train issues
 Make fleet checks on the 20 trains for monitoring issues
 Schedule preventive maintenance for the trains
 Prepare and send NCR (Non Conformity Report) for suppliers of
traincomponent

Page 2
SENIOR ENGINEER AND BUSINEES DEVELEOPMENT ENGINEER, FLOW
MEASUREMENT SYSTEM (FMS) FOR PETROLEUM SERVICES - ZAHRAA MAADI
August 2018 to July 2020

-Establishing, coordinating the maintenance and safety procedures, service schedule, supply of all
materials and tools required for maintenance and equipment in prescribed condition.

-Analyzing Information, Reporting Research Results, Technical Understanding, Promoting Process


Improvement, Developing Standards, Managing Processes.

-Prepare reports by collecting, analyzing, and summarizing data; making recommendations.

- Calibration and perform pressure test procedures for pressure safety relief valves, gate valves,
pressure gauges and hydrostatic testing for hoses according to operating standards.

- Calibration and perform pressure test procedures for Rigs.

-Comply with API and ISO standards for pressure test procedures and equipment’s to meet operation
requirements. (API 527, 526, 598) AND (ISO 4126, 1402).

-Maintenance procedures and test methods for all types of safety relief valves hydraulic and
pneumatic systems (Direct operating - Pilot operated – Balanced bellows).

-Maintenance procedures and valve inspection for gate valves, ball valves, needle valves, check
valves, butterfly valves, globe valves and plug valves.

Record and document test procedures data and pressure test charts.

Inspection on machines and tools used for test, diagnose and rectify any faults.

Maintenance Senior Service Valve Engineer at ERC (Egyptian Refining Company)


August 2020 Present
Our refinery has more than 70,000 valves (Manual & PSV’s) and all of them under our responsibility
for maintenance.

DUTIES:

-Establishing, coordinating the maintenance and safety procedures, service schedule, supply of all
materials and tools required for maintenance and equipment in prescribed condition.

- Calibration and perform pressure test procedures for pressure safety relief valves, gate valves,
pressure gauges and hydrostatic testing for hoses according to operating standards.

-Comply with API and ISO standards for pressure test procedures and equipment’s to meet operation
requirements. (API 527, 526, 598) AND (ISO 4126, 1402).

Page 3
-Maintenance procedures and test methods for all types of safety relief valves hydraulic and
pneumatic systems (Direct operating - Pilot operated – Balanced bellows).

-Maintenance procedures and valve inspection for gate valves, ball valves, needle valves, check
valves, butterfly valves, globe valves and plug valves
Record and document test procedures data and pressure test charts.

-Prepare full plans for shutdowns (Manpower, spares, schedule and complete plan for maintenance).

-Inspection on machines and tools used for test, diagnose and rectify any faults.

SKILLS LANGUAGE SKILLS


Native Arabic Spoken and Written.

Fluent English Spoken and Written.

SOFT SKILLS
Very Hard Worker.

Knowledgeable in technical and engineering work.

Team Worker.

Ability to work under pressure.

Ability to learn anything new.

Communicate well with people.

COMPUTER SKILLS
Very Good use of Microsoft Office applications, presentations, spreadsheets and word processing.

Very Good use of AutoCAD.

Very Good use of Mat lab.

Very Good use of porter and Visual basic for C++ programming language. Very

Good use of Macro C in Micro Controller Programming.

Courses
Preparation course for API 570 (Piping Inspection Code: In-service
Inspection, Rating, Repair, and Alteration of Piping Systems)

Page 4
PERSONAL
DETAILS Date of Birth: 03/02/1992
Nationality: Egyptian
Military Status: Completed
Place of Birth: Cairo, Egypt

Certificates Available Upon Request

Page 5

You might also like