0% found this document useful (0 votes)
1K views2 pages

Appendix D1-Form

This document is a completion certificate for structural work on a home. It contains details of the home builder, property information, and specifies which rational design appendices (RD1-RD13) and foundation appendices (F3-F8) are applicable. The competent person appointed by the home builder must inspect the work, certify that it complies with their design requirements, and sign the certificate along with providing their name, signature, and date.

Uploaded by

rodystjames
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

Appendix D1-Form

This document is a completion certificate for structural work on a home. It contains details of the home builder, property information, and specifies which rational design appendices (RD1-RD13) and foundation appendices (F3-F8) are applicable. The competent person appointed by the home builder must inspect the work, certify that it complies with their design requirements, and sign the certificate along with providing their name, signature, and date.

Uploaded by

rodystjames
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NHBRC Central Office

10 Muswell Road South


Phase 4 Medscheme Building
Bryanston, Johannesburg
P.O. Box 461
Randburg, 2125
Docex 96 Randburg.
Toll Free No. 080 0200 824
Fraud Hotline 080 0203 698
Tel: +27(0)11 317 0000
Fax: +27(0)11 317 0058
www.nhbrc.org

APPENDIX D1 - (Completion Certificate by Competent Person: Satisfactory Completion of Structural Work) (v1)
Please complete all blocks individually. Write in black pen.

SECTION A: HOME BUILDER DETAILS


Registration Number Company Name
R

SECTION B: PROPERTY DETAILS

Unit Stand

Township
E x t
Region (Please tick one item only)
Free State Gauteng KZ-Natal Mpumalanga N/Cape N/West Province W/Cape E/Cape Limpopo

SECTION C: APPENDIX DETAILS


RD1 RD5 RD9 RD13 F6
Please see reverse on this sheet for a full
RD2 RD6 RD10 F3 F7
explanation of each rational design. You
RD3 RD7 RD11 F4 F8 may select more than one item.
RD4 RD8 RD12 F5

SECTION D: DECLARATION/CONDITIONS & COMPETENT PERSON DETAILS


I, being the Competent Person appointed by the above mentioned Home Builder, in accordance with the Certificate of Appointment of Competent
Person: Rational Design (Appendix B1) hereby certify that I have inspected the work during the course of construction and have found the work to
be in accordance with my design and/or requirements.

Competent Person Note:


Please read the above conditions thoroughly. By appending the bar code label to this document you are accepting all the conditions mentioned.

Competent Person Name


Bar Code

Signature

Date Competent Person Signed

d d m m y y y y
Home Builder
Representative

Signature

Date Home Builder Signed

d d m m y y y y

7972478970
Explanation of Rational Design (Refer to Part 1, Section 3, Table 1 and 2 of NHBRC Home Building
Manual)

RD1 Rational Design in respect of masonry walls, reinforced concrete roofs & floor slabs, retaining walls,
beams and columns; reinforced masonry retaining walls, beams & columns; isolated timber or steel
beams & columns; timber frames; timber trusses and steel roof trusses

RD2 Foundation designs for homes of masonry construction designed in accordance with the
SAICE/I.Struct.E Code of Practice for Foundations and Superstructures of Single Storey Residential
Buildings of Masonry Construction

RD3 Foundation designs for homes with foundations other than RD2 above or not founded on Class P
(Dolomites/Limestone – D3) sites

RD4 Design in respect of non-standardised construction systems or elements, which do not have an
Agrément Board Certificate

RD5 Nail-plated timber roof trusses

RD6 Timber buildings

RD7 Design in respect of non-standardised drainage construction, which does not have an Agrément Board
Certificate

RD9 Stormwater and Drainage installation in interconnected complexes

RD10 Fire

RD11 Glazing

RD12 Basements/semi-basements

RD13 Design of septic tanks below permanent or perched water tables; design of unlined VIP toilets

F3 Placement of fills

F4 Assess risk associated with areas underlain by dolomites and limestones

F5 Mandatory precautions on sites underlain by dolomites/limestones on fully serviced sites

F6 Removal of trees within building perimeter

F7 Drainage in waterlogged areas

F8 Departures from the provisions of Part 3 (Construction Standards)

You might also like