Ground Screw Solutionfor Rapid Foundation Constructionof Trattic Control Devicesand Other Structures
Ground Screw Solutionfor Rapid Foundation Constructionof Trattic Control Devicesand Other Structures
net/publication/331345171
CITATION READS
1 1,395
5 authors, including:
All content following this page was uploaded by Ngo Phuong on 26 February 2019.
Abstract: Along with the development of the economy, the demand for transportation infrastructure is
increasing. To ensure traffic safety, many traffic control devices, such as signage, signal light, sound wall,
surveillance camera, bus shelter, etc., are needed along the roads. In our country, the foundations of these
structures are usually cast-in-place reinforced concrete (RC) spread footings. Although the concrete volume of a
footing is not much but there are many footings scattered along the road or intersections. To build a footing, we
have to use many kinds of materials and execute many steps such as digging foundation pit, making formwork,
placing reinforcement, pouring concrete. This takes long time and is not economically effective. At present, in
some countries using small screw pile (mini screw pile, ground screw) can overcome these disadvantages and
has lower costs, very potential in replacing cast-in-place RC spread footing mentioned above to make
foundation for traffic control devices and other structures.
Keywords: Screw pile, spiral pile, helical pile, ground screw
a) b)
Fig.1: Small screw-pile a) Continuous wing, b) Interrupted wing
This article is mainly focused on analysis of small shaft screw-piles with continuous wing (mini screw-
pile, ground screw).
Advantages of mini screw-piles: Fast preparation and application time, less manpower required; The
piles have small cross section and light weight , which can be transported; executed by hand crafted machine or
by specialized machine; Easy to connect; easy to link with steel columns of the upper structure; Easy to
dismantle when used as temporary foundation; Can be installed in narrow space (such as under bridges); The
piles may be vertical or oblique, can be installed on sloping terrain or vertical and inclined wall; Have less
vibration and less noise in construction; less space, so it should not move near the ground; Be prepared piles, so
it isn‘t affected by the weather; Have no waste land or waste material due to construction; Pile materials is
reusable and recyclable; Can bear force immediately after lowering the piles; It is possible to predict the bearing
capacity of the piles through the torque of the pile lowering equipment;
Disadvantages: Cross section of the pile shaft is small, so it is bad at horizontal force bearing and anti-
flip; Foreign objects and hard ground can make it difficult to lower the piles; can be eroded in the land.
However, these disadvantages can be overcome such as hot dip galvanized piles for anticorrosion; Horizontal
poles can be used with multiple piles or with additional horizontal bearing ("+"wings or "+" wings combined
with sleeves to increase the cross section of the pile) as shown in Figure 2 or use oblique piles; Working in hard
ground or encountering a foreign object that can deflect the heart of the pile, it may overcome by a guiding
frame or encountering foreign objects may be repaired by pulling up the piles to remove foreign objects (if the
foreign object is small and located near the ground) or changing pile position.
Pile lowering method: Small screw-pile may be lowered by many various equipment such as: by hand
and rotor; by handheld machine and shaped frame; by spiral pile drill attached to the self-operating vehicle; by
spiral pile drill with instructions attached on the self-operating vehicle[1].
a) b) c) d)
Fig.2: Method of screwing
a) by hand and rotor b) by handheld machine and shaped frame c) by spiral pile drill attached to the self-
operating vehicle, d) by spiral pile drill with instructions attached on the self-operating vehicle.
a)Spiral pile drill
without guiding
/YDS3000, Unit
price: 62,3 million
VND (2769.23USD)
c)
Fig. 4: Specification of some spiral pile drills of Goinjade New Energy Technology Company (China) [7]
Scope of application of mini screw-piles: With small size, lightweight, fast construction,
environmental friendliness in countries, mini screw-piles are widely applied in construction of new works and
reinforcement and repair of existing works.
Fig.6: Model calculated according the load bearing capacity of each Fig. 7: Effects of distance between
screw wing (left) and the cylindrical surface surrounding the screw wings
wing (right) (Narasimha Rao 1991).
