2023 AACE Conference Transactions - Table of Contents

This document provides the table of contents for the 2023 AACE® International Transactions. It lists over 100 articles across various topics related to project controls, including construction claims and dispute resolution, cost and schedule control, building information modeling, data science and analytics, estimating, and earned value management. The articles provide insights on optimization techniques, data analysis methods, cost forecasting approaches, and more.

Uploaded by

Bruno Schambeck
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views5 pages

2023 AACE Conference Transactions - Table of Contents

This document provides the table of contents for the 2023 AACE® International Transactions. It lists over 100 articles across various topics related to project controls, including construction claims and dispute resolution, cost and schedule control, building information modeling, data science and analytics, estimating, and earned value management. The articles provide insights on optimization techniques, data analysis methods, cost forecasting approaches, and more.

Uploaded by

Bruno Schambeck
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

2023 AACE® INTERNATIONAL TRANSACTIONS

Table of Contents
ADVERSE CONDITIONS (ADV)
ADV -3966 Optimization of Procurement in the Construction Robert Raynes
Industry: What Today’s Environment Has Taught Us

BUILDING INFORMATION MODELING (BIM)


BIM-3967 5D Planning in Earthworks Mining Constructions in Axel Franco Castro Cuadra;
Hilly Topography Franco Manuel Sánchez Romero, CCP;
Julio Cesar Velasco Alvarez; Christian Chinchay Rios
BIM-4057 Leveraging BIM, Automation, and Machine Patricia Kusumadjaja, CEP
Learning for Future Cost Assessment of Energy
Conservation Measures
BIM-4065 Key Benefits of 4D BIM Scheduling Implementation Muhammad Azri Ahmad Baharom;
in Oil & Gas Projects and the Challenges Khairul Hafiz Zolkipli; Rodzleana Abdul Razak
BIM-4087 BIM and VE Optimization for Construction Schedule Dr. Kwame B.O. Amoah
and Cost Control
BIM-4116 Integration of BIM, CPM Schedule, Short Interval Britton L. Wolf; Martin Figlarz; Tyler C. Simches
Planning, Schedule Animation, and Progress on Fast
Track Projects

CLAIMS AND DISPUTE RESOLUTION (CDR)


CDR-3955 Assessing Contractor Responsible Concurrency Ronald J. Rider; Dr. Stephen P. Warhoe, PE CCP
When Using MIP 3.3 – Can a Sensible Procedure be CFCC FAACE Hon. Life
Developed?
CDR-3963 Pitfalls to Avoid When Quantifying Extended Field Suleiman Al Rai, PE PSP;
Office Overhead Costs Cory R. Milburn, CCP CFCC PSP
CDR-3968 Validating Change Order Requests for Forensic David Carlson; Keefe Mulligan; Khaled Alhamouri
Analysis
CDR-3977 A Primer for Claims and Disputes (Claims 101) John J. Ciccarelli, PE CCP PSP FAACE;
Erin M. Fallon, CCP PSP
CDR-3997 Advanced Measured Mile Method Using GMM Dr. Wael El Ghandour; Brahim Seddiki;
Belkacem Foura
CDR-4026 The Hybrid Earned Value Analysis– A Proxy for the Ryan N. Witters; Russell H. Wodiska, EVP
Measured Mile
CDR-4027 The Risk of Mitigation - A Case Study of the Impact Brenton J. Sadauskas, PSP; Russell H. Wodiska, EVP
of Contemporaneously Changing Logic
CDR-4037 Forensic Delay Analysis of Disrupted Projects: An Alexander Voigt; Moneer S. Khalaf;
Alternative Approach Using System Dynamics Dr. Sam G. Mattar
CDR-4051 Assigning As-Planned Gains-Delays in MIP 3.4, Split Christopher W. Carson, CEP DRMP PSP FAACE;
Contemporaneous Period Analysis John J. Ciccarelli, PE CCP PSP FAACE;
Kenji P. Hoshino, CFCC PSP FAACE;
Greta A. Martin, PE PSP; Mark F. Nagata, PSP
CDR-4055 Total Cost Claim Versus Global Claim in Dr. Tong Zhao, PE CCP CFCC PSP; Robert B. Cavoto
Construction Claims
CDR-4059 Benefits for Dispute Boards with the Application of Luis Otavio Rosa
AACE International Recommended Practices
CDR-4068 Legal Pitfalls of the "Windows" Delay Analysis Ahmed Y. El Sayed; Dr. Waleed M. El Nemr;
Method Khalid S. Al-Gahtani
CDR-4072 Using a Measured Mile Productivity Analysis in Michelle McMillan, P.Eng.; Nawfal Merzouk, P.Eng.
Combination with a Collapsed As-Built Delay
Analysis
CDR-4082 Schedule Updates Using Remaining Original Thomas C. Long
Duration versus Remaining Work Duration
CDR-4098 The Engineer/Initial Decision Maker’s Role in Dr. Rania Fayed; Dr. Waleed M. El Nemr
Adjudicating Claims under FIDIC 2017 and AIA232-
2019 Contracts

