0% found this document useful (0 votes)
123 views14 pages

Katalog Maccaferri Terramesh

Terramesh by maccaferri

Uploaded by

Lynn Mail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
123 views14 pages

Katalog Maccaferri Terramesh

Terramesh by maccaferri

Uploaded by

Lynn Mail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 14
Where the grass regrows awe were nie ee i solution for all wironments mesh System stv ston filed font face unt 1m to 0.5m thick can be for: ‘ertical wal ‘tepped walls. rove erosion protection for rive and steams where the lis exposed to permanent water inTerramesh System -sthetic solution combining engineered soi reinforcement on set at a maximum angle of 70" to ensure sufficient ‘ater penetration to support longterm vegetation growth. roviding permanent engineered structure hidden by natural sliage. quires no rock front face resulting in one ofthe most conomica retaining structure eve. Penyelesaian untuk semua persekitaran Sistem Terramesh Unit muka depan sian batu yang menark dengan ketebalant 1m hingga 0.5m boleh digurakan untuk + Tembok tegak * Tembok bertangga ‘© Menyediakan pertindungan hatisan untuk sungai dan atu dh ‘mana tembok tersebut sntiasa terdedah kepada ai. Sistem Green Terramesh Penyelesian este yong menggaungkanpenyelesaan tab beretuang yong dtetapkan pada suit maksimur 70" bagi tmemasttan penembusan air hujan yang cukup bagi _menggalotéan pertunbuhan tunbultumbuhan dalam angka ponang * Menyedokan struktrteeka bent eka yang terselining €tsebalic imbunan dun seach. «Tio memerlan mua depan btu, menjocannyaantara strat penohan yang pain menjnatkon. /Compacted Sand Fil 429m Teams tetaeing wal ora gld mine in _ Sumbena indonesia 5 Embankment infrced wth Terameint, fentong Rural oad, Route F058 Pahang Masaya {6 Sipe stbilZation and protection ving Green snes, Shah Alam Stadium. Selangor“ Malaya, 7. felorced hil slope wth Terrase, Kuala Kral, Fecal Route, Gua Musang Rood Malaya, 4 Tembok penghan Teramest® 250 untuk lombong cemosd Sombana Indore 5 Tembat yang dneteguh dengan Terrames, alan Doss entang,talvan F068, Pahang Alay, §.pertbion dn pega in eragnakan ‘Groen Teams Sada Shap Am Selangor“ Malan. 2. Memperteguhtarcaan buble dengan menagunaéa Terramesh Kula Ra Lalan Perchatuan us nang = aloo, he reinforcement: solutions eneguhan: penyelesaian The Terramesh® System Sistem Terramesh® Close cooperation with construction companies has alowed Macafritoofe products created to reduce the placement cost and problems on the consruction sit Instaltion ofthe Teramesh® system can be easily and rapidly executed by unskled staf ater proper taining. Compliance with the installation instructions given by Maccafer is fundamental to obtain aso lasting and cost-effective structure In ation, they ensure safety onthe jb ite Compaction and preparation of sols cared outwith traditional eipmentin acordance with al leant local specications for road construction Te structural embankment should be of selected good quality sxanular fil witha high daining capacity an high angle of intemal ction, Particular ts characteristics must remain unatered in time. If ths snot posible it's necessary to make sure that the design has taken into account the characteristics of the soi used dung placement. ‘The results ofthe tests have demonstrated that grading, varying {rom 0.2mm upto 6 mm (100% passin) isan optimum scale of values for the embankment You can also use greater gradations incase a partial safety factors inserted in the reinforcement to prevent possible coatings damage. In the case of aren fac, in oder to obtain the maximum effectiveness inthe greening process itis necessary to prepare a smal layer of vegetal ol inthe area immediately lying behind the external face. An appropriate hyeoseeding and fing f plant cutings wil have tobe considered to ensure the greening proces aking into account the local climatic situation, the exposure, the geometry of ‘the project, and the floristic vegetaton characteristics of ‘the area, Kesjasama erat dengan syaritat-syarkat pembinaan telah ‘membolekan Maccaferi menawarkan produkproduk yang ddreka cipta untuk mengurangkan kas pemasangan dan masala rmasalah di fapak pembinaan. Sister Terramest? boleh dipasang dengan mudah dan cepat oleh Kakitangan yang tidak mahi selepas menjalan latiban. Arahan- arakan pomasangan yang diber oleh Maccafer amat pening dlipatuhi bagi mendspatkanstuktur yang kul, tafan lama dan berkesan kas. Di samping itu, a juga menjaminkeselamatan di tapak ke. Pemadatan dan penyediaan tanahdijtankan menggunakan kelengkapan tadisiona selaras dengan semua spsifiast tempatan yang relevan bagi pembinaan jalan. Tanah Tambak hharuslah teri darpade sian berbutirberkualit tinggi yong tepith dengan keupayazn penyalian yang gg dan sudut geseran yang tinggi. Cir-cinya terutamanya mestlah kekal tidak brubah amakan masa, Kalau ini tidak boleh dlaksanakan, maka perllah cipasican bahawa rekabentuk tesebut telah mengambil Kira circ tanah yang digunakan semasa pemasangan. asi fan menunjukkan bahawa penggredan, berbeza-beza daria 0.02mm hingga 6m (penemtusan 100%) merypakan sala nile yang optimur bagi tambak. Anda juga boleh ‘menggunakan penggredan yang lett besarsekianya faktor eselamatan separa dimasukkan ke dalam peneguhan untuk ‘mencegah kemungkinan Berlakunya kerasekan pada salutan. Bagi perrukaan hij pula, bagi memperoleh Keberkesanan yang ‘ptimum dalam proses penghjauar, maka perllahdisediakan seapican kell anah vegetal di kawasan yang tvetak di belakang permukaan liar Hcroperyemaian yang sesuai dan penanaman Keatan tumbuhan perulah dpetimbangkan bagh ‘memastitan proses penghjauan tersebut trut mengambi kira eadaanikim setempat, pendedatan, geomet projek, dan ci

You might also like