From Figure 7, it can be seen that with the small distance of screw wings, the ground surrounding the
pile limited by the screw wing side remains intact, the damage side of the pile is a cylindrical side surrounding
the screw side. Considering the pile limited by two screw wings, as the screw wing distance increases, the total
friction of the side wall of the pile section increases as the length increases, while the intensity of the ground
Parameter of mini screw-pile: Pile length, L=1,800m; length of pile section with screw wings,
Lb=1,000m; Pile diameter, Dp = 0.076m; Diameter of screw wing, Dp = 0.106m; Thickness of steel pipe of pile
shaft, tp = 4mm; Steel grade Q235MPa; Cross-sectional area of screw head, Ab = 0.0088mm2; Cross-sectional
area of the pile shaft, Ap=0,0045mm2; Perimeter of screw wing, ub = 0.3330m; Perimeter of pile shaft,
up=0.2388m.
Refer to quotation of Goinjade New Energy Technology Company (China) 2018 (in China): Pile 1800
* 76 * 4mm, Q235 (hot dip galvanized): 460,000 VND / pile, pile 1400 * 60 * 3mm , Q235 (hot dip
galvanized): 240,000 VND / pile
Foundation ground parameters: sandy ground, moderate density: thickness of 3.00 m; is the calculated
density of ground, =18kN/m3; friction angle, =30o; adhesive force, c=0,01 kN/m3;
The load bearing capacity of the 1.8m mini screw-pile as shown above is 1.5 tons. This load bearing
capacity can be applied when applying for the foundation of big signs, signal light posts, etc. In case of applying
as foundation of pickets, small signposts, the shorter piles can be used. In case of larger foot load, more piles
can be used.
Therefore, if only one initial investment was required for a pile drill to install for multiple piles with a
signpost that required only a pile of 1800 * 76 * 4mm to be connected directly to the steel pipe of signpost
without pile-work. The aforementioned cost is cheaper than the cost of materials and manpower of digging
foundation, formwork, pouring concrete, returning pavement/sidewalk.
IV. CONCLUSION
From the requirements of the technology of mini screw-pile foundation construction in urban traffic
works, the current technical standards, based on the analysis of construction equipment in the world, the authors
have selecting equipment Screw-type pivoting machine Screw-type head mounted on the base machine available
is the crawler excavator hydraulic as the construction equipment synchronous piles for pile foundation works for
transportation projects In Vietnam, it is suitable with actual construction conditions and calculates the basic
parameters of the equipment with appropriate technical features, which is the basis for the complete design and
That is the basis for the complete design and manufacture equipment in water.
With low cost, simple and fast construction, mini screw-pile overcomes the disadvantages of single
reinforced concrete foundation poured in place, is very suitable for fast construction of foundation for traffic
signposts and other structures
REFERENCES
[1]. Abbas Mohajeranin, Dusan Bosnjak, Damon Bromwich: Analysis and design methods of screw piles:
A review, Elsevier, 2014.
[2]. D. Zang.: Predicting capacity of helicel screw piles in Alberta soils. M.Sc. thesis, Department of Civil
and Envicronmental Engineering, University of Alberta, Edmonton, Alberta, 1999.
[3]. G.N Nguyen., Q.T. Pham: Analyzing the effect of diameter, screw spacing and cement pile strength on
the performance of ATT piles. Journal of Science and Technology Engineering, Hanoi, Vietnam 2014.
[4]. John L. Maier, Ali M. Oskoorouchi: Increasing lateral capacity of helical piles with lateral restraint
devices, Fifth International Conference on Recent Advances in Geotechnical Earthquake Engineering
and Soil Dynamics ad Symposium in Honor of Professor I.M. Idriss, San Diego, California, USA,
2010.
[5]. TCVN 10304:2014: Standard of pile foundation design.
[6]. TCVN 11520:2016: Screwed nails in pile point - Design requirements.
[7]. Specification of pile screw equipment and pile quotas and equipment of Goinjade New Energy
Technology Company (China).