Table of Contents – Page 1


Copyright © AACE® International
2023 AACE® INTERNATIONAL TRANSACTIONS

CDR-4105 Assessing the Reasonableness and Reliability of Brian Celeste, CCP CFCC PSP;
CPM Schedules for Use in Forensic Schedule Andrew Leavitt, CCT CST
Analyses
CDR-4111 Maximizing Early Claims Resolution Success Kristin Glavitsch
through Contemporaneous Project Data Capture
CDR-4121 Death by a Thousand Cuts: Cumulative Impact Colleen Lenz; David M. Ponte, PE CFCC
Claims
CDR-4123 The Schedule Delay Analysis for Subcontractors – Charles E. Bolyard, Jr. CFCC PSP FAACE Hon. Life;
Different by Necessity Laura Freas
CDR-4138 The Theory of Delay: Timing and Basis for Mark C. Sanders, PE CCP CFCC PSP
Identifying and Measuring Delay
CDR-4156 Construction Claim Work Book for Forensic Analysis Dr. Wael El Ghandour
CDR-4158 Schedule Delay Analysis in a Multi-Prime Joseph W. Wallwork, PE CCP CFCC PSP; Matthew A.
Environment Street, PSP; Eric J. Wallwork
CDR-4169 Progress is Best Measured One “Half-Step” At A Christopher J. Brasco; Dakus Gunn;
Time Glen B. Grant, PSP; Matthew D. Baker

COST AND SCHEDULE CONTROL (CSC)


CSC-4005 Field Overhead – Direct or Indirect Cost and the Nickolas Florez, CFCC
Proper Use of NAVFAC Form 4330/43
CSC-4074 Contingency Drawdown and the Roadmap to the Ghaith Al-Hiyari, CCP; Bahy Saleh, CCP PRMP;
Project Cost at Completion Sedat Akkaya
CSC-4102 Why Large Capital Projects Are Too Often Over Glen R. Palmer, CFCC PSP FAACE;
Budget and What to Do About It? Dr. Lev Virine, P.Eng.
CSC-4122 Major Project Execution Cost Forecasting – Back to Moses Y. Nkuah, CCP EVP
Basics
CSC-4154 Controlling Small Projects Sudhakar R. Pulagam, P.Eng. CCP EVP

PROFESSIONAL DEVELOPMENT (DEV)


DEV-4033 Best Practices in Implementing Emerging Ben Milner;
Technologies in Construction Controls Dr. Bahadir V. Barbarosoglu, CCP EVP PSP
DEV-4077 The Evolution to Well-Rounded Project Controls Dana N. Rutledge
Professionals in Aviation

DATA SCIENCE AND ADVANCED ANALYTICS (DSAA)


DSAA-4001 Lean Operating Systems – Project and Portfolio John W. Blodgett; Bria Goggins; Erica Sinkey;
Management Data Visualization Using Integrated Randy Smith
Reporting
DSAA-4064 Artificial Intelligence & Machine Learning Impact on Muhammad Azri Ahmad Baharom;
Robust Project Control Improvement in Portfolio Mohd Shahrizan Abd Rahman
Management
DSAA-4094 Integrated Real-Time Location System Information Hassan Bardareh;
and 3D Point Clouds for Object Localization Onsite Dr. Osama El Sayed Moselhi, P.Eng. FAACE
Using Deep Neural Networks
DSAA-4101 Lean Operating Systems – Project and Portfolio Vahan Hovhannisyan; Peter Zachares; Alan Mosca;
Management Data Visualization Using Integrated Yael Grushka-Cockayne; Carlos Ledezma
Reporting
DSAA-4109 A Milestone in a Digital Transformation Journey: Emily Smith; Abbas Shakourifar, PSP
Implementation of ISO 19008 Taxonomy as Part of
Chevron’s Cost Engineering Data
DSAA-4162 Insights on Project Performance from 500,000 Dev Amratia; Richard Bendall-Jones; Taylor Burns;
Projects Gerard Cardoso Negrie

Table of Contents – Page 2


Copyright © AACE® International
2023 AACE® INTERNATIONAL TRANSACTIONS

ESTIMATING (EST)
EST-4013 Confronting Price Escalation and Volatility Issues Neil D. Opfer, CCP CEP PSP FAACE
with Construction Materials
EST-4016 Does Historical Data on Unique Government Robert G. Fatzinger, CEP; Alfred G. Levinson
Nuclear Facilities Have an Expiration Date?
EST-4062 Using Case Based Reasoning to Improve Top-Down Dr. Nils J. Gransberg; Saf'a Maraqa;
Estimate Accuracy Beau Solimando
EST-4104 FY2022 Department of Energy Project Management Matthew Zachary West; Dipali R. Amin
Escalation Study for Capital Assets
EST-4120 Project Code of Accounts – Enhanced by Adding Corey Clemmons; Dan Melamed, CCP EVP FAACE;
Construction or Environmental Remediation Bryan A. Skokan, PE CCP; Jake Lefman;
Industry Standards Rodney Lehman
EST-4129 Utilization of Internal Cost Benchmarking in EPC Mu Chen, CCP
Bidding

EARNED VALUE MANAGEMENT (EVM)


EVM-4025 Fully Integrating Earned Value and CPM Schedule J. Gerard Boyle, CFCC
Analysis at a Causal Level – A New Analytical
Approach
EVM-4050 Effectiveness of the Earned Schedule vs. the Earned Keight Charles Navarro Hurtado, PSP
Value
EVM-4080 Using Earned Value and Parametric Methods to Glauco Bezerra da Silva
Estimate Remaining Costs of Construction
EVM-4093 Use of Duration-Day Resource Earned Value to Christopher W. Carson, CEP DRMP PSP FAACE;
Monitor Performance Andrew Dick, PSP
EVM-4133 Comparing Different Methods of Performance Abbas Saifi, CCP EVP PSP
Measurement for Earned Value for Linear
Infrastructure Industry with Recommendation
EVM-4159 A Case Study on Implementing the Integrated Melvin G. Frank; Hala Sanboskani; David Kester;
Project/Program Management Maturity and Mounir El Asmar; Dr. G. Edward Gibson Jr;
Environment Total Risk Rating using an Earned Matthew Z. West

GLOBAL PROJECTS (INT)


INT-4030 Logistic Challenges in Large-Sized Theme Park Lan Zhang; Tianqi Xiong; Renjun Luo
Projects in China and An Appropriate Management
Model
INT-4035 Challenges of Contractor's Management Lan Zhang; Jian Chen; Jiang Lu
Organization for a Large Semiconductor Project in
China

IT/IM in PROJECT AND COST MANAGEMENT (IT)


IT-4095 Bidding Process Budget and Proposals Comparative Leandro André; Vitor dos Santos Borré
Analysis

OWNER ISSUES (OWN)


OWN-3987 Main Considerations for Design and Reza Shahran; Abbas Shakourifar, PSP
Implementation of Project Management Guidelines
for Owner Companies
OWN-3989 Main Considerations for Design and Micah J. Meads
Implementation of Project Management Guidelines
for Owner Companies
OWN-4031 Implementing a Data-Driven Method to Reduce Avi Schwartz; Jodie Kim, PE; Eric Dembert; Yue Ou;
Deferred Maintenance and Repair Brandon Billy; Brendan Hurley
OWN-4056 IProject Control for Owners' Small Project Portfolios Stephen L. Cabano, FAACE
OWN-4146 Project Controls Plan - Owner's Perspective Syd Daneshyar, P.Eng. CCP

Table of Contents – Page 3


Copyright © AACE® International
2023 AACE® INTERNATIONAL TRANSACTIONS

OWN-4166 Project Contingency Forecasting – Owner’s Rajmohan Mishra


Perspective
OWN-4168 Enhancing the Control and Quality of Process Piping Ghassan Al-Dossary, CCP; Abdullah Y. Saleh;
Manufacturing Mohammed S. Alghamdi;
Hussain A. Al-Omani, CCP CEP DRMP EVP PSP

PROJECT MANAGEMENT (PM)


PM-4045 Applying Influential Behaviors on Non-Operated Claudette Richard-Smith
Joint Venture Projects
PM-4071 An Overview of Hydropower Construction Projects Ali Montaser, P.Eng. CCP EVP PSP; Ahmed
in Canada and Lessons Learned Montaser, EVP
PM-4076 Maturity Gain With the Application of PEP in Jéssica Chequer dos Santos
Mining and Steel Projects
PM-4090 Last Line of Defense: Integration of Quality Control Sedat Akkaya; Krishan Mittal, P.Eng.;
Initiatives With Project Controls for More Noor Al-Shaikh
Predictable Outcomes
PM-4141 New Payment Provision for Win-Win Negotiations Ashraf El Azouni; Ali Fares
Between Contractor and Subcontractors Using
Genetic Algorithms
PM-4155 Interface Management Performance Framework for Dr. Wael El Ghandour
Brownfield Construction Projects using Construction
Simulation Language

PLANNING AND SCHEDULING (PS)


PS-3986 A Proposal for a Standardized Set of Definitions of Michael A. Mac Guinness, C.Eng.
Work Availability
PS-3990 Managing the Master Schedule for Multi-Prime Pirouz Bozorgnia, PSP; Ibrahim Odeh; Weijia Chen
Contracts
PS-4018 Benefits and Applications of Half-Step Scheduling Joao Paulo Matos Dias, PSP; Loami Cabral
PS-4021 How to Save a Troubled Project: Case Studies of A. Keith Rines, PE PSP
Transitioning to Takt Planning
PS-4042 Extending Your CPM Schedules to Embrace the Santosh Bhat, PSP;
Power of Linear Scheduling Christopher W. Carson, CEP DRMP PSP FAACE
PS-4044 Integrating Sustainability Metrics with CPM Dr. Achintyamugdha S. Sharma; Dr. Priyanka Deka;
Schedules: A Novel Approach with Applications in Goutam Jois, Esq.; Umesh K. Jois
the Construction Industry
PS-4061 Past Performance Can Be a Good Indicator of Tara L. Hannebaum; William C. Schwartzkopf
Future Results
PS-4070 Identifying and Understanding Schedule Revisions Matthew Marzilli, PSP; Michael P. Ryan, PE PSP
using Basic Primavera Software
PS-4097 Float Enabled Resource Envelope: A New Tool for Kenji P. Hoshino, CFCC PSP FAACE; Richard J.
Resource Management Wood; Steinar Dalva
PS-4126 Changing Schedule Performance Index Kareem M. Khattab, PSP
Methodology
PS-4127 Application of Linear Schedules in Project Validation Aldo D. Mattos, CCP PSP FAACE
and Forensic Analysis
PS-4131 The Value of Total Float Values in Schedule Saeid Khademagha, P.Eng. PSP
Analysis: Ensuring and Restoring the Integrity of
Schedule Float Values
PS-4151 Advanced CPM Milestone Review Ronald M. Winter, PSP FAACE
PS-4157 Scheduling Requirements Across the U.S. Federal Michael R. Nosbisch, CCP PSP FAACE;
Government: Summary and Recommendations Diane Bragoni, PSP

Table of Contents – Page 4


Copyright © AACE® International
2023 AACE® INTERNATIONAL TRANSACTIONS

DECISION AND RISK MANAGEMENT (RISK)


RISK-3965 Perceptions and Use of Building Price Data in Dr. Anthony J. Mills; Dr. Argaw Gurmu;
Australia Dr. Citra Ongkowijoyo; Dr.Wenying Yao;
Dr. Alexia A. Nalewaik, CCP FAACE;
Anthony Lieberman
RISK-4038 Lessons Learned from the US Department of State, Sholeh Lee, PE; Benjamin R. Hodel;
Bureau of Overseas Buildings Operations, Office of Justin Jacobsen, PRMP PSP;
Construction Management on its Enterprise-wide Michael T. Siburt, PE CCP PRMP PSP
Implementation of Project Risk Management
RISK-4091 Reducing Subjectivity of Qualitative Risk Scoring Dr. Ashraf Salem, P.Eng.; Dr. Emad Elwakil, PE CCP
and Analysis
RISK-4118 A Causal Approach to Integrated Risk Analysis J. Gerard Boyle, CFCC
Using Time Performance Factors
RISK-4124 Risk Management Lessons Learned Christopher P. Caddell, PE CCP DRMP FAACE
RISK-4144 A Risk-Based Approach to Construction Chloe E. Edwards; Yasaman Shahtaheri
Management
RISK-4170 Risk Identification and Assessment of Facility Li Huaiyin; Xuebo Dang; Lei Zhang; Jiayin Wang
Engineering for International Oil and Gas Projects

TOTAL COST MANAGEMENT (TCM)


TCM-4048 Implementation of an Integrated Phase-Gate Christopher W. Carson, CEP DRMP PSP FAACE;
Project Controls Process Leo Carson-Penalosa
TCM-4079 Aligning Organizational Drivers with the Benefit of Dana N. Rutledge; Stuart B. Wood;
Projects Controls for Aviation Government Entities Steven Andersen
TCM-4106 Developing Cost-Models from a Contractor’s Cost- John B. Newman, CCP CEP
Loaded Schedule
TCM-4139 Performing Under Pressure – Implementing TCM Courtney J. Gosewisch, CCP
Principles in an Evolving Project Environment

Table of Contents – Page 5